Date post: | 19-Dec-2015 |
Category: |
Documents |
Upload: | kathleen-daniels |
View: | 543 times |
Download: | 38 times |
BSNL ERP Project
ERP Training for Senior Management
Contents
• Enterprise Resource Planning (ERP) – OverviewEnterprise Resource Planning (ERP) – Overview
• BSNL Enterprise Organization Structure mapping to ERPBSNL Enterprise Organization Structure mapping to ERP
• ERP (SAP) – NavigationERP (SAP) – Navigation
• Overview on implemented modules of ERP for BSNLOverview on implemented modules of ERP for BSNL
• Project System (PS) moduleProject System (PS) module
• Materials Management (MM) moduleMaterials Management (MM) module
• Plant Maintenance (PM) modulePlant Maintenance (PM) module
• Real Estate Management (REM) moduleReal Estate Management (REM) module
• Sales and Distribution (SD) moduleSales and Distribution (SD) module
• Finance and Controlling (FICO) moduleFinance and Controlling (FICO) module
• Human Capital Management (HCM) module with Employee / Manger Self Service Human Capital Management (HCM) module with Employee / Manger Self Service (ESS/MSS)(ESS/MSS)
Integration is an extremely important part
of ERP and its main objective is to
integrate data and processes from all areas
of an organization
Using ERP, a transparent information flow
is achieved to facilitate better decision
making, improvement in the performance
of the organization processes
Information available in current
independent systems is available in a
single system
Process standardization
Single version of truth
Real-time information availability
MIS – Reports across functions
Why ERP ?
VisionAn Open, Standard ,
Transparent and Integrated Information System to achieve
competitive advantage
SAP ERPfor Enterprise-
wide Transformation
.
Current RealityMultiple stand alone systems,
Time lag between market realities and decision making
The need for Information
The traditional application systems, which the organizations generally employ, treat each
transaction separately.
They are built around the strong boundaries of specific functions that a specific application
is meant to cater.
For an ERP, it stops treating these transactions separately as stand-alone activities and
considers them to be the part of the inter-linked processes that make up the business.
Similar to typical application systems ERP has provision to store data, process them and
present them in the appropriate form However the data and processes are interlinked and
integrated across modules
In Traditional application systems there is no link between the application systems being
used by different departments.
An ERP system also does the same thing, but in a different manner. There are hundreds of
such data tables, which store data generated as a result of diverse transaction
Transactions are not confined to any departmental or functional boundaries, rather
integrated to be used by multiple users, for multiple purposes and at multiple places.
How does ERP work ?
ERP : SAP (Systems, Applications, and Products in Data Processing )
There are various ERP vendors available today. Few of them are;
SAP AG (SAP R/3), BaaN Infosystems (BaaN IV),
People Soft, Ramco Systems (Marshal), System Software Associates (BPCS),
QAD (MFG/PRO), etc.
These vendors offer slightly differing features in their products; still the major modules are same in all of the
products.
SAP ERP (SAP R/3), which is the market leader in this segment, offers the following major
modules:
Financial Accounting Treasury Controlling
Enterprise Controlling Investment Management
Production Planning Materials Management
Plant Maintenance & Service Management Quality Management
Project System Sales & Distribution
Human Resources Management Business Information Warehouse
Today SAP is considered to be the most exhaustive ERP system.
6
Major Modules of SAP
Project Systems
ProductionPlanning
R/3CLIENT/SERVER ABAP/4
Sales & distribution
MaterialsManagement
Finance and Controlling
Plant
Maintenance
Real Estate Management
Human Capital Management
SD
MM
PP
QM
PS
PM
QualityManagement
FICO
HCM
REM
BSNL ERP - Organization Structure
Organization Structure contd..
Controlling Area Organizational unit used for management accounting purposes. A controlling area may contain one or more company codes
Controlling Area for BSNL : 1000
Company Code The company code is the smallest organisational unit for which you can have complete independent accountingIt is a legal entity for which the financial statements such as Balance Sheet, Profit & Loss Account are createdIt may represent a company within a corporate group
Territorial Circles, Telecom Factory, Project Circle, Maintenance Region etc..,
Business Area A Business area is an organizational unit within accounting that represents a separate area of operations or responsibilities in a business organization
For BSNL – All primary accounting units are considered as business area. E.g. SSAs, Sub- Regions, Project Areas etc..,
Profit / Cost Centres
Organizational unit in Accounting that reflects a management-oriented structure of the organization for the purpose of internal control.
Cost centres are the smallest organizational unit within the Cost Centre accounting structure of a legal entity
CFA, Broadband, CM, EB etc..,
CDMA-Radio Access Nw, Core-Fxd Access Broadand, etc..,
Plant Usually a Manufacturing Facility, Warehouse, or a Location that Stocks , Manages, and Valuates InventorySame can also be used as Maintenance Plant : A plant in which the technical objects i.e. Switches ,transmission systems ,E/A sets etc. of a company are installed and where maintenance is done
SSAs, Sub- Regions, Project Areas etc..,
Storage Location A Location within a Plant where Inventory is Stored Respective Stores under SSAs, Sub- Regions, Project Areas etc..,
Maintenance Planning Plant
The planning responsibility for a Maintenance plant is defined using a Planning plant. Maintenance plants are assigned to Planning plants. Maintenance tasks for the plant are planned and prepared in the Planning plants by planner groups.
SSAs, Sub- Regions, Project Areas etc..,
Maintenance Planner Group
Planner Group is a group of persons responsible for maintenance planning in a particular Planning plant.In BSNL, planner groups are defined as per various functions
Fixed Indoor/Outdoor, Broadband, Transmission, etc..
Purchasing Organization
Responsible for Procurement for One or More PlantsResponsible for Negotiating Pricing and Delivery Terms with Vendors
Centralized Purchase, Decentralized Purchase
Purchasing Group A separate group initiating or anlyzing the purchases Corporate, Circle, SSAs etc..
Organization Structure contd..
Sales Organization Sales organization stands for a selling unit in the legal sense. Regional subdividing of the market can also be carried out with the help of sales organizations
Corporate, Circles, Training centres etc..
Distribution Channel
Represent a means of distributing goods.Within a sales organization a customer can be supplied through several distribution channels.
Direct Sales, Channel sales, EB etc..,
Sales Division Product groups, i.e. divisions, can be defined for a wide-ranging spectrum of products.
CFA, CM, Data Circuits etc..,
Business Entity A means of forming coherent groupings of individual real estate objects, depending on their purpose and/or geographical location
SSAs, Sub- Regions, Project Areas etc..,
Personnel Area A specific entity for Personnel Administration; a sub division of the company code
Territorial Circles, Telecom Factory, Project Circle, Maintenance Region etc..,
Personnel Sub Area
A sub division of the personnel Area SSAs, Sub- Regions, Project Areas etc..,
Organization Structure contd..
Logging On
SAP Window components
Using the Navigation Area
Transaction Codes
Standard Tool Bar
SAP Easy Access settings
User Settings
Messages
More help on GUI
On screen help
Transaction Variants
Business Workplace
Logging Out
Navigation
Logging on..
1
23
Status Bar
Title BarStandard Tool Bar
Menu Bar
SAP System IDServer
Insert/Overwrite IndicatorScreen Body
Application Tool Bar
SAP Window components
Using the Navigation Area (SAP Menu)
You can expand and collapse menus in the navigation area by choosing the dropdown arrows to the left of the menu items, as in the example below
To open an application in the
navigation area Double-click its node
User Menu - Selection
You can expand and collapse menus in the navigation area by choosing the dropdown arrows to the left of the menu items, as in the example below
To open an application in the
navigation area Double-click its node
Using the Navigation Area (User Menu)
You can Insert or drag and drop Transaction Codes into “Favorites” folder
Insert T-Code:
You can also insert folders
Favorites
A transaction code can be entered in the Command field.
If you precede the transaction codewith /n then the transaction is thenext screen opened in the current session.
If you precede the transaction codewith /o then a new session is openedfor the transaction. This means you then have multiple sessions.
To start a transaction in ECC 6.0, there are 4 options:
Position the cursor on the required transaction in the tree structure and press enter
Double-click on the required transaction in the tree structure
Position the cursor on the required transaction in the tree structure and select Edit Execute (or press F2)
Expand the command field and enter the transaction code
Transaction Codes
The Standard Toolbar contains the Command field and the standard SAP Toolbar buttons.
Command Field: The Command field is used to enter transaction codes that take you directly to a system task without using menus.
ButtonKeyboard
ShortcutDescription Button Keyboard Shortcut Description
Enter Key Enter/Continue Ctrl + Page Up First page
Ctrl + S Save to database Page Up Previous page
F3 Back Page Down Next page
Shift + F3 Exit System Task Ctrl + Page Down Last page
F12 Cancel None Create New session
Ctrl + P Print NoneCreate shortcut on
Desktop
Ctrl + F Find F1 F1 Help
Ctrl + G Find next Alt + F12 Customize Local Layout
Standard Toolbar
Users can set how SAP displays the Menu by choosing Extras Settings. Here, you can specify whether:
Your favorites should appear before or after the menu
Only your favorites, and not the menu, should appear
The SAP Easy Access graphic should appear on the right-hand side of the screen.
Technical names of menu options should appear in the navigation area
SAP Easy Access Settings
Users can maintain their own settings by choosing System User Profile Own Data Defaults
• Change default printer, language, and date and decimal display formats
• Parameters allow user to create default information for frequently used fields.
User Settings
Messages appear either in the status bar or in a pop-up window, depending on user settings
Messages starting with:
“E” indicate an Error message
“W” indicate a Warning message
Messages not beginning with an “E” or a “W‘’ are simply Information messages
Required fields are denoted by a check mark
Messages
Double Click on this T-code
Business Workplace
Or
Click on this icon
Click on Inbox
Click on Workflow
Select the proper line Item.
Click on Unread Documents
Business Workplace contd..
Business Workplace contd..
Logging out..
4
5
6
Can you try.. 1,2,3,4..
1. Log on 2. Find Menu
3. Check Work place
4. Log out
BSNL ERP - Process Scenarios - Overview
PS – Project System REM – Real Estate ManagementCFA Projects Rental Objects Lease in / Lease outCM Projects Staff Quarter Allotment / Payroll update
BB Projects Auditorium / Community Centre/ Holiday home / Hostel BookingElec & Civil Projects - Internal Inspection Quarter AllotmentElec & Civil Projects - Extrernal REM ContractsOut of Project EstimatesPM – Plant Maintenance FICO – Finance and ControllingEquipment Phase-In Booking of the vendor invoice and Vendor payment ApprovalPreventive Maintenance Customer InvoicesCorrective Maintenance Asset Acquisition and Retirement / Charginf DepreciationCalibration Temporary advance Application, Approval and Settlement Breakdown Maintenance Electricity and Fuel payment processShutdown Maintenance HCM – Human Capital ManagementGeneral Maintenance Personnel Administration Equipment Phase-Out Organization ManagementMM – Material Management Time ManagementDecentralized Procurement with GR at CTSD / SSA PayrollStock Transfer - CTSD to SSA / SSA to SSA / TF to CTSD ESS (Employee Self Service): Physical Inventory Process MSS (Manager Self Service): SD – Sales and Distribution MIS – Management Information System across ModulesCM Sales Processes SAP Inbox/ WorkFlow (WF)Point Of Interconnect (POI) Sales Standard / Customized Reports
Project System (PS)
Projects usually play a role in an organization. A project-specific method of organization is
required in order to monitor and regulate all the tasks that are involved in realizing a project.
This method of organization should be positioned so that it overlaps with the departments
involved.
A project is a summary of certain business processes within an enterprise that can be
defined by the uniqueness of its conditions:
– Precise goals
– Time, money, or personnel restrictions
– Use or defined resources
– Complexity
– Cross departmental processing
– Typically follow the order of concept, rough cut planning, detailed planning, approval,
execution, completion.
PS PS - General overview
PS – Processes contd..
Note sheet SBWP
Menu path Office Workplace
Transaction SBWP
•Update the Project Status to PE cum DE Approved (DGM)
Select the Note sheet received in Inbox
Click on
PS – Processes contd..
Click on
The note sheet screen will appear
PS – Processes contd..
Click on button.
Information Message will appear once Project Estimate has been approved.
Click on
The User Status of WBS Element shall be changed as PEAP
Note: Project Estimate shall be approved only when all the lower level WBS Elements including Root level is set to PEFI stage.Project Estimate shall be sent for approval from Root Level WBS Element only.
PS - Management Information System
Transaction Code Report
ZFA_PPR CFA Project Progress Report
ZFA_PROJ PE Sanction & Capitalization Report
ZFA_QSR Quarterly Status Report
ZOAN_SUMMARY OAN Summary Report
CN41 Project Structure Report
CJI3 Project Actual Costs
CN53N Project Milestones Report
CN41 : Project structure overview
PS - Management Information System
Material Management (MM)
Material management mainly deals with Procurement Process, Master Data
(Material & Service Master),Inventory Management, Valuation of Material &
Account Determination, Invoice Verification etc.
MM Processes involve following major steps, Determining materials/service requirements
Checking whether or not the stock is available.
Identifying the sources for supplying the material, if stock is not available.
Negotiating the terms and conditions of an order with the vendor.
Placing a purchase order.
Receiving the goods in the stores
Issuing /transfer the goods to the concerned department/stores.
MM MM - General overview
Click on Workflow
Select the proper line Item.
MM – PR/APO/PO/RFQ Approval
Click on the icon to approve
Click on the icon to revert the request
MM – PR/APO/PO/RFQ Approval
MM – Management Information System
Transaction Code Report
MM60 Display Materials List
ME5A List Display Of Requisitions
ME2L Purchasing Documents per Vendor
ME2M Purchasing Documents per Material
ME2K Purchasing Documents by Account Assignment
MMBE Stock Overview
MB51 Material Document List
ME80FN General Analysis of Purchasing Documents
MKVZ Display Purchasing Vendor List
ME4L List RFQ by Vendor
ME3L Outline Agreements per Vendor
MM – Management Information System
ME2L :- Purchasing Documents per Vendor
Plant Maintenance (PM)
Plant Maintenance provides planning, control and processing of scheduled maintenance,
inspection, damage-related maintenance, to ensure availability of operational systems.
Various Technical hierarchy can be designed to represent various location, equipment data
and to record maintenance activities on these equipment
Plant Maintenance uses certain tools/components to accomplish the above mentioned
processes. The tools are as below.
Technical Objects – Technical hierarchy is represented as Functional locations, equipment, sub-
equipment and Bill of Material (Assembly)
Notification – To record maintenance incidences (or) requirements (or) activities and History
maintenance.
Maintenance Work Order – To Plan resources (Men, Inspection instrument, Material (or) Spares, any
Specialized Service procurement, etc) and Record Resources utilized.
Measurement Document – To record (or) monitor measurements, consumptions.
Confirmation – To record actual time the resource (Workmen) consumed.
Completion – To complete maintenance activities and settle cost to cost receivers.
PMIS – Plant Maintenance Information System, contains various MIS Reports
Notification
PM PM - General overview
Create Maintenance Order
Allocate Work Center / Tool
Allocate Spare Part /Material
Allocate External Services
Plant Maintenance Information
System
Breakdown(Manual)
Preventive(Automatic)
Confirm Actual Hours, Record Service Entry sheet,
Return Unused Stock
Technical Complete MO
Settle MO and Close Order
Release Notification
Plan Resources / Release MO
Issue Stock and/or
Receive Ext. Services
Execute Work
Raise Notification1
2
3
4
5
6
7
8
9
On requirement of ….
Preventive maintenance
Breakdown maintenance
Maintenance by Vendor
Corrective maintenance
CalibrationReporting faults across depts.
Shutdown maintenance
Energy Audit
General Maintenance
Notification Notification – Escalation to Manager
Notification Notification – Escalation to Manager
Maintenance Order Maintenance Order – Need based service
Maintenance Order Maintenance Order – Need based service
PR Approval
Click on the icon to approve
Click on the icon to revert the request
PM - Management Information System
Standard ReportsT-Code ReportIH01 Structured Technical Hierarchy
MCI3 Location – evaluations based on the location of the technical object. MCI4 Planning – evaluations based on the planner group.
MCI1 Object Class – evaluations on the basis of the technical object class.
MCI2 Manufacture – evaluations based on the manufacturer of the technical object.
MCI5 Damage Analysis – evaluations based on the notification type, damage, cause of damage MCI7 Breakdown Statistics – MTTR, MTBR
MCI8Cost Evaluation – evaluations based on order type, Activity type, the planned costs, actual costs for material costs, Service cost & Internal manpower costs.
Developed ReportsT-Code ReportZPMORG1 Plant and Plant sectionsZPMORG2 Plant and LocationsZPMORG3 Planning Plant and Planner GroupsZPM01 Vendor docket ReportZFI85 Integrated Asset – Equipment ReportZPM03 Report_Warranty_AMC_DatesZPM04 Shutdown_Request_ReportZPM05 Affected_Equip_FL_ReportZPM06 Asset_Life_ReportZPM07 Report on FL Re-Parenting
PM - Management Information System
IH01 : Structured Technical Hierarchy
Management of Real Estate Records
Real Estate Asset Records link to Asset Accounting
Management of Real Estate Contract
Management of Space
Occupancy/Vacancy details
Rental Accounting
Document Management
Correspondences with Landlord/Tenants
Real Estate Management (REM)
Real Estate Management (REM)
REM- Master Data
Business Entity
Buildings/Towers
Lands
Rental Objects
Business Entity is a means of forming coherent groupings of individual Real Estate Objects, depending on their geographical location. Business entities are part of a company code and group buildings and/or land into coherent units. For BSNL following three categories of Business Entities have been identified:• SSA (multiple in each circle)• Tower Infra (one in each circle)• USO Tower Infra (one in each circle)
Buildings are objects on the basis of which rental units of bldgs. (for instance SQs, tower slot, office, etc.) are derived and rented. Towers are also created as Building in system. In SAP REM, a building is defined under a Business entity.
Land/Property in the Real Estate component refers to open plot only; it does not include the building on it. Land is also defined under a Business Entity. Rental objects for Land can be derived against a land for renting. Rental object is a RE object which defines a unit which is leased in/out. Each rental unit is uniquely assigned to a building or a property.
REM- Processes
Lease in of Lands
Lease in of Buildings
Lease out of Lands/ Buildings
Lease in /Lease out of CMTS / USO Towers
Staff Quarter Allotment
Short Term Allotment of SQ
Inspection Quarter/Holiday home / Hostel / Community Centre/ Auditorium Booking
Lease in of land for CMTS /USO Towers and stores etc.
Lease in of Building for Telephone Exchanges, offices, roof top towers etc.
Lease out of Land for Hoardings Lease out Building for ATMs, Shops, Building space etc. Lease out of Vacant SQ to other Departments/ Pvt. Agencies etc.
Lease in of Tower Slots by BSNL from other IPs Lease out of Tower Slots by BSNL to other USPs
Staff Quarter allotment to BSNL/DoT employees Staff Quarter Retention by Transferred / Retired employee
Allotment of SQ for short term
Short Term Booking of Inspection Quarters /Holiday home / Hostel / Community Centers and Auditoriums
REM REM – Process overview
REM – Contract Creation
REM – Contract Creation
REM – Management Information System
T-Code ReportREISBE Report to view Business Entities
REISBU Report to view Building/Tower Master Data
REISPR Report to view Land Master Data
REISRO Report to view Rental Objects
REISCN Report to view Contracts
REISCDCN Report to view Contracts Conditions Details
REISCDCF Report to view the Cash Flow Details for Contracts
REISROOC Report to view Occupancy/ Vacancy status of Rental Objects
ZRE001_2 Report on Booking information for IQ/HH/ Hostel/ Community Centers /Auditoriums
ZRE001_4 Occupancy /Vacancy Report for IQ/HH/ Hostel/ Community Centers /Auditoriums
REISCN : Report to view Contracts
REM – Management Information System
REISCN : Report to view Contracts
REM – Management Information System
Sales and Distribution (SD)
Sales and Distribution handles sales activities and distribution of goods and services. The main activities are sales order handling and distribution of Shipment to the Customers. Also the billing process, customer invoice, delivery and risk management is handled from SAP SD module.
The Sales and Distribution (SAP SD) consists of all master data, system configuration, and transactions to complete the Order to Cash process. It includes the following information and processes:
Customer Master and Material Master data Sales Orders Deliveries Pricing Billing Credit Management
SD SD - General overview
S&MS&M CSCCSC AccountsAccountsDistribute StockDistribute Stock
SalesSalesReceive StockReceive Stock
Operator Request for New POI service
Operator Request for New POI service
POI Order raised and status/progress is monitored
POI Order raised and status/progress is monitored
POI Order Commissioned and billied annually
POI Order Commissioned and billied annually
CMCM
POIPOI
Sales Processes – System landscape
ERP/MM(SSA) ERP/MM(SSA)
ERP/SD(CSC)ERP/SD(CSC)
ERP/FICO(Accounts)ERP/FICO(Accounts)
Distribute StockDistribute Stock
Bulk SalesBulk Sales
Receive StockReceive Stock
ERP/SD(SSA/CSC)ERP/SD(SSA/CSC)
ERP/FICO(Accounts)ERP/FICO(Accounts)SalesSales
ERPERPSancharsoftSancharsoft
PyroPyro SIM/RC Stock to CSC
SIM/RC Stock to CSC
C-Topup Alloc to CSC
C-Topup Alloc to CSC
SIM/RC CSC SalesSIM/RC CSC Sales
SIM/RC Sale to FR / DSASIM/RC Sale to FR / DSA
C-Topup Sale tp Ch Partners
C-Topup Sale tp Ch Partners
C-Topup sales by CSC
C-Topup sales by CSC
ERP – Sancharsoft Transaction flowERP – Sancharsoft Transaction flow
ERP – Pyro Transaction flowERP – Pyro Transaction flow
ERP – Sancharsoft / ERP – PyroERP – Sancharsoft / ERP – Pyro
POI Process
Operator Request for New POI service
Operator Request for New POI service
POI Order raised and status/progress is monitored
POI Order raised and status/progress is monitored
POI Order Commissioned and billied annually
POI Order Commissioned and billied annually
Information is shared through the Note Sheet functionality provided in Sales Order transaction
SD – Management Information System
T-Code Description
CM Process
ZSD050 CSC Sales Report
ZSD057A Sales/Stock Position Report
ZSD053 Recharge Coupen Sales
ZSDSERIAL_SALES Material sales
ZSDCANBIL Cancelled Billing Report
ZSDSERIAL Serial Stock CSC
ZSDSERIAL_PO Serial Stock Post Office
POI Process
ZSD059 POI Report
ZPOIPORTCOM Port Commission Report
ZPOIPORTDECOM Port Decommission Report
ZPOIPENCOM Pending Payment Report
ZPOIMEDMIG Media Migration Report
ZPOIINFRACOM Infra Commission Report
ZPOIINFRADECOM Infra Decommission Report
SD – Management Information System
ZSD050 : CSC Sales Report
Finance and Control (FICO)
Financial Accounting mainly deals with invoicing , payments , revenue , asset
master and depreciation on same .
FI Processes involve following major steps,
Booking of the vendor invoice
Approval process of the vendor payments
Payment against the vendor bill
Customer Invoices
Asset acquisition and retirement
Charging Depreciation on the assets
Temporary advance application and settlement of same
FICO - General overview:Invoice Verification and Payment
FICO - General overview:Temporary Advance Process
FICO - General overview:Asset Accounting
FICO - Vendor Invoice Approval
Click on this Click on INBOX
Select the mail item from the Workflow
FICO - Vendor Invoice Approval
Select Forward option to forward the mail to next approver
Select Final Release By option to add the Final approver
Select Return To Option to send the mail to the previous level
Use Review History box to give comments
FICO - Temporary Advance Process
FICO - Temporary Advance Process
FICO - Temporary Advance Process
FICO – Management Information System
Transaction Code Report
FBL1N Vendor Line Item Report
FBL3N GL Line Item Balance Report
FBL5N Customer Line Item Report
S_P99_41000099 Vendor Payment List report
S_ALR_87011963 Asset Balances Report
AR03 Asset Depreciation Report
GR55 Trial Balance
ZFI070 Temporary Advance and Settlement Status Report
KSB1 Actual Cost Line Items report for Cost Center
FICO – Management Information System
FBL1N :- Vendor Line Item Display
Human Capital Management (HCM)
Personnel Administration : Helps manage all modern personnel administration tasks like hiring, terminating, master data maintenance etc.
Organization Management: Helps to depict organizational and reporting structures. It gives an up-to-date picture of the enterprise’s organizational plan and task profiles, presented as a hierarchy, matrix or network.
Time Management: Supports in performing processes involving the planning, recording, and valuation of employees’ work performed and absence times
Payroll: Supports performing payroll processes; country versions are available for more than 50 countries.
ESS (Employee Self Service): Allows employees to access and modify the data related to their employment, payment, benefits etc.- thus relieving the burden on the HR support personnel.
MSS (Manager Self Service): Provides managers with real time access to Information such as KPIs (Key Performance Indicators) and Analytical Information to speed up decision making process.
HCM HCM - General overview
Creation of Position
Leave Request Creation in ESS
Leave Request Creation in ESS
Leave Approval in ESS
MSS Overview
MSS Overview
Attendance Overview
Team Overview
HCM – Management Information System
T-Code DescriptionOrganizational ManagementS_AHR_61018869 Periods When Positions Are Unoccupied per Organizational Unit S_AHR_61016502 Existing Positions S_AHR_61016503 Staff Assignments S_AHR_61016504 Position Description S_AHR_61016505 Task Description for Positions S_AHR_61016509 Vacant Positions S_AHR_61016510 Correct Vacancies S_AHR_61018831 Obsolete Positions S_AHR_61016511 Complete Position Description PA ReportsS_PH0_48000450 Date Monitoring S_PH9_46000216 Service Anniversaries S_PH9_46000224 Education and Training S_PH9_46000223 EEs Entered and Left S_PH9_46000222 Family Members S_PH9_46000221 Birthday List S_AHR_61016354 Telephone Directory S_AHR_61016362 Flexible Employee Data S_AHR_61016369 Employee List Time ReportsPT64 Attendance Data Overview PT90 Absence Data: Calendar View PT_EDT_TEDT Time Statement PT_EDT_TELU Time Balances Overview PT_QTA10 Display Absence Quota Information
T-Code DescriptionPC00_M40_EPF India EPFPC00_M40_PNY PC00_M40_PNY – Annual Pension ReportPC00_M40_PFY Annual PF ReportPC00_M40_Calc PC00_M40_Calc – PayrollPC00_M99_CIPE PostingPC00_M40_F24Q Form 24PC00_M40_F16 Form 16PC_PAYRESULT Payroll ResultPC00_M40_PTX Professional Tax Form 5ZFI114 ZFI114 – Bank Transfer
Regulation Monthly Annual T-Code
Income Tax Form24 (Quarterly ) Form 16 and 24 PC00_M40_F24Q
Professional Tax Monthly PTax Report PC00_M40_PTX
Provident Fund Form 5, 10 and 12A Form 3A and 6A PC00_M40_EPF
Pension Form 4, 5 and 6 Form 7 and 8 PC00_M40_EPN
Statutory Reports
HCM – Management Information System
Payroll Reports
S_AHR_61016502 - Existing Positions
HCM – Management Information System
S_PH9_46000221 - Birthday List - Output
HCM – Management Information System
PT64 - Absence data overview - Selection Screen
HCM – Management Information System
PC00_M40_EPF - Provident Fund Report -
HCM – Management Information System
MIS – Management Information System
MIS – Management Information System
SAP Inbox/ Work Flow (WF)
Standard Reports
MIS – Management Information System
Customized Reports
MIS – Management Information System
Can you try.. 1,2,3..
1. SAP Inbox/ Work Flow (WF) 2. Standard Reports 3. Customized Reports
Further Reference
https://10.197.216.213
User Manuals ERP Project documentation Instructions Post Implementation Support (PIS)
THANK YOU