Date post: | 15-Dec-2015 |
Category: |
Documents |
Upload: | josue-porte |
View: | 221 times |
Download: | 4 times |
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
Build As OneSM
WelcomeWelcome
An on-line introduction to
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
AgendaAgenda
• Why BIM?• BIM is what?• Measuring the benefits.
• Who is doing BIM?
• Examples of BIM in practice.
• Highlighted technologies for BIM
…and 1 minute about Bentley.
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
Outline Agenda• Why BIM?• BIM is…?• Measuring the payoffs.
• Who is doing BIM?
• Examples of BIM in practice.
• Highlighted technologies for BIM• …and 1 minute about Bentley.
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
Build As OneBuild As OneBenefits of integrated processes, teams, and toolsBenefits of integrated processes, teams, and tools
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
Build As One…Integrate the work, processes and information of:
– Multiple Disciplines• Architects, Engineers, Specialists
– Multiple Companies• Peers, Subs, Partners, Clients• A “one-time enterprise”
– Multiple Project Phases• Design• Construct• Operate
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
Build As One - TimeTeams that build as one,waste less time.
– Design • Increase opportunity for design iterations• Exchange information between disciplines quickly
– Documentation• Spend less time on grunt work• Spend less time documenting, avoid redundant efforts
– Construction • Fast-tracking• Managed schedules• Design/Build
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
Build As One - QualityTeams that build as one, improve the quality of work.
– Improve coordination• between documents• between disciplines• between teams
– Reduce errors & omissions• Coordinated documents• Well captured design intent
– Enhance the design process• Informed design environment
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
Build As One - MoneyTeams that build as one,enhance profitability & competitiveness.
– Effectively applied man-hours– Efficient deliverables– Lower error and omission remediation costs– Lower contingencies– Lower insurance premiums
– Faster delivery of service– More competitive quality of work– Tighter bidding for design and construction
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
What is BIM? What is BIM? And how does it help us build as one?And how does it help us build as one?
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.Image courtesy NBBJ BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
A working definition of BIM
Image courtesy NBBJ
Building– The entire lifecycle of the building
(Not just design…)
Information– All information about the building and it’s lifecycle
(Not just Architectural Drawings…)
Modeling– Defining & Simulating the building, its delivery, operation
(Not just the physical characteristics…)
Image courtesy NBBJ
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
20 Enabling Technologies for BIM
5. Facility/Asset Mapping4. Interactive Visualization/Analysis3. Feature-based Solids Modeling2. Parametric Design1. Discipline-specific applications
20. IP Management19. Scalable, Open System18. Enterprise System Integration
17. Project Standards Management16. Multi-Disciplinary Model15. Context-sensitive Representation
14. Change Management13. Coordinated Documentation 12. Construction/Schedule Simulation11. Rapid Prototyping
10. Anywhere Publishing9. Project Querying8. Document Management7. Federated Data Architecture 6. Native DWG/DGN
Create / Access / AnalyzeCreate / Access / Analyze
Shared InformationShared Information
Synchronized InformationSynchronized Information
Information ContextInformation Context
Secure InformationSecure Information
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
BIM Business Benefits… BIM Business Benefits…
As told by our usersAs told by our users
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
Evolution
BuildingBuilding InformationInformation
ModelingModeling
’00s
ComputerComputerModelingModeling
( 3D )( 3D )
’90s
ComputerComputerDraftingDrafting
( 2D )( 2D )
’80s
T-SquareT-SquareAidedAided
DraftingDrafting
’70s
Ben
efit
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
BuildingBuilding InformationInformation
ModelingModeling
’00s
ComputerComputerModelingModeling
( 3D )( 3D )
’90s
ComputerComputerDraftingDrafting
( 2D )( 2D )
’80s
T-SquareT-SquareAidedAided
DraftingDrafting
’70s
Ben
efit
Evolution
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
BuildingBuilding InformationInformation
ModelingModeling
’00s
ComputerComputerModelingModeling
( 3D )( 3D )
’90s
ComputerComputerDraftingDrafting
( 2D )( 2D )
’80s
T-SquareT-SquareAidedAided
DraftingDrafting
’70s
Ben
efit
Evolution
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
Right information, at the right time
Time
Impact of decisionsIn traditional methodologies high impact decisions are often made when minimal relevant information is available…
Amount of in
formatio
n
Amount of in
formatio
n
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
Right information, at the right time
Time
Impact
BIM enables high impact decisions to be better informed
by increasing the availability and timeliness of relevant information.
Info
rmatio
n
Info
rmatio
n
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
design documentation constructiondesign documentation construction
rem
edia
tion
cost
rem
edia
tion
costThe Cost of Design Errors
Cost and time to rectify a design error or omissionincrease dramatically the later it is discovered
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
Measuring the value in practice
– 15.8 Billion cost/yr. in the US due to fragmentation
– $1.2 Billion to AEs
– 10% Schedule Reduction potential
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
“Reductions in delivery time, on the order of 20 to 50 percent, are possible…”
“Our industry’s inability to communicate effectively has created tremendous waste and inefficiency, estimated at up to 30 percent of the total cost of each building project.”
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
BIM is being Demanded
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
Where Does the NIST Money Go?
Planning, Design & Engineering
Construction
Operations & Maintenance
$2.7b$2.7b
$4.1b$4.1b
$9.1b$9.1b
Source: NIST
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
Where Does the NIST Money Go?
Planning, Design & Engineering
Construction
Operations & Maintenance
$2.7b$2.7b
$4.1b$4.1b
$9.1b$9.1b
You should care about this…
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
Where Does the NIST Money Go?
Planning, Design & Engineering
Construction
Operations & Maintenance
$2.7b$2.7b
$4.1b$4.1b
$9.1b$9.1b
You should care about this…
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
Where Does the NIST Money Go?
Planning, Design & Engineering
Construction
Operations & Maintenance
$2.7b$2.7b
$4.1b$4.1b
$9.1b$9.1b
You should REALLY care about this…
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
So, where is BIM first and strongest?Where risks and rewards are shared
– Between design disciplines– Between Phases of work/responsibility
Where the building is strategic to the owner’s business– Integrated into the business, not just containing it
Where ‘extra’ is desired– Delivery Process– Performance– Form
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
So what does that mean to you?So what does that mean to you?How are BIM practitioners capturing those NIST dollars?How are BIM practitioners capturing those NIST dollars?
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
Measuring the value in practice
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
Measuring the value in practice
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
Measuring the value in practice
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
Measuring the value in practice
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
Architects - EngineersArchitects - EngineersSSOESSOE
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
BE Award Nominee
Founded in 1948Founded in 1948560 employees560 employees11 offices in US,11 offices in US,Puerto Rico & ShanghaiPuerto Rico & Shanghai
Key MarketsAutomotiveChemicalCivil/InfrastructureCommercialEducationEnergyFood & BeverageGlassHealthManufacturingPersonal/Household CarePharmaceuticalRetail
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
½ the Time at ½ the Cost½ the Time at ½ the Cost
What if that was the goal you client was setting for themselves?What if that was the goal you client was setting for themselves?
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
The Old Way – 2d AbstractionBIM removes abstraction, connects processes
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
Building Information Modeling
A multidisciplinary 3d model that integrates– Multiple disciplines– Design and documentation– Plans, Sections, Details, Elevations– Graphics and data
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
Coordinated Documentation3D Details
One 3D = Three+ 2d
One recent project: 16 3D Details Replaced 50 2d Saved 200 hours Saved $20K fees
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
Coordinated Documentation
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
Measuring the value in practice
BIM beats the budget by 14%
With BIM
14% Savings
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
Time to Market
A typical auto project = 36 months12,000 Pickup Trucks per month1 month = $40 million
A typical auto project = 36 months12,000 Pickup Trucks per month1 month = $40 million
Structural steel reduced by 1 month
BIM reduces design by 5 months
Structural steel reduced by 1 month
BIM reduces design by 5 months
= $40 Mil. More Revenue for the owner
= $200 Mil. More Revenue for the owner
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
Time to Market
A typical auto project = 36 months12,000 Pickup Trucks per month1 month = $40 million
A typical auto project = 36 months12,000 Pickup Trucks per month1 month = $40 million
Structural steel reduced by 1 month
BIM reduces design by 5 months
Structural steel reduced by 1 month
BIM reduces design by 5 months
= $40 Mil. More Revenue for the owner
= $200 Mil. More Revenue for the owner
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
What you need to BUILD AS ONEWhat you need to BUILD AS ONE
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
Discipline Specific Applications
ArchitectureStructural EngineeringM/E/P Engineering
– HVAC– Plumbing– Fire Protection– Electrical– Communications/Data
Civil/Site Engineering– Site– Infrastructure
Etc.• Optimized per discipline • To Design, Refine, Analyze• In your domain, language, libraries
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
Working TogetherA Shared, Common Technology Platform
– Ensure data compatibility– Avoid data re-entry – Integrated functionality– Coordinated user environments
Open and Customizable– APIs, VBA, COM, ODBC, Scripts and Macros, Interface, etc...
Supporting Industry Standards– IFC, CIS/2, SDNF, STEP, IGES, STL, VRML, DXF, CGM, PDF, DGN, DWG, PDF...
Managed Environment– Integrate distributed teams, tools and processes– Manage and publish building information
BUILD AS ONE
BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.
[email protected]@bentley.comfor more informationfor more information