すばる望遠鏡運用の状況
2016/09/27 JST
国立天文台ハワイ観測所
Budget Status
‘Subaru Telescope Project’ budget allocation over years
1000
1500
2000
2500
3000
3500
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
Fiscal year
Budg
et (M
JPY
)
Budget allocated for Subaru Telescope project. From 2014 there are additional inputs from NAOJ.
Budget 2013-2015
0
500,000
1,000,000
1,500,000
2,000,000
2,500,000
2013 2014 2015Telescope maintenance and upgrade Facility maintenance and upgrade Instrument maintenanceOperations Computer, network and archive New developmentOpenuse Electricity and water Human resourcesPIO Research and education TravelOthers
(k JPY)
2,1052,1072,077
*2014はNew Developmentから 留置金で入ったPFS経費を除いている
HR cost for NAOJ faculty members (~$3M) is not included.
Budget Pi-chart (w NAOJ HR cost, JPY)
cf. typical HR cost fraction of other observatories is ~60%
国立天文台予算 (当初配分)
2%2%1%
22%
1%6%
7%1%
9%
49%C Projects
B ProjectsA Projects
Centers 研究部
事務部
人件費
国際連携室
EAO(JCMT)委員会等
予備費
すばる 17%
A, B, Cプロジェクト 光赤外: 全体予算の26.8% 電波: 全体予算の26.9%
すばる望遠鏡装置タイムライン (proposal, update 2016/09/21)
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
主焦点
カセグレン焦点
ナスミス焦点
Suprime-CamFMOS
HSCPFS
FOCASCOMICSMOIRCS
ULTIMATE
HDSIRCS
AO188SCExAO
IRD
終了終了
終了?
CHARIS
TBD終了持ち込み装置
TBD
終了
TBD
TBD終了終了
review
New Inst?
可視光観測装置 赤外線観測装置
upgrade
(GLAO+WFC)
upgrade?
upgrade?
upgrade
すばるUM (Jan. 10-12, 2017)で議論
Telescope Time
SAC recommendation Sep. 21 JST
• 従来の方針: 戦略枠プログラムは共同利用観測の25%以内
• PFS SSPを控え、HSC SSPの加速が必要
• IRD SSPも予定されている
• 新方針:通常の公募観測を全体の40%以上確保する
• ‘通常の公募観測’ には normal, service, intensiveのすばる観測、および時間交換プログラムを含む
An example of HSC SSP night allocations
Runs SSP Cum. SSP No HSC
S17A 5 36 164 May
S17B 4 48 212 TBD
S18A 6 26 238 May-June?
S18B 3 30 268 TBD
S19A 4 32 300 TBD
total 22 172
This requires ~8 nights/run allocation for HSC SSP.Number of open-use HSC nights will be suppressed.
15
共同利用の見通し: 仮定• M1 recoating: S18A (or S17B), S21B, S25B
• Downtime: できるだけ明夜に
• PFS SSP: from S19B, 300 dark nights
• Subaru-WFIRST joint programは入れていない
• UHは年間52夜 (downtimeが無い場合)
• ‘EAO time’ 3 DDT nights in S17A and S17B
Dark Nights
0
25
50
75
100
16A 16B 17A 17B 18A 18B 19A 19B 20A 20B 21A 21B 22A 22B 23A 23B 24A 24B 25A 25B
HSC SSP PFS SSP PFS comm G-S K-S UHDDT+GTO Open-use Downtime
HSC SSP PFS SSP
GeminiKeckUH
Open-use
Bright Nights
0
25
50
75
100
16A 16B 17A 17B 18A 18B 19A 19B 20A 20B 21A 21B 22A 22B 23A 23B 24A 24B 25A 25B
PFS comm IRD-SSP US-SSP G-S K-S UH DDTOpen-use Downtime
IRD SSP GeminiKeckUH
DDT
Open-use
Dark ave. 27 Open-use Nights / Semester
0
25
50
75
100
S16A S17A S18A S19A S20A S21A S22A S23A S24A S25A S26A
Open-use - dark (SSP - dark) (Others - dark)
Open-use
Bright ave. 40 Open-use Nights / Semester
0
25
50
75
100
S16A S17A S18A S19A S20A S21A S22A S23A S24A S25A S26A
Open-use - bright (SSP - bright) (Others - bright)
Open-use
Regular program fraction
0
40
80
120
160Normal+TimeExchange (Others)
S16A
S16B
S17A
S17B
S18A
S18B
S19A
S19B
S20A
S20B
S21A
S21B
S22A
S22B
S23A
S23B
S24A
S24B
S25A
S25B
S26A
0.4
0.6
0.8
0.2
1.0
Normal + Time Exchange
共同利用の見通し: 今後議論すべき事項
• Subaru-Keck collaboration program?
• UH to join SSPs?
• Subaru-WFIRST joint program(s)?
• International partners