EMNAMBITHI/LADYSMITH MUNICIPALITY MOTIVATION FOR AN INCREASE IN TARIFF FOR 22.38% PRESENTED TO NERSA ON 09 JUNE 2011
Transcript
Page 1: BULK ELECTRICITY TARIFFS

EMNAMBITHI/LADYSMITH MUNICIPALITY

MOTIVATION FOR AN INCREASE IN TARIFF FOR 22.38%

PRESENTED TO NERSA ON 09 JUNE 2011

Page 2: BULK ELECTRICITY TARIFFS

EMNAMBITHI/LADYSMITH MUNICIPALITY

MOTIVATION FOR AN INCREASE IN TARIFF FOR 22.38%

PRESENTED TO NERSA ON 09 JUNE 2011

PRESNETED BYMr S Mathew, Executive Manager

Mrs. R Sompersad, Asst Manager (Finance)Mr P Ramsunder, Asst Manager (Electricity)

Page 3: BULK ELECTRICITY TARIFFS

INTRODUCTION

Emnambithi/Ladysmith local municipality in KZN

under uThukela DM.

A nodal point in the Western Inland development

corridor along N3 highway identified by the Kwazulu

Natal Provincial Growth and Development strategy.

Strategically positioned to attract investment.

Increase in tariff 22.38% for 2011-12

No structural change in tariff

Page 4: BULK ELECTRICITY TARIFFS

GEOGRAPHIC LOCATION

Page 5: BULK ELECTRICITY TARIFFS

CUSTOMER AND LOAD INFORMATION

Domestic Prepaid – 10126

Domestic Credit meter - 7800

Business/Commercial - 1193

Industrial – 85

NMD Ladysmith - 60MVA

NMD Colenso - 1.8MVA

Page 6: BULK ELECTRICITY TARIFFS

TARIFF TYPES 2011/2012

Scale 1 : All Domestic/Prepaid and Life Line Supply

Scale 2: Domestic supply Credit metering

Domestic Supply Prepayment

Scale 3: Businesses Credit and Prepaid

Scale 4: Medium Businesses and Industrial Premises –Credit meters and TOU tariff

Scale 5: Large Businesses and Industrial Premises

Credit meters and TOU tariff

Page 7: BULK ELECTRICITY TARIFFS

HISTORICAL TARIFF INCREASES

Page 8: BULK ELECTRICITY TARIFFS

BUDGET 2011/2012Electricity

2010/2011 2010/2011 2011/2012 2012/2013

budget Actual Budget budget

Salaries 18,876,074 17,527,028 21,749,503 23,272,090

General Expenses 151,514,585 128,677,962 183,383,355 222,456,705

Repairs and Maintenance 4,147,819 5,739,638 4,304,745 4,475,970

Contribution 5,247,440 5,247,440 2,461,188 2,559,640

Capital Charges 8,139,019 8,139,019 16,319,581 15,221,840

Total Expenditure 187,924,937 165,331,087 228,218,372 267,986,245

Recoveries and Charge outs

Recoveries 5,358,970 5,358,970 10,111,325 10,111,325

Charge outs (11,192,069) (6,253,259) (12,758,697) (12,689,570)

Total Recoveries and charge outs (5,833,099) (894,289) (2,647,372) (2,578,245)

Nett Expenditure 182,091,838 164,436,798 225,571,000 265,408,000

-

Income

Electricity 178,459,164 170,788,994 215,325,707 265,735,820

Surplus/(Deficit) (3,632,674) 6,352,196 (10,245,293) 327,820

Unfunded depreciation 16,319,581

Nett Surplus/(Deficit) 6,074,288

Page 9: BULK ELECTRICITY TARIFFS

BUDGET INDICATORS

Salary increase : 6.8%

Bulk purchase cost : 77.7%

Bulk Purchase cost increase : 26.71%

Page 10: BULK ELECTRICITY TARIFFS

REVENUE BY TARIFFREVENUE 20.38% 22.38%

Domestic prepaid R 27,074,854 R 27,627,402

Domestic conventional R 50,593,977 R 51,626,507

Manufacturing/Industrial

LV - Bulk R 17,853,571 R 18,217,930

HV- Bulk R 68,786,319 R 70,190,121

Commercial R 29,020,879 R 29,613,142

Other- Vacant land R 825,507 R 842,354

Total revenue   R 194,155,107 R 198,117,456

Page 11: BULK ELECTRICITY TARIFFS

ADDITIONAL REVENUE REQUIRED

Repairs and maintenance R 3,123,621

Appointment of additional staff R 838,728

Interlinking Jantha and Settler's Switch House R 3,571,330

Percentage for repairs and Maint. and 6.6%

refurbishment

Admin R 27,000

Distribution R 2,984,165

Metering and Services R 1,293,580

Refurbishment of substations R 8,756,500

R 13,061,245

Page 12: BULK ELECTRICITY TARIFFS

INFRASTRUCTURE UPGRADE AND REFURBISHMENTS

Capacity constraints in the lower CBD and no further

expansion of business will be possible.

The planning and installation of electrical services was

done ± fifty years ago and most of the infrastructure has

exceeded its design life. Revised Master Planning in

progress.

Major industrial and commercial developments in pipeline

for which infrastructure upgrades are needed.

Expansion of an existing major industry with additional

load requirement from 6.5 MVA to 8.5 MVA from July

2011.

Insufficient existing capacity to provide new connections

as well as to sustain current load growth needing

infrastructure upgrades.

Page 13: BULK ELECTRICITY TARIFFS

CAPITAL PROJECT

A new substation at the lower end of the

CBD has been constructed.

Interconnection of the existing 132 kV

substation to the newly constructed

Settler’s substation.

Page 14: BULK ELECTRICITY TARIFFS

CAPITAL AND REFURBISHMENT PLAN

– 2011/2012 Newcastle Rd Switch house circuit breakers

Eric Trautman Switch house

Replacement/refurbishment of several 11 kV Circuit Breakers and Ring Main Units

Approximate costs - R8 756 500

Interlinking of Jantha and – R3 571 330.

Settlers substation (Capital)

TOTAL R12 327 830

Page 15: BULK ELECTRICITY TARIFFS

IBT

Implementation challenges

Poor combined households with single point of supply

unfairly treated.

Sale of prepaid electricity to customers will be confusing

Prepayment customers purchasing for more than one

month or in bulk will pay higher tariff.

Wider consultation and roll out and education needed on

the concept to prevent dissatisfaction.

Cross-subsidization will drive businesses away from

Ladysmith with broader impact on local economy

Page 16: BULK ELECTRICITY TARIFFS

IBT

Financial challenges

Not adequately staffed to read meters every month.

Customers will demand monthly reading of meters which

the municipality is not able to do at the current state.

Majority of the customers falls under the first three blocks

leading to revenue loss.

Higher end users able to afford other energy sources

leading further revenue loss.

Page 17: BULK ELECTRICITY TARIFFS

TARIFF 2011/2012

Tariff 2011

Page 18: BULK ELECTRICITY TARIFFS

Prepayment vending Third party vending

A convenience fee of 5% on customers

preferring to buy electricity from third party

vendors.

Page 19: BULK ELECTRICITY TARIFFS

CONCLUSIONMain drivers for increase :

Additional technical manpower to keep the networks

running efficiently (operation and maintenance).

Capital and refurbishment costs mainly due to

ageing infrastructure, theft and vandalism.

Capital infrastructure and maintenance costs

increasing above inflation rates.

Page 20: BULK ELECTRICITY TARIFFS