    Erection of Steam GeneratorsErection of Steam Generators 11

    WelcomeWe come toto

    Power PlantPower Plant

    ErectionErection

    Presentation on Erection ofPresentation on Erection of

    Steam GeneratorsSteam Generators

  • 7/31/2019 Boiler Erection 2

    2/51

    Erection of Steam GeneratorsErection of Steam Generators 22

    TONNAGE SCHEDULE OF SG

    10000

    6000

    4500

    4000

    1500

    6500

    Structures Pressure Parts Rotary Machines & Mills

    Ducting Fuel Oil system& piping ESP

  • 7/31/2019 Boiler Erection 2

    3/51

    Erection of Steam GeneratorsErection of Steam Generators 33

    1.0 Sequence of erection1.0 Sequence of erection

    Erection of Main and AuxiliaryErection of Main and Auxiliarycolumnscolumns

    Erection of MBLs (Main Brace Level)Erection of MBLs (Main Brace Level)

    Erection ofErection ofCeiling GirdersCeiling Girders

    Boiler Drum LiftingBoiler Drum Lifting

    http://var/www/apps/conversion/current/tmp/scratch11425/G:/Misc/Presentations/Boiler%20Presentation/Ceiling%20Girder%20Erection.shshttp://var/www/apps/conversion/current/tmp/scratch11425/G:/Misc/Presentations/Boiler%20Presentation/Ceiling%20Girder%20Erection.shshttp://var/www/apps/conversion/current/tmp/scratch11425/G:/Misc/Presentations/Boiler%20Presentation/Ceiling%20Girder%20Erection.shs
  • 7/31/2019 Boiler Erection 2

    4/51

    Erection of Steam GeneratorsErection of Steam Generators 44

    Erection of PentErection of Pent House Headers and RoofHouse Headers and Roof

    Erection ofErection ofWater Wall tubesWater Wall tubesand Ringand RingHeaderHeader

    Erection ofErection ofSuper heater coils,Super heater coils,ReheaterReheatercoilscoils,, Economizer coilsEconomizer coilsand Eco inletand Eco inletheaderheader

    Erection ofErection ofBack Pass RoofBack Pass Roof, steam cooled, steam cooledwalls and back pass lower headerswalls and back pass lower headers

    http://var/www/apps/conversion/current/tmp/scratch11425/G:/Misc/Presentations/Boiler%20Presentation/Top%20view%20Hdrs.TIFhttp://var/www/apps/conversion/current/tmp/scratch11425/G:/Misc/Presentations/Boiler%20Presentation/Top%20view%20Hdrs.TIFhttp://var/www/apps/conversion/current/tmp/scratch11425/G:/Misc/Presentations/Boiler%20Presentation/WW%20Erection.shshttp://var/www/apps/conversion/current/tmp/scratch11425/G:/Misc/Presentations/Boiler%20Presentation/WW%20Erection.shshttp://var/www/apps/conversion/current/tmp/scratch11425/G:/Misc/Presentations/Boiler%20Presentation/Erection%20of%20SH%20&%20RH%20coils.shshttp://var/www/apps/conversion/current/tmp/scratch11425/G:/Misc/Presentations/Boiler%20Presentation/Erection%20of%20SH%20&%20RH%20coils.shshttp://var/www/apps/conversion/current/tmp/scratch11425/G:/Misc/Presentations/Boiler%20Presentation/Erection%20of%20SH%20&%20RH%20coils.shshttp://var/www/apps/conversion/current/tmp/scratch11425/G:/Misc/Presentations/Boiler%20Presentation/Erection%20of%20SH%20&%20RH%20coils.shshttp://var/www/apps/conversion/current/tmp/scratch11425/G:/Misc/Presentations/Boiler%20Presentation/Erection%20of%20SH%20&%20RH%20coils.shshttp://var/www/apps/conversion/current/tmp/scratch11425/G:/Misc/Presentations/Boiler%20Presentation/Erection%20of%20SH%20&%20RH%20coils.shshttp://var/www/apps/conversion/current/tmp/scratch11425/G:/Misc/Presentations/Boiler%20Presentation/Erection%20of%20ECO%20coils.shshttp://var/www/apps/conversion/current/tmp/scratch11425/G:/Misc/Presentations/Boiler%20Presentation/Erection%20of%20ECO%20coils.shshttp://var/www/apps/conversion/current/tmp/scratch11425/G:/Misc/Presentations/Boiler%20Presentation/BP%20Roof%20Erection.shshttp://var/www/apps/conversion/current/tmp/scratch11425/G:/Misc/Presentations/Boiler%20Presentation/BP%20Roof%20Erection.shshttp://var/www/apps/conversion/current/tmp/scratch11425/G:/Misc/Presentations/Boiler%20Presentation/BP%20Roof%20Erection.shshttp://var/www/apps/conversion/current/tmp/scratch11425/G:/Misc/Presentations/Boiler%20Presentation/Erection%20of%20ECO%20coils.shshttp://var/www/apps/conversion/current/tmp/scratch11425/G:/Misc/Presentations/Boiler%20Presentation/Erection%20of%20SH%20&%20RH%20coils.shshttp://var/www/apps/conversion/current/tmp/scratch11425/G:/Misc/Presentations/Boiler%20Presentation/Erection%20of%20SH%20&%20RH%20coils.shshttp://var/www/apps/conversion/current/tmp/scratch11425/G:/Misc/Presentations/Boiler%20Presentation/Erection%20of%20SH%20&%20RH%20coils.shshttp://var/www/apps/conversion/current/tmp/scratch11425/G:/Misc/Presentations/Boiler%20Presentation/WW%20Erection.shshttp://var/www/apps/conversion/current/tmp/scratch11425/G:/Misc/Presentations/Boiler%20Presentation/Top%20view%20Hdrs.TIF
  • 7/31/2019 Boiler Erection 2

    5/51

    Erection of Steam GeneratorsErection of Steam Generators 55

    Erection of Eco link, MS Pipe and RHErection of Eco link, MS Pipe and RH

    inlet & outlet pipes.inlet & outlet pipes.

    Hydro test of BoilerHydro test of Boiler

    Installation and Trial of FD fanInstallation and Trial of FD fan

    Installation and Trial of SAPHInstallation and Trial of SAPH

    Completion of Secondary Air pathCompletion of Secondary Air path

  • 7/31/2019 Boiler Erection 2

    6/51

    Erection of Steam GeneratorsErection of Steam Generators 66

    Completion of Flue Gas path with FlapCompletion of Flue Gas path with Flap

    DamperDamper

    Installation and Trial of coal millsInstallation and Trial of coal mills

    Boiler Light Up with LDO/ HFO/CoalBoiler Light Up with LDO/ HFO/Coal

    Alkali Boil Out, Acid CleaningAlkali Boil Out, Acid Cleaning

    Steam BlowingSteam Blowing

  • 7/31/2019 Boiler Erection 2

    7/51

    Erection of Steam GeneratorsErection of Steam Generators 77

    Synchronization of unitSynchronization of unit

    Trial operationTrial operation

    PG TestPG Test

    Handing Over to O&M GroupHanding Over to O&M Group

  • 7/31/2019 Boiler Erection 2

    8/51

    Erection of Steam GeneratorsErection of Steam Generators 88

    2.0 Documents Required2.0 Documents Required

    Erection DrawingsErection Drawings

    Category 1 Drawing: Approved by NTPCCategory 1 Drawing: Approved by NTPC

    Category 2 Drawing: Subject to commentsCategory 2 Drawing: Subject to comments

    Category 3 Drawing: Not ApprovedCategory 3 Drawing: Not Approved

    Category 2 Drawing: Taken for informationCategory 2 Drawing: Taken for information(Only conceptual drawing)(Only conceptual drawing)

    ContdContd

  • 7/31/2019 Boiler Erection 2

    9/51

    Erection of Steam GeneratorsErection of Steam Generators 99

    WPSWPS

    FQPFQP (Field Quality Plan)(Field Quality Plan)

    Welding ScheduleWelding Schedule

    Contract DocumentsContract Documents (e.g. LOA, LOI, NOA Scope of(e.g. LOA, LOI, NOA Scope ofwork, General &Special condition of contract etc.)work, General &Special condition of contract etc.)

    2.0 Documents Required2.0 Documents Required

    http://var/www/apps/conversion/current/tmp/scratch11425/G:/Misc/Presentations/Boiler%20Presentation/Boiler%20Structure%20FQP.pdfhttp://var/www/apps/conversion/current/tmp/scratch11425/G:/Misc/Presentations/Boiler%20Presentation/Boiler%20Structure%20FQP.pdfhttp://var/www/apps/conversion/current/tmp/scratch11425/G:/Misc/Presentations/Boiler%20Presentation/Boiler%20Structure%20FQP.pdf
  • 7/31/2019 Boiler Erection 2

    10/51

    Erection of Steam GeneratorsErection of Steam Generators 1010

    3.0 T&P Requirement3.0 T&P Requirement

    FMC-LS-718 CraneFMC-LS-718 Crane : 1 No.:: 1 No.: 350 MT capacity350 MT capacitywith ringerwith ringer

    FMC-LS-248FMC-LS-248 CraneCrane: 1 No.:: 1 No.: 150 MT capacity150 MT capacity KH-700KH-700 CraneCrane: 1 No.:: 1 No.: 150 MT capacity150 MT capacity

    KF-500KF-500Crane: 1 No.:Crane: 1 No.: 100 MT capacity100 MT capacity TFC-280TFC-280 Crane: 6 No.:Crane: 6 No.: 75 MT capacity75 MT capacity TFC-75TFC-75 Crane: 1 No.:Crane: 1 No.: 25 MT capacity25 MT capacity WinchesWinches : 15 No. (of capacity: 15 No. (of capacity

    2MT,5MT, 10MT, 20MT)2MT,5MT, 10MT, 20MT)

    WinchesWinches : 2 No. (of capacity 30MT): 2 No. (of capacity 30MT) Chain Pulley Blocks, Hook chooks & Wire ropeChain Pulley Blocks, Hook chooks & Wire rope

    slings as and when required.slings as and when required.

  • 7/31/2019 Boiler Erection 2

    11/51

    Erection of Steam GeneratorsErection of Steam Generators 1111

    4.0 Erection Strategy4.0 Erection Strategy

    PreassemblyPreassembly :: The main tool toThe main tool to

    reduce the project cycle timereduce the project cycle time

    Erection Sequence :Erection Sequence : TheThe

    foresightednessforesightedness of the Executerof the Executer

    http://var/www/apps/conversion/current/tmp/scratch11425/G:/Misc/Presentations/Boiler%20Presentation/Erection%20stratgy.xlshttp://var/www/apps/conversion/current/tmp/scratch11425/G:/Misc/Presentations/Boiler%20Presentation/Erection%20stratgy.xlshttp://var/www/apps/conversion/current/tmp/scratch11425/G:/Misc/Presentations/Boiler%20Presentation/Erection%20stratgy.xls
  • 7/31/2019 Boiler Erection 2

    12/51

    Erection of Steam GeneratorsErection of Steam Generators 1212

    5.0 System of Nomenclature of5.0 System of Nomenclature of

    contractor (e.g. BHEL)contractor (e.g. BHEL)

    PG (Product Group)PG (Product Group)

    MA (Main Assembly)MA (Main Assembly)

    DU No. (Dispatch Unit number)DU No. (Dispatch Unit number)

  • 7/31/2019 Boiler Erection 2

    13/51

    Erection of Steam GeneratorsErection of Steam Generators 1313

    6.0 Project Cycle Time6.0 Project Cycle Time

    36 months for Coal firing &36 months for Coal firing &

    SynchronizationSynchronization

    42 months for Completion of Trial42 months for Completion of Trial

    operation & PG Test.operation & PG Test.

  • 7/31/2019 Boiler Erection 2

    14/51

    Erection of Steam GeneratorsErection of Steam Generators 1414

    SL NO MILESTONE MONTHS (FROMNOA)

    REMARKS

    1Establishment Of Site Office 6

    1.1Mobilization Of Installation Staff At

    Site

    8

    2Commencement of Boiler Erection 11

    3Boiler Drum Lifting 15 Approx. Tonnage17%

    4 Boiler Hydraulic Test (Drainable) 26 Approx. Tonnage61%

    5Readiness of SG C&I for Boiler Lightup

    30

    6Readiness of ESP 31

    7Boiler Light Up & Alkali Boil out 32 Approx. Tonnage81%Acid cleaning completion 33

    9Steam Blowing completion. 34

    10Safety valve Floating 35

    11Steam to TG Set 36

    12Coal Firing 36 Approx. Tonnage95%

  • 7/31/2019 Boiler Erection 2

    15/51

    Erection of Steam GeneratorsErection of Steam Generators 1515

    M O N T H L Y E R E C T I O N D E T

    0

    5 0 0

    1 0 0 0

    1 5 0 0

    2 0 0 0

    2 5 0 0

    OCT'0

    2

    NOV'0

    2

    DEC'0

    2

    JAN'0

    3

    FEB'0

    3

    MAR'O

    3

    APR'0

    3

    MAY'0

    3

    JUN'0

    3

    JULY'03

    AUG'03

    SEP'0

    3

    OCT'0

    3

    NOV'0

    3

    DEC'0

    3

    JAN'0

    4

    FEB'0

    4

    MAR'O

    4

    APR'0

    4

    MAY'0

    4

    JUN'0

    4

    JULY'04

    AUG'04

    SEP'0

    4

    OCT'0

    4

    NOV'0

    4

    DEC'0

    4

    JAN'0

    5

    FEB'0

    5

    MAR'O

    5

    APR'0

    5

    MAY'0

    5

    JUN'0

    5

    JULY'05

    AUG'05

    SEP'0

    5

    M O N

    QTY

    (MT)

    0

    5 0 0 0

    1 0 0 0 0

    1 5 0 0 0

    2 0 0 0 0

    2 5 0 0 0

    3 0 0 0 0

    QTY(MT)

    B L R # 3 M O N T H L YB L R # 4 M O N T H L YB L R # 3 C U M M .B L R # 4 C U

  • 7/31/2019 Boiler Erection 2

    16/51

    Erection of Steam GeneratorsErection of Steam Generators 1616

    H P E Q U I V A L E N T J O I N T C O M

    0

    1 0 0 0

    2 0 0 0

    3 0 0 0

    4 0 0 0

    5 0 0 0

    6 0 0 0

    7 0 0 0

    JULY'03

    AUG'03

    SEP'0

    3

    OCT'0

    3

    NOV'0

    3

    DEC'0

    3

    JAN'0

    4

    FEB'0

    4

    MAR'O

    4

    APR'0

    4

    MAY'0

    4

    JUN'0

    4

    JULY'04

    AUG'04

    SEP'0

    4

    OCT'0

    4

    NOV'0

    4

    DEC'0

    4

    JAN'0

    5

    FEB'0

    5

    MAR'O

    5

    M O N

    JOINTS

    (NO.)

    0

    5 0 0 0

    1 0 0 0 0

    1 5 0 0 0

    2 0 0 0 0

    2 5 0 0 0

    3 0 0 0 0

    3 5 0 0 0

    JOINTS

    (NO.)

    U # 3 M O N T H L YU # 4 M O N T H L YU # 3 C U M M U L A T I V EU # 4 C U M M U

  • 7/31/2019 Boiler Erection 2

    17/51

    Erection of Steam GeneratorsErection of Steam Generators 1717

    M O N T H L Y T O N N A G E D

    0

    1 0 0

    2 0 0

    3 0 04 0 0

    5 0 0

    6 0 0

    7 0 0

    8 0 09 0 0

    1 0 0 0

    OCT'0

    2

    NOV'0

    2EC

    '02

    JAN'0

    2

    FEB'0

    2

    MAR'O

    3

    APR'0

    3AY

    '03

    JUN'0

    3

    JULY'03

    AUG'0

    3

    SEP'0

    3

    OCT'0

    3

    NOV'0

    3

    DEC'0

    3

    JAN'0

    4

    FEB'0

    4

    MAR'O

    4

    APR'0

    4AY

    '04

    JUN'0

    4

    JULY'04

    AUG'0

    4

    SEP'0

    4

    OCT'0

    4

    NOV'0

    4EC

    '04

    JAN'0

    5

    FEB'0

    5

    AR'O5

    APR'0

    5

    MAY'0

    5

    JUN'0

    5

    JULY'05

    AUG'0

    5

    SEP'0

    5

    M O N

    0

    1 0 0 0

    2 0 0 0

    3 0 0 0

    4 0 0 0

    5 0 0 0

    6 0 0 0

    7 0 0 0

    CUMMULAT

    IVEMT

    E S P # 3 M O N T H L YE S P # 4 M O N T H L YE S P # 3 C U M M .E S P # 4 C

  • 7/31/2019 Boiler Erection 2

    18/51

    Erection of Steam GeneratorsErection of Steam Generators 1818

    7.0 (A) Contract Value for Korba, Stage- III (1X500 MW)7.0 (A) Contract Value for Korba, Stage- III (1X500 MW)

    under LOI No. 4669under LOI No. 4669

    Description Prices (Rs)

    1 0 Ex Works Price for main equipment 8,49,50,00,000

    2 0 Ex Works Price for mandatoryspares 36,50,00,000

    3 0 Type Test Charge 3,25,00,000

    TOTAL 8,89,25,00,000

    Total in words: Rupees Eight Billion Eight Hundred Ninety TwoMillion Five Hundred Thousand Only.

    7.0 Budget

  • 7/31/2019 Boiler Erection 2

    19/51

    Erection of Steam GeneratorsErection of Steam Generators 1919

    7.0 (B) Contract Value for Korba, Stage- III (1X500 MW)7.0 (B) Contract Value for Korba, Stage- III (1X500 MW)

    under LOI No. 4670under LOI No. 4670

    Sl No Description Prices (Rs)

    1 0 Unloading, receipt, handling, storage, completeinstallation, supervision, pre commissioning,commissioning, completion of facilities, conductingguarantee tests

    86,00,00,000

    2 0 Local transportation including port clearance & portcharges and inland insurance charges for mainequipment

    19,35,00,000

    3 0 Local transportation including port clearance & portcharges and inland insurance charges for mandatory

    spares

    1,40,00,000

    TOTAL 1,06,75,00,000

    Total in words: Rupees One Billion Sixty Seven Million Five HundredThousand Only.

  • 7/31/2019 Boiler Erection 2

    20/51

    Erection of Steam GeneratorsErection of Steam Generators 2020

    8.0 Scope of Work Under SG8.0 Scope of Work Under SG

    PackagePackage

    Furnace ,Water Wall Headers, Tubes,Furnace ,Water Wall Headers, Tubes,

    RisersRisers

    Drum with internals and fittingsDrum with internals and fittings

    Super heaters, Re heaters &Super heaters, Re heaters &Economizer with its auxiliariesEconomizer with its auxiliaries

  • 7/31/2019 Boiler Erection 2

    21/51

    Erection of Steam GeneratorsErection of Steam Generators 2121

    Water circulation pumps with drivesWater circulation pumps with drives

    and coolersand coolers

    Spray type attemperators withSpray type attemperators with

    valves and accessoriesvalves and accessories

    Complete valves and fittings forComplete valves and fittings for

    boiler & aux.boiler & aux.

    Soot blowing systemSoot blowing system

  • 7/31/2019 Boiler Erection 2

    22/51

    Erection of Steam GeneratorsErection of Steam Generators 2222

    Thermal insulation for the boiler andThermal insulation for the boiler and

    pipingpiping

    FD fans with silencers (2 no. per unit)FD fans with silencers (2 no. per unit)

    Motors for the aboveMotors for the above

    ID fans (2 no. per unit)ID fans (2 no. per unit)

    Motors for the aboveMotors for the above

  • 7/31/2019 Boiler Erection 2

    23/51

    Erection of Steam GeneratorsErection of Steam Generators 2323

    Regenerative air pre heaters 4 No. perRegenerative air pre heaters 4 No. per

    unit (2 no. PAPH &2 no. SAPH)unit (2 no. PAPH &2 no. SAPH)

    Steam coil air pre heaters4 No. per unitSteam coil air pre heaters4 No. per unit

    Coal preparation system which includesCoal preparation system which includesraw coal chutes, bunker shut off gates andraw coal chutes, bunker shut off gates and

    raw coal feeders.raw coal feeders.

    Coal pulverisers with motors (10 no. perCoal pulverisers with motors (10 no. per

    unit) Bowl & Roller type XRP1003unit) Bowl & Roller type XRP1003

  • 7/31/2019 Boiler Erection 2

    24/51

    Erection of Steam GeneratorsErection of Steam Generators 2424

    Seal air fans (2 No. per unit)Seal air fans (2 No. per unit)

    Coal burnersCoal burners

    PF piping and ceramic bendsPF piping and ceramic bends

    Complete ductingComplete ducting

    DampersDampers

  • 7/31/2019 Boiler Erection 2

    25/51

    Erection of Steam GeneratorsErection of Steam Generators 2525

    Fuel oil systemFuel oil system

    Galleries, stairways, walkways,Galleries, stairways, walkways,

    roofing, handrails, platforms,roofing, handrails, platforms,

    gratings etc.gratings etc.

    Electrostatic precipitatorsElectrostatic precipitators

    Cranes and hoistsCranes and hoists

  • 7/31/2019 Boiler Erection 2

    26/51

    Erection of Steam GeneratorsErection of Steam Generators 2626

    9.0 Constructional Details Of Boiler9.0 Constructional Details Of Boiler

    Design Wt. of each unitDesign Wt. of each unit

    (Boiler + ESP):32000 MT Approx.(Boiler + ESP):32000 MT Approx.

    No of ceiling girdersNo of ceiling girders : 6: 6

  • 7/31/2019 Boiler Erection 2

    27/51

    Erection of Steam GeneratorsErection of Steam Generators 2727

    Elevation of T.O.S. of main columnsElevation of T.O.S. of main columns

    84.945 m84.945 m

    Type of Main columns: Star sectionType of Main columns: Star section

    Type of aux columns: Box sectionType of aux columns: Box section

    No. of HP joints: 27000 approx.No. of HP joints: 27000 approx.

  • 7/31/2019 Boiler Erection 2

    28/51

    Erection of Steam GeneratorsErection of Steam Generators 2828

    No of Coal elevationsNo of Coal elevations : 8 to 10: 8 to 10

    No of Oil elevationsNo of Oil elevations : 4 to 5: 4 to 5

    No of front & rear WW tubesNo of front & rear WW tubes : 269: 269

    No of left & right side WW tubes: 212No of left & right side WW tubes: 212

  • 7/31/2019 Boiler Erection 2

    29/51

    Erection of Steam GeneratorsErection of Steam Generators 2929

    No of blocks in Eco systemNo of blocks in Eco system : 2 to 3: 2 to 3

    No of rows of Eco system coils : 184No of rows of Eco system coils : 184

    No. of tubes in one coil of EcoNo. of tubes in one coil of Eco : 6: 6

    No of blocks in LTSH systemNo of blocks in LTSH system : 2: 2

    No of rows of LTSH system coilsNo of rows of LTSH system coils : 124: 124

    No. of tubes in one coil of LTSHNo. of tubes in one coil of LTSH : 6: 6

  • 7/31/2019 Boiler Erection 2

    30/51

    Erection of Steam GeneratorsErection of Steam Generators 3030

    No of rows of RH systemNo of rows of RH system : 74: 74

    No. of tubes in one coilNo. of tubes in one coil : 12: 12

    No of rows of Platen coilsNo of rows of Platen coils : 25: 25

    No. of tubes in one coil of Platen : 16No. of tubes in one coil of Platen : 16

  • 7/31/2019 Boiler Erection 2

    31/51

    Erection of Steam GeneratorsErection of Steam Generators 3131

    No of rows of Divisional SH systemNo of rows of Divisional SH system

    coilscoils : 6: 6

    No. of coils in one row of Div. SHNo. of coils in one row of Div. SH: 8: 8

    No of tubes in one coil of Div. SHNo of tubes in one coil of Div. SH

    : 9: 9

    No of LRSBNo of LRSB : 34: 34

    No of Wall blowersNo of Wall blowers : 88: 88

  • 7/31/2019 Boiler Erection 2

    32/51

    Erection of Steam GeneratorsErection of Steam Generators 3232

    FD fanFD fan : 2 No, AXIAL AP1-26/16,: 2 No, AXIAL AP1-26/16,

    Blade pitch control, 980 rpm, 1300Blade pitch control, 980 rpm, 1300kw motorkw motor

    PA fanPA fan : 2 No, AXIAL AP2-20/12,: 2 No, AXIAL AP2-20/12,

    Blade pitch control, 1480 rpm, 2950Blade pitch control, 1480 rpm, 2950kw motor.kw motor.

    ID fanID fan :2 No, NDZV 47 SIDOR, Inlet:2 No, NDZV 47 SIDOR, Inlet

    damper + VFD control, 580 rpmdamper + VFD control, 580 rpm4050 kw motor4050 kw motor

  • 7/31/2019 Boiler Erection 2

    33/51

    Erection of Steam GeneratorsErection of Steam Generators 3333

    10.0 Constructional Details of ESP10.0 Constructional Details of ESP

    ESP efficiency: 99.914 %ESP efficiency: 99.914 %

    No of ESP passes: 4 pass per unitNo of ESP passes: 4 pass per unit

    No of fields : 8 fields/passNo of fields : 8 fields/pass

  • 7/31/2019 Boiler Erection 2

    34/51

    Erection of Steam GeneratorsErection of Steam Generators 3434

    Total no. of collecting electrodes perTotal no. of collecting electrodes perboilerboiler : 11712: 11712

    Nominal length of collecting elNominal length of collecting el ::13 m13 mNominal length of collecting el :750Nominal length of collecting el :750

    mmmm Type of emitting el: Spiral withType of emitting el: Spiral with

    hookshooksSize of emitting electrode: 2.7 mmSize of emitting electrode: 2.7 mm

    dia.dia. Total no of emitting electrodes perTotal no of emitting electrodes per

    boilerboiler : 1,03,680: 1,03,680

  • 7/31/2019 Boiler Erection 2

    35/51

    Erection of Steam GeneratorsErection of Steam Generators 3535

    Rappers for collecting electrodesRappers for collecting electrodes

    No. of rappers: one drop hammer perNo. of rappers: one drop hammer per

    rowrow

    Rapper size: 4.9 kgRapper size: 4.9 kg

    Frequency of rap: varying from 20 rapsFrequency of rap: varying from 20 raps

    per hour at inlet field to 1 rap per hourper hour at inlet field to 1 rap per hour

    at the exit field.at the exit field.

  • 7/31/2019 Boiler Erection 2

    36/51

    Erection of Steam GeneratorsErection of Steam Generators 3636

    Rappers for emitting electrodesRappers for emitting electrodes

    No. of rappersNo. of rappers : Approx. one drop: Approx. one drophammer for two rows of electrodes.hammer for two rows of electrodes.

    Rapper sizeRapper size : 3.0 kgs: 3.0 kgs

    Frequency of rapping: 10 raps per hourFrequency of rapping: 10 raps per hour No. of hoppers per unit: 32No. of hoppers per unit: 32

  • 7/31/2019 Boiler Erection 2

    37/51

    Erection of Steam GeneratorsErection of Steam Generators 3737

    11.0 Insulation Details11.0 Insulation Details

    Mineral Wool

    Pourable RefractoryCastable Refractory

  • 7/31/2019 Boiler Erection 2

    38/51

    Erection of Steam GeneratorsErection of Steam Generators 3838

    12.0 Stress Relieving of Ceiling12.0 Stress Relieving of Ceiling

    GirdersGirders HeatingHeating up to 620 degree:up to 620 degree:

    Web- @ 65 deg/hrWeb- @ 65 deg/hrFlangeFlange - @75 deg/hr- @75 deg/hr

    Soaking:Soaking: At 620 degrees for a timeAt 620 degrees for a timeperiod ofperiod of

    WebWeb - 96 Min.- 96 Min.

    FlangeFlange - 135 Min- 135 Min

    Cooling:Cooling: @ 65 deg/hr for both flange &@ 65 deg/hr for both flange &web up to 300 degrees and then left forweb up to 300 degrees and then left fornatural cooling.natural cooling.

  • 7/31/2019 Boiler Erection 2

    39/51

    Erection of Steam GeneratorsErection of Steam Generators 3939

    13.0 Boiler Mountings13.0 Boiler Mountings

    Location No Set Pr.(Kg/cm2)

    SafetyValves

    Drum 2 207.0,209.0

    4 211.1,211.1,213.2,213.2

    SHoutlet

    SV 2 188.5,188.5

    ERV 5 185.5,185.5,186.6,186.6,186.6RH Inlet 4 52.4,52.4,54.0,54.0

    Outlet(1) 4 49.4,49.4,50.9,50.9

    Outlet(2) 4 48.4,48.4,48.9,48.9

    Soot Blower 1 40

    Waterlevelindicator

    Drum DWLG 2

    EWLI 4 -----------------------

  • 7/31/2019 Boiler Erection 2

    40/51

    Erection of Steam GeneratorsErection of Steam Generators 4040

    14.0 Materials used in Pressure Parts14.0 Materials used in Pressure Parts

    Material Area of Application

    SA 335 P91 (MS line)

    SA 213 T91 (Re heater stage-II, SH Platen & Divisional)

    SA 213 TP 347H (Platen& Div. SH, RH, SC spacers)

    SA 213 T22 (Platen& Div. SH, RH tubes)

    SA 213 T11 (Radiant Roof, LTSH )

    SA210Gr C (WW panels, UCT, LCT,WW hanger tubes, WW screen tubes, WW bottomHdr nipples, BP SC wall tubes, BP hanger tubes)

    SA106Gr C (Suction manifold & Disch. Line of CC pump, WW O/L Hdrs, Saturation

    tubes

    SA335 P 12 (DESH link LTSH to Div. I/L header & Div. O/L header to platen )

    SA515Gr70 (DC pipes, Lower ring Hdrs)

    SA387Gr12CL2 (Collector plate, Crown plate)

  • 7/31/2019 Boiler Erection 2

    41/51

    Erection of Steam GeneratorsErection of Steam Generators 4141

    15.0 Major steps taken to reduce15.0 Major steps taken to reduce

    cycle timecycle timePre assembly:Pre assembly:

    If we reduce the no of lifts, the cycle time of anyIf we reduce the no of lifts, the cycle time of anyactivity reduces itself. Therefore, two auxiliaryactivity reduces itself. Therefore, two auxiliary

    columns of boiler are welded at ground and thencolumns of boiler are welded at ground and thenthey were erected in single lift. For examplethey were erected in single lift. For example

    Aux column + Aux ColumnAux column + Aux Column

    MBLMBL Bracing + Gusset PlateBracing + Gusset Plate

  • 7/31/2019 Boiler Erection 2

    42/51

    Erection of Steam GeneratorsErection of Steam Generators 4242

    During mill erection, union head andDuring mill erection, union head and

    journal may be preassembled in yard,journal may be preassembled in yard,

    transported to site and then erected. Thistransported to site and then erected. This

    has reduced the number of lifts from 60has reduced the number of lifts from 60

    to 30.to 30.

    Coal pipes may be welded at groundCoal pipes may be welded at groundwhere ever it was possible.where ever it was possible.

  • 7/31/2019 Boiler Erection 2

    43/51

    Erection of Steam GeneratorsErection of Steam Generators 4343

    Foresightedness:Foresightedness:

    If MBL members are not available inIf MBL members are not available insequence then ?sequence then ?

    Planning for Space for movement ofPlanning for Space for movement of

    crane for erecting ceiling girderscrane for erecting ceiling girdersMiddle columns &Middle columns &

    Rear equipmentsRear equipments

  • 7/31/2019 Boiler Erection 2

    44/51

    Erection of Steam GeneratorsErection of Steam Generators 4444

    Planning for loose soilsPlanning for loose soils

    CAT HAED structures developed atCAT HAED structures developed atground.ground.

    Drum dragging saddles (2 no.)Drum dragging saddles (2 no.)fabricationfabrication

    To use the psychological slack timeTo use the psychological slack time

    After Drum Lifting: Erection of SilencersAfter Drum Lifting: Erection of Silencers& BP Roof P/A etc& BP Roof P/A etc

    After Hydro TestAfter Hydro Test

  • 7/31/2019 Boiler Erection 2

    45/51

    Erection of Steam GeneratorsErection of Steam Generators 4545

    use of sliding pulley arrangement touse of sliding pulley arrangement to

    erect the Economizer coils and LTSHerect the Economizer coils and LTSH

    coils, which reduces the change overcoils, which reduces the change overtime from one coil to another.time from one coil to another.

    Use of same resource for maximumUse of same resource for maximumtime e gtime e g

    ScaffoldingsScaffoldings

    Sky climbersSky climberscranescranes

  • 7/31/2019 Boiler Erection 2

    46/51

    Erection of Steam GeneratorsErection of Steam Generators 4646

    Supply of electricity supply fromSupply of electricity supply from

    two sourcestwo sources

    Installation of welding equipmentsInstallation of welding equipments

    at different locationsat different locations

    Arrangement for alternateArrangement for alternate

    resources in critical areas likeresources in critical areas like

    welding of P91 Materialwelding of P91 Material

  • 7/31/2019 Boiler Erection 2

    47/51

    Erection of Steam GeneratorsErection of Steam Generators 4747

    17.0 QUALITY ASSURANCE17.0 QUALITY ASSURANCE

    * A- class check :* A- class check : criticalcritical

    * B- class check:* B- class check: majormajor

    * C- class check:* C- class check: minorminor

  • 7/31/2019 Boiler Erection 2

    48/51

    Erection of Steam GeneratorsErection of Steam Generators 4848

    How to ensure qualityHow to ensure quality ??

    Use of good quality manpower andUse of good quality manpower and

    material like argon gas, weldingmaterial like argon gas, welding

    consumables etcconsumables etc

    Deployment of qualified, experiencedDeployment of qualified, experienced

    and sincere supervisorsand sincere supervisors

    Higher frequency of inspectionHigher frequency of inspection

    O S18 0 DEVIATIONS AND THEIR

  • 7/31/2019 Boiler Erection 2

    49/51

    Erection of Steam GeneratorsErection of Steam Generators 4949

    18.0 DEVIATIONS AND THEIR18.0 DEVIATIONS AND THEIR

    DISPOSITIONING STRATEGIES:DISPOSITIONING STRATEGIES:

    MDRMDR

    SARSAR

    NCRNCR

  • 7/31/2019 Boiler Erection 2

    50/51

    Erection of Steam GeneratorsErection of Steam Generators 5050

    19.0 SAFETY ASSURANCE19.0 SAFETY ASSURANCE

    PEP talkPEP talk

    DemonstrationsDemonstrations

    Use of PPEsUse of PPEs

    RewardReward

    Warning & PenaltyWarning & Penalty

  • 7/31/2019 Boiler Erection 2

    51/51

    ThankThank

    YouYou