Chile Earthquake and TsunamiChile Earthquake and Tsunamiof February 27of February 27thth, 2010 , 2010
Chile Earthquake and TsunamiChile Earthquake and Tsunamiof February 27of February 27thth, 2010 , 2010
ASCE/COPRI ASCE/COPRI RECONNAISSANCERECONNAISSANCE
ASCE/COPRI ASCE/COPRI RECONNAISSANCERECONNAISSANCE
COPRIPresented by:
Omar Jaradat, Ph.D., P.E.,M P h P E
Presented by:
Omar Jaradat, Ph.D., P.E.,M P h P EMarc Percher, P.E.,
Arul Arulmoli, G.E., F.ASCEMarc Percher, P.E.,
Arul Arulmoli, G.E., F.ASCE
QuakeQuakeQuakeQuake
February 27 2010 February 27 2010
San Antonio
February 27, 2010 8.8 Magnitude 120+ seconds shaking
February 27, 2010 8.8 Magnitude 120+ seconds shaking Plate uplift Tsunami
35ft run-up typical in south
Plate uplift Tsunami
35ft run-up typical in south
COPRI 100ft run-up in Tirua Decks overtopped 1ft in north
Aftershocks up to 6.9 M
100ft run-up in Tirua Decks overtopped 1ft in north
Aftershocks up to 6.9 Mpp
Coronel
San Vicente
Isla Santa Maria
Chile Earthquake Fault Rupture
COPRI
Chile Earthquake (February 27, 2010)
More than 500
( y , )
people lost lives Destroyed more
than 500 000 homesthan 500,000 homes Displaced over
1,000,000 people
COPRI
p p Estimated damage is
more than $20-$30 Billion (US) equivalent toBillion (US), equivalent to 10-15% of Chile’s GDP
Earthquake ReconnaissanceEarthquake ReconnaissanceEarthquake ReconnaissanceEarthquake Reconnaissance
Chile Chile Chile April 10 to 17, 2010 Organized by ASCE Coasts Oceans Ports and
Ri I tit t (COPRI)
Chile April 10 to 17, 2010 Organized by ASCE Coasts Oceans Ports and
Ri I tit t (COPRI)Rivers Institute (COPRI) 8 Marine & Coastal Engineering Professionals
Structural (Wharves, MOTs, Bridges)
Rivers Institute (COPRI) 8 Marine & Coastal Engineering Professionals
Structural (Wharves, MOTs, Bridges)
COPRI Coastal (Tsunami, Coasts) Geotechnical (Marine Structures) Coastal (Tsunami, Coasts) Geotechnical (Marine Structures)
ObjectivesObjectivesObjectivesObjectives
Assess and learn from the performance of port Assess and learn from the performance of port Assess and learn from the performance of port infrastructure including: Waterfront structures and Foundation systems
Assess and learn from the performance of port infrastructure including: Waterfront structures and Foundation systems Handling equipments and Utilities
Assess and learn from the effects of the earthquake and subsequent tsunami
Handling equipments and Utilities Assess and learn from the effects of the
earthquake and subsequent tsunamiCOPRI
earthquake and subsequent tsunami Identify infrastructure that performed as intended
and the ones that performed poorly
earthquake and subsequent tsunami Identify infrastructure that performed as intended
and the ones that performed poorlyp p yp p y
Site Site InvestigationsInvestigations
San Antonio
1. Talcahuano2. San Vicente Port3. San Vicente Gas
Terminal
1. Talcahuano2. San Vicente Port3. San Vicente Gas
TerminalTerminal4. Dichato5. Port of Lirquen6 Port of Coronel
Terminal4. Dichato5. Port of Lirquen6 Port of Coronel
COPRI
6. Port of Coronel7. Isla Santa Maria8. Punta Tumbes9. Valparaiso Port
6. Port of Coronel7. Isla Santa Maria8. Punta Tumbes9. Valparaiso Portp10. San Antonio Port
p10. San Antonio Port Isla Santa
Maria
San Vincente
Coronel
ObservationsObservationsObservationsObservations
Damage related to Tsunami Damage related to Tsunami Damage related to Tsunami Damage due to earthquake shaking – Inertia and
kinematic loading
Damage related to Tsunami Damage due to earthquake shaking – Inertia and
kinematic loadingg Damage due to lateral spreading, slope failure,
liquefaction, land vertical movement
g Damage due to lateral spreading, slope failure,
liquefaction, land vertical movement
COPRI Indirect damage due to power failure, vessels,
cranes, etc…. Indirect damage due to power failure, vessels,
cranes, etc….
ObservationsSoil Slope Failures
ObservationsSoil Slope FailuresSoil Slope FailuresSoil Slope Failures
COPRI
Observations: Loss of Dikes/ Sheetpiles/Observations: Loss of Dikes/ Sheetpiles/pRetaining Walls
pRetaining Walls
Coronel
Talcahuano
COPRISan Vicente
Loss of dike/sheetpile/retaining wall results in loss Loss of dike/sheetpile/retaining wall results in loss
Talcahuano
p gof backlands
Tsunami removes evidence (if any) of liquefaction
p gof backlands
Tsunami removes evidence (if any) of liquefaction
ObservationsObservationsSoil Slope FailuresSoil Slope Failures
Dry Season It could have been worse! Dry Season It could have been worse! Dry Season – It could have been worse! Dry Season – It could have been worse!
COPRI
ObservationsConcrete Pier / Wharf
ObservationsConcrete Pier / WharfConcrete Pier / WharfConcrete Pier / Wharf
COPRI
San Vicente San Vicente PortPort
COPRI
COPRI
ObservationsSteel Pier / Wharf
ObservationsSteel Pier / WharfSteel Pier / WharfSteel Pier / Wharf
COPRI
Port of CoronelPort of CoronelPort of CoronelPort of Coronel
COPRI
San Vincente Gas TerminalSan Vincente Gas TerminalSan Vincente Gas TerminalSan Vincente Gas Terminal
COPRI
MUELLE LO ROJAS - CORONELMUELLE LO ROJAS - CORONEL
COPRI
MUELLE LOTA BAJOMUELLE LOTA BAJO
COPRI
ObservationsKinematic Loading
ObservationsKinematic LoadingKinematic LoadingKinematic Loading
COPRI
Port of Port of CoronelCoronel
COPRI
ObservationsCranes and Base Isolated Pier
ObservationsCranes and Base Isolated PierCranes and Base Isolated PierCranes and Base Isolated Pier
COPRI
Port LirquenPort LirquenPort LirquenPort Lirquen
COPRI
Valparaiso PortValparaiso PortValparaiso PortValparaiso Port
COPRI
Based Isolated PierBased Isolated PierBased Isolated PierBased Isolated PierCoronel
COPRI
Designed and constructed (including isolators) in Chile No damage seen or measured (not instrumented) Designed and constructed (including isolators) in Chile No damage seen or measured (not instrumented) Crane at base isolated structure hit by vessel
Possibly due to interaction during earthquake Crane at base isolated structure hit by vessel
Possibly due to interaction during earthquake
ObservationsObservationsPipingPiping
Performed well no ruptured piping found even Performed well no ruptured piping found even Performed well, no ruptured piping found, even where pounding or anchorage loss
Performed well, no ruptured piping found, even where pounding or anchorage loss
COPRI
Coronel Coronel
ObservationsObservations Courtesy of Bill Bruin, Bay of San Vicente
TanksTanks
COPRI
Near Santiago Airport
Outside scope of trip, can’t help but look Outside scope of trip, can’t help but look
ObservationsT i I t DObservationsT i I t DTsunami – Impact DamageTsunami – Impact Damage
Much of the damage is from debris impact Much of the damage is from debris impactTalcahuano Much of the damage is from debris impact Much of the damage is from debris impactTalcahuano
COPRI
Talcahuano
ObservationsObservationsTsunami – Vessel TheftTsunami – Vessel Theft
Breaks lines carries away vessel Breaks lines carries away vessel Breaks lines, carries away vessel Breaks lines, carries away vessel
Road to Dichato
COPRI
ObservationsObservationsTsunami – Vessel EscapeTsunami – Vessel Escape
San Antonio 7 of 9 berths filled at earthquake San Antonio 7 of 9 berths filled at earthquake San Antonio – 7 of 9 berths filled at earthquake 1.5 hours later all vessels had escaped San Antonio – 7 of 9 berths filled at earthquake 1.5 hours later all vessels had escaped
COPRI
ObservationsObservationsCranes – Vessel EscapeCranes – Vessel Escape During earthquake power lost During earthquake power lost During earthquake power lost Cranes left inside vessels or w/ hanging containers Vessel escapes – catches container / crane and damages it
During earthquake power lost Cranes left inside vessels or w/ hanging containers Vessel escapes – catches container / crane and damages it
San Antonio
COPRI
San Antonio
ObservationsObservationsBollards – Vessel EscapeBollards – Vessel Escape Do not use quick release hooks in Chile (costs) Do not use quick release hooks in Chile (costs) Do not use quick release hooks in Chile (costs) Most bollards performed well, but San Antonio lost 3 Do not use quick release hooks in Chile (costs) Most bollards performed well, but San Antonio lost 3
COPRI
San Antonio
Lessons LearnedLessons LearnedLessons LearnedLessons Learned
Port Structures built to current Building code Port Structures built to current Building code Port Structures built to current Building code performed well
Loss Retaining Walls Loss Backlands
Port Structures built to current Building code performed well
Loss Retaining Walls Loss Backlandsg Soil Movement impacts:
Structural PerformanceP t EQ O bilit
g Soil Movement impacts:
Structural PerformanceP t EQ O bilit
COPRI Post-EQ Operability
Cranes lose power damaged by escaping vessel
Post-EQ Operability Cranes lose power damaged by escaping
vesselvessel Operations MUST work around damage Debris impact causes majority of tsunami damage
vessel Operations MUST work around damage Debris impact causes majority of tsunami damage
Rapid evacuation of vessels reduces port damage significantly
Rapid evacuation of vessels reduces port damage significantly
Tsunami RecommendationsTsunami RecommendationsTsunami RecommendationsTsunami Recommendations
Have Have Have EXISTING vessel evacuation plan Risk assessments to determine tsunami zone
Have EXISTING vessel evacuation plan Risk assessments to determine tsunami zone Audible warning systems and signage Plans for VERTICAL evacuation Audible warning systems and signage Plans for VERTICAL evacuation
COPRI Design foundations for scour in tsunami zone Low lying buildings need flowthrough, anchorage,
and low importance
Design foundations for scour in tsunami zone Low lying buildings need flowthrough, anchorage,
and low importanceand low importance Keep critical equipment away from lowlands
and low importance Keep critical equipment away from lowlands
Earthquake RecommendationsEarthquake RecommendationsEarthquake RecommendationsEarthquake Recommendations
Chile NATIONAL instrumentation program Chile NATIONAL instrumentation program Chile NATIONAL instrumentation program Consider soil movement in structural design Use anchored retaining structures consolidated
Chile NATIONAL instrumentation program Consider soil movement in structural design Use anchored retaining structures consolidated Use anchored retaining structures, consolidated
ground, in-depth geotechnical studies Quick release hooks at moorings OR balanced
Use anchored retaining structures, consolidated ground, in-depth geotechnical studies
Quick release hooks at moorings OR balanced
COPRIdesign for bollards
Keep in mind post event resource limitations Need steel plates aggregate fill etc
design for bollards Keep in mind post event resource limitations
Need steel plates aggregate fill etc Need steel plates, aggregate fill, etc. Need engineers, inspectors, and regulators on
board and best prepared
Need steel plates, aggregate fill, etc. Need engineers, inspectors, and regulators on
board and best prepared
Questions?Questions?Questions?Questions?
COPRI