building solar infrastructure
UNDISPUTED LEADERSHIP Eighty years of
Larsen & Toubro is a major Indian multinational in technology, engineering, construction, manufacturing and financial services, with global operations. Its products and systems are marketed in over 30 countries worldwide. A strong, customer-focused approach and the constant quest for top-class quality have enabled L&T to attain and sustain leadership in its major lines of business business across eighty years.
• Construction
• Heavy Engineering
• Hydrocarbon Engineering
• Power
• Metallurgical & Material Handling
• Ship Building
• Infrastructure Concession
• Realty
• Electrical & Automation
• Construction & Mining Machinery
• Valves
• Infotech
• Technology Services
• Financial Services
The IndianCONSTRUCTION GIANTL&T Construction, India’s largest construction organization and ranked among the world’s top 30 contractors, has been over the past seven decades transforming cityscapes and landscapes with structures of immense size and grandeur. The company’s capabilities span the entire gamut of construction - civil, mechanical, electrical and instrumentation engineering - and its services extend to all core sector industries and infrastructure projects.
Several of the country’s prized landmarks - edifices, structures, airports, industrial projects, flyovers, viaducts, water and power infrastructure projects carry L&T’s signature of excellence in construction. Today, more and more structures beyond India’s boundaries are standing tall, thanks to L&T Construction.
L&T Construction straddles seven related businesses:
• Buildings & Factories
• Transportation Infrastructure
• Heavy Civil Infrastructure
• Power Transmission & Distribution
• Water & Effluent Treatment
• Smart World & Communication
• Renewable Energy
*The track record information published here is as of September 2019
Building landmarks, setting benchmarks*
• 11 International Airports
• 400+ High Rise Towers
• 40 Institutions & Public Spaces
• 65000+ Apartment Units
• 80+ Manufacturing Facilities
• 21000+ Hospital Beds
• 5 lakh + km of Water & Waste Water Networks
• 7200 MLD of Water & Waste Water Treatment Plants
• 7.3 lakh Hectares of Land Being Irrigated
• 770 Substations
• 34200 ckm of Transmission Lines
• 1.5 lakh+ km of Distribution Lines
• 136000 Habitations Electrified
• 120 Towns Power Quality Enhanced
• 2+ GW Portfolio of Solar Plants
• 315 km of Metro Rail Corridors
• 19.5 km of Monorail Corridors
• 22600 Lane km of Highways
• 11.02 million Sq. m. of Runways
• 8315 MW of Hydro Power Projects
• 8080 MW of Nuclear Power Projects
• 5075 tkm of Railway Track Laying
• 16035 tkm of Railway Electrification
• 32150 MW of E-BoP
• 245 Signalling & Telecom Installation in Stations
• India’s Largest City Surveillance Project: 6000 cameras at 1500 locations at Mumbai
INDIA’S LARGEST SOLAR EPC PLAYERcapability to provide solutions for every challenge under the sun.
track record that includes execution of some of the largest solar plants
viable and technically superior solutions for solar power plants. The
Technology test bed
Gujarat
Grid Connected PV (Utility Scale)in India, L&T provides technologically agnostic,
independent and flexible utility solar power
superior quality and optimum land requirement.
KNITTING AGREEN ZONE
Tracker technology
Concentrating Solar Power (CSP)
The strategic technology tie-ups with global leaders complement innovative design
and construction techniques for successful project commissioning.
FOCUSING THE BEAM
Microgrids and mega rooftops for micro grids which are integrated energy system networks
careful analysis of source and load controls to operate as a single
autonomous grid either in parallel or exclusive island set-up
from the existing utility power grid. A stable integration of
emissions.
various clients.
commercial end users.
THROUGH GREEN CANOPIES
HARNESSING
training institute in Kancheepuram
i-LSTKINTEGRATED LUMPSUM TURNKEY SOLUTIONSL&T is committed to playing a significant role in the arena of renewable energy by
in different solar technologies to design and execute solar power plants including
financing assistance for solar projects of different capacities.
Pre-bid Services: L&T provides bid management services and load-flow study
coordination to key clients and developers interested in bidding for projects under
Project Development: pre-feasibility analysis, economic feasibility analysis, technical assessment, land
arrangement, solar farm site evaluation and selection, power purchase agreements and
grid connectivity along with permits and regulatory approvals.
Project Finance: support through financing institutions, as well as assistance through in-house financial
consultants.
Engineering: A core team of in-house design experts uses cutting-edge software
to design the layout and choose the best technology for a solar farm. L&T produces
long-term energy prediction analysis.
Procurement: experience across a global supply chain and long-term component partnerships it
Construction: point responsibility give L&T an edge over competition. Timely project completion
is ensured within the estimated budget, thus establishing a long-term sustainable
solution for the customer in the shortest time.
Operations & Maintenance:
plant owners.
Grid connected approval
RECORDSUNDER THESUN
and has derived valuable insights on different aspects of solar power systems.
using the latest software and the designs are accredited by leading financial
institutions and technical agencies. A core team interacts with global
technology suppliers in the solar domain to constantly enhance knowledge and
engineering experts have developed unique structural designs and innovative
techniques to hasten the construction process.
SPECIALIZED DESIGN CAPABILITIES
PROJECT MANAGEMENTperfect understanding of the fundamental drivers in the sector, L&T implements world-class
project management practices in all its projects and meets the core criteria of shortest gestation
in the Indian solar industry. L&T has executed the largest and fastest solar power plant
SAFETY AND QUALITYand procedures have been established for implementing the requisites at all stages
stringent quality standards and adherence to time schedules across all projects.