building for the generations Phase II of the Capital/Endowment Campaign Front View of Parish House with new section in lighter shade and to the right Side View of Parish House (from the Camp Hill Road entrance) with new section in lighter shade and a covered walkway in the rear connecting the old and new sections.
Transcript
Page 1: building for the generations - St. Thomas' Church · Building for the Generations Phase I: What We Have Accomplished Replacement of the 125-year-old church roof Installation of new

building for the generationsPhase II of the

Capital/Endowment Campaign

Front View of Parish House with new section in lighter shade and to the right

Side View of Parish House (from the Camp Hill Road entrance) with new section in lighter shade and a covered walkway in the rear connecting the old and new sections.

Page 2: building for the generations - St. Thomas' Church · Building for the Generations Phase I: What We Have Accomplished Replacement of the 125-year-old church roof Installation of new

2

It is our hope that as you review this publication you will see just how dynamic and strong St. Thomas’ is and why the need to create and renovate space is vital. As you read further and review past, present and future projects we hope you will invest in our future and support us with a generous pledge, an extension of a current pledge or a gift to make our vision a reality.

What do we need?

Aerial View Depicting Our Three Areas of Focus: Learning, Worshipping and Serving.

Page 3: building for the generations - St. Thomas' Church · Building for the Generations Phase I: What We Have Accomplished Replacement of the 125-year-old church roof Installation of new

3

Building for the GenerationsPhase I: What We Have Accomplished

Replacement of the 125-year-old church roof

Installation of new lighting and sound system in the church

Upgrades to the Church Road entrance to our property (Spring 2015)

Signifi cant planning and fund-raising for improvements and an addition to the Parish House

Phase I: Unexpected Costs

Repair of extensive deterioration of the stonework of the bell tower and church discovered during the roofi ng work cost $500,000 over the amount budgeted for the new roof.

Unanticipated state and township requirements have added signifi cant costs to the entrance driveway project.

These extra expenditures have consumed the entire contingency fund built into the budget.

Phase II: Next Steps

Modernize the Parish House, including air conditioning, a fi re sprinkler system and new energy- effi cient windows

Update MacColl Auditorium to make it suitable for wedding and funeral receptions and other outside events, as a projected source of revenue

Add space to the Parish House to accommodate expanded Nursery School activities, parish meetings and church school, as well as a chapel that would work well for the Faith at Five service and smaller weddings and funerals

The currently projected costs for the Parish House addition and renovations now stand about $1 million above what was originally budgeted.

Page 4: building for the generations - St. Thomas' Church · Building for the Generations Phase I: What We Have Accomplished Replacement of the 125-year-old church roof Installation of new

4

Our Campaign VisionSt. Thomas’ will be a vibrant church community where future generations will come to worship God, care for one another, and reach out to others. Just as we have benefi ted from the hard work and vision of our church ancestors, now is our moment to nurture, tend, and grow—to preserve our legacy and lay the groundwork for future generations to thrive at St. Thomas’ Church.

We envision St. Thomas’ further developing as a thriving center in the lives of our community:

Where every child cannot wait to go to the Discovery Hour.

Where every teenager wants to come on the weekends, to form friendships, learn and serve, as well as pursue fun activities geared to their needs.

Where young singles can meet new friends through a vibrant series of programs and will be supported in their careers, life and faith development.

Where young families benefi t from the excellent pre-school and family friendly worship, vibrant fellowship, family learning and service opportunities and events.

Where older families experience a powerful support system as they face many personal and family pressures and challenges.

Where senior couples and individuals receive pastoral and spiritual support and enjoy worship, fellowship and service opportunities.

Where members of the community can come for inspiration, education, musical and artistic offerings, events, speakers, and to offer community service.

The Vestry, Staff and Commission

Chairs of St. Thomas’ Church

THE CAMPAIGN PRAYER

Almighty God, help us in our worship,

caring and growing so that we can serve

Thee with a grateful heart in thanks

for all you have done for us at

St. Thomas’ Church. Amen.

Page 5: building for the generations - St. Thomas' Church · Building for the Generations Phase I: What We Have Accomplished Replacement of the 125-year-old church roof Installation of new

5

What We Do Every week our volunteers and staff touch countless lives through 65 distinct ministries.

We worship, learn and serve as part of our mission to know Jesus and make him known to others.

We provide powerful, relevant messages and vibrant, inspiring music.

Discovery Hour teachers impart faith to our younger members, youth mentors meet with our teenagers, our Sunday Faith Forum boasts scintillating speakers, and hospitality is evident wherever you go. In addition, we recently started a Family Faith Forum.

On weekdays, parents entrust their children aged two to fi ve to what many believe to be the fi nest Nursery School in the region.

Service is at the heart of our parish. St. Thomas’ contribute enormously to the local community, inner-city Philadelphia, and far beyond.

What we do above all is build community. We create one parish family committed to serving God and helping to make the world brighter for others.

“We want to serve as the village green for our extended community exuding a sense of warmth and beauty and accessibility that invites people from around the region to enjoy our campus and be blessed by its offerings.”

—Gus Carey

Page 6: building for the generations - St. Thomas' Church · Building for the Generations Phase I: What We Have Accomplished Replacement of the 125-year-old church roof Installation of new

6

Dear Friends:

Imagine what our community would be like had St. Thomas’ never existed. Think of all the individuals who would never have received words of comfort and guidance from a caring priest, youth leader, Stephen Minister, nursery school or Discovery Hour teacher.

Think of all the Christmas and Easter services, Sunday worship, baptisms, confi rmations, weddings and funerals that would never have been held. Consider

all the children and teenagers whose values and character would not have been shaped by our church, Discovery Hour and nursery school. Imagine if there were no tranquil campus, stunning sanctuary, teaching, preaching, music, worship, sacraments, labyrinth, carillon concerts, Second Saturday Sales, community and outreach to others.

St. Thomas’ does exist, however, and has been serving our communities for more than three centuries. It now provides 65 ministries and, during these past 317 years, has touched countless lives locally, nationally and now internationally. Our forebears erected a log cabin church in 1698 that has blossomed into a landmark congregation – Montgomery County’s oldest church – and one of the most vital Episcopal churches in the United States. It is one of the ten strongest Colonial churches in the country.

Many times in our history, St. Thomas’ parishioners have risen to meet severe, even crippling, challenges. Meeting these crises successfully has called for great vision, bold planning, and fi rm dedication. We have never failed to prevail.

In 2012 we faced perhaps our greatest challenge, that of building for the generations to come. To meet it, we have used parishioner input to craft a bold Master Plan. Our leaders worked hard to create a vision for a sustainable future. This plan allows us to build endowment, preserve buildings, beautify our campus and downsize what we have to maintain to ensure great ministry for years to come.

Together, we reached and exceeded the Phase I Goals , which ensures that St. Thomas’ remains a beacon of hope throughout the Whitemarsh Valley and surrounding region as we touch and transform countless lives. In Phase II we address needs previously unknown and a few new plans whose time has come!

We hope that you will continue to make God and your church the top priority in your life and give generously to this bold endeavor, either for the fi rst time or in a second offering pledge or gift.

With every blessing,With every blesssss

St. Thomas’ is a place that makes all of us proud to be Episcopalian. It has withstood the test of time. For more than three centuries our church has enriched our community. The time

has come for us to ensure that it will be here to bless future generations.

Page 7: building for the generations - St. Thomas' Church · Building for the Generations Phase I: What We Have Accomplished Replacement of the 125-year-old church roof Installation of new

7

Dear fellow members of St. Thomas’ Church,

Five years ago, the exterior of 122 year old Church Hill Hall was in very bad condition and something had to be done before the building suffered structural damage. The Vestry authorized a small capital campaign to fi nance the repairs and today Church Hill Hall is in excellent shape and will hopefully serve us well for another 122 years. You supported and funded this and we thank you heartily!

The Vestry realized that other buildings had maintenance needs, and an overall Campus Master Plan had not been done since the 1990’s.

The Vestry asked for a review of buildings and grounds and development of Master Plans for the campus. The Landscape Commission and Building Commission took the lead and worked from 2010-2012 to develop the Landscape and Building Master Plan. The plan covers landscape, parking and traffi c patterns, building maintenance needs and potential improvements to better support worship and programs.

The members of the Vestry viewed a presentation of the Master Plan and were enthusiastic that it addressed funding the substantial deferred and current maintenance needs. The members of the Vestry became committed to taking steps to raise the necessary funds and directed the staff to begin planning for a Campaign in the latter part of 2012. They recognize that there are choices to be made within the Master Plan and sought guidance from the report of the Parish Readiness Assessment for a Capital Campaign.

In 2012, I informed parishioners that each year we designate money in the operating budget for repairs and upkeep, but it is less than $20,000 a year for nine buildings, a mile of paving and 48 acres of land (which is larger than the Philadelphia Zoo). That means each year we defer many repair and upkeep needs. I shared that several major building expenses were looming. Primary among those included the following:

The Church roof – the main part of the roof was the original dating from when the Church was built and is over 125 years old.

The Parish House heating system – the piping and radiator system has a 50-year design life and is now 55 years old. A breakdown in the piping system would be a major headache.

I am very happy to report that the Church roof has been replaced, and I invite you to read in this brochure about the needs that Phase II will be supplementing.

Best Regards,

Pem Hutchinson,

Campaign Chairman and Vestry member

Please join us in completing

the Building for the Generations

campaign!

Page 8: building for the generations - St. Thomas' Church · Building for the Generations Phase I: What We Have Accomplished Replacement of the 125-year-old church roof Installation of new

8

Finished view of the completed stonework.

Roof during investigation phase.

Page 9: building for the generations - St. Thomas' Church · Building for the Generations Phase I: What We Have Accomplished Replacement of the 125-year-old church roof Installation of new

9

PHASE I Accomplishments 2012-2014Total Funding Goal:

Our original campaign goal for Capital Projects Phase I was $6,250,000 and our Goal for Endowment giving was $12,250,000 (over 15 years). We have now received pledges for $6,601,982 for capital and $753,500 for endowment as well as $100,000 for the capital needs of the cemetery.

Annual Financial Support:

The vestry and the Stewardship Commission, along with the Capital Campaign Committee and the Rector, made a concerted effort to explain to the parish the detailed cost of sustaining the ministries of the church and the physical plant. In 2012 the average pledge for operating support was $2,718. This was not the level needed to support the healthy functioning of the church. The parish responded and in 2013, annual stewardship rose to $3,405, an increase of 25%. The key is and was to emphasize giving to St. Thomas’ as the top priority in one’s charitable giving goals.

Deferred Maintenance:

Original preliminary studies indicated that we had $2 million in deferred maintenance on the entire property. As we tackled projects we discovered some estimates to be high but most to be signifi cantly lower than anticipated. Much of this could not be known until slates were removed from roofs so substructures could be studied or cranes were raised to examine stonework. Therefore, in some cases, we found ourselves with larger projects than anticipated.

Church Roof and Stonework:

The cost to replace the slate roof and to repair and re-point one side of the bell tower stonework, which was in danger of stone falling onto the roof, as well as repairing carillon window inserts, was just over $1 million. Some adjacent roofs were redone as they were structurally poor and would have caused problems inside the church and Haas Hall.

Church Sound System:

The second project that was deferred was the church’s sound system. This was replaced under budget and is now quite good for the spoken word as well as musical or performance needs.

Church Interior Painting: The third deferred project in the church was painting. This was recently completed in line with the church’s new lighting and is a warm beige.

Barn and Haas Cottage:

These areas have been or will be repaired and upgraded so that the Minister to Youth and Children and his family can live safely in the cottage and those participating in Second Saturday Sales (our major source of outreach support) can shop in the barn and its environs in comfort and safety.

Page 10: building for the generations - St. Thomas' Church · Building for the Generations Phase I: What We Have Accomplished Replacement of the 125-year-old church roof Installation of new

10

Capital ImprovementsRelighting the Church:

Our old church lighting produced a dark and dreary setting. In 2014 we completed new lighting, within our $300,000 budget. Along with the new paint color, we now have a warm, vibrant lighting set-up, adjustable for numerous purposes. People can see the service at the altar, they can read their programs and they can see one another. This raises our spirits. Our church attendance has risen 39% since this work was completed and we believe that some credit must go to this effort.

Before the relighting. After the relighting.

Page 11: building for the generations - St. Thomas' Church · Building for the Generations Phase I: What We Have Accomplished Replacement of the 125-year-old church roof Installation of new

11

Church Road Entrance Project:

This project has been envisioned for numerous reasons.

It re-aligns the driveway 35’ up Church Road, making visibility much better for all.

It is currently a one lane drive, causing bottlenecks and near accidents regularly.

It is not a proper entrance with signage, lighting and a welcoming feel but rather an old drive with an old mailbox and an unattractive feel.

The new entrance will project a message of welcome, safety and aesthetic quality. It will be two lanes, with lighting. The Church Hill Hall parking lot area and the area around Toad Hall (the toy cottage) will be improved as well.

This project has increased in cost due to storm water management, re-forestation (when trees are removed), lighting, etc. A $100,000 matching gift has been made and offerings toward this match are being gratefully accepted. A spring 2015 completion is expected.

Conceptual Drawing.

Page 12: building for the generations - St. Thomas' Church · Building for the Generations Phase I: What We Have Accomplished Replacement of the 125-year-old church roof Installation of new

12

Phase II Projects and Costs: Phase I Construction Project:

The Emily Norris Carey Learning Center is envisioned as a wonderful new wing of the Parish House and will provide two levels of learning and worship space (see exterior drawings on the front of the brochure-new spaces are in lighter shades). An elevator will allow access to both levels. The lower level will provide classrooms for Nursery School expansion as well as Discovery Hour use. On the upper level, adult gathering spaces as well as a performing arts/worship space (via a new chapel) will be included for smaller services, concerts and activities.

We have expanded programs since the inception of the capital campaign creating a successful new Faith at Five service, which would ideally be located in the new chapel. This space, along with the renovated MacColl auditorium could host smaller weddings and funerals. It would also be ideal for our nursery school chapel, which now occurs weekly on our stage. The new addition would also be perfect for our new Family Faith Forum on Sunday mornings, allowing parents to be near their young children as they attend Discovery Hour.

The original fi nancial goal for this wing has been reached. This achievement is a testament to the generosity of our parish. We would be very close to starting construction. We have one major hurdle to jump—increased project scope and cost. Despite this we feel this is achievable and that construction could begin as soon as August 2015 if funds were pledged or given. Please read the next section carefully to understand what is needed and how you can help.

We have developed the Parish House project to a point where a solid budget could be assembled by our construction manager. That budget has revealed that the costs assigned to this project in the 2008-2009 time period did not anticipate the manner in which the project has developed. The contingency that might have offset construction cost escalation has been exhausted by the church roof project. While the size of the building remains the same, the cost of building that space is now greater. All reasonable means have been explored to use effi cient, yet not extravagant materials. Space and energy effi ciency have been stressed, but in the end, the new construction budget falls short by $800,000 and $300,000 for the existing auditorium, of providing what has been evaluated as needed space after extensive review with the clergy and the other groups using the facility.

With these facts fi rmly in our mind, and a determination to build and renovate for what we need without scaling back to a point where a small and ineffective version exists, we have, as a parish team, developed the plans for the Parish House and the Emily Norris Carey Learning Center. The next pages will show you plans and renderings of what is envisioned.

Page 13: building for the generations - St. Thomas' Church · Building for the Generations Phase I: What We Have Accomplished Replacement of the 125-year-old church roof Installation of new

13

With the Carey Learning Center, program space will be added that will allow the Church to better serve the congregation and the community, including:

A multi-purpose Chapel: for Faith at Five and smaller weddings, funerals and concerts. The new chapel would allow us to accommodate all of our students, their teachers and parents for a weekly Nursery School chapel service.

Nursery School classrooms that will accommodate the latest curriculum, as well as additional students and the resulting increased tuition income.

Creating a facility that could be used by the community for events that would generate additional income for the church.

Emily Norris Carey Learning Center

Funding Needs:

Cost escalation since 2010—$500,000

Landscaping of new addition—$100,000

Finishes, Furnishing and S.T.E.A.M. room equipment—$200,00

Total: $800,000

Example of S.T.E.A.M. Room (Science,Technology, Engineering, Art & Math)

Proposed Lounge with View into Chapel. NAMING OPPORTUNITY: Lounge: $200,000.

Page 14: building for the generations - St. Thomas' Church · Building for the Generations Phase I: What We Have Accomplished Replacement of the 125-year-old church roof Installation of new

14

Renovated and air-conditioned throughout: New windows, lighting,

fl ooring, ceiling, furnishings

New Restrooms

Storage

ElevatorCovered exterior

walkway from auditorium stairwell

New 50 seat room with Chapel

Expansion

New 100 seat Chapel

Lounge

NA

MIN

G O

PPOR

TUN

ITY:

Nam

e the Large Multi-P

urpose Room

$250,000

Nam

e Classroom

3 (upstairs)

$150,000

Page 15: building for the generations - St. Thomas' Church · Building for the Generations Phase I: What We Have Accomplished Replacement of the 125-year-old church roof Installation of new

15

Ramp to/from existing school

S.T.E.A.M. Room

Classroom 1

Classroom 2

Elevator

Storage

Elect

Mechanical

NA

MIN

G O

PPOR

TUN

ITIES:

Nam

e the S.T.E

.A.M

. Room

$250,000

Nam

e Classroom

1

$150,000

Nam

e Classroom

2

$150,000

Page 16: building for the generations - St. Thomas' Church · Building for the Generations Phase I: What We Have Accomplished Replacement of the 125-year-old church roof Installation of new

16

NAMING OPPORTUNITY:Name the chapel $750,000 Name the organ $500,000Name the altar $50,000

Name the pulpit $30,000 Name a chapel window $25,000 Name the lectern $20,000

NAMING OPPORTUNITY:Name the Parish House (not Auditorium) $500,000

Page 17: building for the generations - St. Thomas' Church · Building for the Generations Phase I: What We Have Accomplished Replacement of the 125-year-old church roof Installation of new

17

Parish House and Auditorium

Funding Needs:

Renovation of auditorium: $300,000

Parish House Roof (on existing building) $400,000

Total: $700,000

Parish House Design and remodeling highlights include:

Replacement of all the leaky, ineffi cient windows

Facelift for the nursery school classrooms

Installation of a fi re sprinkler system throughout

Air conditioning the entire building (existing and new) will permit some extended day and early drop off classes to be used year-round, signifi cantly increasing annual operating revenue from the Nursery School. We see the need for extended day and early drop off as more and more couples in our area are both working outside the home. We would have the capacity to double our Nursery School enrollment, if we desired. Our main goal is to assure excellence and strong continued growth and service.

We would like to make further renovations to MacColl Auditorium to make it much more aesthetically pleasing and more suitable for hosting wedding and funeral receptions and outside events as a source on annual revenue. We project raising as much as $50,000 in additional annual revenue from leasing our facilities.

Our Crumbling Walls – A Phase II Priority for the Church Building

The condition of the stone in the church walls and bell tower continues to deteriorate. A number of factors have contributed to this problem:

A waterproof coating applied in 1992 traps moisture

Parging, a coating applied to the inside of the walls, causes moisture to be trapped between it and the exterior waterproofi ng, stressing the stone

Normal winter freeze/thaw cycles and salting of sidewalks

Cost of repairs for church: $850,000

Cost of repairs to tower: $600,000

Total cost of masonry repairs: $1.45 million

NAMING OPPORTUNITY:

Name the Bell tower $750,000Spalled Stone.

Page 18: building for the generations - St. Thomas' Church · Building for the Generations Phase I: What We Have Accomplished Replacement of the 125-year-old church roof Installation of new

18

Building and Growing Our EndowmentsBuilding and Hardscape Preservation Fund - $2,000,000

Our church buildings have no designated endowment. Each year we accrue approximately $100,000 of deferred maintenance. The Vestry’s vision is to build a $2 million endowment for building preservation to ensure that as things break or wear down or require painting, electrical repairs and other maintenance that we can fi x them quickly and effi ciently rather than allowing problems to expand and become far more costly. This endowment would yield approximately $80,000 to address maintaining our nine separate buildings each year and end the cycle of conducting a major capital campaign every decade to handle signifi cant deferred maintenance.

Worship and Music Fund - $2,000,000Worship is at the center of our life at St. Thomas’ Church. It is the reason that brings us all to church. Offering outstanding preaching, liturgy and music is vital to each of our lives. The most expensive part of this is offering music. In 2011, we spent $192,000 on our music program. Through careful steps, we were able to reduce our music costs by over $50,000 in 2012. We want, however, to ensure that we can offer fi ne worship for generations to come. We hope to increase our Worship and Music Endowment from $145,000 to $2 million. This would generate approximately $80,000 for annual income, take pressure off our annual operating budget, and potentially draw more people to St. Thomas’. Our worship is a means of attracting members to St. Thomas’ and a crucial means of infl uencing sustained membership and life-altering experience.

Children and Youth Fund - $2,000,000The future of our church lies with attracting and nurturing young families, children and youth. We want St. Thomas to be the place where every family in the area has the opportunity to grow happy, involved and supported children of all ages. Offering a great youth ministry is a costly endeavor. Experts in Youth Ministry tell churches to budget $1,000 annually for each teenager that the church wants to be active in Youth Ministry. We hope to increase our Endowment for Children and Youth from $61,000 to $1 million. This would yield $40,000 for our annual operating budget and ensure that we can have a Youth Minister on our staff for generations to come.

Page 19: building for the generations - St. Thomas' Church · Building for the Generations Phase I: What We Have Accomplished Replacement of the 125-year-old church roof Installation of new

19

Clergy Staffi ng Fund - $1,000,000The one thing that we will always need at St. Thomas is outstanding clergy if we are to continue our mission and carry out our ministries. The Vestry would like to create an endowment to ensure that the church can always provide clergy to lead our church and provide strong pastoral care for our members, excellent worship and teaching. We hope to create a $1 million endowment that will yield $40,000 annually for our operating budget and supplement our annual giving.

Outreach Fund - $1,000,000Servant ministry and outreach are at the heart of what it means to be a Christian. We begin with worship, grow in learning and this naturally leads us to caring for those in need. Together we live out our Baptismal Covenant and strive to serve Christ in all persons as we reach out to the suffering whether geographically close or far away. We want to increase our Outreach Endowment from $59,000 to $1 million. This will yield $40,000 to allocate in Outreach gifts each year.

Landscape Preservation Fund - $2,000,000It can cost up to $3,000 to remove a dead, diseased or dying tree from our campus. Our Landscape Commission has adopted a policy of replacing every tree removed from our property with two new trees. In addition, we hope to conduct beautifi cation projects on our campus, such as a the recent enhancement of the corner of our property where Bethlehem Pike and Church Road intersect. A Landscape Preservation Fund could also help to underwrite the cost of a part-time gardener to help care for the perimeter of our property, which is most visible and also easily neglected. It could help underwrite the cost of our grounds crew, which has dwindled from four full-time to one full-time and two part-time employees during the past thirteen years. We hope to build a $2,000,000 endowment that will yield $80,000 annually.

Page 20: building for the generations - St. Thomas' Church · Building for the Generations Phase I: What We Have Accomplished Replacement of the 125-year-old church roof Installation of new

20

Adult Spiritual Formation Fund - $750,000St. Thomas’ Church has a national reputation for attracting great guest speakers and preachers and offering one of the fi nest adult spiritual formation programs in the Episcopal Church. Our creation of The Bible Challenge has attracted much national and even international attention and is now being shared with other Episcopalians and Anglicans in over 1,000 churches in 14 different countries. We would like to increase our endowment for Adult Spiritual Formation from $72,000 to $750,000, which would yield $30,000 annually for our budget.

Carillon Program and Maintenance Fund - $500,000We have one of only about sixty full carillons attached to any church in the United States. It takes at least twenty-four bells to be a carillon. St. Thomas is blessed to have forty-eight bells, which weigh several tons and reside in our tower. They can be heard not only before, during and after worship, but their peals can be heard throughout the Whitemarsh Valley. We hope to create a $500,000 endowment for the carillon to ensure that the bells can be heard for generations to come and that a summer concert series can continue. This endowment would yield $20,000 per year.

Nursery School Fund - $1,000,000Most schools have an endowment,. We just started one. We believe that we must now take an important step forward and create a St. Thomas’ Nursery School Endowment to ensure the long-term health and well-being of our Nursery School, which is considered the fi nest nursery school in the region. Our school recently celebrated sixty years of wonderful ministry. We hope to endow and ensure its successful future for decades to come. It is one of the strongest attractions to St. Thomas’ Church. This endowment would yield $40,000 a year.

Page 21: building for the generations - St. Thomas' Church · Building for the Generations Phase I: What We Have Accomplished Replacement of the 125-year-old church roof Installation of new

21

Land Conservation - $3,000,000

St. Thomas’ Church members have a strong calling to land conservation. Many of our members over the years have been active in land conservation programs, have left part or all of their estate to be conserved and have helped to found and support organizations such as the Nature Conservancy and the Wissahickon Valley Watershed Association.

We believe that we have the capacity to raise $3 million to create an easement and not develop this land. If parishioners and/or friends of our parish are willing to contribute this sum of money, the Vestry is prepared not to sell or develop this land. The money that is raised would then be added to our Endowment to ensure that we are able to preserve our buildings and grounds and no longer accrue large amounts of annual deferred maintenance.

Page 22: building for the generations - St. Thomas' Church · Building for the Generations Phase I: What We Have Accomplished Replacement of the 125-year-old church roof Installation of new

22

Will you invest in a bold future?

Parishioner and supporter engagement has enabled St. Thomas’ to become what we are today. And in order to continue to build for greater worship, learning and service, we need your fi nancial support.

Capital and Endowment Funding

Capital giving takes place in response to signifi cant need and, therefore, occurs only when absolutely necessary.

It is over and above annual giving.

It invests in permanent properties and in endowments which aid in sustaining the fi nancial health of St. Thomas’ in diffi cult fi nancial times.

It covers larger amounts than annual budgets can.

It allows payments to be spread over a longer period of time.

It often involves the giving of real estate, securities, or other tangible assets.

Your capital and endowment pledges are crucial in allowing St. Thomas’ to address immediate needs and make signifi cant improvements to our facilities that will sustain us as we move into the future.

Make your commitment...

Complete your annual pledge card.

If you are already pledging on an annual basis, commit to an increase to help us overcome our annual shortfall and fulfi ll the funding needs of our worship, learning and service.

If you have never made a pledge before, plan to give a manageable amount on a regular schedule.

Complete your capital and endowment pledge card.

Give generously in addition to your annual pledge. Payments may be spread over an extended period of time of up to fi ve years. Just select a giving plan that is convenient for you.

Consider making a non-cash pledge such as securities, qualifi ed IRA or other tangible assets.

Thank you for your inspiration, engagement and investment in the future of St. Thomas’.

Page 23: building for the generations - St. Thomas' Church · Building for the Generations Phase I: What We Have Accomplished Replacement of the 125-year-old church roof Installation of new

23

Phase II Capital Projects

Campaign administrative expenses $50,000

Church priority maintenance 1,450,000

Parish Hall priority maintenance 400,000

New Wing 800,000

Redo MacColl Auditorium 300,000

Total $3,000,000

Priority Endowments

Building and Hardscape Preservation Fund $2,000,000

Worship and Music Fund 2,000,000

Children and Youth Fund 2,000,000

Landscape Preservation Fund 2,000,000

Clergy Staffi ng Fund 1,000,000

Outreach Fund 1,000,000

Nursery School Fund 1,000,000

Adult Spiritual Formation 750,000

Carillon Program and Maintenance 500,000

Total $12,250,000

Land Conservation $3,000,000

Page 24: building for the generations - St. Thomas' Church · Building for the Generations Phase I: What We Have Accomplished Replacement of the 125-year-old church roof Installation of new

24

Page 25: building for the generations - St. Thomas' Church · Building for the Generations Phase I: What We Have Accomplished Replacement of the 125-year-old church roof Installation of new

25

NAMING OPPORTUNITY INVESTMENTName the Bell tower $750,000Name the Chapel $750,000Name the Parish House (not Auditorium) $500,000Name the Organ in the New Chapel $500,000Name the Large Multi-Purpose Room $250,000Name the S.T.E.A.M. Room $250,000Name the Lounge $200,000Name Classroom 1 $150,000Name Classroom 2 $150,000Name Classroom 3 (upstairs) $150,000Name the altar $ 50,000Name the Pulpit in the New Chapel $ 30,000Name a Chapel Window $25,000Name the lectern $20,000Name the Landscaping $100,000

Campaign Gift Selection Chart Five-year Pay Period5-Yr Gift Level Per Year Per Quarter Per Month Per Week

3,000,000 600,000 150,000 50,000 11,5381,500,000 300,000 75,000 25,000 5,7691,000,000 200,000 50,000 16,667 3,846500,000 100,000 25,000 8,333 1,923250,000 50,000 12,500 4,167 962100,000 20,000 5,000 1,667 38550,000 10,000 2,500 833 19230,000 6,000 1,500 500 11525,000 5,000 1,250 417 9620,000 4,000 1,000 333 7715,000 3,000 750 250 5810,000 2,000 500 167 385,000 1,000 250 83 192,500 500 125 42 102,000 400 100 33 81,500 300 75 25 61,000 200 50 17 4

Page 26: building for the generations - St. Thomas' Church · Building for the Generations Phase I: What We Have Accomplished Replacement of the 125-year-old church roof Installation of new
Page 27: building for the generations - St. Thomas' Church · Building for the Generations Phase I: What We Have Accomplished Replacement of the 125-year-old church roof Installation of new

We/I want to be faithfully engaged in a church that is building for the generations. To that end, we/I commit to the

Endowment/Capital Campaign a total of $__________________.

Discretionary Use Option:We/I wish our funds be used for Endowment and/or Capital needs as determined most appropriate by St.Thomas’ Church leadership.

Endowment Use Option:We/I wish $_______________to be directed to Endowment needs that are being addressed by the Campaign.

We/I wish that the pledged Endowment funds be:

used as deemed appropriate by St. Thomas’ Church leadership to help resolve the endowment needs identified in theCampaign.

used for the following Endowment Fund: _________________________________________________________________

Capital Use Option:We/I wish $__________________to be directed to the Capital needs that are being addressed by the Campaign.

We/I wish that the pledged Capital funds:

to be used as deemed appropriate by St. Thomas’ Church leadership.

to fund 100% of the ____________________________ project (naming opportunity) opportunity.

We/I enclose $______________with our pledge. The balance of our pledge will be paid as follows:

$ Paid Monthly for Months beginning Please Circle Beginning Month & Year

$ Paid Quarterly for Quarters beginning Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

$ Paid Annually for Years beginning 2015 2016 2017 2018

Other:

We/I wish to contribute by credit card. * We/I wish to contribute by automated bank transfer.*

* go online atwww.stthomaswhitemarsh.com to setthis up.

We/I understand that this commitment may be paid in cash, securities, and/or other real property in accordance with the St. Thomas’ Church GiftAcceptance Policy. Please indicate by checking here (_____) if you will be transferring securities for payment of any portion of your gift.

Signature Signature Date

Please make checks payable to St. Thomas’ Church and write “Capital/Endowment Campaign Account” on the Memo Line.Questions should be directed to:

Capital Campaign Office, P.O. Box 247, Fort Washington, PA 19034; Phone: 215 233 3970 x126

Statement of Intended Support

St. Thomas’ ChurchBuilding for the Generations Phase II Campaign

Capital/ Endowment Pledge Card

Page 28: building for the generations - St. Thomas' Church · Building for the Generations Phase I: What We Have Accomplished Replacement of the 125-year-old church roof Installation of new

Depiction of renovated auditorium in the Parish House. This area would be air conditioned, have new windows and window treatments, lighting, sound, furniture and

décor. Events such as smaller weddings and funerals, parties and conferences could

be held here.