Asbestos Assessment Report Storage Structure - 52 West Marion Road Greenville, South Carolina S&ME Project No. 4269-19-014 Phase 01 PREPARED FOR: Greenville County 301 University Ridge, Suite 4100 Greenville, South Carolina, 29601 PREPARED BY: S&ME, Inc. 48 Brookfield Oaks Drive, Suite F Greenville, SC 29607 September 16, 2019 Inspection Performed by: Taylor Williams SCDHEC License BI-01602 Inspection Date: September 3, 2019 Asbestos Identified No Asbestos Design Required No Asbestos Air Monitoring Required No ATTACHMENT D
Transcript
Page 1: Brian Mulholland SCDHEC License BI -00 06 91 Inspection ......ATTACHMENT D. Asbestos Assessment Report ... during future demolition. The scope of this assessment fulfills the requirements

Asbestos Assessment Report

Storage Structure - 52 West Marion Road

Greenville, South Carolina

S&ME Project No. 4269-19-014 Phase 01

PREPARED FOR:

Greenville County

301 University Ridge, Suite 4100

Greenville, South Carolina, 29601

PREPARED BY:

S&ME, Inc.

48 Brookfield Oaks Drive, Suite F

Greenville, SC 29607

September 16, 2019

Inspection Performed by:

Taylor Williams

SCDHEC License BI-01602

Inspection Date: September 3, 2019

Asbestos Identified No

Asbestos Design Required No

Asbestos Air Monitoring Required No

Inspection Performed by:

Brian Mulholland

SCDHEC License BI-000691

Inspection Date: October 20, 2017

ATTACHMENT D

Page 2: Brian Mulholland SCDHEC License BI -00 06 91 Inspection ......ATTACHMENT D. Asbestos Assessment Report ... during future demolition. The scope of this assessment fulfills the requirements

S&ME, Inc. | 48 Brookfield Oaks Drive, Suite F | Greenville, SC 29607 | p 864.297.9944 | www.smeinc.com

September 16, 2019

Greenville County

301 University Ridge, Suite 4100

Greenville, South Carolina 29601

Attention: Ms. Jessica Jordan

Reference: Asbestos Assessment Report

Storage Structure – 52 West Marion Road

Greenville, South Carolina

S&ME Project No. 4269-19-014, Phase 07

Dear Ms. Jordan:

S&ME, Inc. (S&ME) has completed an asbestos assessment for the referenced property. The purpose of the

assessment is to identify asbestos-containing materials (ACMs) in the structure prior to demolition. Our

assessment was conducted in general accordance with our Proposal Number 42-1600890 dated July 20, 2016.

This work was authorized by the Greenville County Task Order # 04, dated August 27, 2019.

S&ME appreciates the opportunity to provide our asbestos assessment services to Greenville County. Please

contact us at your convenience if there are questions regarding the information contained in this report.

Sincerely,

S&ME, Inc.

Brian Mulholland Tom Behnke, P.G., CHMM

Industrial Hygiene Project Manager Senior Reviewer

[email protected] [email protected]

BM/TB T:\Projects\2019\ENV\4269-19-014 Gville County_Asbestos & AAM 2019 Services\Working_Documents\Phase 07 - 52 W Marion Rd

ACM\52 West Marion Road Asbestos Report.docx

ATTACHMENT D

Page 3: Brian Mulholland SCDHEC License BI -00 06 91 Inspection ......ATTACHMENT D. Asbestos Assessment Report ... during future demolition. The scope of this assessment fulfills the requirements

Asbestos Assessment Report

Storage Structure – 52 West Marion Road

Greenville, South Carolina

S&ME Project No. 4269-19-014, Phase 07

September 16, 2019 ii

Table of Contents

Executive Summary .................................................................................................................... 1

1.0 Introduction ....................................................................................................................... 2

2.0 Site and Project Descriptions.......................................................................................... 2

2.1 Purpose ............................................................................................................................................ 2

2.2 Site Description ............................................................................................................................... 2

3.0 Asbestos Assessment ........................................................................................................ 2

3.1 Sampling and Analysis .................................................................................................................. 2

3.2 Assessment ...................................................................................................................................... 3

3.3 Findings and Results ...................................................................................................................... 3

4.0 Assumptions and Limitations ........................................................................................ 4

5.0 Conclusions and Recommendations ............................................................................. 4

Appendices Appendix I – Figure and Photographs

Appendix II – Table 1 – Summary of Asbestos Results

Appendix III – Asbestos Laboratory Reports

Appendix IV – Copy of Inspector’s License

ATTACHMENT D

Page 4: Brian Mulholland SCDHEC License BI -00 06 91 Inspection ......ATTACHMENT D. Asbestos Assessment Report ... during future demolition. The scope of this assessment fulfills the requirements

Asbestos Assessment Report

Storage Structure – 52 West Marion Road

Greenville, South Carolina

S&ME Project No. 4269-19-014, Phase 07

September 16, 2019 1

Executive Summary

S&ME performed an asbestos assessment of the structure located at 52 West Marion Road in Greenville, South

Carolina. The assessment was conducted by S&ME on September 3, 2019. This Executive Summary is intended as

an overview for the convenience of the reader. The complete report must be reviewed in its entirety prior to

making decisions regarding this site.

The subject structure is an approximately 1,000 square foot (SF) vacant single-story storage structure. We

understand the structure is scheduled for demolition. According to the Greenville County Tax Assessor’s database,

the subject property is identified as Tax Parcel #0132.00-03-028.00. The interior is generally finished with drywall

walls and ceilings, concrete floors, and tack down carpet. Exterior materials consist of wood siding, concrete block

foundation, wood roof, and metal framed windows. Thermal insulating materials appear to consist of fiberglass

insulation.

The asbestos assessment included bulk sampling and laboratory analysis of suspect ACMs associated with the

interior and exterior of the structure. A total of 16 samples were collected including drywall with associated joint

compound, textured ceiling material, carpet mastic, roof shingles and roof felt paper.

The Environmental Protection Agency (EPA) and South Carolina Department of Health and Environmental Control

(SCDHEC) define materials as asbestos-containing (ACMs) if an asbestos content of one percent or greater (> 1%)

is detected in a representative sample.

Asbestos was not identified in the samples collected from the storage structure.

This summary is for convenience only and should not be relied upon without first reading the full contents of this

report, including appended materials.

ATTACHMENT D

Page 5: Brian Mulholland SCDHEC License BI -00 06 91 Inspection ......ATTACHMENT D. Asbestos Assessment Report ... during future demolition. The scope of this assessment fulfills the requirements

Asbestos Assessment Report

Storage Structure – 52 West Marion Road

Greenville, South Carolina

S&ME Project No. 4269-19-014, Phase 07

September 16, 2019 2

1.0 Introduction

S&ME was contracted by Greenville County to perform an asbestos assessment of the structure located at 52

West Marion Road in Greenville, South Carolina. S&ME performed the asbestos assessment on September 3,

2019. This assessment consisted of observing for, sampling, and analyzing suspect ACM that may be disturbed

during future demolition.

The scope of this assessment fulfills the requirements of the United States Environmental Protection Agency

(USEPA) National Emissions Standards for Hazardous Air Pollutants (NESHAPS) asbestos regulation, 40 CFR, Part

61, Subpart M, and SCDHEC Regulation 61-86.1, which requires an asbestos assessment of buildings scheduled for

renovation or demolition.

2.0 Site and Project Descriptions

2.1 Purpose

The assessment was performed to identify ACMs, prior to disturbing building materials during demolition

activities. The assessment included the interior and exterior of the building including roofing materials of the

Storage structure located on the property. No additional structures were observed on the property. An

assessment strategy appropriate for this purpose was presented in our proposal and this report should be

interpreted only with regard to the specific purpose indicated.

2.2 Site Description

The subject structure is an approximately 1,000 square foot (SF) vacant single-story storage structure. We

understand the structure is scheduled for demolition. According to the Greenville County Tax Assessor’s database,

the subject property is identified as Tax Parcel #0132.00-03-028.00. The interior is generally finished with drywall

walls and ceilings, concrete floors, and tack down carpet. Exterior materials consist of wood siding, concrete block

foundation, wood roof, and metal framed windows. Thermal insulating materials appear to consist of fiberglass

insulation.

3.0 Asbestos Assessment

3.1 Sampling and Analysis

The assessment was performed by observing, assessing, and sampling suspect ACMs associated with the

referenced areas. The possibility exists that suspect materials were undetected in inaccessible areas such as

flooring overlays, wall voids, or pipe chases. If additional suspect ACMs not identified in this report are discovered

during destructive activities, bulk samples must be collected by a SCDHEC licensed inspector and analyzed for

asbestos content prior to disturbance or disposal of the suspect materials.

A sampling strategy was developed to provide representative samples in accordance with the SCDHEC and the

EPA. Bulk samples of suspect ACMs were collected by a SCDHEC licensed inspector. The bulk samples were then

ATTACHMENT D

Page 6: Brian Mulholland SCDHEC License BI -00 06 91 Inspection ......ATTACHMENT D. Asbestos Assessment Report ... during future demolition. The scope of this assessment fulfills the requirements

Asbestos Assessment Report

Storage Structure – 52 West Marion Road

Greenville, South Carolina

S&ME Project No. 4269-19-014, Phase 07

September 16, 2019 3

recorded on a chain of custody record and submitted to Eurofins CEI Labs of Cary, North Carolina for analysis by

Polarized Light Microscopy (PLM) and Transmission Electron Microscopy (TEM) for those non-friable organically

bound materials reported negative via PLM. The laboratory is accredited by the National Voluntary Laboratory

Accreditation Program (NVLAP), which is administered by the National Institute of Standards and Technology.

Polarized Light Microscopy (PLM)

The suspect materials were analyzed by trained microscopists using PLM techniques coupled with dispersion

staining in accordance with EPA Test Method Title 40 Code of Federal Regulations, Chapter I (1-1-87 edition), Part

763, Subpart F-APPENDIX A. This method identifies asbestos mineral fibers based on six optical characteristics:

morphology, birefringence, refractive index, extinction angle, sign of elongation and dispersion staining colors.

The laboratory analysis reports the specific type of asbestos identified (there are six asbestos minerals) and the

percentage of asbestos present.

Transmission Electron Microscopy (TEM)

Representative suspect non-friable organically bound materials, exhibiting negative results via PLM analysis, were

analyzed by trained microscopists via TEM, in accordance with ASTM E2356 per the SCDHEC requirements.

3.2 Assessment

The sampled materials were assessed based on condition (good, fair or poor) and potential for disturbance due to

the scheduled renovation/demolition. The sampled materials were also categorized based on the EPA’s National

Emission Standards for Hazardous Air Pollutants (NESHAP) regulation categories. Friable ACM is classified as an

ACM that can be crumbled to a powder by moderate hand pressure. Non-friable ACM is classified as either

Category I Non-friable ACM or Category II Non-friable ACM. Category I and Category II Non-friable ACM are

distinguished from each other by their fiber release potential when damaged. Generally, Category I Non-friable

ACM, which by definition includes intact ACM roofing materials, gaskets, packing, resilient floor coverings and

floor mastics, is less likely to become friable and release fibers in a damaged state. Category II Non-friable ACM

include all other non-friable ACM excluding Category I that have a high probability of being rendered friable

during removal activities or demolition. All Friable ACM, Category I Non-friable ACM that has become friable,

Category I Non-friable ACM that will be or has been subjected to sanding, grinding, cutting or abrading, or

Category II Non-friable ACM that has a high probability of becoming or has become crumbled, pulverized, or

reduced to powder by the forces expected to act on the material in the course of demolition or renovation

operations are considered to be a Regulated Asbestos-Containing Material (RACM).

3.3 Findings and Results

A total of 16 samples were collected including drywall with associated joint compound, textured ceiling material,

carpet mastic, roof shingles and roof felt paper. The EPA and SCDHEC define materials as asbestos containing

when an asbestos content >1% is detected in a representative sample.

Asbestos was not identified in the samples collected from the storage structure.

ATTACHMENT D

Page 7: Brian Mulholland SCDHEC License BI -00 06 91 Inspection ......ATTACHMENT D. Asbestos Assessment Report ... during future demolition. The scope of this assessment fulfills the requirements

Asbestos Assessment Report

Storage Structure – 52 West Marion Road

Greenville, South Carolina

S&ME Project No. 4269-19-014, Phase 07

September 16, 2019 4

The general layout of the structure is depicted in Figure 1 in Appendix I. Photographs of the suspect samples are

also included in Appendix I. Table 1, Asbestos Results Summary, is found in Appendix II, and presents a summary

of the suspect materials, material friability, condition, potential for disturbance, quantity, and asbestos analysis of

the samples collected. The laboratory results are located in Appendix III.

4.0 Assumptions and Limitations

This report is provided for the sole use of the Client. Use of this report by any other parties will be at such party’s

sole risk, and S&ME disclaims liability for any such use or reliance by third parties. The results presented in this

report are indicative of conditions only during the time of the sampling period and of the specific areas

referenced. Under no circumstances is this report to be used as a bidding document, or as a project design or

specification.

S&ME performed the services in accordance with generally accepted practices of reputable environmental

consultants undertaking similar studies at the same time and in the same geographical area. S&ME has

endeavored to meet this standard of care. No other warranty, expressed or implied, is intended or made with

respect to this report or S&ME’s services. Users of this report should consider the scope and limitations related to

these services when developing opinions as to risks associated with the site.

The possibility exists that suspect materials were undetected in inaccessible or concealed areas such as under

carpeting or multiple flooring layers, and inside pipe chases or wall voids. If additional suspect materials are

discovered during the planned destructive activities, bulk samples must be collected by an asbestos inspector and

analyzed for asbestos content.

5.0 Conclusions and Recommendations

No asbestos-containing materials were identified in the building. Therefore, no specific recommendations are

made at this time. This report should be provided to the contractor(s) to assist with compliance with applicable

State and Federal regulations. If additional suspect materials are discovered during demolition activities, bulk

samples must be collected and analyzed for asbestos content prior to continuation of work.

ATTACHMENT D

Page 8: Brian Mulholland SCDHEC License BI -00 06 91 Inspection ......ATTACHMENT D. Asbestos Assessment Report ... during future demolition. The scope of this assessment fulfills the requirements

Appendices

ATTACHMENT D

Page 9: Brian Mulholland SCDHEC License BI -00 06 91 Inspection ......ATTACHMENT D. Asbestos Assessment Report ... during future demolition. The scope of this assessment fulfills the requirements

Appendix I – Figure and Photographs

ATTACHMENT D

Page 10: Brian Mulholland SCDHEC License BI -00 06 91 Inspection ......ATTACHMENT D. Asbestos Assessment Report ... during future demolition. The scope of this assessment fulfills the requirements

C2 B3

A2

C3

B4

A4

A5

D1

B5

A1

B1

D3 B2 C1 A3 D2

SCALE: NTS Approximate Asbestos Sample Locations FIGURE NO.

1

DATE: 9/3/2019 Project Number : 4269-19-014 Phase 07

CHECKED BY: SW 52 W. Marion Road

DRAWN BY: TRW Greenville, South Carolina

ATTACHMENT D

Page 11: Brian Mulholland SCDHEC License BI -00 06 91 Inspection ......ATTACHMENT D. Asbestos Assessment Report ... during future demolition. The scope of this assessment fulfills the requirements

52 W. Marion Road

Greenville, South Carolina

S&ME Project # 4269-19-014 Phase 07

Taken by: Taylor Williams Date Taken: 8/28/2019

1

1 General front view of the structure.

52 W. Marion Road, Greenville, South Carolina

2 Sample A – Textured ceiling located throughout structure.

No asbestos detected.

3 Sample B – Drywall and joint compound located throughout

structure. No asbestos detected.

4 Sample D – Roof shingles with felt paper located on roof.

No asbestos detected.

ATTACHMENT D

Page 12: Brian Mulholland SCDHEC License BI -00 06 91 Inspection ......ATTACHMENT D. Asbestos Assessment Report ... during future demolition. The scope of this assessment fulfills the requirements

Appendix II – Table 1 – Summary of Asbestos Results

ATTACHMENT D

Page 13: Brian Mulholland SCDHEC License BI -00 06 91 Inspection ......ATTACHMENT D. Asbestos Assessment Report ... during future demolition. The scope of this assessment fulfills the requirements

Summary of Asbestos Results

52 W. Marion Road

Greenville, South Carolina

S&ME Project No. 4269-19-014 Phase 07

Date of Sampling: August 28, 2019

HA Material DescriptionMaterial

Location

2Approx.

Quantity

Cat.

(F/I/II)Type

Condition/

Potential for

Disturbance

Sample

Number

Sample

Location

1Type and

Percent

Asbestos

A1 Main Room ND

A2 Main Room ND

A3 Main Room ND

A4 Main Room ND

A5 Main Room ND

B1 Main RoomND

ND

B2 Main RoomND

ND

B3 Main RoomND

ND

B4 Main RoomND

ND

B5 Main RoomND

ND

C1 Main Room ND

C2 Main Room ND

C3 Main Room ND

D1 Roof

ND

ND

ND

D2 Roof

ND

ND

ND

D3 Roof

ND

ND

ND

SF = square feet Misc. = Miscellaneous LPD = low potential for disturbance

LF = linear feet Sur. = Surfacing PD = potential for disturbance

F= friable TSI = Thermal System Insulation PSD = potential for significant disturbance

NF = non-friable G = good ND = No Asbestos Detected

Cat I = Category I D = damaged N/A = Not Applicable

Cat II = Category II SD = significantly damaged EA = each

1EPA, SCDHEC and OSHA defines a material as asbestos containing if an asbestos content greater than one percent (>1%) is detected in a representative sample

2Quantities are estimated, and should not be used for bidding purposes, as field conditions should be verified

3Samples analyzed by TEM to confirm negative results reported by PLM analysis

Table I: Summary of Asbestos Results

2,500 SFThroughout Walls and

CeilingsFB

Drywall and Joint

Compound

Misc. &

Sur.D / PD

A Textured Ceiling Throughout Ceiling 800 SF F Misc. D / PD

C Yellow Carpet Mastic

Misc. G / LPDDRoof Shingles (2 layers)

with Felt PaperRoof 1,000 SF NF

800 SF NF Misc. G / LPDThroughout

Page 1 of 1

ATTACHMENT D

Page 14: Brian Mulholland SCDHEC License BI -00 06 91 Inspection ......ATTACHMENT D. Asbestos Assessment Report ... during future demolition. The scope of this assessment fulfills the requirements

Appendix III – Asbestos Laboratory Reports

ATTACHMENT D

Page 15: Brian Mulholland SCDHEC License BI -00 06 91 Inspection ......ATTACHMENT D. Asbestos Assessment Report ... during future demolition. The scope of this assessment fulfills the requirements

September 6, 2019

S&ME48 Brookfield Oaks Dr, Suite FGreenville, SC 29607

CLIENT PROJECT: 52 W. Marion Road, 4269-19-014 Phase 07CEI LAB CODE: B195456

Dear Customer:

Enclosed are asbestos analysis results for PLM Bulk samples received at our laboratory onSeptember 5, 2019. The samples were analyzed for asbestos using polarizing lightmicroscopy (PLM) per the EPA 600 Method.

Sample results containing >1% asbestos are considered asbestos-containing materials(ACMs) per EPA regulatory requirements. The detection limit for the EPA 600 Method is <1%asbestos by weight as determined by visual estimation.

Thank you for your business and we look forward to continuing good relations.

730 SE Maynard Road • Cary, NC 27511 • 919.481.1413

Tianbao Bai, Ph.D., CIHLaboratory Director

Kind Regards,

ATTACHMENT D

Page 16: Brian Mulholland SCDHEC License BI -00 06 91 Inspection ......ATTACHMENT D. Asbestos Assessment Report ... during future demolition. The scope of this assessment fulfills the requirements

ASBESTOS ANALYTICAL REPORTBy: Polarized Light Microscopy

Prepared for

S&ME

CLIENT PROJECT:

LAB CODE:

TEST METHOD: EPA 600 / R93 / 116 and EPA 600 / M4-82 / 020

REPORT DATE:

TOTAL SAMPLES ANALYZED:

# SAMPLES >1% ASBESTOS:

52 W. Marion Road, 4269-19-014 Phase 07

B195456

14

09/06/19

ATTACHMENT D

Page 17: Brian Mulholland SCDHEC License BI -00 06 91 Inspection ......ATTACHMENT D. Asbestos Assessment Report ... during future demolition. The scope of this assessment fulfills the requirements

Asbestos Report SummaryBy: POLARIZING LIGHT MICROSCOPY

PROJECT: 52 W. Marion Road, 4269-19-014 Phase07

LAB CODE: B195456

Client ID Lab ID Color Sample DescriptionASBESTOS

%Layer

METHOD: EPA 600 / R93 / 116 and EPA 600 / M4-82 / 020

B82404 White Textured Ceiling None DetectedA1

B82405 White Textured Ceiling None DetectedA2

B82406 White Textured Ceiling None DetectedA3

B82407 White Textured Ceiling None DetectedA4

B82408 White Textured Ceiling None DetectedA5

Layer 1 B82409 White Joint Compound None DetectedB1

Layer 2 B82409 White Drywall None Detected

Layer 1 B82410 White Joint Compound None DetectedB2

Layer 2 B82410 White Drywall None Detected

Layer 1 B82411 White Joint Compound None DetectedB3

Layer 2 B82411 White Drywall None Detected

Layer 1 B82412 White Joint Compound None DetectedB4

Layer 2 B82412 White Drywall None Detected

Layer 1 B82413 White Joint Compound None DetectedB5

Layer 2 B82413 White Drywall None Detected

B82414 Tan Carpet Mastic None DetectedC1

B82415 Tan Carpet Mastic None DetectedC2

B82416 Sample Submitted for TEMAnalysis

C3

Layer 1 B82417A Black Roof Shingle None DetectedD1

Layer 2 B82417A Black,White Roof Shingle None Detected

B82417B Black Felt Paper None Detected

Layer 1 B82418A Black Roof Shingle None DetectedD2

Layer 2 B82418A Black,White Roof Shingle None Detected

B82418B Black Felt Paper None Detected

B82419 Sample Submitted for TEMAnalysis

D3

Page 1 of 1

ATTACHMENT D

Page 18: Brian Mulholland SCDHEC License BI -00 06 91 Inspection ......ATTACHMENT D. Asbestos Assessment Report ... during future demolition. The scope of this assessment fulfills the requirements

ASBESTOS BULK ANALYSISBy: POLARIZING LIGHT MICROSCOPY

Lab Code: B195456Date Received: 09-05-19Date Analyzed: 09-06-19Date Reported: 09-06-19

Client IDLab ID

LabAttributes

LabDescription

ASBESTOS%

ASBESTOS BULK PLM, EPA 600 METHODNON-ASBESTOS COMPONENTS

Non-Fibrous

Client: S&ME48 Brookfield Oaks Dr, Suite FGreenville, SC 29607

Project: 52 W. Marion Road, 4269-19-014 Phase 07

Fibrous

WhiteTextured CeilingA1

B82404Heterogeneous

Non-fibrousBound

20%65%15%

VermiculiteCalc CarbBinder

None Detected

WhiteTextured CeilingA2

B82405Heterogeneous

Non-fibrousBound

20%65%15%

VermiculiteCalc CarbBinder

None Detected

WhiteTextured CeilingA3

B82406Heterogeneous

Non-fibrousBound

20%65%15%

VermiculiteCalc CarbBinder

None Detected

WhiteTextured CeilingA4

B82407Heterogeneous

Non-fibrousBound

20%65%15%

VermiculiteCalc CarbBinder

None Detected

WhiteTextured CeilingA5

B82408Heterogeneous

Non-fibrousBound

20%65%15%

VermiculiteCalc CarbBinder

None Detected

WhiteB1

B82409

Heterogeneous

Non-fibrousBound

5%70%25%

PaintCalc CarbBinder

None DetectedLayer 1

Joint Compound

WhiteDrywall

B8240915%Heterogeneous

FibrousBound

85%Cellulose Gypsum None DetectedLayer 2

Page 1 of 5

ATTACHMENT D

Page 19: Brian Mulholland SCDHEC License BI -00 06 91 Inspection ......ATTACHMENT D. Asbestos Assessment Report ... during future demolition. The scope of this assessment fulfills the requirements

ASBESTOS BULK ANALYSISBy: POLARIZING LIGHT MICROSCOPY

Lab Code: B195456Date Received: 09-05-19Date Analyzed: 09-06-19Date Reported: 09-06-19

Client IDLab ID

LabAttributes

LabDescription

ASBESTOS%

ASBESTOS BULK PLM, EPA 600 METHODNON-ASBESTOS COMPONENTS

Non-Fibrous

Client: S&ME48 Brookfield Oaks Dr, Suite FGreenville, SC 29607

Project: 52 W. Marion Road, 4269-19-014 Phase 07

Fibrous

WhiteB2

B82410

Heterogeneous

Non-fibrousBound

5%70%25%

PaintCalc CarbBinder

None DetectedLayer 1

Joint Compound

WhiteDrywall

B8241015%Heterogeneous

FibrousBound

85%Cellulose Gypsum None DetectedLayer 2

WhiteB3

B82411

Heterogeneous

Non-fibrousBound

5%70%25%

PaintCalc CarbBinder

None DetectedLayer 1

Joint Compound

WhiteDrywall

B8241115%Heterogeneous

FibrousBound

85%Cellulose Gypsum None DetectedLayer 2

WhiteB4

B82412

Heterogeneous

Non-fibrousBound

5%70%25%

PaintCalc CarbBinder

None DetectedLayer 1

Joint Compound

WhiteDrywall

B8241215%Heterogeneous

FibrousBound

85%Cellulose Gypsum None DetectedLayer 2

WhiteB5

B82413

Heterogeneous

Non-fibrousBound

5%70%25%

PaintCalc CarbBinder

None DetectedLayer 1

Joint Compound

Page 2 of 5

ATTACHMENT D

Page 20: Brian Mulholland SCDHEC License BI -00 06 91 Inspection ......ATTACHMENT D. Asbestos Assessment Report ... during future demolition. The scope of this assessment fulfills the requirements

ASBESTOS BULK ANALYSISBy: POLARIZING LIGHT MICROSCOPY

Lab Code: B195456Date Received: 09-05-19Date Analyzed: 09-06-19Date Reported: 09-06-19

Client IDLab ID

LabAttributes

LabDescription

ASBESTOS%

ASBESTOS BULK PLM, EPA 600 METHODNON-ASBESTOS COMPONENTS

Non-Fibrous

Client: S&ME48 Brookfield Oaks Dr, Suite FGreenville, SC 29607

Project: 52 W. Marion Road, 4269-19-014 Phase 07

Fibrous

WhiteDrywall

B8241315%Heterogeneous

FibrousBound

85%Cellulose Gypsum None DetectedLayer 2

TanCarpet MasticC1

B82414<1%<1%

Homogeneous

Non-fibrousBound

98%2%

Synthetic FiberCellulose

MasticSilicates

None Detected

TanCarpet MasticC2

B82415<1%<1%

Homogeneous

Non-fibrousBound

98%2%

Synthetic FiberCellulose

MasticSilicates

None Detected

Sample Submitted forTEM Analysis

C3B82416

BlackD1

B82417A

20%Heterogeneous

FibrousBound

55%25%

Fiberglass TarGravel

None DetectedLayer 1

Roof Shingle

Black,WhiteRoof Shingle

B82417A20%Heterogeneous

FibrousBound

55%25%

Fiberglass TarGravel

None DetectedLayer 2

BlackFelt PaperB82417B 70%Homogeneous

FibrousBound

30%Cellulose Tar None Detected

BlackD2

B82418A

20%Heterogeneous

FibrousBound

55%25%

Fiberglass TarGravel

None DetectedLayer 1

Roof Shingle

Page 3 of 5

ATTACHMENT D

Page 21: Brian Mulholland SCDHEC License BI -00 06 91 Inspection ......ATTACHMENT D. Asbestos Assessment Report ... during future demolition. The scope of this assessment fulfills the requirements

ASBESTOS BULK ANALYSISBy: POLARIZING LIGHT MICROSCOPY

Lab Code: B195456Date Received: 09-05-19Date Analyzed: 09-06-19Date Reported: 09-06-19

Client IDLab ID

LabAttributes

LabDescription

ASBESTOS%

ASBESTOS BULK PLM, EPA 600 METHODNON-ASBESTOS COMPONENTS

Non-Fibrous

Client: S&ME48 Brookfield Oaks Dr, Suite FGreenville, SC 29607

Project: 52 W. Marion Road, 4269-19-014 Phase 07

Fibrous

Black,WhiteRoof Shingle

B82418A20%Heterogeneous

FibrousBound

55%25%

Fiberglass TarGravel

None DetectedLayer 2

BlackFelt PaperB82418B 70%Homogeneous

FibrousBound

30%Cellulose Tar None Detected

Sample Submitted forTEM Analysis

D3B82419

Page 4 of 5

ATTACHMENT D

Page 22: Brian Mulholland SCDHEC License BI -00 06 91 Inspection ......ATTACHMENT D. Asbestos Assessment Report ... during future demolition. The scope of this assessment fulfills the requirements

LEGEND: Non-Anth = Non-Asbestiform AnthophylliteNon-Trem = Non-Asbestiform TremoliteCalc Carb = Calcium Carbonate

METHOD: EPA 600 / R93 / 116 and EPA 600 / M4-82 / 020

REPORTING LIMIT: <1% by visual estimation

REPORTING LIMIT FOR POINT COUNTS: 0.25% by 400 Points or 0.1% by 1,000 Points

REGULATORY LIMIT: >1% by weight

Due to the limitations of the EPA 600 method, nonfriable organically bound materials (NOBs) such asvinyl floor tiles can be difficult to analyze via polarized light microscopy (PLM). EPA recommends thatall NOBs analyzed by PLM, and found not to contain asbestos, be further analyzed by TransmissionElectron Microscopy (TEM). Please note that PLM analysis of dust and soil samples for asbestos isnot covered under NVLAP accreditation. Estimated measurement of uncertainty is available onrequest.

This report relates only to the samples tested or analyzed and may not be reproduced, except in full,without written approval by Eurofins CEI. Eurofins CEI makes no warranty representation regardingthe accuracy of client submitted information in preparing and presenting analytical results.Interpretation of the analytical results is the sole responsibility of the client. Samples were received inacceptable condition unless otherwise noted. This report may not be used by the client to claimproduct endorsement by NVLAP or any other agency of the U.S. Government.

Information provided by customer includes customer sample ID, location, volume and area as well asdate and time of sampling.

Page 5 of 5

ANALYST: APPROVED BY:Tianbao Bai, Ph.D., CIHLaboratory Director

Samantha Card

ATTACHMENT D

Page 23: Brian Mulholland SCDHEC License BI -00 06 91 Inspection ......ATTACHMENT D. Asbestos Assessment Report ... during future demolition. The scope of this assessment fulfills the requirements

ATTACHMENT D

Page 24: Brian Mulholland SCDHEC License BI -00 06 91 Inspection ......ATTACHMENT D. Asbestos Assessment Report ... during future demolition. The scope of this assessment fulfills the requirements

ATTACHMENT D

Page 25: Brian Mulholland SCDHEC License BI -00 06 91 Inspection ......ATTACHMENT D. Asbestos Assessment Report ... during future demolition. The scope of this assessment fulfills the requirements

September 11, 2019

S&ME48 Brookfield Oaks Dr, Suite FGreenville, SC 29607

CLIENT PROJECT: 52 W. Marion Road, 4269-19-014 Phase 07LAB CODE: T192656

Dear Customer:

Enclosed are asbestos analysis results for TEM bulk samples received at our laboratory onSeptember 6, 2019. The samples were analyzed for asbestos using transmission electronmicroscopy (TEM) per Chatfield Method.

Sample results containing > 1% asbestos are considered asbestos-containing materials(ACMs) per the EPA regulatory requirements. The detection limit for the TEM Chatfieldmethod is <1% depending on the processed weight and constituents of the sample.

Thank you for your business and we look forward to continuing good relations.

730 SE Maynard Road • Cary, NC 27511 • 919.481.1413

Tianbao Bai, Ph.D., CIHLaboratory Director

Kind Regards,

ATTACHMENT D

Page 26: Brian Mulholland SCDHEC License BI -00 06 91 Inspection ......ATTACHMENT D. Asbestos Assessment Report ... during future demolition. The scope of this assessment fulfills the requirements

ASBESTOS ANALYTICAL REPORTBy: Transmission Electron Microscopy

Prepared for

S&ME

CLIENT PROJECT:

LAB CODE:

TEST METHOD: Bulk ChatfieldEPA 600 / R93 / 116

REPORT DATE:

52 W. Marion Road, 4269-19-014 Phase 07

T192656

09/11/19

ATTACHMENT D

Page 27: Brian Mulholland SCDHEC License BI -00 06 91 Inspection ......ATTACHMENT D. Asbestos Assessment Report ... during future demolition. The scope of this assessment fulfills the requirements

ASBESTOS BULK ANALYSISBy: TRANSMISSION ELECTRON MICROSCOPY

Lab Code: T192656Date Received: 09-06-19Date Analyzed: 09-10-19Date Reported: 09-11-19

Client IDLab ID

MaterialDescription

TEM BULK CHATFIELD / EPA 600 / R93 / 116

Client: S&ME48 Brookfield Oaks Dr, Suite FGreenville, SC 29607

Project: 52 W. Marion Road, 4269-19-014 Phase 07

SampleWeight

(g)

OrganicMaterial

%

Acid SolubleMaterial

%

Acid InsolubleMaterial

%Asbestos

%

T105439C3 Carpet Mastic 0.178 39.3 3.9 56.8 None

Detected

T105440D3 Black Roof Shingle 0.394 25.6 35 39.4 None

Detected

T105441D3 Black, White Roof Shingle 0.565 20.9 52.7 26.4 None

Detected

T105442D3 Felt Paper 01.02 98.1 1.1 .8 None

Detected

Page 1 of 2

ATTACHMENT D

Page 28: Brian Mulholland SCDHEC License BI -00 06 91 Inspection ......ATTACHMENT D. Asbestos Assessment Report ... during future demolition. The scope of this assessment fulfills the requirements

LEGEND: None

METHOD: CHATFIELD & EPA/600/R-93/116

LIMIT OF DETECTION: Varies with the weight and constituents of the sample (<1%)

REGULATORY LIMIT: >1% by weight

This report relates only to the samples tested or analyzed and may not be reproduced, except in full,without written approval by Eurofins CEI. Eurofins CEI makes no warranty representation regardingthe accuracy of client submitted information in preparing and presenting analytical results.Interpretation of the analytical results is the sole responsibility of the client. Estimated measurement ofuncertainty is available on request. Samples were received in acceptable condition unless otherwisenoted.

Information provided by customer includes customer sample ID, location, volume and area as well asdate and time of sampling.

Page 2 of 2

ANALYST: APPROVED BY:Tianbao Bai, Ph.D., CIHLaboratory Director

Emily Morris

ATTACHMENT D

Page 29: Brian Mulholland SCDHEC License BI -00 06 91 Inspection ......ATTACHMENT D. Asbestos Assessment Report ... during future demolition. The scope of this assessment fulfills the requirements

ATTACHMENT D

Page 30: Brian Mulholland SCDHEC License BI -00 06 91 Inspection ......ATTACHMENT D. Asbestos Assessment Report ... during future demolition. The scope of this assessment fulfills the requirements

ATTACHMENT D

Page 31: Brian Mulholland SCDHEC License BI -00 06 91 Inspection ......ATTACHMENT D. Asbestos Assessment Report ... during future demolition. The scope of this assessment fulfills the requirements

Appendix IV – Copy of Inspector’s License

ATTACHMENT D

Page 32: Brian Mulholland SCDHEC License BI -00 06 91 Inspection ......ATTACHMENT D. Asbestos Assessment Report ... during future demolition. The scope of this assessment fulfills the requirements

S&ME, Inc. | 48 Brookfield Oaks Drive, Suite F | Greenville, SC 29607 | p 864.297-9944 | www.smeinc.com

South Carolina Department

of

Health and Environmental Control

Asbestos License

Taylor R Williams

ATTACHMENT D


Recommended