Transcript
  • 7/28/2019 Boq Andma Building

    1/15

    Currency: US Dollars

    Project No:

    Project Title: ANDMA Building in Heart

    Location: Herat, Afghanistan

    Tender No: 01

    Tender Title: 2-Story Administration Building and a Guardhouse

    Original Issue: November 07, 2010

    UNOPS

    UNITED NATIONS OFFICE FOR PROJECT SERVICES

    BILL OF QUANTITIES

    ANDMA Building in Heart

    Herat, Afghanistan

    1017

    2-Story Administration Building and a Guardhouse

    NOTICE TO ALL BIDDERS - COMPLETE PROJECT PRICE:

    3. Eventual claims for extra works are covered by project general

    documentation of contract.

    1. All bidders MUST examine the complete project documents. Thesedocuments include the Drawings, BOQ, Schedules and Specifications.

    Any discrepancies between these documents are to be brought to the

    immediate attention of UNOPS Engineer.

    2. Quotation given by the contractor on this BOQ are to cover any and all

    additional materials, labor or associated costs to complete the works as

    documented on the complete project documents.

  • 7/28/2019 Boq Andma Building

    2/15

    Currency: US Dollars

    Project No: 1017

    Project Title: ANDMA Building in Heart

    Location: Herat, Afghanistan

    Tender No: 01

    Component: 2-Story Administration Building and a Guardhouse

    Original Issue: November 07, 2010

    Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total

    1. General

    1.1 Preliminaries 1.1 Occupied Areas, 1.1 ExistingServices Schedule an d1.1 Items

    to be supplied schedules

    1 Pre-construction work, mobilisation activitiesincluding paper/ documentation tasks. LS 1.00

    2 Post construction works and clean up.LS 1.00

    1.2 General Requirements 1.2 Inspection notificationschedule an d1.2 Warranty

    schedules

    1 Testing and Operation/Maintenance Manuals.LS 1.00

    Subtotal General

    2. Site

    2.0 Deal with Graves 2.1 Identified hazardous materialsan d2.3 Earthwork schedules

    1 Deal with human remains found in unmarkedgraves on the site. Excavate, remove remains,

    place in a suitable container, and re-bury

    remains in a place to be agreed by local

    authorities. All work to be carried out in a

    manner that does not offend religious and

    cultural rules and norms. No. 5.00

    2.3 Earthwork 2.1 Identified hazardous materialsan d2.3 Earthwork schedules

    1 Excavation (any soil type) for main buildingfoundation and surrounding yard for grading

    purposes. This item includes disposal and

    temporary support or shoring if needed. Seedrawing and schedule for details. CU.M 1,300.00

    2 Excavation (any soil type) for guard roomfoundation. This item includes disposal and

    temporary support or shoring if needed. See

    drawing and schedule for details. CU.M 25.00

    3 Excavation (any soil type) for septic tank. Thisitem includes disposal and temporary support

    or shoring if needed. See drawing and

    schedule for details. CU.M 110.00

    4 Ground improvement under foundations ofmain building. This includes supplying of filling

    materials and compacting the layers according

    to schedule and drawings. CU.M 15.00

    5 Soil backfilling on and around foundation of themain building up to ground level. This includes

    supplying of needed materials. See drawings

    and schedules for levels/dimensions and

    details. CU.M 20.00

    Pos.

    UNOPS

    DETAILS OF COMPONENT

    Vertical Structures Unit

  • 7/28/2019 Boq Andma Building

    3/15

  • 7/28/2019 Boq Andma Building

    4/15

    Currency: US Dollars

    Project No: 1017

    Project Title: ANDMA Building in Heart

    Location: Herat, A fghanistan

    Tender No: 01

    Component: 2-Story Administration Building and a Guardhouse

    Original Issue: November 07, 2010

    Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost TotaPos.

    1 PCC lean concrete (10 Mpa) under thefoundations and any other places shown as

    lean concrete for septic tank. CU.M 2.00

    2 RCC (20 Mpa) at the foundtions of 2-storymain building. The quantity includes RCC at

    foundations and tie beams under the ground. CU.M 18.00

    3 RCC (20 Mpa) at the columns of first story ofmain building. CU.M 13.00

    4 RCC (20 Mpa) at the columns of second storyof main building. CU.M 11.00

    5 RCC (20 Mpa) at the beams of first story of

    main building. CU.M 10.00 6 RCC (20 Mpa) at the beams of second story of

    main building. CU.M 10.00

    7 RCC (20 Mpa) at the slabs of first story of mainbuilding. CU.M 20.00

    8 RCC (20 Mpa) at the slabs of second story ofmain building. CU.M 19.00

    9 RCC (20 Mpa) at the RCC stair case insidemain building. CU.M 4.00

    10 RCC (20 Mpa) at the parapet of main building.CU.M 4.00

    11 RCC (20 Mpa) at the entire guard room. Thequantity includes RCC at foundations, floors,

    columns, beams, ring beams, lintels, etc. CU.M 6.00

    12 RCC (20 Mpa) at entire septic tank and its

    manhole. The cost for RCCs here includes wallmounted fixed ladder inside the septic tank as

    well. CU.M 15.00

    13 PCC (20 Mpa) at the floors, roofs, side walks,ramps, window sills, kerbs, PCC pavements,

    flowerpots, septic tank, yard, and any other

    places shown as PCC in the drawings for main

    building, guard room and the septic tank.

    CU.M 63.00

    3.5 Brickwork 3.5 Brickwork constructionschedule

    1 Second Class Brick masonry with mortar formain building. This includes all brick walls/

    brick masonry in the entire building. CU.M 110.00

    2 Second Class Brick masonry with mortar for

    guard room. This includes all brick walls/ brickmasonry in the entire building. CU.M 18.00

    3.6 Stonework

    1 Stone masonry with mortar at the foundationsand/or any places shown in the drawings for

    main building. See drawing and schedule for

    details. CU.M 50.00

    2 Stone masonry with mortar at the foundationsand/or any places shown in the drawings for

    guard room. See drawing and schedule for

    details. CU.M 13.00

    3.10 Concrete Unit Masonry 3.10 Concrete Unit Masonry

    1 CMU masonry with mortar. This item coversCMU works on the roof and any other places

    shown on the drawings for main building. The

    cost includes all needed materials, steel bars,anchors etc and works. CU.M 7.00

    Subtotal Structure

  • 7/28/2019 Boq Andma Building

    5/15

    Currency: US Dollars

    Project No: 1017

    Project Title: ANDMA Building in Heart

    Location: Herat, A fghanistan

    Tender No: 01

    Component: 2-Story Administration Building and a Guardhouse

    Original Issue: November 07, 2010

    Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost TotaPos.

    4. Enclosure

    4.1 Waterproofing 4.1 Waterproofing systemschedule

    1 Single layer bitumen membrane (Isogam) atthe floor and walls of toilets/kitchen and at the

    ground floors of main building and as well as

    guard room. This includes preparation of base

    layers shown on the drawings. Refer to

    schedule/drawing for details. SQ.M 255.00

    4.2 Roofing 4.2 Roofing materials, an d4.2Gutter and Down pipe Schedules

    1 Flat roof for the main building. The cost for thisitem includes all roof layers shown such as

    rigid foam insulation layer, brick powder layer,

    PCC beneath Isogam layer, Isogam layer and

    the protective PCC layer on the Isogam. See

    drawings for details. The cost also includes

    Isogam and flashings needed for the parapet

    around the roof. SQ.M 160.00

    2 GI corrugated roof for water tank enclosure onthe roof of the building. The cost for this item

    includes all roof layers such as GI sheet, steel

    profiles for purlins, steel C-shape channels as

    the supporting members, mineral wool layer

    and the steel mesh supporting the mineral

    wool layer, and as well as all needed materials

    and accessories required for complete

    installation of a functioning roof.

    SQ.M 10.00

    3 GI flat K-span roof for guard room. The cost forthis item includes all roof layers such as GI

    sheet standing seam and mineral wool

    insulation layer and all needed materials,

    accessories, connections required for complete

    installation of a functioning roof. SQ.M 51.00

    4 Down pipes, PVC pipe class-B. This includesall accessories such as over flow and stuff-

    holder required for complete installation such

    as supplying, fixing and others as per drawing

    and schedules. Lin M 40.00

    4.3 Windows and Window Hardware 4.3 Window, 4.3 WindowHardware, 4.5 Annealed Glasses,

    an d4.6 Glassblock work

    schedules

    1 Wooden frame windows for main building. Thework includes making, transportation,

    installation, hardware, glazing, glass-block

    work around window, insect screen, 3 coats of

    oil-based painting, and other accessories

    required for complete installation as per

    drawings and schedule. SQ.M 102.00

    NOTE: Prior to work, samples must be approved by

    UNOPS Engineer.

  • 7/28/2019 Boq Andma Building

    6/15

    Currency: US Dollars

    Project No: 1017

    Project Title: ANDMA Building in Heart

    Location: Herat, A fghanistan

    Tender No: 01

    Component: 2-Story Administration Building and a Guardhouse

    Original Issue: November 07, 2010

    Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost TotaPos.

    2 Wooden frame windows for guard room. Thework includes making, transportation,

    installation, hardware, glazing, glass-block

    work around window, insect screen, 3 coats of

    oil-based painting, and other accessories

    required for complete installation as per

    drawings and schedule. SQ.M 6.00

    4.4 Doors and Door Hardware 4.4 Joinery doors 4.4 PVC doors,4.4 Steel doors an d4.5

    Annealed Glasses schedules

    1 Wooden frame doors for main building. Thework includes making, transportation,

    installation, hardware, glazing, and other

    accessories required for complete installation

    as per drawings and schedule. SQ.M 58.00

    2 Wooden frame doors for guard room. The

    work includes making, transportation,installation, hardware, glazing, and other

    accessories required for complete installation

    as per drawings and schedule. SQ.M 9.00

    3 Steel frame doors (for water tank enclosure onmain building). The work includes making,

    transportation, installation, hardware, glazing,

    1 coat of anti-rust followed by 2 other coats of

    oil-based painting, and other accessories

    required for complete installation as per

    drawings and schedule. SQ.M 0.80

    4 Steel doors [the access way to the roof of mainbuilding] plus steel type fixed ladder at first

    floor hall. The work and the cost includes

    construction and complete installation of inner

    steel door to the ceiling of the first floor, andinstallation of outer steel plate pane at the roof,

    and as well as wall mounted steel ladder as

    shown. The cost also includes all

    hardware/accessories/works/materials needed

    to a complete and functioning job. The cost

    also includes one coat anti-rust followed by 2

    other coats of oil-based painting to all non-

    galvanized steel surfaces as per given specs

    and full satisfaction of UNOPS engineer.

    LS 1.00

    4.5 Glazing 4.5 Mirrors schedules

    1 Mirrors (40x60cm) at toilets of main buildingand the guard room. This includes complete

    installation. No 7.00

    4.6 Glass Blockwork 4.6 Glass Block Schedule

    NOTE: Prior to work, samples must be approved by

    UNOPS Engineer.

    NOTE: Cost for steel related items in this section

    includes supplying materials, accessories,

    connections, welding, any works, painting according

    to the schedules and specifications for steel member

    painting, which is at least on coat of anti-rust

    followed by 2 other coats of oil-based painting for all

    surfaces.

  • 7/28/2019 Boq Andma Building

    7/15

    Currency: US Dollars

    Project No: 1017

    Project Title: ANDMA Building in Heart

    Location: Herat, A fghanistan

    Tender No: 01

    Component: 2-Story Administration Building and a Guardhouse

    Original Issue: November 07, 2010

    Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost TotaPos.

    1 Mortar jointed panels glass blockwork atwindow 'W6'. This includes reinforcement and

    all other accessories required for complete

    work. See drawing and schedule for details. SQ.M 12.00

    Subtotal enclosure

    5. Interior

    5.4 Suspended Ceiling 5.4 Suspended Ceiling Schedule

    1 Lasani wooden board, 6mm, fixed ceiling forsoffits and ceilings of the water tank enclosure

    on main building. The cost includes fixings,

    accessories, materials, works, oil based

    painting etc for a complete job to the full

    satisfaction of Engineer. SQ M 10.00

    2 Aluminum frame with 60x60 gypsum boardsuspended ceiling for guard room. The cost

    includes fixings, accessories, materials, works,

    etc for a complete job to the full satisfaction of

    Engineer. SQ M 28.00

    5.5 Joinery 5.5 Joinery fixtures schedule

    1 Wooden frame, MDF finish, wall mountedcabinet at the kitchen for main building. See

    drawings for details. The cost includes making,

    installation, framing, hardware, finish, 3 coatsoil-based painting and all to the complete job.

    LS 1.00

    2 Wooden frame, MDF finish, wall mountedcabinet at the kitchen for guard room. See

    drawings for details. The cost includes making,

    installation, framing, hardware, finish, 3 coats

    oil-based painting and all to the complete job.

    LS 1.00

    3 Wooden frame, MDF finish, floor mountedcupboard at the kitchen for main building. See

    drawings for details. The cost includes making,

    installation, framing, finish, hardware, stone

    table top, splash back, 3 coats oil-based

    painting and all to the complete job.

    LS 1.00

    4 Wooden frame, MDF finish, floor mountedcupboard at the kitchen for guard room. See

    drawings for details. The cost includes making,

    installation, framing, finish, hardware, stone

    table top, splash back, 3 coats oil-based

    painting and all to the complete job.

    LS 1.00

    5.6 Metalwork 5.6 Metal Fixtures Schedule

    1 Metallic plaster beads for outer corners at thecorridors only, including edge of walls for main

    building and as well as for guard room. This

    includes any needed work for complete

    installation. See schedules and drawings for

    details. Lin M 95.00

  • 7/28/2019 Boq Andma Building

    8/15

    Currency: US Dollars

    Project No: 1017

    Project Title: ANDMA Building in Heart

    Location: Herat, A fghanistan

    Tender No: 01

    Component: 2-Story Administration Building and a Guardhouse

    Original Issue: November 07, 2010

    Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost TotaPos.

    2 Metal handrails, balustrades, infill andmoldings to concrete stairs for main building.

    This includes any needed work for complete

    installation and also includes painting as per

    schedule and specification for metallic surface

    painting. See drawing for details. Lin M 8.00

    3 Metal guardrails at stair's landing for mainbuilding. This includes any needed work for

    complete installation and also includes painting

    as per schedule and specification for metallic

    surface painting. See drawing for details.

    Lin M 2.20 4 Metal handrails, balustrades, infill and

    moldings to concrete for ramp. This includes

    any needed work for complete installation and

    also includes painting as per schedule and

    specification for metallic surface painting. See

    drawing for details. Lin M 11.00

    5 Toilet roll holders for main building and guardroom. This also includes installation. No 7.00

    6 Grab rail for handicap toilet. One complete set.This includes supplying and complete

    installation. LS 1.00

    7 Soap dishes for main building and guard room.This also includes installation. No 7.00

    5.8 Fire Extinguishers and Blankets 5.8 Fire Extinguishers Schedule

    1 Extinguishers at main building and guard room,wall mounted, powder-type (9kg). No 3.00

    Subtotal Interior

    6. Finish

    6.1 Plastering 6.1 Plastering Schedule

    Internal and external surfaces

    1 Cement render medium CRM followed bycement render fine CRF on all internal and

    external surfaces of walls/ ceilings/ beams/

    columns/ reveals/ parapets, porches etc formain building. See schedule for detail. SQ.M 1,940.00

    2 Cement render medium CRM followed bycement render fine CRF on all internal and

    external surfaces of walls/ ceilings/ beams/

    columns/ reveals/ etc for guard room. See

    schedule for detail. SQ.M 200.00

    6.3 Tiling 6.3 Wall tiling an d6.3 Floor tilingschedules

    For main building:

    1 Ceramic wall tiles for toilets, kitchen. The costincludes bed preparation, bedding and grout.

    SQ.M 90.00

    2 Ceramic floor tiles for toilets including bedpreparation, bedding and grout. SQ.M 43.00

    NOTE: Prior to work, samples must be approved by

    UNOPS Engineer.

    NOTE: Prior to work, samples must be approved by

    UNOPS Engineer.

  • 7/28/2019 Boq Andma Building

    9/15

    Currency: US Dollars

    Project No: 1017

    Project Title: ANDMA Building in Heart

    Location: Herat, Afghanistan

    Tender No: 01

    Component: 2-Story Administration Building and a Guardhouse

    Original Issue: November 07, 2010

    Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost TotaPos.

    3 Marble tiles for all rooms and halls where didnot receive ceramic tiles. The cost includes

    bedding and grout. SQ.M 202.00

    4 Marble skirting for all rooms and halls wheredid not receive ceramic tiles. The cost includes

    bedding and grout. Lin M 210.00

    5 Granite tiles (30mm) for stairs treads andlandings including bedding and grout. SQ.M 15.00

    6 Granite tiles (10mm) for stairs raise includingbedding and grout. SQ.M 4.00

    7 Granite skirting for stairs including bedding andgrout. Lin M 14.00

    8 Granite tiles for internal window sill at windowW6, including bedding and grout. No 1.00

    For guard room:

    9 Ceramic wall tiles for toilets, kitchen. The costincludes bed preparation, bedding and grout.

    SQ.M 40.00

    10 Ceramic floor tiles for toilets including bedpreparation, bedding and grout. SQ.M 14.00

    11 Marble skirting for all walls that did not receiveceramic tiles. The cost includes bedding and

    grout. Lin M 13.00

    6.6 Painting 6.6 Interior/Exterior paintingschedule

    Internal surfaces

    1 Flat water based: Interior, on all surfaces thatreceive cement plaster for main building. The

    cost includes wall putty (gypsum filling) layer

    before painting and all needed preparation of

    the surfaces for painting. See schedule for

    detail on this paint system SQ.M 1,450.00

    2 Flat water based: Interior, on all surfaces thatreceive cement plaster for guard room. The

    cost includes wall putty (gypsum filling) layer

    before painting and all needed preparation of

    the surfaces for painting. See schedule for

    detail on this paint system SQ.M 105.00

    External surfaces

    3 Flat water based: Exterior, on all surfaces thatreceive cement plaster for main building. The

    cost includes wall putty (gypsum filling) layer

    before painting and all needed preparation of

    the surfaces for painting. See schedule for

    detail on this paint system SQ.M 490.00

    4 Flat water based: Exterior, on all surfaces thatreceive cement plaster for guard room. The

    cost includes wall putty (gypsum filling) layer

    before painting and all needed preparation of

    the surfaces for painting. See schedule for

    detail on this paint system SQ.M 95.00

    Subtotal Finishes

    8. Water Services

    NOTE: Prior to work, samples must be approved by

    UNOPS Engineer.

  • 7/28/2019 Boq Andma Building

    10/15

    Currency: US Dollars

    Project No: 1017

    Project Title: ANDMA Building in Heart

    Location: Herat, Afghanistan

    Tender No: 01

    Component: 2-Story Administration Building and a Guardhouse

    Original Issue: November 07, 2010

    Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost TotPos.

    8.1 Water Services 8.1 Water services samples, 8.1Water system piping, 8.1 Sanitary

    fixtures, 8.1 Water heater

    schedules an d8.1 Water

    Services Testing schedules

    NOTE: The cost for all pipes exposed to

    weather includes glass wool thermal insulation

    cover. The cost given for all GI and PVC pipes

    with diameter less than 60mm includes all

    required fittings, accessories and work for

    complete system installation. To be mentioned

    that the following section cover watersanitation needs for main building, septic tank

    and the guard room.

    Water supply piping

    1 GI water supply pipe D=32mm, includingfittings and installation. Lin M 80.00

    2 GI water supply pipe D=25mm, includingfittings and installation. Lin M 110.00

    3 GI water supply pipe D=20mm, includingfittings and installation. Lin M 100.00

    4 GI water supply pipe D=15mm, includingfittings and installation. Lin M 148.00

    5 Water supply bronze Valve D=32mm, includingfittings and installation. No 2.00

    6 Water supply bronze Valve D=25mm, includingfittings and installation. No 3.00

    7 Water supply bronze Valve D=20mm, includingfittings and installation. No 4.00

    8 Damp proof Insulation rubber tape for all GIPiping. Lin M 200.00

    9 Water supply inspection manhole less than1200mm deep. This includes excavation and

    any needed work to make the manhole as per

    drawings and schedule. No 1.00

    Sanitation Piping

    10 PVC pipe D=125mm, including supply andinstallation. This also includes supply and

    installation of PVC pipe from GI sheet

    downpipes to the open channel collector at the

    side walks. Lin M 40.00 11 PVC pipe D=100mm, including supply and

    installation. This also includes supply and

    installation of PVC pipe from GI sheet

    downpipes to the open channel collector at the

    side walks. Lin M 95.00

    12 PVC pipe D=50mm, including fittings andinstallation. Lin M 110.00

    13 Ventilation PVC pipes D=100mm (from toiletsto roof). This also includes supplying and

    installation of PVC screen at the pipe inlets

    inside the toilets. See drawing and schedule

    for details. Lin M 10.00

    14 Ventilation PVC pipes D=50mm (from toilets toroof). This also includes supplying and

    installation of PVC screen at the pipe inletsinside the toilets. See drawing and schedule

    for details. Lin M 35.00

  • 7/28/2019 Boq Andma Building

    11/15

    Currency: US Dollars

    Project No: 1017

    Project Title: ANDMA Building in Heart

    Location: Herat, Afghanistan

    Tender No: 01

    Component: 2-Story Administration Building and a Guardhouse

    Original Issue: November 07, 2010

    Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost TotPos.

    15 PVC Elbow D=50x50,45, including supply andinstallation. No 2.00

    16 PVC Elbow D=50x50,90, including supply andinstallation. No 8.00

    17 PVC Elbow D=100x100,45, including supplyand installation. No 1.00

    18 PVC Elbow D=100x100,135, including supplyand installation. No 4.00

    19 PVC Tee D=100x50x100,45, including supplyand installation. No 4.00

    20 PVC Tee D=50x100x50,45, including supply

    and installation. No 7.00 21 PVC Tee D=50x50,45, including supply and

    installation. No 5.00

    22 PVC Tee D=100x100, 45, including supply andinstallation. No 2.00

    23 Sewer Manhole. This includes excavation andany needed work to make the manhole

    according to the drawings and schedules. No 7.00

    Sanitary and other fixtures

    24 Western toilet, including supply, installationand accessories. No 7.00

    25 Ceramic sink at toilets and labs, includingmixer and all accessories, supplying and

    installation. No 7.00

    26 Shower, including supply, installation andaccessories. No 1.00

    27 Floor trap D=50mm, including supply andinstallation. No 7.00

    28 kitchen steel sink, Including supply andinstallation. No 2.00

    29 Ventilation cap D=100mm, including supplyand installation. No 1.00

    30 Ventilation cap D=50mm, including supply andinstallation. No 3.00

    31 Service Sink, including supply and installation.No 2.00

    32 Electrical water boiler with capacity of 50 Liter,including supply and installation. No 3.00

    33 Electrical water boiler with capacity of 30 Liter,including supply and installation. No 2.00

    34 PVC Reservoir capacity of 2000 Liter, includingsupply and installation. No 1.00

    35 Grease Trap less than 1200mm deep. Thisincludes excavation and any needed work to

    make the manhole according to the drawings

    and schedules. No 2.00

    Tube well:

    Borehole

    Drilling well (8") diameter in soil, any type.

    Actual well depth will depend the site water

    level. Lin M 80.00

    36 Gravel river type 8-12mm in size.LS 2.00

    37 PCC and clay seal to borehole.

    LS 2.00

  • 7/28/2019 Boq Andma Building

    12/15

    Currency: US Dollars

    Project No: 1017

    Project Title: ANDMA Building in Heart

    Location: Herat, A fghanistan

    Tender No: 01

    Component: 2-Story Administration Building and a Guardhouse

    Original Issue: November 07, 2010

    Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost TotaPos.

    38 (6") diameter PVC pipe 7-10mm in thickness.The actual pipe length will be adjusted

    according to the actual well depth in the site.

    Lin M 50.00

    39 (6") diameter PVC filter 7-10mm thickness.See schedule for slot sizes and other specs.

    The actual pipe length will be adjusted

    according to the actual well depth in the site.

    Lin M 8.00

    40 Insulation of casing and filter.LS 2.00

    41 Gravel pack around casing, filters up to 10mfrom surface of ground. LS 2.00

    42 Clay and cement pack from 10m to surfacelevel. LS 2.00

    43 Water wash and Compression test of well.LS 2.00

    44 Preparation of hydro geological section, yieldof well, water level, in report LS 2.00

    45 Chemical and bacteriological analysis tests ofwater samples. No 2.00

    46 Draw down test for wellLS 2.00

    47 Manhole on top of the well More than1200mm deep. This includes excavation and

    any needed work to make the manhole

    according to the drawings and schedules. No 1.00

    48 Installation of Italian 'Pedrollo' brand orequivalent submersible D=40mm water pumpwith 40 L\min discharge capacity capable of

    153m total head, power capacity=4kw,three

    phase. This item includes complete and

    functioning pump installation and reinstating of

    the place to the satisfaction of UNOPS

    engineer if required. This also includes all

    mechanical works needed for successful

    installation. For electrical accessories required

    for the pump installation refer to section 9.

    Electrical Services down this document.

    No 1.00

    Subtotal Water Services

    9. Electrical Services

    9.1 Electrical Services 9.1 Electrical systems, 9.1Electrical supply mains, 9.1

    Electrical switchboard design, 9.1

    Main 380VAC Distribution

    System, 9.1 Panel Construction,

    9.1 Power accessories, 9.1

    Lighting control and fittings, 9.1

    Fire Detection Equipment

    Schedule Schedules an dthe

    Attachments

    Note: for all items below the cost includes

    complete/installations with all needed

    accessories and works. To be mentioned that

    the following section cover water sanitationneeds for main building and the guard room.

  • 7/28/2019 Boq Andma Building

    13/15

    Currency: US Dollars

    Project No: 1017

    Project Title: ANDMA Building in Heart

    Location: Herat, Afghanistan

    Tender No: 01

    Component: 2-Story Administration Building and a Guardhouse

    Original Issue: November 07, 2010

    Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost TotPos.

    Power Distribution Main and Sub Boards

    1 30KA ISC /0.5Sec, 380Y/220 Volt. 3 Phase, 4Wire , 50Hz, having grounding bus and surge

    arrestors with all accessories. Out door NEMA

    enclosure type, Main Power Distribution Panel

    Board (MDP) . No. 1.00

    2 30KA ISC /0.5Sec, 380Y/220 Volt. 3 Phase, 4Wire , 50Hz, having grounding bus and surge

    arrestors with all accessories. In door NEMA

    enclosure type, Main Power Distribution Panel

    Board (DP1) . No. 1.00 3 30KA ISC /0.5Sec, 380Y/220 Volt. 3 Phase, 4

    Wire , 50Hz, having grounding bus and surge

    arrestors with all accessories. In door NEMA

    enclosure type, Main Power Distribution Panel

    Board (DP2) . No. 1.00

    4 30KA ISC /0.5Sec, 380Y/220 Volt. 3 Phase, 4Wire , 50Hz, having grounding bus and surge

    arrestors with all accessories. Out door NEMA

    enclosure type, Main Power Distribution Panel

    Board (DP3) . No. 1.00

    5 Main circuit breaker, MCCB, 3x80Amps.No. 1.00

    6 Main circuit breaker, MCCB, 3x63Amps.No. 3.00

    7 Main circuit breaker, MCCB, 3x40Amps.No. 1.00

    8 Main circuit breaker, MCCB, 3x20Amps.No. 2.00

    9 Circuit breaker, MCB, 1x32Amps.No. 3.00

    10 Circuit breaker, MCB, 1x20Amps.No. 33.00

    11 Circuit breaker, MCB, 1x16Amps.No. 6.00

    Distribution cabling and wiring

    12 1(4Cx16mm) PVC/PVC Insulated Cable, in50mm PVC electrical conduit.

    Note: (conduit is only from hand hole to the

    DP1) Lin M 65.00

    13 1(4Cx10mm + 1x10mm ) PVC/PVC InsulatedCable, in 50mm PVC electrical conduit.

    Lin M 6.00

    14 1(4Cx6mm ) PVC/PVC Insulated Cable. Lin M 25.00

    15 2(1C x 4mm) + 4mm GND wires pulled inPVC conduit, assorted colors as per phase

    requirement RST/UVW, white color is for

    neutral and green color for grounding, the duct

    should not be filled more than 50%. Lin M 560.00

    16 2(1C x 2.5mm) + 2.5mm GND wires pulled inPVC conduit, assorted colors as per phase

    requirement RST/UVW, white color is for

    neutral and green color for grounding, the duct

    should not be filled more than 50%. Lin M 260.00

    Fittings/Fixtures

    17 10Amp Single Pole/Double Pole light switch.No 30.00

    18 4x18W recessed mounted fluorescent lightfixture. Water proof and normal No 4.00

    19 2x36W surface mounted fluorescent lightfixture No 25.00

  • 7/28/2019 Boq Andma Building

    14/15

    Currency: US Dollars

    Project No: 1017

    Project Title: ANDMA Building in Heart

    Location: Herat, A fghanistan

    Tender No: 01

    Component: 2-Story Administration Building and a Guardhouse

    Original Issue: November 07, 2010

    Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost TotaPos.

    20 1x36W surface mounted fluorescent lightfixture. No 22.00

    21 1x32W ceiling mounted circular fluorescentlight fixture, Water Proof No 9.00

    22 1x18W ceiling mounted circular fluorescentlight fixture, Water Proof No 4.00

    23 1x18W wall mounted mirror light fixture, WaterProof No 2.00

    24 1x20W wall mounted rechargeable emergencylight fixture. No 3.00

    25 1x20W surface mounted rechargeable exit

    light fixture. No 3.00 26 13Amp Duplex power receptacle.

    No 55.00

    27 16 Amp water proof power receptacle.No 10.00

    28 20 Amp water proof power receptacle.Note: according to the drawings for AC & oven.

    No 6.00

    29 20 Amp non fuse disconnect switch.No 3.00

    AC/Split Units and Exhaust fans

    30 18000 BTU AC/ Split outdoor, indoor andremote control units with all accessories,220 V,

    50HZ Samsung or equalingNo 1.00

    31 12000 BTU AC/ Split outdoor, indoor andremote control units with all accessories,220 V,

    50HZ Samsung or equalingNo 2.00

    32 9000 BTU AC/ Split outdoor, indoor andremote control units with all accessories,220 V,

    50HZ Samsung or equalingNo 7.00

    33 50W ,220V, 50Hz exhaust fans .No 4.00

    Electrical Grounding.

    34 Grounding system according to the groundingdrawing with electrodes, ground ring and

    grounding cables. Sets 2.00

    Labeling

    35 Proper and correct all circuits numbering, cablecircuit drawings, cable and switchboard

    labeling to the full satisfaction of UNOPS

    engineer. LS 1.00

    Subtotal Electrical Services

  • 7/28/2019 Boq Andma Building

    15/15

    Currency: US Dollars

    Project No: 1017

    Project Title: ANDMA Building in Heart

    Location: Herat, Afghanistan

    Tender No: 01

    Component: 2-Story Administration Building and a Guardhouse

    Original Issue: November 07, 2010

    Work Type

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    Signature

    Total for Interior

    Total for General

    Total for Site

    UNOPS

    SUMMARY ESTIMATE

    Vertical Structures Unit

    Total for Structure

    Total for Enclosure

    Total for Finish

    Total for Water Supply Services

    Agreed on behalf of Contractor UNOPS

    Zero

    Total for 2-Story Administration Building and a Guardhouse

    Total for Electrical Services

    Estimate Value for whole tender in words:

    Signature

    Address and

    Mobile Number

    Name Name

    Position Position


Recommended