Building Team

ClientArchitect/Consultant

Contractor

8/3/2019 Building Team[1]

http://slidepdf.com/reader/full/building-team1 2/23

Architect/Consultant

Architectural Engineers/Architects

Structural EngineersQuantity Surveyors [Architects QS]

Draughtsman

Technical Officers

8/3/2019 Building Team[1]

http://slidepdf.com/reader/full/building-team1 3/23

ContractorEngineers

Surveyors

Quantity Surveyors [Contractors QS]Estimators

Draughtsman

Technical Officers

Supervisorscraftsman

8/3/2019 Building Team[1]

http://slidepdf.com/reader/full/building-team1 4/23

Quantity Surveyor's Stationeries

Query sheet

Dimensions sheet

Abstract sheet

Bill Page

8/3/2019 Building Team[1]

http://slidepdf.com/reader/full/building-team1 5/23

Measurement procedures

Entering Dimensions

Spacing of item

WasteOder of Dimensions

Timesing

Abbreviations and SymbolsGrouping of Dimensions

Measurements of irregular figures

Alterations to dimensions

8/3/2019 Building Team[1]

http://slidepdf.com/reader/full/building-team1 6/23

Standard Method of Measurements 7 [SMM7]

Bill of Quantities [BOQ]

This consists of a schedule of items of work 

to be carried out under the contract with

quantities entered against each item, prepared 

in accordance with SMM

8/3/2019 Building Team[1]

http://slidepdf.com/reader/full/building-team1 7/23

Major Parts of a BOQ Preliminaries

Sectional Trade Bills

Preambles

Money Provisions

General Summary

8/3/2019 Building Team[1]

http://slidepdf.com/reader/full/building-team1 8/23

The first wk. secn. In a BOQ is

often termed the PreliminariesBill and covers many important

financial matters which relate to

the contract as a whole and arenot confined to any particular

wk. secn.

Preliminaries

8/3/2019 Building Team[1]

http://slidepdf.com/reader/full/building-team1 9/23

1. Items which are not specific to work

sections but which have an identifiable

cost which is best consideredseparately for tendering process, such

as contractual requirements for

insurances, site facilities for theemployers representative and

payments to the local authorities.

The Preliminaries section of a BOQ

contains two separate and distinct types

of items.

8/3/2019 Building Team[1]

http://slidepdf.com/reader/full/building-team1 10/23

2. Items for fixed and time related costs

which derive from the contractors

expected method of carrying out thework, such as bringing plant to and from

the site, providing temporary works and

supervision.

8/3/2019 Building Team[1]

http://slidepdf.com/reader/full/building-team1 11/23

Typical preliminary clauses in respect

of;1.water for work

The contractor shall provide clean, fresh water for

use on he works. Pay all necessary charges, provide

all temporary storage, plumbing services andconnections and shall clear away and make good on

completion.

2. Temporary Work

The contractor shall provide and maintain all

necessary roads, crossings and the like and shall clear

away and make good on completion

8/3/2019 Building Team[1]

http://slidepdf.com/reader/full/building-team1 12/23

3. Scaffolding

The contractor shall provide and

maintain all necessary temporary

scaffolding for the execution of work

8/3/2019 Building Team[1]

http://slidepdf.com/reader/full/building-team1 13/23

Sectional Trade BillsThere would be a number of sectional trade

bills in accordance with the scope, or

complexity of the project. All the measuredwork will be inserted in to sectional trade bills.

Such as;

Bill No. 2 D- Ground work

Bill No 3 F- Masonry

Bill No 4 E- In-situ Concrete etc..

8/3/2019 Building Team[1]

http://slidepdf.com/reader/full/building-team1 14/23

Preamble

Preambles are clauses usually inserted at thehead of each work section bills, and principally

contained descriptions of material and

workmanships as found in specifications,

together with another relevant information of 

which the contractor should be aware in pricing.

Inserting the preamble in the B.O.Q, the lenth of 

the work descriptions are reduced and thespecifications is not necessary if they provide the

information

8/3/2019 Building Team[1]

http://slidepdf.com/reader/full/building-team1 15/23

Functions of Preambles

Specify quality of materials,

Specify the standard of the workmanship

required,Assist in pricing measured work,

Repetition of same information item by item

will be avoided and hence the work descriptionswill be more concise.

8/3/2019 Building Team[1]

http://slidepdf.com/reader/full/building-team1 16/23

Preambles for Excavation.

The quantities of excavation, includingdisposal of excavated material have been

measured nett and the contractor is to allow

in his bill rates for any increase in bulk and for

any additional excavation that may be

required for working space, other than that

provided in accordance with the SMM.

Excavation rates shall include for grubbing up

and removing any tree roots and similar

obstructions that may be encountered

8/3/2019 Building Team[1]

http://slidepdf.com/reader/full/building-team1 17/23

Excavation shall be inspected and approved by

the Architect and the representative of the Local

Authority before any concrete or filling is laid,and any variations measured by the Quantity

Surveyor.

If any excavations are carried out to a greater

width or depth than directed or required, then the

Contractor is to make up or fill in to the required

width or depth with concrete [1:12] at his own

expense, where directed by the Architect, and nopayment will be made for the additional

excavation

8/3/2019 Building Team[1]

http://slidepdf.com/reader/full/building-team1 18/23

Hard core shall be clean, hard brick or stone

broken to pass a 5 diameter ring and be well

graded and compacted in layers not exceeding

150 mm thick, with a 800 kg vibrating roller

running at a slow speed with a minimum of 

three passes over each layer.

8/3/2019 Building Team[1]

http://slidepdf.com/reader/full/building-team1 19/23

Money Provision

Prime Cost Sum[ PC sum]

Provisional Sum

8/3/2019 Building Team[1]

http://slidepdf.com/reader/full/building-team1 20/23

R

easons for the use of PC sums1. It gives architect control over the

choice of firm to carry out work

in the case of nominated subcontractor

2. It will enable the architect to

select good or materials

manufactured by particular firms.

8/3/2019 Building Team[1]

http://slidepdf.com/reader/full/building-team1 21/23

General Summary

The general summary is to provide monetary

collection at the end of each group of work

sections such as, D Ground Work, andF

masonry, the total of which are then

transferred to the general summary

8/3/2019 Building Team[1]

http://slidepdf.com/reader/full/building-team1 22/23

£ P

D. Ground Work

E. In situ Concrete

F. Masonry

G Structural/ Carcassing Timber

H. Cladding/Covering

J. Waterproofing

.

.

Total carried to final summary 

General Summary

8/3/2019 Building Team[1]

http://slidepdf.com/reader/full/building-team1 23/23

Final Summary

1. Preliminaries/General Condition

2. Prime cost and Provisional Sum

3. Measured Work*

4. Contingencies

Total carried to Form of Tender


Recommended