    Bob MenziesHead of Delivery

    Cambridgeshire Guided Busway

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    2/53

    Cambridgeshire Guided Busway

    Background

    Delivery

    Construction

    Operations

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    3/53

    The technology

    Guide wheel

    Weak point

    Guide arm

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    4/53

    The technology

    Guide wheel Guide Kerb

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    5/53

    Guided Busways - Advantages

    Narrower right of way

    Ride QualitySegregation

    Drainage

    Ecology

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    6/53

    Cambridgeshire Guided Busway

    Background

    Cambridge Transport Strategy

    Traffic reduction in CambridgeA14 Congestion

    CHUMMS Multi-modal study

    Growth Agenda

    Structure Plan Northstowe New town

    Cambridge Fringes

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    7/53

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    8/53

    Delivery

    Business Case July 2002

    Provisional funding approved -

    2003

    Public Inquiry Sept to Dec 2004

    Transport and Works Order -

    Dec 2005

    Funding approved - June 2006

    Opened August 2011

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    9/53

    Funding

    Budget - 116.27 million

    DfT - 92.5 million

    Developer Funding -

    23.7 million

    Section 106

    Town and Country Planning Act

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    10/53

    New Developments

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    11/53

    Transport and Works Order

    Transport and Works Act 1992

    Railways, Tramways, Trolley buses and guided

    transport systemsAuthorises works

    Defines Limits of Deviation

    Includes:

    Compulsory Purchase Powers

    Deemed Planning Permission

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    12/53

    Transport and Works Order

    Process:

    Environmental Assessment 2003

    Consultations 2003

    Draft Orders Feb 2004

    Public Inquiry Sept Dec 2004

    CGB Order made Dec 2005

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    13/53

    Specification and Tolerances

    Design Manual for Roads and Bridges

    Overall alignment

    Drainage Structures

    Junctions

    Landscaping etc.

    Railway Group Standards Stops

    Ride Quality?

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    14/53

    Ride Quality

    Essen pre-cast

    Leeds insitu

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    15/53

    Cambridgeshire Specification

    Gauge 2600 mm +0mm 5mm

    Kerb alignment +/- 2mm (horizontal)

    Running surface alignment +/-2mm (vertical)

    Joints +/-2mm

    Joint spacing 10m minimum

    Guideway Tolerances

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    16/53

    Guideway construction

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    17/53

    Construction

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    18/53

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    19/53

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    20/53

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    21/53

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    22/53

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    23/53

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    24/53

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    25/53

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    26/53

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    27/53

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    28/53

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    29/53

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    30/53

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    31/53

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    32/53

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    33/53

    Construction

    Park and Rides

    Bus stops

    Bridleway/cyclewayFlares

    Car Traps

    Ecology

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    34/53

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    35/53

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    36/53

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    37/53

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    38/53

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    39/53

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    40/53

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    41/53

    Bus Operations

    All operating risks and costs to be taken by Operators

    Open access

    Multiple operatorsAccess Charges

    Multi-operator ticketing

    Quality Partnership

    High quality vehicles

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    42/53

    Frequently Asked Questions

    What happens when a bus breaks down?

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    43/53

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    44/53

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    45/53

    Frequently Asked Questions

    What happens when it snows?

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    46/53

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    47/53

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    48/53

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    49/53

    Frequently Asked Questions

    Can I use my pass?

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    50/53

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    51/53

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    52/53

    Services - Peak hour from St Ives to Cambridge

    Pre-busway

    5 per hour

    Busway

    8 per hour at opening

    10 per hour from 4

    th

    Sept

  • 8/12/2019 Cambridge Guided Busway Presentation 15 Sep 11

    53/53