BTW Planned Engineering Works 90 day overview June 2013 to August 2013 These dates are indicative dates only and not to be used for any forecasting purposes as they are all subject to change. Please ensure that you wait for formal notifications from IRAMS. - PowerPoint PPT Presentation
13
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT). Please treat it accordingly and do not forward, republish or permit unauthorized access. BT reserves the right to make changes to the information in this Presentation at any time without further notice . BTW Planned Engineering Works 90 day overview June 2013 to August 2013 These dates are indicative dates only and not to be used for any forecasting purposes as they are all subject to change. Please ensure that you wait for formal notifications from IRAMS.
Transcript
Page 1: BTW 2012 Network Changes – 3 month rolling plan

1

The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).

Please treat it accordingly and do not forward, republish or permit unauthorized access.

BT reserves the right to make changes to the information in this Presentation at any time without further notice.

BTW Planned Engineering Works 90 day overview June 2013 to August 2013

These dates are indicative dates only and not to be used for any forecasting purposes as they are all subject to change. Please ensure that you wait for formal notifications from IRAMS.

Page 2: BTW 2012 Network Changes – 3 month rolling plan

2

BTW 2012 Network Changes – 3 month rolling plan

• Whilst BTW has continually worked to enhance its network, we are currently undergoing an exceptional level of change driven by four main drivers:-

– Stability – to improve the reliability of the network, BTW is targeting certain network elements with hardware and software improvements.

– Capacity – the need for additional capacity is driven by an increase in the number of broadband users on the 21C network (through migration from 20C and growth) and also by the ever-increasing bandwidth demands of those users.

– Resilience –to improve the resilience of the network , BTW is actively removing single points of failure from the network

– New Functionality – to meet the needs of the market BTW needs to enhance its network to deliver the services its customers require.

• This presentation outlines the key upgrade programmes, their drivers, customer impact and the number of upgrades per programme per week.

• BTW is keen to deliver all the required improvements as quickly as possible whilst actively managing the risk to customers. For this reason a range of run-rates against each programme has been outlined. The actual run-rates achieved will be determined by this ongoing live analysis of risk.

• Customer outage times for the PEWs start between 00:01 and 02:00 with the aim of completing customer impacting work by 04:00. This allows 2 hours for roll-back should the PEW be unsuccessful.

• Business as usual capacity upgrades and upgrades to resilient structures have not been listed here.

Page 3: BTW 2012 Network Changes – 3 month rolling plan

3

Customer Service / BTID Network Change - Executive Summary

New Deployments May – July 2013

Prog

No:

Upgrade Key Drivers Total Upgrades

Average EU Impact per upgrade

Affected Products

Average EU outage (Mins)

Upgrades per week

Target Months Targat End

June

July

Aug

Sep

500G IEA chassis upgrade

Scaling 4 port 10G line-card

TBC TBC TBC TBC TBC TBA

2nd vendor P card Upgrade

Scaling 11 0 None None 2 TBA

21c EES, EEA, IEA, MSE Upgrade

Vendor support, Functionality

Approx 2500. 6000 HE, WBMC, WBC

20 75 Dec 13

40

41

45

Page 4: BTW 2012 Network Changes – 3 month rolling plan

4

Ongoing 21C UpgradesPro

g No:

Upgrade Key Drivers Upgrades Complete / Total

EUs per upgrade

Upgrades per PEW

Affected Products

Av. End user outage (Mins)

Upgrades per week

Progress Planned

EndMay

Jun

Jul

Aug

SVLAN moves

Capacity,Stability

Ongoing Av 800Min 0

Max 1000

9 WBC 35 Up to 75Ongoing

EEA – EES Backhaul Uplift

Capacity 1052/1060 Non Customer impacting

40 None 0 5 Jun 13

HT-BEA IOS-XR Upgrade

Functionality 5/6 Average 200k

1 WBC / WCC

15 mins 1 Jun 13

BRAS 11.1.2.5 P8 Upgrade

Functionality (IPv6), stability.

177/257 BB EU’s per BRAS

Av 35000Max 45000

6 WBC / WBMC

45 Up to 24Jun-13

High ThroughputBEA-VS

Capacity 9/20 Av 120K 1 WBC / WCC

45 mins 1 Jun-14

2nd vendor MSPE Software Upgrade

Functionality (Lag Support), stability.

4/80 None 1 None None 4 June-13

6

SVLAN moves - these moves offload SVLAN’s (bundles of Broadband traffic) from one BRAS to another. This is carried out to alleviate capacity issues mplet

24 EEA – EES 7750 Lag Migration - This change provides increased scalability .

35Software upgrade to support BTR 40G Product requirements

37

22

38

BRAS Software upgrade

HT-BEA- Capacity requirement for bigger switch. 13 slot device replacing 9 slot device

Capacity – Software upgrade to replace software which is going out of vendor support.

Microsoft Excel Worksheet

Page 5: BTW 2012 Network Changes – 3 month rolling plan

5

Ongoing 20C Upgrades Cont’d

Prog No:

Upgrade Key Drivers Upgrades Complete / Total

EUs per upgrade

Upgrades per PEW

Affected Products

Av. End user outage (Mins)

Upgrades per week

Progress Planne

d EndM

ayJun

Jul

Aug

ERX BRAS12.3

EoL 11/225 Av 11000Min 3000

Max 18000

2 IPSC 20 8Jul 14

IPSTREAM MSIP Bypass

Platform Transformation

66/4200 TBC 15 IP Stream 10 75 Sept 14

Primary Vendor MSAN Upgrade

TVC launch – TV over copper

3841/8655 800 130 WBC / WBMC

5 650

Jul 13

46

49

Microsoft Excel Worksheet

47

Page 6: BTW 2012 Network Changes – 3 month rolling plan

6

Completed 20C Upgrades

1

14

2

10k BRAS SB11 Stability 122/122 Av 11000Min 3000

Max 18000

6 IPSC Up to 18 Apr 1336

Page 7: BTW 2012 Network Changes – 3 month rolling plan

7

Completed 21C Upgrades

Progr No:

Upgrade Key Drivers

Upgrades Complete / Total

BB EUs and/or Ethernet Circuits per upgrade

Upgrades per PEW

Affected Products

Av. End user outage (Mins)

Upgrades per week

Date Ende

d

Copper MSAN Upgrade

Functionality

5594/5594 Non-Customer Impacting

Up to 120

None 0 Up to 480 Dec 11

EAD Chassis Code Upgrade

Stability 6950/6950 Up to 15 Ethernet Circuits

Up to 200

Ethernet,Mobile

Ethernet

<1 Up to 1000

Feb 12

21C BRAS Core Migration

Capacity 151/151 Non Customer Impacting

Up to 12 WBC 0 16-30 Feb 12

BEA VS Card Upgrade

Capacity 20/20 – Complete

Non-Customer Impacting

1 None 0 Up to 4 Mar 12

DDR Hardware replacement

Stability 200/200 Non Customer impacting

10 None 0 50 May 12

15

16

3

17

28

Page 8: BTW 2012 Network Changes – 3 month rolling plan

8

Completed 21C Upgrades

Progr No:

Upgrade Key Drivers

Upgrades Complete / Total

BB EUs and/or Ethernet Circuits per upgrade

Upgrades per PEW

Affected Products

Av. End user outage (Mins)

Upgrades per wee

Date Ende

d

EAD Chassis Code Upgrade

Stability 6950/6950 Up to 15 Ethernet Circuits

Up to 200 Ethernet,Mobile

Ethernet

<1 Up to 1000

Feb 12

21C BRAS Core Migration

Capacity 151/151 Non Customer Impacting

Up to 12 WBC 0 16-30 Feb 12

BEA VS Card Upgrade

Capacity 20/20 – Complete

Non-Customer Impacting

1 None 0 Up to 4 Mar 12

DDR Hardware replacement

Stability 200/200 Non Customer impacting

10 None 0 50 May 12

MPLS Core Router Upgrades

Code Update 109/109

Av 20000Min 0

Max 100000

1 WBMC180

(240 Max)

1-4 Jun12

16

3

17

28

11

Page 9: BTW 2012 Network Changes – 3 month rolling plan

9

Completed 21C Upgrades

Progr No:

Upgrade Key Drivers

Upgrades Complete / Total

BB EUs and/or Ethernet Circuits per upgrade

Upgrades per PEW

Affected Products

Av. End user outage (Mins)

Upgrades per week

Date Ende

d

High ThroughputBEA-VS

Capacity 5/5 Av 120K 1 WBC / WCC

45 mins 1 Jun 12

BRAS software Upgrade

Stability 193/193 Av 17000Max 32000

1 WBC / WBMC/

WCC

45 mins Up to 50 Jul 12

Copper MSANSoftware Upgrade

Stability / Capacity

5844/5844 Average 700

120 WBC /WBMC

30 mins 480 May 12

2nd vendor MSAN Upgrade

Stability 702/702 Average 700

40-50 WBC / WBMC/WCC

40 mins 200 - 250 Jul 12

2nd Vendor MSPE

Stability 51/51 Av 20k 1 WBC / WCC /

Ethernet

30 secs – 2 mins

2 Jan 13

22

26

27

30

23

Page 10: BTW 2012 Network Changes – 3 month rolling plan

Broadband Services on 21CN

12

46

9

11

14

20 22

23

2628

29

31

3227

3834

40 3435

36

37

39

44

45

45

45

45

46

47 48

1150

4946

Page 11: BTW 2012 Network Changes – 3 month rolling plan

11

Ethernet Service on 21CN

Page 12: BTW 2012 Network Changes – 3 month rolling plan

12

Descriptions

Page 13: BTW 2012 Network Changes – 3 month rolling plan

13

Management of risk


Recommended