Bugesera District Performance Contracts FY 2013-2014
Presentation
bugeser
Welcome
PILLAR I: ECONOMIC DEVELOPMENT
Bugesera District Performance Contracts 2013-2014
Objective 1: Increase agriculture & Livestock production, Productivity & value addition
N0 OUT PUT INDICATORS BASE LINE TARGET Achievement % achievement1 Land consolidated
under CIP increased and Banana plantation improved
Number of hectares of land consolidated
Cassava: 11441 Ha
Cassava: 12 000 Ha
1051 ha planted 9%
Maize: 13283 ha
Maize: 12 000 Ha
5684 ha planted 47%
Beans : 34106 ha
Beans: 39,000 ha
1452 ha planted 4%
Soybeans: 1025 ha
Soyabeans:1700 Ha
375 ha planted 22%
Sunflower: 0 ha Sunflower: 1000 ha
27 ha planted 3%
Banana :481 Ha improved
Banana: 500 Ha improved
49 ha improved 10%
Rice :662 Ha Rice :1022 Ha 892 ha cultivated 87%
PILLAR I: ECONOMIC DEVELOPMENT
Bugesera District Performance Contracts 2013-2014
Objective 1: Increase agriculture & Livestock production, Productivity & value addition
N0 OUT PUT INDICATORS BASE LINE TARGET Achievement % achievement2
Crop productivity increased
Increased chemical fertilizer use
19% of fertilize use
40% of the farmers in non consolidated areas use required fertilizer
8747/12018 farmers use chemical fertilizer
72%
100% of farmers in consolidated areas use required Fertilizer
13782/16400 farmers use chemical fertilizer
84%
Increased organic fertilizer use
5% sites using quality compost
40% of the farmers at land use consolidated areas use quality compost
not yet started, collecting data
0%
70% of the farmers use organic manure
100% Farmers using organic manure
Data collection on-going.
7%
Banana rehabilitation (3 suckers/mat, mulching, BXW control)
Compost use rated at 30%
Increase compost use from 30 to 60% through farmer groups composting
35% farmers use compost in their farm
58%
PILLAR I: ECONOMIC DEVELOPMENT
Bugesera District Performance Contracts 2013-2014
Objective 1: Increase agriculture & Livestock production, Productivity & value addition
N0 OUT PUT
INDICATORS BASE LINE TARGET Achievement % achievement
Number of tons/Ha produced
Rice: 7,4T/ha Rice: 7,5T/ha
We are in the plantation period, the production will be available at the end of the season A 2014
10%
Cassava: 13,2 T/Ha
Cassava: 30 T/ha
We are in the plantation period, the production will be available at the end of the season A 2014
10%
Maize: 2,3 t/ ha
Maize: 4 t/ ha
We are in the plantation period, the production will be available at the end of the season A 2014
10%
Sunflower: 0t/ ha
Sunflower: 2t/ha
We are in the plantation period, the production will be available at the end of the season A 2014
10%
Soybeans: 0.5 t/ha
Soybeans: 1,8t/ha
We are in the plantation period, the production will be available at the end of the season A 2014
10%
PILLAR I: ECONOMIC DEVELOPMENT
Bugesera District Performance Contracts 2013-2014
Objective 1: Increase agriculture & Livestock production, Productivity & value addition
N0 OUT PUT INDICATORS
BASE LINE
TARGET Achievement % achievement
Coffee: 0.6 Kg/tree
coffee: 1.6 Kg/tree The harvest period well be at end of march up to june 2014
10%
Banana :15,2 t/ha
Banana :16,5 t/ha The production report of first trimestre well be available on october 2013
0%
3 Area under irrigation and mechanization increased
Ha mechanized
513 ha 600 ha 105 ha are cultivated by using mechanization
17.5%
4 Post-harvest handling increased
Number of Tones of crops stored
3206 T 2600 Tons of beans stored
2567 Tons stored 98.7%
Number of post harvest facilities constructed
29 drying grounds
1 New drying ground constructed (1 maize drying ground in Rweru sector)
Tender process ongoing 20%
PILLAR I: ECONOMIC DEVELOPMENT
Bugesera District Performance Contracts 2013-2014
Objective 1: Increase agriculture & Livestock production, Productivity & value addition
N0 OUT PUT INDICATORS
BASE LINE TARGET Achievement % achieveme
nt 5 drying
grounds in Mwogo Sector completed at 60%
Construction of 5 drying grounds completed at 100%
The construction are in the finishing stage
85%
5 Cassava processing plant constructed
Number of Cassava processing plant
3 cassava processing plant
1 new cassava processing plant constructed at Ruhuha Sector
The construction are in the roof stage
57%
6 Horticulture plantation promoted
Number of trees distributed and planted
48,857 of mangoes
New plantations of 22,500 mangoes trees planted.
The trees in still in nursery bed
10% 85,470 of avocadoes
17,500 avocadoes trees planted
The trees in still in nursery 10%
7 Coffee plantation increased
Number of coffee trees planted
2, 275, 000 coffee trees
636,000 coffee trees The coffee seedlings are being prepared in nurseries.
20%
PILLAR I: ECONOMIC DEVELOPMENT
Bugesera District Performance Contracts 2013-2014
Objective 1: Increase agriculture & Livestock production, Productivity & value addition
N0 OUT PUT INDICATORS BASE LINE TARGET Achievement % achievement
8
Livestock production and productivity improved
Number of Cows distributed
9557 1300 Cows distributed 40 Cows distributed
3%
MCC developed into Dairy business Hub
BMCC/Nyamata is operational
Ruhuha MCC and GASHORA MCC developed into Dairy business Hubs
MCC Ruhuha , Veterinary Farmacy is available
5%
Number of Cows inseminated
6 543 37 500 Cows Inseminated
3 000/37 500 Cows Inseminated
560 Cows inseminated
18%
Number of Cows Vaccinated
32 201 (10 700/37500 Cows Vaccinated against Lump Skin Disease and 12 500/37500 Cows Vaccinated against Black quarter Disease 0/37500 RVF Disease & 0/37500 Brucellosis Disease
10,700/37,500 Cows Vaccinated against Lump Skin Disease and 12 500/37500 Cows Vaccinated against Black quarter Disease - 3935/37500 RVF & 651/37500 Brucellosis
Request of vaccines is already done;identification of sites of vaccination is done
30%
PILLAR I: ECONOMIC DEVELOPMENT
Bugesera District Performance Contracts 2013-2014
Objective 1: Increase agriculture & Livestock production, Productivity & value addition
N0 OUT PUT INDICATORS BASE LINE TARGET Achievement % achievement
Tons of fish produced
126 Tons 150T of fish harvested 32.242 tons 21.40%
Number of poultries farms established
5 poultries farms exist
5 poultries farms in Nyamata, Mayange, Mwogo, Ntarama and Gashora sectors established and operational
(3 poultries farms are operational):One in Ntarama sector; One in Gashora sector;One in Mwogo Sector
60%
PILLAR I: ECONOMIC DEVELOPMENT
Bugesera District Performance Contracts 2013-2014
Objective 2 : Enhance urbanization, rural settlement & sustainable infrastructure development
N0 OUT PUT INDICATORS BASE LINE TARGET Achievement % achievement
9 Rural settlement developed
% of Households living in grouped villages & planned villages.
64476/74111 (87%) 70405/74111 (95%) of Households living in grouped villages & 70% of HHs living in planned Villages
3851 household settled in imidugudu site
28%
MASANGANO IDP Model villages with infrastructure developped
0 1 IDP Model Village at MASANGANO with cowshed, ECD established at Kamabuye Sector
Model Village planning ongoing
12%
10 Nyamata Master plan implemented (Plan, Road constructed)
Number of Km of feeder roads constructed in Nyamata.
24Km of feeder roads constructed in Nyamata town of the existing Nyamata master plan area.
5 Km of feeder roads in Nyamata town constructed.
Tender process in progress
10%
11 Master plan produced
Master Plan of area surrounding Airport zone produced
Sites identified 1 master plan produced Tender process in progress
10%
PILLAR I: ECONOMIC DEVELOPMENT
Bugesera District Performance Contracts 2013-2014
Objective 2 : Enhance urbanization, rural settlement & sustainable infrastructure development
N0 OUT PUT INDICATORS BASE LINE TARGET Achievement % achieveme
nt12 Infrastruct
ures developed
Number of households connected to electricity
8443 households connected to electricity
3,000 New households connected to electricity
570 HH are connected to national grid
19%
Number of Sector Offices with electricity from national grid
11 Sector Offices are connected to national grid
13 Sector's Office are connected to electricity
Contract signed
10%
Capacity of NGENDA Water treatment plant increased
2,400 cubic meter/ day, contract for extension signed
4,400 cubic meter/day Contract signed
10%
% of people accessing Clean Water
217,300/ 363,339 (59.79%) people access Clean Water from EWSA’s water network, boreholes and protected springs
4,500 (61.02%) people access Clean Water
172 HH (average of 860 personns)are connected to EWSA'S water network
19%
PILLAR I: ECONOMIC DEVELOPMENT
Bugesera District Performance Contracts 2013-2014
Objective 2 : Enhance urbanization, rural settlement & sustainable infrastructure development
N0 OUT PUT INDICATORS BASE LINE TARGET Achievement % achieveme
nt13 Infrastruct
ures developed
District office constructed
District office Constructed at 60%
District office Completed roof structure making and walls construction are on going
65%
Nyamata play ground constructed
20% of Nyamata play ground construction works done
Nyamata play ground constructed
Terracing ongoing
30%
PILLAR I: ECONOMIC DEVELOPMENT
Bugesera District Performance Contracts 2013-2014
Objective 2 : Enhance urbanization, rural settlement & sustainable infrastructure development
N0 OUT PUT INDICATORS BASE LINE TARGET Achievement % achievement
14 Market infrastructures developed
Number of integrated craft production centers constructed
Integrated craft centre constructed in Nyamata sector at 50%
Integrated craft centre Completed
roofing is done, finishing works are ongoing
72%
Selling points constructed
Contract signed 2 Selling points constructed at Gashora and Karumuna
selling point of Gashora is under construction up to 40%
32%
15 District own revenues increased
Amount of revenues collected
696,067,669 900,000,000 Rwf collected
213 674 894 Frw
23.7%
16 Viable Investment Society Promoted
Shares bought in EPIC
130 Shares 200 shares bought in Eastern Province Investment Corporation (EPIC )
Payment process ongoing
5%
One steel factory constructed at Kagasa
10 % (site installation and land acquisition)
Steel Factory constructed at 60%
Elevation of building on going
10%
PILLAR I: ECONOMIC DEVELOPMENT
Bugesera District Performance Contracts 2013-2014
Objective 2 : Enhance urbanization, rural settlement & sustainable infrastructure development
N0 OUT PUT INDICATORS BASE LINE TARGET Achievement % achievement
17 Access to finance and financial inclusion promoted
Number of SMEs trained in business planning
80 SMEs 80 SMEs trained in business planning through Hanga Umurimo program.
Preparation ongoing 4%
Number of apprentices receive start up kits
14 apprentices receive start up kits
168 apprentices receive start up kits
Start up kits available remain distribution
60%
Number of SMES receiving business advisory services
127 receive business advisory services
1,500 receive business advisory services through PROBAs
Preparation ongoing 5%
Amount of money of closed MFIs recovered
80,581,553 Rwf 40,000,000 Rwf (60%) of money of closed MFIs recovered
Data, and information collection ongoing
12%
Number of women having access to financial institutions increased
21% 35% Mobilisatiom meeting with 2 women associations are held
5%
18 Youth capacity increased
Number of youth trained
Youth organized in cooperatives
100 youth trained in trained in Entrepreneurship.
youth to be trained are identifed
30%
PILLAR I: ECONOMIC DEVELOPMENT
Bugesera District Performance Contracts 2013-2014
Objective 2 : Enhance urbanization, rural settlement & sustainable infrastructure development
N0 OUT PUT INDICATORS BASE LINE TARGET Achievement % achieveme
nt19 Area
covered by forest increased
Ha planted by forest
7149 Ha 300 ha afforested
Planting site are identified, measured and maping;1294237 seedlings are under production in tree nurseries on 7 sites preparation ongoing
20%
20 Environment protected
Number of mining sites protected
10 mining sites identified
10 mining sites protected at 70% (Fencing).
Piano company has starting to protect its mining sites.
8%
21 Saving energy (RONDEREZA) increased
% of HH using improved cooking stoves
28125/75692 HH (37%)
100% of 75,692HHs with improved cooking stoves.
Mobilization of people for using improved cooking stoves is already started.
5%
Number of Biogas built
200 Biogas operational
60 Biogas Mobilisation of fermer is done
5%
22 Greening & beautification promoted
Number of cells office greened and beautified
34 72 Cells offices are greened and beautified
Mobilisation of local officers to start greening and beautifications on cells officers.
5%
PILLAR II: SOCIAL DEVELOPMENT
Bugesera District Performance Contracts 2013-2014
Objective 1 : Ensure access to quality education and skills development
N0 OUT PUT INDICATORS BASE LINE TARGET Achievement % achievement
23 Quality of 12YBE strengthened
Number of new Classrooms, Latrines, and teachers' Hostels constructed
996 primary classrooms and 461 secondary classrooms
72 New classrooms, 106 Latrines, and 15 teachers' Hostel completed
Contruction work are on going
33%
Gahembe secondary school equiped
Gahembe modern Secondary school constructed
Gahembe modern Secondary school equiped
Discussing equipments provisional
5%
1 new Rurenge primary school constructed - MWOGO Sector
2 schools 8 Classroms, 12 Latrines administration and teachers’ staff room constructed
Provisional notification signed
5%
ECD constructed 5 ECDs 7 ECDs constructed. (3 at Kamabuye, 2 at Ngeruka and 2 at Rweru sectors).
Tendering in process 5%
School inspections carried out
48 School inspections carried out
60 School inspections carried out
Inspection ongoing 12%
PILLAR II: SOCIAL DEVELOPMENT
Bugesera District Performance Contracts 2013-2014
Objective 1 : Ensure access to quality education and skills development
N0 OUT PUT INDICATORS BASE LINE TARGET Achievement % achieveme
nt24 TVET
scaled upNumber of TVET upgraded
3 TVET Centres in place
ETO Nyamata extension workshops constructed
Three classrooms ongoing
35%
25 Drop out rate decreased
% of schools dropout in primary and secondary decreased
20% Primary, 2% Secondary of schools dropout
0% Primary & 0% Secondary of schools dropout
Mobilization, and meeting ongoing
7%
26 Illiteracy rate reduced
Number of new people taught counting, reading and writing
31,200/ 38,000 Total Number adults were trained
3,000 /7,800 Total Number people trained
100 people taught 0.40%
PILLAR II: SOCIAL DEVELOPMENT
Bugesera District Performance Contracts 2013-2014
Objective 2 : Improve access and use of quality healthN0 OUT PUT INDICATORS BASE LINE TARGET Achievement %
achievement
27 Population using maternal and child health services increased
% of women/population using modern family planning methods
41621/85748 (49%)
50591/85748 (59%) of people use contraceptive methods
51.6(43599)/85748) 52%
Number of Women delivering in health facilities
10644/14897 (85%) delivering in health facilities
13407/14897(90%) of women delivered with assistance
2054/2483 by now 82%
28 Population covered under community based health insurance increased
% of people insured in health insurance
83,48% (237 190/ 363 339 Population)
100% (363 339 population) of population covered under Medical Insurance
31,76 (107299/337840) 32%
PILLAR II: SOCIAL DEVELOPMENT
Bugesera District Performance Contracts 2013-2014
Objective 2 : Improve access and use of quality healthN0 OUT PUT INDICATORS BASE LINE TARGET Achievement %
achievement
29 Health facilities constructed.
Number of new maternity wards constructed
9 maternity wards
2 Maternity wards constructed at Nyamata Hospital, & Gakurazo HC
For maternity ward of Nyamata hosp, all Tender process have been done. The contract of construction has been signed. Then for Gagakurazo, the definitive notification has been signed
For Nyamata hosp the construction is ongoing(80%). For Gakurazo, the construction is also ongoing(40%).
Number of emergency wards constructed
1 emergency bad condition
1 emergency ward constructed at Nyamata Hospital
The contract of construction has been signed.
Construction is ongoing ( 60%)
Number of emergency wards constructed
1 emergency bad condition
1 emergency ward constructed at Nyamata Hospital
The contract of construction has been signed.
Construction is ongoing ( 60%)
30 HIV/AIDS among youth fought
Number Awareness compaign of youth organised
0 Awareness compaign of youth organised
3 Awareness compaign of youth organised
site of compang idendifed ,Ruhuha Gashora and Nyamata
10%
PILLAR II: SOCIAL DEVELOPMENT
Bugesera District Performance Contracts 2013-2014
Objective 2 : Improve access and use of quality health
N0 OUT PUT INDICATORS BASE LINE TARGET Achievement % achievement
31 Vulnerable groups supported
Projects supported by VUP through financial services
1042 projects financed under VUP
26 projects financed under VUP
There is nothing done 0%
% of financial services fund recovered
280928459/412260694 (68 %) recovered
80 % of financial services funds recovered
There is nothing done 0%
Number of houses for Vulnerable Genocide survivors rehabilitated
5/173 houses for vulnerable genocide survivors rehabilitated
25 houses for vulnerable genocide survivors rehabilitated
Beneficiaries are identified; The contract of works have ben signed
20%
Number of Cooperatives/ Associations of persons with disabilities supported
0 3 Cooperatives / Association of persons with disalities financialy supported supported
There is nothing done 0%
PILLAR II: SOCIAL DEVELOPMENT
Bugesera District Performance Contracts 2013-2014
Objective 2 : Improve access and use of quality health
N0 OUT PUT INDICATORS BASE LINE TARGET Achievement % achievement
32 Vulnerable groups supported for self-sustainability
All genocide srvivors "incike"mapped
Ongoing mapping of needy genocide survivor elderly
All needy genocide survivor "incike" mapped
There is nothing done 0%
Number of needy genocide survivor "incike" supported
Ongoing mapping of needy genocide survivor "incike"
A 100% of needy genocide survivor "incike" have proper shelter, dairly milk consumption , monthly special direct support allowance and a neighbor/person tasked by local entities to cater for his/her basic needs
There is nothing done 0%
PILLAR II: SOCIAL DEVELOPMENT
Bugesera District Performance Contracts 2013-2014
Objective 2 : Improve access and use of quality healthN0 OUT PUT INDICATORS BASE LINE TARGET Achievement %
achievement33 Malnutrition of
under five children eliminated
Assessment report of Ongoing District program to eliminate malnutrition available
District plan to eliminate malnutrition
The level of implementation of the current District plan to eliminate malnutrition (DPEM) assessed
Not yet done 0%
New District plan to eliminate malnutrition aligned with the fiscal year available
District plan to eliminate malnutrition
A new District plan to eliminate malnutrition aligned with the fiscal year developed
There is nothing done 0%
PILLAR III: GOOD GOVERNANCE & JUSTICE
Bugesera District Performance Contracts 2013-2014
Objective 1 : To promote responsible and accountable governance
N0 OUT PUT INDICATORS BASE LINE TARGET Achievement % achievement
34 Access to equitable justice ensured
Number of litigious solved by INTEKO Y'ABATURAGE
95,5% 100% 245 of 259 litigious cases has been solved
94.50%
Number of judgements tried by Abunzi and courts executed
98% (395/403) Number of judgements tried by Abunzi and courts executed
100% of judgements tried by Abunzi and Courts executed
11 of 20 judgement of Abunzi and court executed
55%
% of cases of Genocide survivors orphans properties solved.
109cases identified and 60 solved (z%)
49 cases concerning properties of genocide survivors orphans resolved 100%
5 of 49 cases of genocide survivors orphans properties solved
10%
35 Cultural values and norms promoted
Number of students participated in National Service 2013-14.
1204 students participated in ITORERO, and National Service 2012-13
1 225 students participated in ITORERO, and National Service 2013-14 organised
Collection of list are finished. Tender process ongoing
40%
PILLAR III: GOOD GOVERNANCE & JUSTICE
Bugesera District Performance Contracts 2013-2014
Objective 1 : To promote responsible and accountable governance
N0 OUT PUT INDICATORS BASE LINE TARGET Achievement % achievement
36 Accountability and citizen participation enhanced
Number of Governance months carried out
One Governance month for 2012/13 organised
Governance month organised twice
Preparation ongoing
5%
37 Information and social media access improved
Number of Video Conference room operational at the District
VC room prepared
1 VC equipped & operationalised
Equipments installed
50%
Number of public TV installed
30 public TV Public TV screen installed at each Cell's Office in each District
Mobilisation in process
6%
38 Public finance management systems are effective and efficient
District & Non Budget Agencies (NBA) audits carried out
1 District & 18 NBA audited
2 District & 12 NBA audited
One audit done 8%
PILLAR III: GOOD GOVERNANCE & JUSTICE
Bugesera District Performance Contracts 2013-2014
Objective 1 : To promote responsible and accountable governance
N0 OUT PUT INDICATORS BASE LINE TARGET Achievement % achievement
39 Security strengthened and Citizens and public properties protected
Amount of money paid
No money has yet been paid
Shares of the District to purchase Fire truck paid
Fund collection period 4%
40 Imihigo for every administrative entity and the family prepared and monitored
% of Local government entity and family with Imihigo prepared and monitored
Previous entities imihigo
100% of Sectors, Cells, Villages and families Imihigo prepared and monitored
74,789 of 75 692 mihigo families prepared, 581 imihigo villages prepared,72 cells imihigo prepared,15 sectors imihigo prepared
98,80%
41 Umuganda value and participation increased
% of participation
65.50% 100% of participation
52,620 of 77096 participated in umuganda
68,2%
Umuganda value
422,198,152 Rwf
550,000,000 Rwf 61,852,095 frw of 550,000,000 frw umuganda value
11,2%