Copper / Aluminum (Rods) Wire drawing Stranding and Compacting Conductor (Core) Conductor Screening Semi Conducting Compound Insulation Dielectric Material Insulation Screening Semi Conducting Compound Triple Extrusion and curing MANUFACTURING PEOCESS IN INDUSTRY- 1
Transcript
  • MANUFACTURING PEOCESS IN INDUSTRY-1

  • MANUFACTURING PEOCESS IN INDUSTRY-2

  • Curing processes-ISTEAM CURING PROCESS WITH CCV LINE :

    This is wet curing process. Cross linking takes place on CCV line under high temperature steam at 200oC and at high pressure in the range of 18-20 bars. During cross linking process the high percentage of moisture is absorbed by the XLPE insulation. By passage of time some percentage of moisture dries out from the XLPE insulation but still it leaves behind moisture in the XLPE insulation 2000 PPM and number of voids in the insulation. The moisture and voids present in the XLPE insulation result in formations of water trees in the XLPE insulation when cables are energized. These trees are converted into electrical trees which ultimately results in shortening the life of the cable and insulation failure. This technology is now out dated and not used.

  • Curing processes-II

    DRY CURING PROCESS

    The cable is extruded by triple extrusion in one process on CCV line where Cross linking takes place simultaneously in the atmosphere of Nitrogen gas of high temperature at about 300oC-350oC and high pressure in the range 10-15 bar of dry Nitrogen gas. Since cross linking take place under Dry atmosphere, this process is known as dry curing process.

    Major advantage of Dry Curing with Nitrogen Gas are: i) Moisture content in the XLPE insulation practically negligible -50PPM ii) Formation of Micro voids in the insulation almost eliminated.

  • Global Energy Consulting Engineers, Hyderabad

  • Curing processes-III

    SIOPLAS TECHNOLOGY Saline grafted polyethylene is extruded on normal PVC extruders and after that it is cured/ cross linked by hot water or steam separately.

  • COMPARISON BETWEEN OHS & UGCS

    DESCRIPTION OF CONSTRUCTIONAL FEATURES -1

    ConductorCopper / AluminumSolid / StrandedCircular / Shaped / Segmental Ns=1+3n(n+1) and D=(1+2n)d andA = D2 / 4 ; where 'Ns' is Number of strands in the core, 'n' is the number of layers, 'D' is the overall dia of the core and 'd' is the diameter of each strand. Normally the number of strands are 1,7,19,37 and 61. Conductor ScreenSemi conducting screen over the conductor is to prevent discharge between the conductor and the insulation and also to provide protrusion free surface over the core for extrusion of insulation Insulation The materials used for insulation should have Good Insulation Resistance Good Thermal Resistance Non Hygroscopic Good Mechanical properties Good chemical / Alkaline resistant Properties

  • COMPARISON BETWEEN OHS & UGCS

    DESCRIPTION OF CONSTRUCTIONAL FEATURES -2

    Insulation Materials Used Rubber Paper PVC XLPE ( Cross Linked Polyethylene )Insulation Screen and Metallic ScreenTo discharge the tangential stress to the ground and to make the stress only radial to prevent damage to the insulationFillersTo fill the gap between the inter-sticks of the cores and to make the shape circularMetallic Sheath / PVC Inner SheathTo make the cable non hygroscopic in the case of paper insulated cables and to bind all the cores together to make the shape circular in other types of cables

  • COMPARISON BETWEEN OHS & UGCS

    DESCRIPTION OF CONSTRUCTIONAL FEATURES-3

    Inner BeddingAnother protective layer over the metallic sheath for paper insulated cables to make it further non hygroscopicArmoringFor mechanical protection by providingSteel tapes for paper insulated cablesSteel strip / Steel round wires for PVC / XLPE CablesOuter Serving / Outer SheathFinishing of the cable with fibrous material impregnated in bitumen compound for PILC cables called outer servingPVC compound treated with anti-rodent anti-termite chemicals for PVC and XLPE cables

  • COMPARISON BETWEEN OHS & UGCS

    SELECTION / SIZING OF CABLES

    Cost Data Final

    1Name of work: Painting of Transformer structure

    S.No.ParticularsUnitQuantityRate (Rs.)Labour ChargesAmount (Rs.)

    1PaintLtr3180150540

    2SundriesLs30

    SUB TOTAL OF MATERIAL COST570

    3Add: 1) 2% on Transportation from Store to Site 2)1% on material cost towards watch and ward4%( On Material Cost)23

    TOTAL593

    4Add: Labour Charges150

    5Add: Service Tax @10.2% on Labour Cost15

    TOTAL758

    6Add: 5%IDC Cost (On material and Labour)38

    7Add:3% Contingencies (On Material and Labour)23

    TOTAL819

    Total819

    2Name of work: Providing of copings to line structure

    S.No.ParticularsUnitQuantityRate (Rs.)Labour ChargesAmount (Rs.)

    1Cement ConcreteCMT0.25875116219

    2SundriesLs40

    SUB TOTAL OF MATERIAL COST259

    3Add: 1) 2% on Transportation from Store to Site 2)1% on material cost towards watch and ward4%( On Material Cost)10

    TOTAL269

    4Add: Labour Charges116

    5Add: Service Tax @10.2% on Labour Cost12

    TOTAL397

    6Add: 5%IDC Cost (On material and Labour)20

    7Add:3% Contingencies (On Material and Labour)12

    TOTAL429

    Total429

    3Name of work: Rectification of oil leaks to the transformer

    S.No.ParticularsUnitQuantityRate (Rs.)Labour ChargesAmount (Rs.)

    1Transport of Transformer to repair shed up and downLs1500

    2Replacement of gaskets and filtering of oilLs800

    3Installation Testing & CommissioningLs200

    SUB TOTAL OF MATERIAL COST0

    3Add: 1) 2% on Transportation from Store to Site 2)1% on material cost towards watch and ward4%( On Material Cost)0

    TOTAL0

    4Add: Labour Charges2500

    5Add: Service Tax @10.2% on Labour Cost255

    TOTAL2755

    6Add: 5%IDC Cost (On material and Labour)138

    7Add:3% Contingencies (On Material and Labour)83

    TOTAL2976

    Total2976

    4Name of work: Providing Lightning Arresters

    S.No.ParticularsUnitQuantityRate (Rs.)Labour ChargesAmount (Rs.)

    19 kV Lightning ArrestersNo3499451497

    2SundriesLs50

    SUB TOTAL OF MATERIAL COST1547

    3Add: 1) 2% on Transportation from Store to Site 2)1% on material cost towards watch and ward4%( On Material Cost)62

    TOTAL1609

    4Add: Labour Charges45

    5Add: Service Tax @10.2% on Labour Cost5

    TOTAL1659

    6Add: 5%IDC Cost (On material and Labour)83

    7Add:3% Contingencies (On Material and Labour)50

    TOTAL1792

    Total1792

    5Name of work: Reconditioning of Earth pits (where earth Resistance is more than 10 )

    S.No.ParticularsUnitQuantityRate (Rs.)Labour ChargesAmount (Rs.)

    1Pipe earthsNo39006632700

    2SundriesLs100

    SUB TOTAL OF MATERIAL COST2800

    3Add: 1) 2% on Transportation from Store to Site 2)1% on material cost towards watch and ward4%( On Material Cost)112

    TOTAL2912

    4Add: Labour Charges663

    5Add: Service Tax @10.2% on Labour Cost68

    TOTAL3643

    6Add: 5%IDC Cost (On material and Labour)182

    7Add:3% Contingencies (On Material and Labour)109

    TOTAL3934

    Total3934

    6Name of work: Replacement of Damaged Bushings

    S.No.ParticularsUnitQuantityRate (Rs.)Labour ChargesAmount (Rs.)

    111 kV BushingsNo3105150315

    2Sundries such as neoprene sheet etc.Ls85

    SUB TOTAL OF MATERIAL COST400

    3Add: 1) 2% on Transportation from Store to Site 2)1% on material cost towards watch and ward4%( On Material Cost)16

    TOTAL416

    4Add: Labour Charges150

    5Add: Service Tax @10.2% on Labour Cost15

    TOTAL581

    6Add: 5%IDC Cost (On material and Labour)29

    7Add:3% Contingencies (On Material and Labour)17

    TOTAL627

    Total627

    7Name of work: Replacement of damaged Bushing Rods

    S.No.ParticularsUnitQuantityRate (Rs.)Labour ChargesAmount (Rs.)

    112/16 kVA Brass Rods with nutsNo71501401050

    2Sundries such as washers etc.Ls50

    SUB TOTAL OF MATERIAL COST1100

    3Add: 1) 2% on Transportation from Store to Site 2)1% on material cost towards watch and ward4%( On Material Cost)44

    TOTAL1144

    4Add: Labour Charges140

    5Add: Service Tax @10.2% on Labour Cost14

    TOTAL1298

    6Add: 5%IDC Cost (On material and Labour)65

    7Add:3% Contingencies (On Material and Labour)39

    TOTAL1402

    Total1402

    9Name of work: Rectification of GOS (AB Switch)

    S.No.ParticularsUnitQuantityRate (Rs.)Labour ChargesAmount (Rs.)

    1ContactsNo3200155600

    2SundriesLs50

    SUB TOTAL OF MATERIAL COST650

    3Add: 1) 2% on Transportation from Store to Site 2)1% on material cost towards watch and ward4%( On Material Cost)26

    TOTAL676

    4Add: Labour Charges155

    5Add: Service Tax @10.2% on Labour Cost16

    TOTAL847

    6Add: 5%IDC Cost (On material and Labour)42

    7Add:3% Contingencies (On Material and Labour)25

    TOTAL915

    Total915

    10Name of work: Rectification of 11 kV DOLO/HG Fuse set

    S.No.ParticularsUnitQuantityRate (Rs.)Labour ChargesAmount (Rs.)

    111 kV Fuse SetSet11710571710

    2Sundries such as binding wire etc.Ls90

    SUB TOTAL OF MATERIAL COST1800

    3Add: 1) 2% on Transportation from Store to Site 2)1% on material cost towards watch and ward4%( On Material Cost)72

    TOTAL1872

    4Add: Labour Charges57

    5Add: Service Tax @10.2% on Labour Cost6

    TOTAL1935

    6Add: 5%IDC Cost (On material and Labour)97

    7Add:3% Contingencies (On Material and Labour)58

    TOTAL2090

    Total2090

    11Name of work: Replacement of damaged Breathers

    S.No.ParticularsUnitQuantityRate (Rs.)Labour ChargesAmount (Rs.)

    1Silica gel BreatherNo1600100600

    2Sundries such as Transformer oil etc.Ls50

    SUB TOTAL OF MATERIAL COST650

    3Add: 1) 2% on Transportation from Store to Site 2)1% on material cost towards watch and ward4%( On Material Cost)26

    TOTAL676

    4Add: Labour Charges100

    5Add: Service Tax @10.2% on Labour Cost10

    TOTAL786

    6Add: 5%IDC Cost (On material and Labour)39

    7Add:3% Contingencies (On Material and Labour)24

    TOTAL849

    Total849

    12Name of work: Providing End Terminations (Alloy lugs) to line cables

    S.No.ParticularsUnitQuantityRate (Rs.)Labour ChargesAmount (Rs.)

    1Solder less Alloy lugsNo1630160480

    2Sundries such as PVC tap etc.Ls30

    SUB TOTAL OF MATERIAL COST510

    3Add: 1) 2% on Transportation from Store to Site 2)1% on material cost towards watch and ward4%( On Material Cost)20

    TOTAL530

    4Add: Labour Charges160

    5Add: Service Tax @10.2% on Labour Cost16

    TOTAL706

    6Add: 5%IDC Cost (On material and Labour)35

    7Add:3% Contingencies (On Material and Labour)21

    TOTAL762

    Total762

    13Name of work: Replacement of damaged / under sized PVC Cable

    S.No.ParticularsUnitQuantityRate (Rs.)Labour ChargesAmount (Rs.)

    1PVC insulated Cable (4 core - 150 mm)MTR6.02234001338

    2PVC Cable 4 core - 150mmMTR30.0852550

    3LugsNo1630480

    4SundriesLs200

    SUB TOTAL OF MATERIAL COST4568

    5Add: 1) 2% on Transportation from Store to Site 2)1% on material cost towards watch and ward4%( On Material Cost)183

    TOTAL4751

    6Add: Labour Charges400

    7Add: Service Tax @10.2% on Labour Cost41

    TOTAL5192

    8Add: 5%IDC Cost (On material and Labour)260

    9Add:3% Contingencies (On Material and Labour)156

    TOTAL5608

    Total5608

    14Name of work: Providing Fencing to Transformer structure (Where ground clearance is low)

    S.No.ParticularsUnitQuantityRate (Rs.)Labour ChargesAmount (Rs.)

    1SupportsNo6100600

    2Barbed wireKg1045450

    3SundriesLs30

    4Labour for Supports erectionNo650300

    5Labour for barbed wire layingKg1030300

    SUB TOTAL OF MATERIAL COST1080

    6Add: 1) 2% on Transportation from Store to Site 2)1% on material cost towards watch and ward4%( On Material Cost)43

    TOTAL1123

    7Add: Labour Charges600

    8Add: Service Tax @10.2% on Labour Cost6161.2

    TOTAL1784

    9Add: 5%IDC Cost (On material and Labour)89

    10Add:3% Contingencies (On Material and Labour)54

    TOTAL54

    Total1927

    15Name of work: Tightening of Stays

    S.No.ParticularsUnitQuantityRate (Rs.)Labour ChargesAmount (Rs.)

    1Labour charges for TighteningLs160

    SUB TOTAL OF MATERIAL COST0

    3Add: 1) 2% on Transportation from Store to Site 2)1% on material cost towards watch and ward4%( On Material Cost)0

    TOTAL0

    4Add: Labour Charges160

    5Add: Service Tax @10.2% on Labour Cost16

    TOTAL176

    6Add: 5%IDC Cost (On material and Labour)9

    7Add:3% Contingencies (On Material and Labour)5

    TOTAL190

    Total190

    16Name of work: Providing guy insulators for stays

    S.No.ParticularsUnitQuantityRate (Rs.)Labour ChargesAmount (Rs.)

    1Guy insulatorsNo42230088

    27/10 GI WireKg250100

    3Sundries .Ls60

    SUB TOTAL OF MATERIAL COST248

    4Add: 1) 2% on Transportation from Store to Site 2)1% on material cost towards watch and ward4%( On Material Cost)10

    TOTAL258

    5Add: Labour Charges300

    6Add: Service Tax @10.2% on Labour Cost31

    TOTAL589

    7Add: 5%IDC Cost (On material and Labour)29

    8Add:3% Contingencies (On Material and Labour)18

    TOTAL636

    Total636

    17Name of work: Connecting PVC Cable to OH line by using PG Clamps

    S.No.ParticularsUnitQuantityRate (Rs.)Labour ChargesAmount (Rs.)

    1P.G. ClampsNo870240560

    2Sundries .Ls40

    SUB TOTAL OF MATERIAL COST600

    3Add: 1) 2% on Transportation from Store to Site 2)1% on material cost towards watch and ward4%( On Material Cost)24

    TOTAL624

    4Add: Labour Charges240

    5Add: Service Tax @10.2% on Labour Cost24

    TOTAL888

    6Add: 5%IDC Cost (On material and Labour)44

    7Add:3% Contingencies (On Material and Labour)27

    TOTAL959

    Total959

    18Name of work: Rectification of Neutral Earthing

    S.No.ParticularsUnitQuantityRate (Rs.)Labour ChargesAmount (Rs.)

    1Pipe earthsNo29004421800

    2Sundries .Ls100

    SUB TOTAL OF MATERIAL COST1900

    3Add: 1) 2% on Transportation from Store to Site 2)1% on material cost towards watch and ward4%( On Material Cost)76

    TOTAL1976

    4Add: Labour Charges442

    5Add: Service Tax @10.2% on Labour Cost45

    TOTAL2463

    6Add: 5%IDC Cost (On material and Labour)123

    7Add:3% Contingencies (On Material and Labour)74

    TOTAL2660

    Total2660

    19 AName of work: Providing LT Protection Kit for 25 kVA & 63 kVA Transformers

    S.No.ParticularsUnitQuantityRate (Rs.)Labour ChargesAmount (Rs.)

    1LT Protection KitNo111003001100

    2Sundries .Ls100

    SUB TOTAL OF MATERIAL COST1200

    3Add: 1) 2% on Transportation from Store to Site 2)1% on material cost towards watch and ward4%( On Material Cost)48

    TOTAL1248

    4Add: Labour Charges300

    5Add: Service Tax @10.2% on Labour Cost31

    TOTAL1579

    6Add: 5%IDC Cost (On material and Labour)79

    7Add:3% Contingencies (On Material and Labour)47

    TOTAL1705

    Total1705

    19 BName of work: Providing LT protection kit for 100 kVA & above Transformer

    S.No.ParticularsUnitQuantityRate (Rs.)Labour ChargesAmount (Rs.)

    1LT Protection with MCB and distribution BoxNo11371453513714

    2Sundries .Ls100

    SUB TOTAL OF MATERIAL COST13814

    3Add: 1) 2% on Transportation from Store to Site 2)1% on material cost towards watch and ward4%( On Material Cost)553

    TOTAL14367

    4Add: Labour Charges535

    5Add: Service Tax @10.2% on Labour Cost55

    TOTAL14957

    6Add: 5%IDC Cost (On material and Labour)748

    7Add:3% Contingencies (On Material and Labour)449

    TOTAL16154

    Total16154

    20Name of work: Providing Danger Plates

    S.No.ParticularsUnitQuantityRate (Rs.)Labour ChargesAmount (Rs.)

    1"DANGER" PlatesNo25020100

    2Clamps with bolts and nutsNo24040

    3Sundries .Ls10

    SUB TOTAL OF MATERIAL COST150

    4Add: 1) 2% on Transportation from Store to Site 2)1% on material cost towards watch and ward4%( On Material Cost)6

    TOTAL156

    5Add: Labour Charges20

    6Add: Service Tax @10.2% on Labour Cost2

    TOTAL178

    7Add: 5%IDC Cost (On material and Labour)9

    8Add:3% Contingencies (On Material and Labour)5

    TOTAL192

    Total192

    Sheet1

    Current carrying capacityThe current carrying capacity is not the same as specified at ambient temperature. The actual current carrying capacity of the cable laid in the ground depends on

    Depth of the cable trench

    Ground temperature

    Thermal resistivity of the soil

    Proximity to other cables

    The actual current carrying capacity for the cable laid in the ground is

    It = I A ( Rdt x Rsr x Rgt x RPC )

    Short Circuit CurrentISC =

    Where the

    K is the constant depending upon the conductor material (Copper or Aluminum) and the initial and final temperatures during SC period.

    A is the cross section of the core in sq.mm

    t is the time duration(in Sec) of the short ciruit

    Voltage dropIfl (RL Cos + XL Sin )

    Losses Sheath losses

    Dielectric losses

    shall be minimum

    Estimates

    S.NoDescription of DefectUnitRate (Rs)QtyAmount (Rs)

    1Painting of structuresNos819.006049,140.00

    2Copings to be provided to structureNos429.001480634,920.00

    3Oil Leaks to be rectifiedNos2,976.00216642,816.00

    4Lightning Arrestors to be providedNos1,792.0012972,324,224.00

    5Improvement Of Earthing System (Earth Resistance more than 10 Ohms)Nos3,934.002901,140,860.00

    6HV Bushings Chipped / CrackedNos627.002415,048.00

    7Damaged Bushing RodsNos1,402.001419,628.00

    8Operating Rod (Telescopic Hot Stick/Hickery Rod)Nos8,000.0050400,000.00

    9D.O.S Alignment not SatisfactoryNos914.003733,818.00

    10HV DOLO SETS requir rectificationNos2,090.0070146,300.00

    11Replacement of BreathersNos849.005647,544.00

    12Lugs to be provided to cable endsNos762.001084826,008.00

    13Under Size LT CableNos5,608.005733,213,384.00

    14Inadequate Ground Clearance (Providing fencing)Nos1,927.00611,562.00

    15Stay Sets to be TightenedNos190.0035767,830.00

    16GUY insulators for the guysNos636.00267169,812.00

    17PVC Cables not properly connected to OH LinesNos959.0014511,391,509.00

    18Require Neutral Earthing RectificationNos2,660.004621,228,920.00

    19 AReplacement of defective LV protection kit for 25/63 kVA TransformersNos1,705.009781,667,490.00

    19 B-do- 100 kVA and above Transformers (Box type)Nos16,154.005879,482,398.00

    20Danger PlatesNos192.001508289,536.00

    Total23,802,747.00

    Or Say Rs.2.38 crores

    Inturrupts

    Interruptions and Outages 11kv feeders in dodaballapur subdivision during year 2002-2003

    Sl NoSub-stationFeeder 11KVFeeder_nameNo of outages During Reference Period 2002-2003Planned Shutdowns c)Total Interupption a+b+cDuration Other than planned shut downs a+b

    < 30 min.(a)> 30 min.(b)

    NosHrMin.NosHrMin.NosHrMin.NosHrMin.NosHrMin.

    1"D" CrossDF-1LOCAL220335231402292013927223624433445

    2DF-2RAGHUNATHPURA282494030515173133504852343531210045

    3DF-3TALAGAVARA12516471434461285185267569381395133

    4DF-4HANABE235353020324618859018443658342556816

    5DF-5ANTHRAHALLY296392048825316061555047371834412213

    6DF-6TELEPHONE-EXCHANGE14247251933402313112539239230161815

    7DF-7LOCAL1679521030122183204295360877404

    8DF-8SSGHATI146215421174016650010333539441673934

    9DF-9RAJAGHATTA209421139632018549938433605924810531

    10DF-10VASAVI64152021385062824914713659855410

    11DF-12HEGGADIHALLY121321528514014538515294469101498355

    12DF-13MELEKOTE983825349125135415302675452013212950

    13KIADBKF-2BIRLASUPER2142915284751541324039620902427620

    14KF-3INDUSTRIAL2473592940284425618140333715

    15KF-4MARASANDRA

    16KF-5KANSAWADI14518152134451451293531118235166530

    17KF-6TULSYAN1842514950122115443530321415

    18KF-7KSSIDC32915292140363820976915613055

    19KF-8TOWN64815123112151214522725332763927

    20KF-9BASETTYHALLY29114527385048495510410030565035

    21KF-10JALIGE221311534451516115245416229152557630

    22KF-11TAFE113201464519222044322525105

    23DoddabelavagalaDBF-1NICHOLOUSEXPRESS4472093650314520848930534410

    24DBF-2DODDABELAVENGALA30413045379055397320380295034122140

    25DBF-3KANASAVADI260331043226103345103363043030325920

    26DBF-4&6KONENAHALLI32251453310915587630413237303551610

    27DBF-5HULIKUNTE29242623134555226103704022131517611

    Total37857701064013921429905845387415800824425216224

    Distribution Transformer failure During the above period

    Distribution TransformerNo. of Failure% of Failures

    No.

    134822517

    PowerTransformer failure During the above period

    Power TransformerNo. of Failure% of Failures

    No.

    000