Outlines
The Green Rotorcraft Project Environmental objectivesMembershipGRC at a glance2012 workplan and associated topics
proposedTopics currently openedQ&A
33
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
Clean Sky / Green Rotorcraft : heading toward ACARE goals
REACH complianceREACH REACH compliancecompliance
Halving noise
Emissions reduction
Green Life Cycle
44
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
ITD-leaders (< 50%)DLR (D)ONERA (F)PZL Swidnik (Pol)CIRA-SELEX ATS: cluster (I)
IGOR: cluster of 11 members (NL, B, D)Airborne Composite, Akustik Universiteit Twente
160M€ Total Budget: 10% of Clean Sky
Agusta-Westland (co-leader)Eurocopter
(co-leader)
Liebherr (D)Hispano-Suiza (F)Thales Avionics
Electrical Systems (F)
DLR (D)ONERA (F)PZL Swidnik (Pol)CIRA-SELEX ATS: cluster (I)
IGOR: cluster of 10 members (NL, B, D)Airborne Composite, Eurocarbon, Fibre Optic Sensors and Sensing Systems, LMS; Microflown Technologies, Micromega Dynamics, NLR, Technische Universiteit Delft, Universiteit Twente
Partners (>25%)
Associates (<25%)
Main Stakeholders of the domain presents in the ITD GRC:Helicopter Manufacturers, Research Institutes, Systems suppliers10 members composed of 23 legal entities
GRC: Participants & Global Shares
66
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
2012 detailed workplan (GRC1)1. Innovative Rotor Blades
Active Twist: tests completion at component level, and confirmation of the full active twist blade design
Active blade deformation e.g. active twist Active Gurney Flap: design of the wind tunnel model incorporating Active Gurney Flaps (CDR early 2013), in parallel with the development of full scale rotor equipped with AGF (incl. actuation device, power transfer, control system & modified blades
Active control surface e.g. Gurney flap3D blade shape: Optimisation will continue, the detailed design process, including definition of the manufacturing process and tooling such as moulds will be conducted following the PDR
77
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
2012 detailed workplan (GRC1)1. Innovative Rotor Blades: list of topics to be launched in 2012
88
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
2012 detailed workplan (GRC2)
2. Drag reduction, required power reductionRotor head drag reduction:
Wind tunnel tests of different h/c configurations (incl fuselage cabin, landing skids, or sponsons, and rotor head) will be completed. Aerodynamic and structural design of a new full scale hub cap for light helicopter will be completed.
Reduction of airframe drag:improved aerodynamic design of the common helicopter platform and of the ERICA tilt-rotor will be conducted, incorporating passive and/or active flow control systems remotely controlled horizontal stabiliser for the wind tunnel model of the helicopter common platform will be manufactured, together with the remote control system
Turbo shaft engine installation: Aerodynamic and noise propagation analysis about new side air intakes
integrations will continue for light and heavy helicopters.
The new nacelle configuration, will be designed for the ERICA tilt rotor model, while astudy for evaluation of emission, engine performance and noise will be accomplished.
99
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
2012 detailed workplan (GRC2)2. Drag reduction, required power reduction: list of topics to be launched in 2012
1010
2012 detailed workplan (GRC3)
3. More electrical HelicopterArchitecure study & assessment:
The analysis, simulation and assessment of the integrated all-electrical helicopter architecture.The new system EPGDS technology architecture will be defined integrating energy management and the different applications under study.
Technology study:Preliminary design studies:
Multi-source regenerative systems power conversion (incl. storage device)Brushless 28VDC Starter-GeneratorElectrical driven tail rotor motor
Detailed design studies:EMA system for medium/heavy helicopter flight controlElectric taxiingHeat Energy recovery systemPiezo Power Supply module ( Active rotor blade demonstration)Rotor braking recoveryManagement of energy recovery
Demonstration performed at system level in a dynamic and representative way on the Copper Bird Test Bench
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
1111
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
2012 detailed workplan (GRC3)3. More electrical Helicopter: list of topics to be launched in 2012
1212
2012 detailed workplan (GRC4)4. Lean powerplant
To reduce drastically CO2 emission thanks to the very low fuel consumption of modern Diesel engine technology: -30% to -40% over full flight envelope
Using regular kerosene fuel (or biodiesel)
To integrate the engine minimising the potential adverse effects:
weight penalty
Vibration
Cooling system
In 2012:
PDR/ CDR of the diesel power pack and engine installation on H/C
Preliminary study of the next h/c generation powered with a diesel engine
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
1313
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
2012 detailed workplan (GRC5)
5. Environment-Friendly Flight Path
Low-noise on-board system
En-route optimised flight paths for the reduction of polluting emissions
IFR & VFR approach and departure procedures (noise footprint minimisation)
Low level VFR & IFR en route navigation (noise impact minimisation)
SNI shorter routes to minimise fuel emission and gas emission
Operational Requirements
Flight guidance systems
1414
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
2012 detailed workplan (GRC5)5. Environment-Friendly Flight Pat: list of topics to be launched in 2012
1515
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
2012 detailed workplan (GRC6)
• Doors & Structural– Recyclable composite parts – Surface preparation for composite-
metallic bonding– Bonding and painting– Repair– testing
Gear Box HousingCr6 free Magnesium protection & touch up AND paintingTesting
Transmission componentsCd free protectionRepair AND paintingtesting
1616
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
2012 detailed workplan (GRC6)6. EcoDesign: list of topics to be launched in 2012
1818
List of topics expected in 2012
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
ID or N° Title 12.1 12.2 12.3
GRC1 - 1 Design of scaled systems representing the GRC1 technologies to be tested at wind tunnel facilities 30 July 12 591GRC1 - 2 Develop and manufacture moulds for active model rotor blades 18 July 12 400GRC1 - 3 Passive model rotor manufacturing and testing – to be replaced by CfP in support of full scale activitie 36 Jan 13 710GRC1 - 4 Design and manufacture power supply for full scale active blade 36 Jan 13 250GRC1 - 5 Design and manufacture data transfer system for full scale active blade 36 Jan 13 215GRC2 - 1 Manufacturing, CFD analysis and WT tests for common platform 36 Sept 12 700GRC2 - 2 CFD analysis and WT tests for tilt rotor fuselage 24 Jan 13 600GRC3 - 1 HPAS Adaptation Kit 12 Aug 12 100GRC3 - 2 HEMAS Adaptation Kit 12 Aug 12 1000GRC3 - 3 Energy Recovery Adaptation Kit 12 Aug 12 200GRC3 - 4 Development and delivery of EMA for a light Helicopter 18 Sept 12 650GRC5 - 1 Sensoring and cockpit monitoring to reduce noise in meneuvering flight 24 Sept. 12 1200GRC5 - 2 Curved SBAS guided helicopter approaches for low noise landing - Safety & ATM compatibility 24 Sept. 12 400GRC6 - 1 Recycling of Metallic Materials from Rotorcraft Transmissions 18 Sept 12 200GRC6 - 2 Disassembly of eco-designed helicopter demonstrators 18 Sept 12 200
Sub Total 1850 4966 600
TOTAL Budget 7416
Topic Description Anticipated Duration(months)
Latest starting date to match
program target
LBUDGET (K€) and Target
650
Blades
Drag
ElectricalSystems
Trajectory
Eco Design
1919
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
Topics still open
4 topics split as follows:
GRC1: Innovative Rotor BladesMould design and manufacture for the production of a very high
tolerance model helicopter blade 400 k€
GRC3: Integration of innovative electrical systemsDevelopment and delivery of Electromechanical Actuator for a light
H/C 650 k€
GRC6: Eco Design for RotorcfraftRecycling of Metallic Materials from Rotorcraft Transmissions 200k€Disassembly of eco-designed helicopter demonstrators 200 k€
2020
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
For further information:www.cleansky.eu
Sébastien DUBOISProject Officer
Contact us
2222
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
© 2010 by the CleanSky Leading Partners: Airbus, AgustaWestland, Alenia Aeronautica, Dassault Aviation, EADS-CASA, Eurocopter, Fraunhofer Institute, Liebherr Aerospace, Rolls-Royce, Saab AB, Safran Thales and the European Commission.
Permission to copy, store electronically, or disseminate this presentation is hereby granted freely provided the source is recognized. No rights to modify the presentation are granted.
2323
GRC1Mould design and manufacture for the
production of a very high tolerance model helicopter blade
GRC1Mould design and manufacture for the
production of a very high tolerance model helicopter blade
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
2424
©20
12 –
CS
JU/G
RC
-ITD
Mem
bers
Background
The design and production of high tolerance moulds for a scaled composite helicopter blade with active gurney flap (AGF) for whirl tower testing
AGF
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
2525
©20
12 –
CS
JU/G
RC
-ITD
Mem
bers
Background
Challenge is:
to meet strict dimensional tolerances (<±0.1mm) on aerodynamic profile, and
to meet strict requirements on mass distribution between each blade produced (<±3% mass variation).
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
2626
©20
12 –
CS
JU/G
RC
-ITD
Mem
bers
Details
Comparison of two manufacturing methods using standard aerospace-grade composite materials
Design and production of at least two moulds (and necessary tooling) for:• Prepreg version• Resin transfer moulding version
In addition, other ideas eg SQRTM, are welcome!
It is not expected that the blades will be made in a one shot process due to complexity of electrical connections required
Up to 10 sets of rotor blades for each version must be made, therefore moulds must be durable.
AGF will be fitted after moulding process and therefore require a (partially) hollow structure and an access route.
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
2727
©20
12 –
CS
JU/G
RC
-ITD
Mem
bers
Scope
Design of tooling and mould sets including:• method for opening and closing of moulds• method for heating and cooling of moulds• design of preform tooling• integration of temperature sensors for cure monitoring• feedback to rotor blade design to improve manufacturability
Manufacturing and delivery of tooling and mould sets
Process testing/shape monitoring to validate functionality of mould and requirements on model blade will be met
The manufacture of 1 prototype per manufacturing process as proof of mould functionality
Reporting of routes for industrialisation and manufacturing of full-scale rotor blade
Assist in technology transfer to the consortium member such that they may manufacture the blades themselves
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
2828
GRC3Development and delivery of
Electromechanical Actuator for a light H/C
GRC3Development and delivery of
Electromechanical Actuator for a light H/C
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
2929
Sub-Project: GRC3 Integration of innovative electrical systems
Topic objectives: Develop and design the electromechanical actuator (EMA) with mechanical feet-beck system
Main features: The EMA will use the existing interfaces and attachments and it will replace the hydraulic actuators located on the main gearbox.
Topic: JTI-CS-2012-1-GRC-03-012Development and delivery of Electromechanical Actuator for a light H/C
Topic: JTI-CS-2012-1-GRC-03-012Development and delivery of Electromechanical Actuator for a light H/C
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
3030
Main featuresGoals: Prototyping and delivery of Electromechanical Actuator for a light H/C
Inputs: Requirements including helicopter data
Work Plan:
T0: May 2012
T0+6 months EMA development (PDR) and first mock-up delivery
T0+10 months Final design of EMA (CDR)
T0+14 months Laboratory test results
T0+18 months Delivery of three prototypes
Topic Value: 650 000 €
Topic: JTI-CS-2012-1-GRC-03-012Development and delivery of Electromechanical Actuator for a light H/C
Topic: JTI-CS-2012-1-GRC-03-012Development and delivery of Electromechanical Actuator for a light H/C
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
3131
Competencies sought
• Good skill of EMA design• Knowledge about the EMA application on the aircraft.• Catia v.5 or NX6 abilities• Good knowledge in EMA software application (programming) • Good know-how on the EMA integration on the aircraft flight control
system• EMA manufacturing abilities• Electromechanical test facilities• Knowledge of the Civil Certification Rules and Certification activity
Topic: JTI-CS-2012-1-GRC-03-012Development and delivery of Electromechanical Actuator for a light H/C
Topic: JTI-CS-2012-1-GRC-03-012Development and delivery of Electromechanical Actuator for a light H/C
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
3232
GRC6Recycling of Metallic Materials from
Rotorcraft Transmissions
GRC6Recycling of Metallic Materials from
Rotorcraft Transmissions
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
3333
©20
12 –
CS
JU/G
RC
-ITD
Mem
bers
Recycling of Metallic Materials from Rotorcraft Transmissions
BACKGROUND
Helicopter power transmissions are critical to the operation of the aircraft and consist of a number of gear boxes which transmit power from the engines to the rotors via a series of shafts.
Transmission systems are primarily manufactured from metal alloys, high specification steel gears and casings of aluminium or magnesium alloys.
Performance of parts is enhanced by the use of various surface treatments including carburising or nitriding of steel working surfaces, hard metal plating (generally chromium or nickel), sprayed ceramic coatings and also polymeric coatings of various types.
Transmission components have a finite life after which they must be withdrawn from service and disposed of.
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
3434
©20
12 –
CS
JU/G
RC
-ITD
Mem
bers
Recycling of Metallic Materials from Rotorcraft Transmissions
RECYCLING
Out of life components cannot be returned to service and must therefore be returned to the raw material market.
The method for this must be;
energy efficient
generate a minimum of environmentally sensitive waste product
be capable of removing surface treatments cleanly with the minimum of waste product.
produce recycled materials of a quality acceptable for reuse by the general market without build up of contaminant elements.
avoid the use or generation of substances listed in REACH candidate lists
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
3535
©20
12 –
CS
JU/G
RC
-ITD
Mem
bers
Recycling of Metallic Materials from Rotorcraft Transmissions
SCOPE OF WORK
The aim of this proposal is apply modern recycling methods to aerospace materials and processes commonly found in helicopter gearboxes in a cost effective and environmentally sensitive manner.
GRC 6 partners will provide details of demonstrator components and assemblies and also trial components as appropriate.
The partner/consortium shall;
Apply recycling methods to the demonstrators of each ITD manager and provide detailed analysis.
Provide expert knowledge of recycling, have access to facilities to apply this knowledge and have the ability to measure the cost and efficiency of the processes selected.
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
3636
©20
12 –
CS
JU/G
RC
-ITD
Mem
bers
Recycling of Metallic Materials from Rotorcraft Transmissions
TIMESCALES AND DELIVERABLES
Deliverable Description Due DateD1 Survey of gearbox components and suitability for recycling methods. To +3
Months
D2 Detailed description of the dismantling methodology with several steps :1 - Separate the different parts2 - Remove the surface treatment3 - Recycling the materials (with minimized energy consumption)
To +6 Months
D3 Application of the dismantling methodology To +9 Months
D4 Evaluate the cost-effectiveness (operation cost and re-use percentage)
To +12 Months
Topic Value to be € 200,000
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
3737
GRC6Disassembly of eco-designed helicopter
demonstrators
GRC6Disassembly of eco-designed helicopter
demonstrators
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
3838
©20
12 –
CS
JU/G
RC
-ITD
Mem
bers
GRC-06-003Background
The current design of structural airframe parts in thermoset based composites makes it difficult to disassemble components in an ecological manner. Many parts are simply scrapped or burnt. To prolong the life of a rotorcraft airframe, it is for example, desired that specific components can be reused after disassembly.
Proposed solutionThermoplastic composites offer many ecological advantages over thermoset
based composites, such as recyclability, longer storage life, fewer additives, etc. Therefore within GRC6, rotorcraft airframe parts made out of thermoplastic composites are being demonstrated.In addition, by using thermoplastic composites for structural components a new ecological way of disassembly can be made feasible by localised melting and(re-)joining.
GoalHence, the goal of this Call is to investigate and evaluate different technology
concepts for separation of thermoplastic composite demonstrator components, such that they can thereafter be recycled or reused
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
3939
©20
12 –
CS
JU/G
RC
-ITD
Mem
bers
ScopeScope of work:The applicant is responsible for the following tasks:•Collect and assess possible component separation technologies and scenarios for particular helicopter structures based on thermoplastic composite materials and junctions, leading to preferred scenarios. •Investigate the quality of the separated components, to assess the component and waste quality, such that input for a ‘waste’ or ‘second-hand component’ catalogue can be made available.•Investigate the design influence on the solutions for component separation, and provide design recommendations.•Demonstrate and define with the cooperating companies a component separation plan and carry out demonstration activities for the most meaningful separation processes (demonstrator parts will partly be provided by industrial partner)•Collect and provide input for the Life Cycle Assessment tool.
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
4040
©20
12 –
CS
JU/G
RC
-ITD
Mem
bers
Requested skillsSpecial skills, certification or equipment expected from the applicantTo fulfil the scope of this Call, the applicant (single organisation or a consortium) shall include research laboratories, institutes and/ or companies having the following facilities and knowledge:•Strong knowledge on aerospace materials (CFRP with thermoplastic as well as thermoset matrices)•Extensive experience and capabilities for joining and disassembly of thermoplastic composite components and their joints.•Experience and capabilities for collecting data that serve as input for a life cycle assessment tool
Total Budget:200.000 €Duration: 18 months
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
4141
©20
12 –
CS
JU/G
RC
-ITD
Mem
bers
SummaryGoal:•Disassembly: separation of structural thermoplastic composite airframe components
• Extraction of thermoplastic composite parts• Presentation of possible end-of-life scenarios, including the proposed
disassembly technology
Steps:•Investigations and demonstration of technologies for disassembly•Verifying environmental aspects, cost analysis•Supply of quantitative input for LCA
Applications:
Door and floor section
Tailboom and other structural parts
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
4242
For further information:
Contact us
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
4343
Clean Sky –Info day/ 29th February 2012 in Madrid (SP)
© 2010 by the CleanSky Leading Partners: Airbus, AgustaWestland, Alenia Aeronautica, Dassault Aviation, EADS-CASA, Eurocopter, Fraunhofer Institute, Liebherr Aerospace, Rolls-Royce, Saab AB, Safran Thales and the European Commission.
Permission to copy, store electronically, or disseminate this presentation is hereby granted freely provided the source is recognized. No rights to modify the presentation are granted.