Building for Learning ProjectPhoto Progress Report 6
February 2010– March 2010
Project commencement 21st September 2009
Aluminium doors and windows plus Hebel Bricks ready for March construction 2010.
Director Marg Crisp inspecting new roof areas.
Structural Engineer Mark and Builder Graeme Connelly with Site Foreman Al - inspections
February 2010
Plaster Jerry’s back and happy to be here!!The first sheet ready for March 2010.
Getting ready for Hebel Bricks (trend setting sunny’s Jeremy), brick work and windows in - March 2010.
With about 8 days using a crane to put materials onto the 1st Floor, we are certainly getting the attention of the
Wodonga public. Main St - March 2010.
David ‘the render man’ – doin’ the business!!!March 2010.
Hebel Building Brick being added to all 1st floor external areas - March 2010.
Bricks continue on our stairway (to heaven ???) March 2010.
Lift Shaft and Stairway close to the top - March 2010.
Yep!!! Power tools haven’t taken over everything just yet - March 2010.
Wall insulation and plaster - March 2010.
Plaster going in, air-conditioners going on and hands up if your happy? Kos - March 2010.
External Painting starts - March 2010.
No knife to cut the cake for ‘Trainee Painter’ Reg, use the Putty Knife – Happy 86th Birthday - March 2010.
Internal room painting starts downstairs
Old stormwater pipes replaced - March 2010.
Jerry – still smiling but can you keep on them all because we getting closer to the finish
date!!!