Business Operating System (BOS)one team - one goal - one process
Leadership Criteria
Leaders need to show competence in the following aspects of these models:
• Ability to articulate all pieces of the Business Model (BOS)
• Ability to establish clear vision
• Ability to clearly communicate vision
What is BOS?
The Business Operating System is the collection of
global business processes which reflect best practices
in the company. The BOS documentation has been
developed by teams from around the world and is
applicable to all facilities. Effective immediately, BOS
replaces all existing operating procedures.
What is BOS?
All BOS processes are:
• Easy to understand and implement
• Value-added
• Interlinked
• Reflective of best practices
• Designed with a minimalist approach & documentation
• ISO-9000 compliant
The objective is to create One Team, One Goal and One Business Operating System.
What is BOS?
Quality Policy
Procedures, Work Instructions, Specifications, Standards
Records
Level 1
Level 2
Level 3
Level 4
PL
US
MO
S
PO
S
LO
S
BOS
Processes
How
Evidence
The Four Pillars of BOS
ExceedingCustomer Expectations
Vision / Mission / Values
Customer Requirements
Quality Cost Delivery
Lead
ership
Op
erating
System
LOS
Pu
rchasin
g
Op
erating
System
POS
Pro
du
ct
Lau
nch
System
PLUS
Man
ufactu
ring
Op
erating
System
MOS
Leadership Operating System (LOS)
• Group Processes
• Financial Processes
• Human Resources Processes
• Information Technology
• Health, Safety, and Environment Processes
Total 38 Level 2 Procedures
Purchasing Operating System (POS)
• Supplier Selection Processes
• Commodity Strategy
• Supplier Development
• Purchase Ordering Process
Total 11 Level 2 Procedures
Manufacturing Operating System (MOS)
People Plant Materials Process Verify• JCMS Series • Audits
• Containment• New Plant
Start Up• Launches
• Bill of Material Reviews
• Balance Out
• Total Productive Maintenance
• Process Capability
Total 35 Level 2 Procedures
Product Launch System (PLUS)
Ideation Proposal DevelopmentDesign
Verification Validation Production
Create future products & strategies
Define new product and/or business
Develop products & procedures
Design & verify the product & process
Validate the product & process
Prepare for production
Total 20 Level 2 Procedures
Why Do We Need BOS?
“Most companies have good people. The companies that win over the long term have the best processes.”
---- Peter Drucker
Why Do We Want a Common Global Business Operating System (BOS)?
• Our goal is to be the finest supplier in the world. This requires a common BOS.
• Our customers are asking for a consistent company around the world. This requires a common BOS.
• A common BOS allows for easier growth as everyone has one system to learn.
• One common company wide system allows for easier and more effective transfer of people.
• A common operating system reduces variation. Variation is waste. Waste costs money. Our customers do not want to pay for waste anymore than we do.
Why Do We Need BOS?
• BOS allows us to solve a problem once and transfer
the solution to all plants, not solve the same problem
multiple times.
• Good processes, consistently applied, lead to
outstanding products, best practices, superior
quality and low cost.
Why Do We Need BOS?
"This year we are "raising the bar", and striving for greater process focus and discipline, innovation and continuous improvement. By doing this, we’ll be delivering higher levels of value to our customers, consumers and shareholders – and ensuring the long-term success of this organization. We all want our company be the premier supplier in the world, so please join me in making the roll-out of our new Business Operating System a great success."
---, President and C.O.O.
Who is Affected by BOS?
• Each employee in every location worldwide is affected by BOS.
• The development of a common set of global business processes affects the way in which we conduct
business.
• Not everything has changed. BOS was constructed by reviewing all company procedures currently in
place to identify the best practices for use globally.
Who is Affected by BOS?
BOS documentation will have a direct affect on the following groups:
• Executive Leadership: The quality management and review processes have been established for the consistent evaluation of all facilities globally.
• Human Resources: The hiring, training and evaluation processes for all employees have been established to ensure global consistency.
• Health, Safety & Environmental: The processes required to safeguard the people, facilities and communities in which we work have been established globally.
• Information Technology: The consistent usage of information technology has been developed for global application.
Who is Affected by BOS?
BOS documentation will have a direct affect on the following groups:
• Finance: The accounting and commercial processes of the company have been established to support the needs of a global organization.
• Purchasing: The sourcing, procurement, and supplier development processes have been developed to integrate the needs of a global company with a global supply base.
• Engineering: A common product and process development process has been developed to allow for a consistent approach in the launch of all products globally.
• Manufacturing: The processes required to establish common practices at each manufacturing facility have been established.
What is the BOS Implementation Plan?
Date Activity
August 20xx BOS procedures finalized
August and September 20xx BOS rollout and training
October 1, 20xx BOS implementation begins
October 20xx - September 20xx All locations audited to BOS procedures
October 1, 20xx All locations certified to XXX based on audit of BOS procedures
What is PLUS?
PLUS is the standard method for developing and launching new
products.
What is PLUS?
• Combines best practices from development centers around the world.
• Helps us meet all quality system requirements.
• Streamlines documentation.
• Drives timing based on customer milestones.
• Connects to a robust set of tools (e.g. costing & project management software, etc.)
• Defines roles, responsibilities, and deliverables for members and suppliers.
Why Do We Need PLUS?
As we have grown into new markets and products, we have outgrown
our old systems. PLUS is a way of delivering new products of any
type, to any customer.
Why Do We Need PLUS?
• Help us achieve our 0 - 100 - 30 success criteria.
• Create synergy as we grow in customers, cultures and products.
• Help us manage complete interior programs.
• Open communication channels.
• Provide a flexibility for new products and types of programs we haven’t yet dreamed of.
Why Do We Need PLUS?
• Simpler – ~160 tasks vs.. 330– 6 phases vs. 9
• More Complete– All forms, procedures, etc.
developed and linked
PIP/EPM:
• Emphasis on process and procedure– Timing templates and
process
• Electronic media– Accessible worldwide– Easier updates
PDP:
Improvements over former processes:
PIP/EPM PIP/EPM Product Introduction Process / Engineering Program ManagementProduct Introduction Process / Engineering Program Management
AdvancedEngineering
ProductionProductionPreparation
CustomerQuote
ProductionValidation
ProductionTooling &Equipment
ConceptSection
Product &ProcessDesign
DesignValidation& ProcessVerification
ProductionRelease
00 2211 33 44 55 66 77 88 99
00 2211 33 44 55IdeationIdeation LaunchLaunchValidationValidationDesign &Design &
VerificationVerificationDevelopmentDevelopmentProposalProposal
Tooling & ProcessProve-OutIdeation
Concept Development
Design Development
ProductEngineering
ProductValidation Product
NPD/PDP NPD/PDP New Product Development / Product Development ProcessNew Product Development / Product Development Process
11 22 33 44 55 66 77
PLUS Groups by Phase
0 1 2 53 4Ideation Proposal Development Design &
VerificationValidation Launch
Manufacturing
Management
Sales & Marketing
Finance
Program Management
Advanced
Engineering
Purchasing
Quality
Why Adopt PLUS?
• Cooperate on complete programs
• Open communication channels
• Ease transfer of people
• Be more flexible
Why Adopt PLUS?
• Emphasis on process and procedure
• RYG reporting
• Supplier Roles (Extended Enterprise)
• Procedure review teams for continuous improvement
• Intranet based training
Best Practices:
PLUS Development Team
PLUS was created by a cross-functional team from most disciplines. Team members include:
PIP/EPM Product Introduction Process / Engineering Program Management
PMH Project Management Handbook
Advanced Engineering
ProductionProductionPreparation
CustomerQuote
ProductionValidation
ProductionTooling &
Equipment
ConceptSection
Product &ProcessDesign
DesignValidation& ProcessVerification
ProductionRelease
0 21 3 4 5 6 7 8 9
0 21 3 4 5Ideation LaunchValidationDesign &
VerificationDevelopmentProposal
21 3 4 5 6
Development &Capturing New
BusinessPilot
PhasePlanning
PhasePrototyping
PhaseProcurement
PhaseMass Production
Phase
PIP/EPM Product Introduction Process / Engineering Program Management
Advanced Engineering
ProductionProductionPreparation
CustomerQuote
ProductionValidation
ProductionTooling &
Equipment
ConceptSection
Product &ProcessDesign
DesignValidation& ProcessVerification
ProductionRelease
0 21 3 4 5 6 7 8 9
0 21 3 4 5Ideation LaunchValidationDesign &
VerificationDevelopmentProposal
Tooling & ProcessProve-OutIdeation
Concept Development
Design Development
ProductEngineering
ProductValidation Product
NPD/PDP New Product Development / Product Development Process
1 2 3 4 5 6 7
0 1 2 53 4Ideation Proposal Development Design &
VerificationValidation Launch
Tactical Business Plan
Project Kick-Off
Development Release
Production Release
Customer Part Submission
Start ofProduction
Targeted Business Plan
• Advanced Development
• Concept Development
• Targeted Business Plan / PD-1
• Product Definition
• Make vs.. Buy (POS)
• Supplier Selection and Sourcing Board (POS)
• Program Business Planning & Quote
• Project Kick-Off
• Product Change Management (LOS)
• Appropriation Request (LOS)
• Product Development
• Process Development
• Quotation Request & Review (POS)
• Product Design
• Process Design
• Product & Process Verification
• Tooling & Equipment Procurement (POS)
• Prototype Build
• Supplier Process Sign- Off Evaluation
• Supplier Part
• Submission
• Pre-Production Build
• Materials System Setup
• Process Sign-Off Evaluation
• Customer Part Submission
PLUS Overview
Phase Exit Review
Phase Exit Review
Phase Exit Review
Phase Exit Review
Phase Exit Review
StageReview
Project ReviewsStageReview
PrototypeRelease
Launch Performance
Report
Feasibility Assessment
DesignReview
DesignReview
Deliver Assemblies to Customer
DesignReview
Ideation Proposal Development Design & Verification
Validation Launch
AdvancedDevelopment
Define the Advanced Development Project
Review Project Plan
Research & Analysis
Create & Propose Directions & Feasibility
Opportunity Assessment
PrepareProject Findings
Close Project
AdvancedDevelopment
Define the Advanced Development Project
Review Project Plan
Research & Analysis
Create & Propose Directions & Feasibility
Opportunity Assessment
PrepareProject Findings
Close Project
Stage Review
Stage Review
0 2 3 4 51
ConceptDevelopment
Define the Concept Development Project
Review Project Plan
Research & Analysis
Create & ProposeDirections & Feasibility
Business Estimation
PrepareProject Findings
Close Project
ConceptDevelopment
Define the Concept Development Project
Review Project Plan
Research & Analysis
Create & ProposeDirections & Feasibility
Business Estimation
PrepareProject Findings
Close Project
Stage Review
Stage Review
Ideation Proposal Development Design & Verification
Validation Launch
Targeted Business PlanPD-1
Market Segment AnalysisPhase 1 Timeline
Targeted Business PlanPD-1
Market Segment AnalysisPhase 1 Timeline
Phase ExitReview
Phase ExitReview
0 2 3 4 51
Customer InputBest in Class
Evaluation
Obtain EnvironmentInformation
Market Research
Receive PreliminaryStatement of Work
Customer InputBest in Class
Evaluation
Obtain EnvironmentInformation
Market Research
Receive PreliminaryStatement of Work
Quality ObjectivesQuality Objectives
Bill Of MaterialsBill Of Materials
Project Kick-Off
Project Award
Baseline SOW & BOM
PD-2 Approval
Assemble SDT
Submit CAR & TA
Phase 2- 5 Timeline
Project Reviews
Product Cost Estimate
Capital Equipment &Tooling Estimates
Create PD-2
Statement of Work
Program Business Plan & Quote
Compile ProgramBusiness Plan
& Quote
Quote Approval
Product Definition
Establish Targets
Document Product& Assumptions
Select CriticalSuppliers
Feasibility Assessment
Create Issues List
Product Definition
Establish Targets
Document Product& Assumptions
Select CriticalSuppliers
Feasibility Assessment
Create Issues List
Ideation Proposal Development Design & Verification
Validation Launch
Phase ExitReview
Phase ExitReview
0 2 3 4 51
Development ReleaseDevelopment Release
Product Development Process Development
Process Flow Diagram
PFMEA
Prototype Control Plan
Measurement System Analysis
Plant Layout
Supplier Selection
Supplier Statement of Work
Supplier RFQ
Make vs.. Buy
Supplier Selection
CAR & TA ApprovalCAR & TA Approval
Develop Drawing & Build Schedule
Models & Layouts
Identify Specifications
DFMEA
Create DVP
Engineering Analysis
Design For Manufacturing
Identify System Level SC’s
Complete Documentation
Design Review
Prepare for Development Release
Ideation Proposal DevelopmentDesign &
VerificationValidation Launch
Phase ExitReview
Phase ExitReview
0 2 3 4 51
Production Release- Equipment
Update Equipment Design
Production Release - Equipment
Production Release- Equipment
Update Equipment Design
Production Release - Equipment
Production Release- Tooling
Update Tooling Design
Production Release - Tooling
Production Release- Tooling
Update Tooling Design
Production Release - Tooling
Product & Process Verification
Order Components
Receive & Inspect Components
Tooling & Equipment Procurement
Receive & Inspect Tooling & Equipment
Assemble Prototypes
Preliminary Capability Study
DV Testing
Deliver Assemblies to Customer
Product & Process Verification
Order Components
Receive & Inspect Components
Tooling & Equipment Procurement
Receive & Inspect Tooling & Equipment
Assemble Prototypes
Preliminary Capability Study
DV Testing
Deliver Assemblies to Customer
Product Design
Create Product DesignDocumentation
Design Review
Prototype Release - Product
Product Design
Create Product DesignDocumentation
Design Review
Prototype Release - Product
Production Release - Product
Update Product Design
Design Review
Production Release - Product
Production Release - Product
Update Product Design
Design Review
Production Release - Product
Process Design
Tooling Design
Equipment Design
Pre-launchControl Plan
Design Shipping Packaging
Prototype Release - Tooling
PrototypeRelease - Equipment
OperatorInstructions
Ideation Proposal DevelopmentDesign &
Verification Validation Launch
Phase ExitReview
Phase ExitReview
0 2 3 4 51
Pre-Production BuildsPre-Production Builds
Production ToolingOrder Tooling
Build Tooling
Qualify Tooling
Production ToolingOrder Tooling
Build Tooling
Qualify Tooling
ProductionTooling
Production Equipment
Pre-Production Builds
PV Testing
Supplier Process Sign-Off Evaluation
Supplier Part Submission
Workforce Hiring/Training
Workforce Hiring/Training
PV TestingPV Testing
Process Sign-Off Evaluation
Process Sign-Off Evaluation
Materials System Setup
Production Control Plan
Production Control Plan
Production EquipmentOrder Equipment
Build Equipment
Qualify Equipment
Production EquipmentOrder Equipment
Build Equipment
Qualify Equipment
EvaluatePkg. System
Complete Logistics
Plan
CompleteSupplier MSO
Receive Customer Releases
CompleteMSO
Set Up SupplierReleases
Customer Part Submission
Customer Part Submission
CompleteMfg. BOM
Set Up MRP System
Supplier Part Submission
Ideation Proposal DevelopmentDesign &
Verification Validation Launch
Phase ExitReview
Phase ExitReview
0 2 3 4 51
Launch Performance ReportLaunch Performance Report
Start of ProductionStart of Production
Ramp-UpRamp-Up
Project File to Product FileProject File to Product File