Calculation Report Port-Frejus 20160127 - Yachtgarage...XXXXXXXX | Fir INDEX 1111 INTRODUCTION 2222...

Date post: 05-Feb-2021
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
61
XXXXXXXX | Fir PROJECT: Temporary Str Aire de Caréna DATE: 16/11/15 01 REV rst Issue ructure owned b nage, 83600 FREJU FILE: Calculation R 16/11/15 DATE DOCUMENT TIT DOCUMENT TIT DOCUMENT TIT DOCUMENT TIT CALCULATION CALCULATION CALCULATION CALCULATION DOCUMENT NU DOCUMENT NU DOCUMENT NU DOCUMENT NU by Chantie Naval P US Report.doc D.B. DESCRIP TLE: TLE: TLE: TLE: REPORT TEMPO REPORT TEMPO REPORT TEMPO REPORT TEMPO UMBER: UMBER: UMBER: UMBER: Port-Frejus, . TION ORARY STRUCTU ORARY STRUCTU ORARY STRUCTU ORARY STRUCTU TITLE: CALCULATION RE JOB N.: D.B. PREP'D URE “CNPF” URE “CNPF” URE “CNPF” URE “CNPF” EPORT TEMPORA DESIGNED BY: D.Bruciafredd D.B. CHK'D ARY STRUCTURE “ do PREPAR D.Bruci AP Job No. Job No. Job No. Job No. P.O.I.: Rev. No.: Rev. No.: Rev. No.: Rev. No.: “CNPF” N° P 61 RED BY: iafreddo CHE PP'D . : . : . : . : : : 01 1 / 61 PAGES: ECKED BY:
Transcript
  • XXXXXXXX | Fir

    PROJECT:

    Temporary Structure owned by Chanti

    Aire de Carénage

    DATE:

    16/11/15

    01

    REV

    First Issue

    Temporary Structure owned by Chanti

    Aire de Carénage, 83600 FREJUS

    FILE:

    Calculation Report

    16/11/15

    DATE

    DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER:

    Temporary Structure owned by Chantie Naval Port

    83600 FREJUS

    Calculation Report.doc

    D.B.

    DESCRIPTION

    DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER:

    e Naval Port-Frejus,

    D.B.

    DESCRIPTION

    CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”

    TITLE:

    CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”

    JOB N.:

    D.B.

    PREP'D

    CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”

    CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”

    DESIGNED BY:

    D.Bruciafreddo

    D.B.

    CHK'D

    CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”

    D.Bruciafreddo

    PREPARED BY:

    D.Bruciafreddo

    APP'D

    Job No. : Job No. : Job No. : Job No. :

    P.O.I.:

    Rev. No.: Rev. No.: Rev. No.: Rev. No.:

    CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”

    N° PAGE

    61

    PREPARED BY:

    D.Bruciafreddo

    CHECKED BY:

    APP'D

    Job No. : Job No. : Job No. : Job No. :

    Rev. No.: Rev. No.: Rev. No.: Rev. No.: 01

    1 / 61

    N° PAGES:

    CHECKED BY:

  • XXXXXXXX | Fir

    Page 1 2 3 4 5 6 7 8 9

    10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

    First Issue

    Rev-1 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

    DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER:

    Rev-2

    DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER:

    REVISIONS TABLE

    Rev-3 Rev

    CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”

    REVISIONS TABLE

    Rev-4

    CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”

    REVISIONS TABLE

    Page 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69

    Rev-1 X X X X X X X X X X X X X X X X X X X X X X X X X X

    Job No. : Job No. : Job No. : Job No. :

    P.O.I.:

    Rev. No.: Rev. No.: Rev. No.: Rev. No.:

    Rev-2

    Job No. : Job No. : Job No. : Job No. :

    Rev. No.: Rev. No.: Rev. No.: Rev. No.: 01

    2 / 61

    Rev-3 Rev

    Rev-4

  • XXXXXXXX | Fir

    INDEXINDEXINDEXINDEX 1111 INTRODUCTIONINTRODUCTIONINTRODUCTIONINTRODUCTION2222 REREFENCE CODESREREFENCE CODESREREFENCE CODESREREFENCE CODES3333 GENERAL PRGENERAL PRGENERAL PRGENERAL PR

    3.1

    4444 BURNING BEHAVIOURBURNING BEHAVIOURBURNING BEHAVIOURBURNING BEHAVIOUR4.1 4.2

    5555 MATERIALSMATERIALSMATERIALSMATERIALS5.1 5.2 5.3

    6666 LOADSLOADSLOADSLOADS6.1 6.2 6.3 6.4 6.5 6.6

    6.7 6.8

    7777 Results and Structural CheckResults and Structural CheckResults and Structural CheckResults and Structural Check7.1

    First Issue

    INDEXINDEXINDEXINDEX INTRODUCTIONINTRODUCTIONINTRODUCTIONINTRODUCTIONREREFENCE CODESREREFENCE CODESREREFENCE CODESREREFENCE CODESGENERAL PRGENERAL PRGENERAL PRGENERAL PRESCRIPTIONESCRIPTIONESCRIPTIONESCRIPTION

    Use and Operation3.1.1 Periodic thorough examination3.1.2 Installation examination3.1.3 Heating and cooking systems3.1.4 Electrical fittings3.1.5 Fire extinguishers

    BURNING BEHAVIOURBURNING BEHAVIOURBURNING BEHAVIOURBURNING BEHAVIOUR European Standards National Standards

    MATERIALSMATERIALSMATERIALSMATERIALS ................................................................................................................................ Structual steel Bolts ................................ Tension Elemen

    LOADSLOADSLOADSLOADS ................................................................................................................................ Structural Non structural load Wind Load Snow Load Seismic Load Load Cases

    6.6.1 Permanent Action G6.6.2 Variable Action Q

    Load Combinations Verification philosophy of stability and equilibrium

    Results and Structural CheckResults and Structural CheckResults and Structural CheckResults and Structural Check Main Results

    7.1.1 Self Weight7.1.2 Tent Cover

    DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER:

    INTRODUCTIONINTRODUCTIONINTRODUCTIONINTRODUCTION ................................................................................................................................REREFENCE CODESREREFENCE CODESREREFENCE CODESREREFENCE CODES ................................................................................................................................

    ESCRIPTIONESCRIPTIONESCRIPTIONESCRIPTIONUse and Operation ................................

    Periodic thorough examinationInstallation examinationHeating and cooking systemsElectrical fittingsFire extinguishers

    BURNING BEHAVIOURBURNING BEHAVIOURBURNING BEHAVIOURBURNING BEHAVIOUR ................................................................................................................................European Standards ................................National Standards –

    ................................................................................................................................Structual steel ................................

    ................................................................Tension Elements ................................

    ................................................................................................................................................................................................................................................................Structural Self-WeightNon structural load ................................Wind Load ................................Snow Load ................................Seismic Load ................................Load Cases ................................

    Permanent Action GVariable Action Q

    Load Combinations ................................Verification philosophy of stability and equilibrium

    Results and Structural CheckResults and Structural CheckResults and Structural CheckResults and Structural CheckMain Results ................................

    Self Weight ................................Tent Cover ................................

    DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER:

    ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

    ESCRIPTIONESCRIPTIONESCRIPTIONESCRIPTION ................................................................................................................................................................

    Periodic thorough examinationInstallation examination ................................Heating and cooking systemsElectrical fittings ................................Fire extinguishers ................................

    ................................................................................................................................................................FRANCE ................................

    ................................................................................................................................................................................................................................................................................................................................

    ................................................................................................................................................................................................

    Weight ................................................................

    ................................................................................................................................

    ................................................................................................................................

    Permanent Action Gk ................................Variable Action Qk ................................

    ................................Verification philosophy of stability and equilibrium

    Results and Structural CheckResults and Structural CheckResults and Structural CheckResults and Structural Check ................................................................................................................................................................................................

    ................................

    ................................

    CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”

    ................................................................................................................................................................................................................................................................

    ................................................................................................................................................................................................................................................................................................................................

    Periodic thorough examination ................................................................

    Heating and cooking systems ................................................................................................

    ................................................................................................................................................................................................................................................................................................................................

    ................................................................................................

    ................................................................................................................................................................................................................................................................................................

    ................................................................................................................................................................................................................................................................................................................................................................................................

    ................................................................................................................................

    ................................................................................................................................

    ................................................................................................

    ................................................................................................................................

    ................................................................Verification philosophy of stability and equilibrium

    ................................................................................................................................................................................................................................................................................................................................

    ................................................................

    ................................................................

    CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”

    ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

    ................................................................................................................................................................................................................................................................................................................................

    ................................................................................................................................

    ................................................................................................................................

    ................................................................................................................................................................................................................................................................................................................................................................................................

    ................................................................................................................................................................................................

    ................................................................................................................................

    ................................................................................................................................................................................................................................................................................................................................

    ................................................................................................................................

    ................................................................

    ................................................................................................

    ................................................................................................

    ................................................................Verification philosophy of stability and equilibrium ................................

    ................................................................................................................................................................

    ................................................................

    ................................................................

    ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

    ................................................................................................................................................................................................

    ................................................................................................................................

    ................................................................................................................................

    ................................................................................................................................................................................................

    ................................................................................................................................................................................................................................................................................................................................

    ................................................................................................

    ................................................................................................................................................................................................

    ................................................................................................

    ................................................................................................................................

    ................................................................................................................................

    ................................................................................................

    ................................................................................................................................

    ................................................................................................................................................................................................................................................................................................................................

    ................................................................

    ................................................................

    Job No. : Job No. : Job No. : Job No. :

    P.O.I.:

    Rev. No.: Rev. No.: Rev. No.: Rev. No.:

    ................................................................................................................................................................................................................................................................

    ........................................................................................................................................................................................................................................................................................................................

    ........................................................................................................................

    ................................................................................................

    ................................................................................................................................................................................................................................................................................................................................

    ............................................................................................................................................................................................................................................................................

    ....................................................................................................................

    ................................................................................................................................................................................................................................................................................................

    ................................................................................................

    .....................................................................................................................

    ................................................................................................................

    ................................................................................................................................

    ................................................................

    ...........................................................................................................................................................................................................................................................................

    ..........................................................

    ..........................................................

    Job No. : Job No. : Job No. : Job No. :

    Rev. No.: Rev. No.: Rev. No.: Rev. No.: 01

    3 / 61

    ....................................................................................................................................................................................................5555 ........................................................................................................................................................................6666

    ........................................................................................................................7777 .............................................. 7 ................................................... 7

    ................................. 7 ........................ 8

    ................................................. 8 .............................................. 8

    ................................................................................................................................................9999 .......................................... 9

    .................... 10 ........................................................................................ 11111111

    .................... 11 ....................................... 12

    ............................................ 12 .................................................................................................................................... 13131313 ................................... 13

    ......................................... 13 ........................... 14 .......................... 16

    ...................... 16 .......................... 17

    ...................................... 17 ........................................... 19

    ......................................... 20 ........................................ 21

    .................................................................................... 22222222

    ....................... 23

    .......................... 23

    .......................... 23

  • XXXXXXXX | Fir

    7.2

    7.3 8888 Load Bearing Structure PictureLoad Bearing Structure PictureLoad Bearing Structure PictureLoad Bearing Structure Picture9999 Calculation ReportCalculation ReportCalculation ReportCalculation Report

    First Issue

    7.1.3 Wind L Structural Check

    7.2.1 SLS Check7.2.2 ULS Check7.2.3 Ground7.2.4 Overturning, Sliding and Lifting Check

    Design of JointsLoad Bearing Structure PictureLoad Bearing Structure PictureLoad Bearing Structure PictureLoad Bearing Structure PictureCalculation ReportCalculation ReportCalculation ReportCalculation Report

    DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER:

    Wind Load ................................Structural Check ................................

    SLS Check ................................ULS Check ................................Ground AnchoragesOverturning, Sliding and Lifting Check

    Design of Joints ................................Load Bearing Structure PictureLoad Bearing Structure PictureLoad Bearing Structure PictureLoad Bearing Structure PictureCalculation ReportCalculation ReportCalculation ReportCalculation Report ................................................................................................................................

    DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER:

    ................................................................................................

    ................................................................................................

    Anchorages ................................Overturning, Sliding and Lifting Check

    ................................................................Load Bearing Structure PictureLoad Bearing Structure PictureLoad Bearing Structure PictureLoad Bearing Structure Picture ................................................................................................................................

    ................................................................................................................................................................................................................................................................

    CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”

    ................................................................................................................................

    ................................................................................................................................

    Overturning, Sliding and Lifting Check ................................................................

    ................................................................................................................................................................................................................................................................................................................................................................................................

    CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”

    ................................................................................................................................................................................................................................................................

    ................................................................................................

    ................................................................................................................................................................................................

    ................................................................................................................................................................................................................................................................

    ................................................................................................................................

    ................................................................................................................................

    ................................................................................................

    ................................................................................................................................................................................................................................................................................................................................

    ................................................................................................................................................................................................................................................................

    Job No. : Job No. : Job No. : Job No. :

    P.O.I.:

    Rev. No.: Rev. No.: Rev. No.: Rev. No.:

    ...........................................................................................

    .......................................................................................................................

    ................................................................................................................................

    .................................................................................................................................................................................................................................................

    ................................................................................................................................

    Job No. : Job No. : Job No. : Job No. :

    Rev. No.: Rev. No.: Rev. No.: Rev. No.: 01

    4 / 61

    ........................... 24 ............................................... 25

    ............................ 25 ........................... 26

    ........................................ 29 .................................. 30

    ................. 31 ................................................................ 32323232

    .................................................................................................................................................................... 33333333

  • XXXXXXXX | Fir

    1111 The aim of this document is to show structure shown in Figure

    The steel structure is installed and used as boats storage. It will be hot galvanized.9.60m. The overall plan dimensionshave an height of 6m.once the structure is erected.structure of 3,50m. The Spiral strands are then connected at the elevation of +2.00m and +6.00m. Only thelevation of +2.57m, +6.00m and +9.60m.For a safe use of the structure it must be respected the “general prescriptions” described in §2 of this document.

    9.00 m

    First Issue

    IIIINTRODNTRODNTRODNTRODaim of this document is to show

    structure shown in Figure

    The steel structure is installed and used as boats storage. It will be hot galvanized.

    The overall plan dimensionshave an height of 6m.once the structure is erected.structure of 3,50m. The Spiral strands are then connected at the elevation of +2.00m and +6.00m. Only the central ropes of the front side consist of three spiral strands at the elevation of +2.57m, +6.00m and +9.60m.For a safe use of the structure it must be respected the “general prescriptions” described in §2 of this document.

    9.00 m

    DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER:

    NTRODNTRODNTRODNTRODUCTIONUCTIONUCTIONUCTIONaim of this document is to show

    structure shown in Figure 1, owned by CNPF in Port Frejus, France.

    Figure

    The steel structure is installed and used as boats storage. It will be hot galvanized. The roof has a segmental arch shape with a total height at the center of

    The overall plan dimensionshave an height of 6m. The base conce the structure is erected. structure of 3,50m. The Spiral strands are then connected at the elevation of +2.00m and

    e central ropes of the front side consist of three spiral strands at the elevation of +2.57m, +6.00m and +9.60m.For a safe use of the structure it must be respected the “general prescriptions” described in §2 of this document.

    DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER:

    UCTIONUCTIONUCTIONUCTION aim of this document is to show the structural design and calculation of the temporary

    1, owned by CNPF in Port Frejus, France.

    Figure 1-1 3D Model of the Temporary structure

    The steel structure is installed and used as boats storage. It The roof has a segmental arch shape with a total height at the center of

    The overall plan dimensions , shown in Figure The base columns are equipped with rubber wheels that

    The anchor points of the Spiral strands have a distance from the structure of 3,50m. The Spiral strands are then connected at the elevation of +2.00m and

    e central ropes of the front side consist of three spiral strands at the elevation of +2.57m, +6.00m and +9.60m.For a safe use of the structure it must be respected the “general prescriptions” described in

    CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”

    the structural design and calculation of the temporary 1, owned by CNPF in Port Frejus, France.

    3D Model of the Temporary structure

    The steel structure is installed and used as boats storage. It The roof has a segmental arch shape with a total height at the center of

    shown in Figure olumns are equipped with rubber wheels that

    The anchor points of the Spiral strands have a distance from the structure of 3,50m. The Spiral strands are then connected at the elevation of +2.00m and

    e central ropes of the front side consist of three spiral strands at the elevation of +2.57m, +6.00m and +9.60m. For a safe use of the structure it must be respected the “general prescriptions” described in

    CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”

    the structural design and calculation of the temporary 1, owned by CNPF in Port Frejus, France.

    3D Model of the Temporary structure

    The steel structure is installed and used as boats storage. It consists of trussed elements that The roof has a segmental arch shape with a total height at the center of

    shown in Figure 1, are 9m x olumns are equipped with rubber wheels that

    The anchor points of the Spiral strands have a distance from the structure of 3,50m. The Spiral strands are then connected at the elevation of +2.00m and

    e central ropes of the front side consist of three spiral strands at the

    For a safe use of the structure it must be respected the “general prescriptions” described in

    the structural design and calculation of the temporary 1, owned by CNPF in Port Frejus, France.

    3D Model of the Temporary structure

    consists of trussed elements that The roof has a segmental arch shape with a total height at the center of

    1, are 9m x 10.2m and the lateral walls olumns are equipped with rubber wheels that

    The anchor points of the Spiral strands have a distance from the structure of 3,50m. The Spiral strands are then connected at the elevation of +2.00m and

    e central ropes of the front side consist of three spiral strands at the

    For a safe use of the structure it must be respected the “general prescriptions” described in

    10.20m

    Job No. : Job No. : Job No. : Job No. :

    P.O.I.:

    Rev. No.: Rev. No.: Rev. No.: Rev. No.:

    the structural design and calculation of the temporary

    consists of trussed elements that The roof has a segmental arch shape with a total height at the center of

    m and the lateral walls olumns are equipped with rubber wheels that

    The anchor points of the Spiral strands have a distance from the structure of 3,50m. The Spiral strands are then connected at the elevation of +2.00m and

    e central ropes of the front side consist of three spiral strands at the

    For a safe use of the structure it must be respected the “general prescriptions” described in

    10.20 m

    Job No. : Job No. : Job No. : Job No. :

    Rev. No.: Rev. No.: Rev. No.: Rev. No.: 01

    5 / 61

    the structural design and calculation of the temporary

    consists of trussed elements that The roof has a segmental arch shape with a total height at the center of

    m and the lateral walls are blocked

    The anchor points of the Spiral strands have a distance from the structure of 3,50m. The Spiral strands are then connected at the elevation of +2.00m and

    e central ropes of the front side consist of three spiral strands at the

    For a safe use of the structure it must be respected the “general prescriptions” described in

    +6.00m

    +9.60m

    consists of trussed elements that The roof has a segmental arch shape with a total height at the center of

    m and the lateral walls are blocked

    The anchor points of the Spiral strands have a distance from the structure of 3,50m. The Spiral strands are then connected at the elevation of +2.00m and

    e central ropes of the front side consist of three spiral strands at the

    For a safe use of the structure it must be respected the “general prescriptions” described in

  • XXXXXXXX | Fir

    2222 The referenctechnical rules developed by the European Committee for Standardisation for the structural design of construction works in the European Union. The following Eurocodes are used:

    • EN 13782:2005 • EN 1990:2004 • EN 1991

    imposed loads for buildings• EN 1991

    Snow loads• EN 1991

    Wind actions• EN 1993

    buildings.• EN 1993

    design.• EN 1993

    First Issue

    REREFENCE CODESREREFENCE CODESREREFENCE CODESREREFENCE CODESThe reference codes for structural calculation are Eurocodes. technical rules developed by the European Committee for Standardisation for the structural design of construction works in the European Union.

    The following Eurocodes are used:EN 13782:2005 EN 1990:2004 EN 1991-1-1:2004 imposed loads for buildingsEN 1991-1-3:2004 Snow loads EN 1991-1-4:2004 Wind actionsEN 1993-1-1: buildings. EN 1993-1-2: design. EN 1993-1-8: Eurocode 3: Design of steel structures

    DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER:

    REREFENCE CODESREREFENCE CODESREREFENCE CODESREREFENCE CODESe codes for structural calculation are Eurocodes.

    technical rules developed by the European Committee for Standardisation for the structural design of construction works in the European Union.

    The following Eurocodes are used:EN 13782:2005 Temporary structures EN 1990:2004 Eurocode: Basis of structural design

    1:2004 Eurocode 1: Actions on structuresimposed loads for buildings

    3:2004 Eurocode 1: Actions 4:2004 Eurocode 1: Actions on structures

    Wind actions 1: Eurocode 3: Design of steel structures

    2: Eurocode 3: Design of steel structures

    8: Eurocode 3: Design of steel structures

    DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER:

    REREFENCE CODESREREFENCE CODESREREFENCE CODESREREFENCE CODESe codes for structural calculation are Eurocodes.

    technical rules developed by the European Committee for Standardisation for the structural design of construction works in the European Union.

    The following Eurocodes are used: Temporary structures

    Eurocode: Basis of structural designEurocode 1: Actions on structures

    imposed loads for buildings. Eurocode 1: Actions

    Eurocode 1: Actions on structures

    Eurocode 3: Design of steel structures

    Eurocode 3: Design of steel structures

    8: Eurocode 3: Design of steel structures

    CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”

    REREFENCE CODESREREFENCE CODESREREFENCE CODESREREFENCE CODES e codes for structural calculation are Eurocodes.

    technical rules developed by the European Committee for Standardisation for the structural design of construction works in the European Union.

    Temporary structures - Tents Eurocode: Basis of structural design

    Eurocode 1: Actions on structures

    Eurocode 1: Actions on structures

    Eurocode 1: Actions on structures

    Eurocode 3: Design of steel structures

    Eurocode 3: Design of steel structures

    8: Eurocode 3: Design of steel structures

    CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”

    e codes for structural calculation are Eurocodes. technical rules developed by the European Committee for Standardisation for the structural design of construction works in the European Union.

    Tents - SafetyEurocode: Basis of structural design.

    Eurocode 1: Actions on structures -

    on structures –

    Eurocode 1: Actions on structures –

    Eurocode 3: Design of steel structures - General rules and rules for

    Eurocode 3: Design of steel structures - General rules

    8: Eurocode 3: Design of steel structures - Design of joints.

    e codes for structural calculation are Eurocodes. They are a set of harmonized technical rules developed by the European Committee for Standardisation for the structural

    - Part 1-1: Densities, self

    – Part 1-3: General actions

    – Part 1-4: General actions

    General rules and rules for

    General rules

    Design of joints.

    Job No. : Job No. : Job No. : Job No. :

    P.O.I.:

    Rev. No.: Rev. No.: Rev. No.: Rev. No.:

    are a set of harmonized technical rules developed by the European Committee for Standardisation for the structural

    1: Densities, self

    3: General actions

    4: General actions

    General rules and rules for

    General rules - Structural fire

    Design of joints.

    Job No. : Job No. : Job No. : Job No. :

    Rev. No.: Rev. No.: Rev. No.: Rev. No.: 01

    6 / 61

    are a set of harmonized technical rules developed by the European Committee for Standardisation for the structural

    1: Densities, self-weight,

    3: General actions -

    4: General actions -

    General rules and rules for

    Structural fire

    weight,

  • XXXXXXXX | Fir

    3333 The following technical prescriptions have to be followed in order to safely use

    1. The structure must always be fixed at the ground through tension components

    2. In case of snow accumulation on the load bearing structure, it is important with the removal of the same by mechanical suitable

    3.13.13.13.1 According to EN 13782: 2004 prescriptions have to be respected.

    3.1.1 Each tent should be examined prior to the end The period between two thorough examinations should be done according to local regulation but should not be longer than 3 years.In general the examination should be carried out on the erected tent. Exceptionally there cbe the possibility to check the tent being dismantled.Mainly the following checks should be performed:

    • correct erection;• check of the structure, especially of modified, repaired or exchanged parts;• identification of damages, tearing and corrosion;• check of safety devices (if appropriate);• fulfilment of conditions from previous examinations.

    3.1.2 3.1.2.13.1.2.13.1.2.13.1.2.1 Tents should be subjected to an installation examination after each new installation, carried out by competent experts.3.1.2.23.1.2.23.1.2.23.1.2.2 The following procedure should be performed:

    • observance of the conditions imposed by the tent book and their fulfilment;

    First Issue

    GENERAL PRESCRIPTIONGENERAL PRESCRIPTIONGENERAL PRESCRIPTIONGENERAL PRESCRIPTIONThe following technical prescriptions have to be followed in order to safely use

    The structure must always be fixed at the ground through tension components In case of snow accumulation on the load bearing structure, it is important with the removal of the same by mechanical suitable devices

    UUUUse and Operationse and Operationse and Operationse and OperationAccording to EN 13782: 2004 prescriptions have to be respected.

    Periodic thorough examinationPeriodic thorough examinationPeriodic thorough examinationPeriodic thorough examinationEach tent should be examined prior to the end The period between two thorough examinations should be done according to local regulation but should not be longer than 3 years.In general the examination should be carried out on the erected tent. Exceptionally there cbe the possibility to check the tent being dismantled.Mainly the following checks should be performed:

    correct erection;check of the structure, especially of modified, repaired or exchanged parts;identification of damages, tearing and corrosion;check of safety devices (if appropriate);fulfilment of conditions from previous examinations.

    Installation examinationInstallation examinationInstallation examinationInstallation examination GeneralGeneralGeneralGeneral

    Tents should be subjected to an installation examination after each new installation, carried out by competent experts.

    Extent Extent Extent Extent of installation examinationof installation examinationof installation examinationof installation examinationThe following procedure should be performed:

    observance of the conditions imposed by the tent book and their fulfilment;

    DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER:

    GENERAL PRESCRIPTIONGENERAL PRESCRIPTIONGENERAL PRESCRIPTIONGENERAL PRESCRIPTIONThe following technical prescriptions have to be followed in order to safely use

    The structure must always be fixed at the ground through tension componentsIn case of snow accumulation on the load bearing structure, it is important with the removal of the same by mechanical

    devices for the removal

    se and Operationse and Operationse and Operationse and OperationAccording to EN 13782: 2004 prescriptions have to be respected.

    Periodic thorough examinationPeriodic thorough examinationPeriodic thorough examinationPeriodic thorough examinationEach tent should be examined prior to the end The period between two thorough examinations should be done according to local regulation but should not be longer than 3 years.In general the examination should be carried out on the erected tent. Exceptionally there cbe the possibility to check the tent being dismantled.Mainly the following checks should be performed:

    correct erection; check of the structure, especially of modified, repaired or exchanged parts;identification of damages, tearing and corrosion;check of safety devices (if appropriate);fulfilment of conditions from previous examinations.

    Installation examinationInstallation examinationInstallation examinationInstallation examinationGeneralGeneralGeneralGeneral

    Tents should be subjected to an installation examination after each new installation, carried out by competent experts.

    of installation examinationof installation examinationof installation examinationof installation examinationThe following procedure should be performed:

    observance of the conditions imposed by the tent book and their fulfilment;

    DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER:

    GENERAL PRESCRIPTIONGENERAL PRESCRIPTIONGENERAL PRESCRIPTIONGENERAL PRESCRIPTIONThe following technical prescriptions have to be followed in order to safely use

    The structure must always be fixed at the ground through tension componentsIn case of snow accumulation on the load bearing structure, it is important with the removal of the same by mechanical

    for the removal.

    se and Operationse and Operationse and Operationse and Operation According to EN 13782: 2004 Temporary structures prescriptions have to be respected.

    Periodic thorough examinationPeriodic thorough examinationPeriodic thorough examinationPeriodic thorough examinationEach tent should be examined prior to the end The period between two thorough examinations should be done according to local regulation but should not be longer than 3 years. In general the examination should be carried out on the erected tent. Exceptionally there cbe the possibility to check the tent being dismantled.Mainly the following checks should be performed:

    check of the structure, especially of modified, repaired or exchanged parts;identification of damages, tearing and corrosion;check of safety devices (if appropriate);fulfilment of conditions from previous examinations.

    Installation examinationInstallation examinationInstallation examinationInstallation examination

    Tents should be subjected to an installation examination after each new installation, carried

    of installation examinationof installation examinationof installation examinationof installation examinationThe following procedure should be performed:

    observance of the conditions imposed by the tent book and their fulfilment;

    CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”

    GENERAL PRESCRIPTIONGENERAL PRESCRIPTIONGENERAL PRESCRIPTIONGENERAL PRESCRIPTION The following technical prescriptions have to be followed in order to safely use

    The structure must always be fixed at the ground through tension componentsIn case of snow accumulation on the load bearing structure, it is important with the removal of the same by mechanical

    Temporary structures

    Periodic thorough examinationPeriodic thorough examinationPeriodic thorough examinationPeriodic thorough examination Each tent should be examined prior to the end of a period given in the tent book.The period between two thorough examinations should be done according to local regulation

    In general the examination should be carried out on the erected tent. Exceptionally there cbe the possibility to check the tent being dismantled.Mainly the following checks should be performed:

    check of the structure, especially of modified, repaired or exchanged parts;identification of damages, tearing and corrosion;check of safety devices (if appropriate); fulfilment of conditions from previous examinations.

    Tents should be subjected to an installation examination after each new installation, carried

    of installation examinationof installation examinationof installation examinationof installation examination The following procedure should be performed:

    observance of the conditions imposed by the tent book and their fulfilment;

    CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”

    The following technical prescriptions have to be followed in order to safely use

    The structure must always be fixed at the ground through tension componentsIn case of snow accumulation on the load bearing structure, it is important with the removal of the same by mechanical devices, by heating of the surfa

    Temporary structures - Tents –

    of a period given in the tent book.The period between two thorough examinations should be done according to local regulation

    In general the examination should be carried out on the erected tent. Exceptionally there cbe the possibility to check the tent being dismantled.

    check of the structure, especially of modified, repaired or exchanged parts;identification of damages, tearing and corrosion;

    fulfilment of conditions from previous examinations.

    Tents should be subjected to an installation examination after each new installation, carried

    observance of the conditions imposed by the tent book and their fulfilment;

    The following technical prescriptions have to be followed in order to safely useThe structure must always be fixed at the ground through tension componentsIn case of snow accumulation on the load bearing structure, it is important

    , by heating of the surfa

    – Safety, the following

    of a period given in the tent book.The period between two thorough examinations should be done according to local regulation

    In general the examination should be carried out on the erected tent. Exceptionally there c

    check of the structure, especially of modified, repaired or exchanged parts;

    Tents should be subjected to an installation examination after each new installation, carried

    observance of the conditions imposed by the tent book and their fulfilment;

    Job No. : Job No. : Job No. : Job No. :

    P.O.I.:

    Rev. No.: Rev. No.: Rev. No.: Rev. No.:

    The following technical prescriptions have to be followed in order to safely use the structure:The structure must always be fixed at the ground through tension componentsIn case of snow accumulation on the load bearing structure, it is important

    , by heating of the surfa

    , the following

    of a period given in the tent book. The period between two thorough examinations should be done according to local regulation

    In general the examination should be carried out on the erected tent. Exceptionally there c

    check of the structure, especially of modified, repaired or exchanged parts;

    Tents should be subjected to an installation examination after each new installation, carried

    observance of the conditions imposed by the tent book and their fulfilment;

    Job No. : Job No. : Job No. : Job No. :

    Rev. No.: Rev. No.: Rev. No.: Rev. No.: 01

    7 / 61

    the structure:The structure must always be fixed at the ground through tension components. In case of snow accumulation on the load bearing structure, it is important to proceed

    , by heating of the surfaces or any

    , the following

    The period between two thorough examinations should be done according to local regulation

    In general the examination should be carried out on the erected tent. Exceptionally there can

    Tents should be subjected to an installation examination after each new installation, carried

    observance of the conditions imposed by the tent book and their fulfilment;

    the structure:

    to proceed ces or any

    The period between two thorough examinations should be done according to local regulation

    an

  • XXXXXXXX | Fir

    • correct packing and anchoring according to the plans with respect to the local ground conditions;

    • checking • conformity with the construction documents, existence of all essential load

    components inclusive of bracing comparison of forms and crosscarrying components. Attention is to be paid to the correct incorporation, staiplatforms, linings, decorations and similar equipment;

    • suitability of the site of tent;• state of conservation of the essential load

    on site);• fastening.

    3.1.3 Electrical heating systemOther heating system should be put outside at a sufficient distance.The warmTo prepare meals and drinks tents can be equipped with fireplaces in kitchens, these areas should be seabsence, with the agreement by parts.

    3.1.4 The electrical fittings should comply with the relevant EN standards or, in absence, with the agreement by parts.

    3.1.5 Types and numbers of extinguishers should be in accordance with EN 3.

    First Issue

    correct packing and anchoring according to the plans with respect to the local ground conditions; checking of anchorage;conformity with the construction documents, existence of all essential loadcomponents inclusive of bracing comparison of forms and crosscarrying components. Attention is to be paid to the correct incorporation, staiplatforms, linings, decorations and similar equipment;suitability of the site of tent;state of conservation of the essential loadon site); fastening.

    Heating and cooking systemsHeating and cooking systemsHeating and cooking systemsHeating and cooking systemsElectrical heating systemOther heating system should be put outside at a sufficient distance.The warm-air generators should be with heat exchangers.To prepare meals and drinks tents can be equipped with fireplaces in kitchens, these areas should be separated. The heating system should comply with the relevant EN standards or, in absence, with the agreement by parts.

    Electrical fittingsElectrical fittingsElectrical fittingsElectrical fittingsThe electrical fittings should comply with the relevant EN standards or, in absence, with the agreement by parts.

    Fire extinguishersFire extinguishersFire extinguishersFire extinguishersTypes and numbers of extinguishers should be in accordance with EN 3.

    DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER:

    correct packing and anchoring according to the plans with respect to the local ground

    of anchorage;conformity with the construction documents, existence of all essential loadcomponents inclusive of bracing comparison of forms and crosscarrying components. Attention is to be paid to the correct incorporation, staiplatforms, linings, decorations and similar equipment;suitability of the site of tent;state of conservation of the essential load

    Heating and cooking systemsHeating and cooking systemsHeating and cooking systemsHeating and cooking systemsElectrical heating system can be installed in tents.Other heating system should be put outside at a sufficient distance.

    air generators should be with heat exchangers.To prepare meals and drinks tents can be equipped with fireplaces in kitchens, these areas

    parated. The heating system should comply with the relevant EN standards or, in absence, with the agreement by parts.

    Electrical fittingsElectrical fittingsElectrical fittingsElectrical fittingsThe electrical fittings should comply with the relevant EN standards or, in absence, with the agreement by parts.

    Fire extinguishersFire extinguishersFire extinguishersFire extinguishersTypes and numbers of extinguishers should be in accordance with EN 3.

    DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER:

    correct packing and anchoring according to the plans with respect to the local ground

    of anchorage; conformity with the construction documents, existence of all essential loadcomponents inclusive of bracing comparison of forms and crosscarrying components. Attention is to be paid to the correct incorporation, staiplatforms, linings, decorations and similar equipment;suitability of the site of tent; state of conservation of the essential load

    Heating and cooking systemsHeating and cooking systemsHeating and cooking systemsHeating and cooking systemscan be installed in tents.

    Other heating system should be put outside at a sufficient distance.air generators should be with heat exchangers.

    To prepare meals and drinks tents can be equipped with fireplaces in kitchens, these areas parated. The heating system should comply with the relevant EN standards or, in

    absence, with the agreement by parts.

    Electrical fittingsElectrical fittingsElectrical fittingsElectrical fittings The electrical fittings should comply with the relevant EN standards or, in absence, with the

    Fire extinguishersFire extinguishersFire extinguishersFire extinguishers Types and numbers of extinguishers should be in accordance with EN 3.

    CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”

    correct packing and anchoring according to the plans with respect to the local ground

    conformity with the construction documents, existence of all essential loadcomponents inclusive of bracing comparison of forms and crosscarrying components. Attention is to be paid to the correct incorporation, staiplatforms, linings, decorations and similar equipment;

    state of conservation of the essential load-bearing construction parts (random check

    Heating and cooking systemsHeating and cooking systemsHeating and cooking systemsHeating and cooking systems can be installed in tents.

    Other heating system should be put outside at a sufficient distance.air generators should be with heat exchangers.

    To prepare meals and drinks tents can be equipped with fireplaces in kitchens, these areas parated. The heating system should comply with the relevant EN standards or, in

    The electrical fittings should comply with the relevant EN standards or, in absence, with the

    Types and numbers of extinguishers should be in accordance with EN 3.

    CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”

    correct packing and anchoring according to the plans with respect to the local ground

    conformity with the construction documents, existence of all essential loadcomponents inclusive of bracing comparison of forms and crosscarrying components. Attention is to be paid to the correct incorporation, staiplatforms, linings, decorations and similar equipment;

    bearing construction parts (random check

    Other heating system should be put outside at a sufficient distance.

    air generators should be with heat exchangers. To prepare meals and drinks tents can be equipped with fireplaces in kitchens, these areas

    parated. The heating system should comply with the relevant EN standards or, in

    The electrical fittings should comply with the relevant EN standards or, in absence, with the

    Types and numbers of extinguishers should be in accordance with EN 3.

    correct packing and anchoring according to the plans with respect to the local ground

    conformity with the construction documents, existence of all essential loadcomponents inclusive of bracing comparison of forms and cross-carrying components. Attention is to be paid to the correct incorporation, staiplatforms, linings, decorations and similar equipment;

    bearing construction parts (random check

    Other heating system should be put outside at a sufficient distance.

    To prepare meals and drinks tents can be equipped with fireplaces in kitchens, these areas parated. The heating system should comply with the relevant EN standards or, in

    The electrical fittings should comply with the relevant EN standards or, in absence, with the

    Types and numbers of extinguishers should be in accordance with EN 3.

    Job No. : Job No. : Job No. : Job No. :

    P.O.I.:

    Rev. No.: Rev. No.: Rev. No.: Rev. No.:

    correct packing and anchoring according to the plans with respect to the local ground

    conformity with the construction documents, existence of all essential load--sections of load

    carrying components. Attention is to be paid to the correct incorporation, stai

    bearing construction parts (random check

    To prepare meals and drinks tents can be equipped with fireplaces in kitchens, these areas parated. The heating system should comply with the relevant EN standards or, in

    The electrical fittings should comply with the relevant EN standards or, in absence, with the

    Types and numbers of extinguishers should be in accordance with EN 3.

    Job No. : Job No. : Job No. : Job No. :

    Rev. No.: Rev. No.: Rev. No.: Rev. No.: 01

    8 / 61

    correct packing and anchoring according to the plans with respect to the local ground

    -bearing sections of load-

    carrying components. Attention is to be paid to the correct incorporation, staircases,

    bearing construction parts (random check

    To prepare meals and drinks tents can be equipped with fireplaces in kitchens, these areas parated. The heating system should comply with the relevant EN standards or, in

    The electrical fittings should comply with the relevant EN standards or, in absence, with the

    correct packing and anchoring according to the plans with respect to the local ground

    parated. The heating system should comply with the relevant EN standards or, in

  • XXXXXXXX | Fir

    4444 The following is the itextile fabrics (for the covering of temporary structures)

    4.14.14.14.1 EN 1101:1996, Textiles and textile products Detailed procedure to determine the ignitability of vertically oriented specimens (small flame) EN 1102:1995, Textiles and textile products Detailed procedure to determine the flame spread of vertically oriented specimensEN 1624:1999, Textiles and textile products textiles -EN 1625:1999, Textiles and textile products textiles —EN 1363EN 1363EN 1364EN 1364EN 1365EN 1365EN 1365EN 1365EN 1365EN 1365EN 13501Classification using test data from reaction to fire testsEN 13501Classification using data from fire resistance te

    First Issue

    BURNING BEHAVIOURBURNING BEHAVIOURBURNING BEHAVIOURBURNING BEHAVIOURThe following is the itextile fabrics (for the covering of temporary structures)

    EEEEuropean Standardsuropean Standardsuropean Standardsuropean StandardsEN 1101:1996, Textiles and textile products Detailed procedure to determine the ignitability of vertically oriented specimens (small

    EN 1102:1995, Textiles and textile products Detailed procedure to determine the flame spread of vertically oriented specimensEN 1624:1999, Textiles and textile products

    - Procedure to determine the flame sEN 1625:1999, Textiles and textile products

    — Procedure to determine the ignitability of vertically oriented specimensEN 1363-1, Fire resistance tests EN 1363-2, Fire resistance tests EN 1364-1, Fire resistance tests for nonEN 1364-2, Fire resistance tests for nonEN 1365-1, Fire resistance tests for loadbearing elements EN 1365-2, Fire resistance tests for loadbearing elements EN 1365-3, Fire resistance tests for loadbearing elements EN 1365-4, Fire resistance tests for loadbearing elements EN 1365-5, Fire resistance tests for loadbearing elements EN 1365-6, Fire resistance tests for loadbearing elements EN 13501-1, Fire classificatioClassification using test data from reaction to fire testsEN 13501-2, Fire classification of construction products and building elements Classification using data from fire resistance te

    DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER:

    BURNING BEHAVIOURBURNING BEHAVIOURBURNING BEHAVIOURBURNING BEHAVIOURThe following is the identification of national standards about the burning behaviour of textile fabrics (for the covering of temporary structures)

    uropean Standardsuropean Standardsuropean Standardsuropean StandardsEN 1101:1996, Textiles and textile products Detailed procedure to determine the ignitability of vertically oriented specimens (small

    EN 1102:1995, Textiles and textile products Detailed procedure to determine the flame spread of vertically oriented specimensEN 1624:1999, Textiles and textile products

    Procedure to determine the flame sEN 1625:1999, Textiles and textile products

    Procedure to determine the ignitability of vertically oriented specimens1, Fire resistance tests 2, Fire resistance tests 1, Fire resistance tests for non2, Fire resistance tests for non1, Fire resistance tests for loadbearing elements 2, Fire resistance tests for loadbearing elements 3, Fire resistance tests for loadbearing elements

    resistance tests for loadbearing elements 5, Fire resistance tests for loadbearing elements 6, Fire resistance tests for loadbearing elements

    1, Fire classificatioClassification using test data from reaction to fire tests

    2, Fire classification of construction products and building elements Classification using data from fire resistance te

    DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER:

    BURNING BEHAVIOURBURNING BEHAVIOURBURNING BEHAVIOURBURNING BEHAVIOURdentification of national standards about the burning behaviour of

    textile fabrics (for the covering of temporary structures)

    uropean Standardsuropean Standardsuropean Standardsuropean Standards EN 1101:1996, Textiles and textile products Detailed procedure to determine the ignitability of vertically oriented specimens (small

    EN 1102:1995, Textiles and textile products Detailed procedure to determine the flame spread of vertically oriented specimensEN 1624:1999, Textiles and textile products

    Procedure to determine the flame sEN 1625:1999, Textiles and textile products

    Procedure to determine the ignitability of vertically oriented specimens1, Fire resistance tests — Part 12, Fire resistance tests — Part 2: Alternative and additional procedures1, Fire resistance tests for non-2, Fire resistance tests for non-1, Fire resistance tests for loadbearing elements 2, Fire resistance tests for loadbearing elements 3, Fire resistance tests for loadbearing elements

    resistance tests for loadbearing elements 5, Fire resistance tests for loadbearing elements 6, Fire resistance tests for loadbearing elements

    n of construction products and building elements Classification using test data from reaction to fire tests

    2, Fire classification of construction products and building elements Classification using data from fire resistance te

    CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”

    BURNING BEHAVIOURBURNING BEHAVIOURBURNING BEHAVIOURBURNING BEHAVIOUR dentification of national standards about the burning behaviour of

    textile fabrics (for the covering of temporary structures)

    EN 1101:1996, Textiles and textile products — Burning behaviour Detailed procedure to determine the ignitability of vertically oriented specimens (small

    EN 1102:1995, Textiles and textile products — BurniDetailed procedure to determine the flame spread of vertically oriented specimensEN 1624:1999, Textiles and textile products — Burning behaviour of industrial and technical

    Procedure to determine the flame spread of vertically oriented specimensEN 1625:1999, Textiles and textile products — Burning behaviour of industrial and technical

    Procedure to determine the ignitability of vertically oriented specimensPart 1: General requirementsPart 2: Alternative and additional procedures

    -loadbearing elements -loadbearing elements

    1, Fire resistance tests for loadbearing elements 2, Fire resistance tests for loadbearing elements 3, Fire resistance tests for loadbearing elements

    resistance tests for loadbearing elements 5, Fire resistance tests for loadbearing elements 6, Fire resistance tests for loadbearing elements

    n of construction products and building elements Classification using test data from reaction to fire tests

    2, Fire classification of construction products and building elements Classification using data from fire resistance tests, excluding ventilation services

    CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”

    dentification of national standards about the burning behaviour of textile fabrics (for the covering of temporary structures).

    Burning behaviour Detailed procedure to determine the ignitability of vertically oriented specimens (small

    Burning behaviour Detailed procedure to determine the flame spread of vertically oriented specimens

    Burning behaviour of industrial and technical pread of vertically oriented specimens

    Burning behaviour of industrial and technical Procedure to determine the ignitability of vertically oriented specimens

    : General requirementsPart 2: Alternative and additional procedures

    loadbearing elements loadbearing elements

    1, Fire resistance tests for loadbearing elements — Part 1: Walls2, Fire resistance tests for loadbearing elements — Part 2: Floors and roofs3, Fire resistance tests for loadbearing elements — Part 3: Beams

    resistance tests for loadbearing elements — Part 4: Columns5, Fire resistance tests for loadbearing elements — Part 5: Balconies and walkways6, Fire resistance tests for loadbearing elements — Part 6: Stairs

    n of construction products and building elements Classification using test data from reaction to fire tests

    2, Fire classification of construction products and building elements sts, excluding ventilation services

    dentification of national standards about the burning behaviour of

    Burning behaviour — Curtains and drapes Detailed procedure to determine the ignitability of vertically oriented specimens (small

    ng behaviour — Curtains and drapes Detailed procedure to determine the flame spread of vertically oriented specimens

    Burning behaviour of industrial and technical pread of vertically oriented specimens

    Burning behaviour of industrial and technical Procedure to determine the ignitability of vertically oriented specimens

    : General requirements Part 2: Alternative and additional procedures

    loadbearing elements — Part 1: Wallsloadbearing elements — Part 2: Ce

    Part 1: WallsPart 2: Floors and roofsPart 3: BeamsPart 4: ColumnsPart 5: Balconies and walkwaysPart 6: Stairs

    n of construction products and building elements

    2, Fire classification of construction products and building elements sts, excluding ventilation services

    Job No. : Job No. : Job No. : Job No. :

    P.O.I.:

    Rev. No.: Rev. No.: Rev. No.: Rev. No.:

    dentification of national standards about the burning behaviour of

    Curtains and drapes Detailed procedure to determine the ignitability of vertically oriented specimens (small

    Curtains and drapes Detailed procedure to determine the flame spread of vertically oriented specimens

    Burning behaviour of industrial and technical pread of vertically oriented specimens

    Burning behaviour of industrial and technical Procedure to determine the ignitability of vertically oriented specimens

    Part 2: Alternative and additional procedures Part 1: Walls Part 2: Ceilings

    Part 1: Walls Part 2: Floors and roofsPart 3: Beams Part 4: Columns Part 5: Balconies and walkwaysPart 6: Stairs

    n of construction products and building elements —

    2, Fire classification of construction products and building elements — sts, excluding ventilation services

    Job No. : Job No. : Job No. : Job No. :

    Rev. No.: Rev. No.: Rev. No.: Rev. No.: 01

    9 / 61

    dentification of national standards about the burning behaviour of

    Curtains and drapes —Detailed procedure to determine the ignitability of vertically oriented specimens (small

    Curtains and drapes —Detailed procedure to determine the flame spread of vertically oriented specimens

    Burning behaviour of industrial and technical pread of vertically oriented specimens

    Burning behaviour of industrial and technical Procedure to determine the ignitability of vertically oriented specimens

    Part 2: Floors and roofs

    Part 5: Balconies and walkways

    Part 1:

    Part 2:

    Burning behaviour of industrial and technical

    Burning behaviour of industrial and technical

  • XXXXXXXX | Fir

    4.24.24.24.2 NF P 92-according to their reaction to fireNF P 92-Electrical burner test used for flexible materialsFD G 07-test to be usedNF G 07-45 degrees orientedspecimens NF G 07-destroyed

    First Issue

    NNNNational Standards ational Standards ational Standards ational Standards -507:2004, Safety against fire

    according to their reaction to fire-503:1995, Safety against fire

    Electrical burner test used for flexible materials-180:1985, Textiles

    test to be used -182:1985, Textiles

    45 degrees orientedspecimens - Determination of flame spread rate

    -184:1985, Textiles destroyed

    DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER:

    ational Standards ational Standards ational Standards ational Standards 507:2004, Safety against fire

    according to their reaction to fire503:1995, Safety against fire

    Electrical burner test used for flexible materials180:1985, Textiles —

    182:1985, Textiles —45 degrees oriented

    Determination of flame spread rate184:1985, Textiles —

    DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER:

    ational Standards ational Standards ational Standards ational Standards –––– FRANCEFRANCEFRANCEFRANCE507:2004, Safety against fire —

    according to their reaction to fire 503:1995, Safety against fire —

    Electrical burner test used for flexible materials— Fire behaviour

    — Fire behaviour

    Determination of flame spread rate— Behaviour in fire

    CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”

    FRANCEFRANCEFRANCEFRANCE — Building —

    — Building materials Electrical burner test used for flexible materials

    Fire behaviour — Data for choosing standardized methods of

    Fire behaviour — Measurement of flame spread p

    Determination of flame spread rate Behaviour in fire —

    CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”

    — Interior fitting materials

    Building materials —

    Data for choosing standardized methods of

    Measurement of flame spread p

    — Classification method based on the surface

    Interior fitting materials

    — Reaction to fire tests

    Data for choosing standardized methods of

    Measurement of flame spread p

    Classification method based on the surface

    Job No. : Job No. : Job No. : Job No. :

    P.O.I.:

    Rev. No.: Rev. No.: Rev. No.: Rev. No.:

    Interior fitting materials — Classification

    Reaction to fire tests

    Data for choosing standardized methods of

    Measurement of flame spread properties of

    Classification method based on the surface

    Job No. : Job No. : Job No. : Job No. :

    Rev. No.: Rev. No.: Rev. No.: Rev. No.: 01

    10 / 61

    Classification

    Reaction to fire tests —

    Data for choosing standardized methods of

    roperties of

    Classification method based on the surface

    Classification

    roperties of

    Classification method based on the surface

  • XXXXXXXX | Fir

    5555 The following are the main materials used.

    5.15.15.15.1 All structural elements are steel characteristic of the material. The section used for all elements of the temporary structure is a 40x40x2,5 mm square hollow section shown in the following picture extracted from the FEM software.

    First Issue

    MATERIALSMATERIALSMATERIALSMATERIALSThe following are the main materials used.

    SSSStructual steeltructual steeltructual steeltructual steelAll structural elements are steel characteristic of the material.

    The section used for all elements of the temporary structure is a 40x40x2,5 mm square hollow section shown in the following picture extracted from the FEM software.

    Yielding strengthTensile strengthYoung ModulusPoisson coefficientThermal Mass density

    DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER:

    MATERIALSMATERIALSMATERIALSMATERIALS The following are the main materials used.

    tructual steeltructual steeltructual steeltructual steelAll structural elements are steel characteristic of the material.

    The section used for all elements of the temporary structure is a 40x40x2,5 mm square hollow section shown in the following picture extracted from the FEM software.

    Yielding strengthTensile strengthYoung ModulusPoisson coefficientThermal expansion coefficientMass density

    DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: DOCUMENT TITLE: CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER: DOCUMENT NUMBER:

    The following are the main materials used.

    tructual steeltructual steeltructual steeltructual steel All structural elements are steel Qcharacteristic of the material.

    The section used for all elements of the temporary structure is a 40x40x2,5 mm square hollow section shown in the following picture extracted from the FEM software.

    Figure 5-1

    Yielding strength Tensile strength Young Modulus Poisson coefficient

    expansion coefficient

    CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”

    The following are the main materials used.

    Q345. The following table shows the mechanical

    The section used for all elements of the temporary structure is a 40x40x2,5 mm square hollow section shown in the following picture extracted from the FEM software.

    1 Section 40x40x2,5mm

    SSSSteelteelteelteel

    expansion coefficient

    CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”CALCULATION REPORT TEMPORARY STRUCTURE “CNPF”

    . The following


Recommended