+ All Categories
Home > Documents > Camilla Duffy [english protfolio]

Camilla Duffy [english protfolio]

Date post: 22-Jul-2016
Category:
Upload: camillarduffy
View: 235 times
Download: 6 times
Share this document with a friend
Description:
Landscape Architecture
29
Duffy Camilla Landscape architect student +33 6 27 14 23 92 // [email protected]
Transcript
Page 1: Camilla Duffy [english protfolio]

1

Duffy Camilla Landscape architect student

+33 6 27 14 23 92 // [email protected]

Page 2: Camilla Duffy [english protfolio]

2

[ Children instructor] 3 years | Le Pylône | Les fauvettes | La mosaïquev [ 2010/2013 ]Worked as a summercamp instructor in several camps and associations for languistic holidays.Managed a team of instructors on two off them. - This implied journey management and organising pedagogical projects around nature and culture for children.

[ Gap Year ] 9 month | ... [ 2011/2012 ]Tour de France» trip, Milano, Edinburg, London, Berlin visit. Worked for an activity center near Paris.

[ Internship ] 6 weeks | Endroits en Vert Landscape studio [ June 2015 ]The first two weeks, I have been trusted to design a 2ha Urban park above an underground parking slab. Then I will work for four weeks with Sophie Roux, Landscape architecte, to design a playground square.

Education :

«Brevet Technicien Supérieur Agricole - aménagements paysagers» Yard management, technical knowledge, landscaping, hort iculture.Diploma awarded with honours 06/2011

Since 2013 :

2 0 1 2 / 2 0 1 3 :

2 0 0 9 / 2 0 11 :

E c o l e N a t i o n a l e S u p é r i e u r e d u P a y s a g e i n Ve r s a i l l e s , F r a n c eMas te r and Pos t Mas te r deg ree - Gradua t ion i n 07 /2017

Prep schoo l i n An t ibes , F rance , A r t and Landscape ph i l osophyaddi t ion to a Geography bachelor graduat ion year.

2006/2009 : Agricultural highschool - Agronomy, biology and environment «bac»Landscaping option - diploma awarded with high honours.

2 0 1 5 / 2 0 1 6 : ERASMUS - Exchange student in Amsterdamse Hogeschool voor de Kunsten

[ Internship ] 6 weeks | Griesmar Architecture | Architecture and Landscape studio [ April 2013 ]Joined an International and pluridisciplinairy team. to work on the «Europan 12» project contest, «multi-mix» theme, for the requalification of the Laakso-Aurora hospital in Helsinki.

[ Internship ] 3 month | Brin d’Herbe | Landscape and garden company [ Mai 2010 ] Worked on several yards, planing and organising the construction site, practiced team management and have participate to the different gardening and building works.

[ President] 1 year | Student union association | ENSP Versailles [ september 2013 ]Managed the student union association. The aim was to organise meetings, activities and represent the Landscape student of Versailles in reunions with the school administration and also in public meetings.

[ 1rst prize ] 2 month work | Suresnes Garden Competition, school challenge [ Mars 2010 ]I have designed and build an effemerical garden with a team of 3 students from TECOMAH. We have won the first prize from the public vote and from the jury for our «Grey is the new green» garden.

Internships / Personal Experience :

Software skills:

Languages : Fluant in French and English, learning Deutch

Can use PC and Mac - Have a personal Laptop

Discovering new places, horseriding, surfing, cycling, drawing, food : cooking and eating, cultural exhibitions, contemporary art, cinema, history and again discovery...

Hobbies :

Page 3: Camilla Duffy [english protfolio]

3

Public space

closest scale

Urban planning territory programation

WS6 - Deform to form [p.20]

Territorial expertise [p.22]

WS7 - Walk the line [p.14]

WS4 - Opening spin 43 [p.12]

Europan project [p.15]

Step by step [p.8]

grey is the new green [p.7]

connecting [p.25]

Suspention [p.27]

WS5 - Graduation [p.18]

EU WS - Airgriculture [p.19]

Ephemerical village [p.9]

residential edgewood [p.10]

Thin tension [p.26]

Arts project

Overview

Project timeline :

[p.7] [p.25] [p.15] [p.27] [p.9] [p.26] [p.12] [p.18] [p.20] [p.22] [p.19] [p.10] [p.14][p.8]

2015201420132010

Page 4: Camilla Duffy [english protfolio]

4

Project approach

As a student, I have experienced many different scales and many directives. Each of them made me adapt my tools to approach and to create a project. I believe that each project comes with its own experiences and representation manners and that my methods have to adapt themselves, evolve and combine to be the most relevent they can be to create first but also to communicate at different actors.

Listen, Addapt, evolve, combine

Meeting with the site

I have experience to ways of meeting the site :

• Physically, without other information that my senses.

• In a folder, with information, maps, and google street views.

I believe that mixing both approaches are important. The first to feel the scale, the second to understand the context more widely.

Getting in the scale

Project starters

This is the for me an important step to take. Being able to represent myself at any scale concerning the project. It calls for heavy abstraction, but I can feel now that I am able to represent myself in a 1/50 scale as well as 1/25000. To do so, I use my life territory. I measure places I know by heart, compare them to the ones I work on and manage to feel the scale.

It can be anything, but it is always closely linked to the site. Sometimes, it happens that the first starter is less important at the end that at the beginning, but I believe that they all contribute in a way. I always try to be open at any new idea coming along and ready to drop out something that becomes irrelevant.

Sensitive density map

History diagram

References Surfaces places publiques / distances batie

140m

53m

20m

90m

10m

36m

35m

18m

Place george pompidou : 7 420m²

90m123m

Place Niki de saint phall : 3240m²

Place garibaldie 900m²

Place Anthéa antibes : 2720m²

80m

34m

Dimension reference sheet testing model

Mind drawing

principal drawing

Page 5: Camilla Duffy [english protfolio]

5

Verifiing, prooving, changing

Share and communicate

This must be the most challenging part of a project. Here is often the moment when we have to be inventive. Also, I believe it’s the moment when you have to exchange with other, explain and listen to what they understand, what they would do.

I try to verify the ideas all along the reflection process as it often gives more than it takes from the project. For me measuring, thinking ahead of the presentation and the creation is really important.

Making sure that the project is more than a creation of the mind and that it’s communicable is the most defiant part.

I believe in several ways of presenting a project. For me it has to be really close to the process and adapted to the people we are presenting it to. I usually do it with slides, panels and have lately experienced it by video.

View verification section

1/50 scale model

Sketchup 1/1 model

View verification layout

capture of the presentation video

Page 6: Camilla Duffy [english protfolio]

6

closest scale

Page 7: Camilla Duffy [english protfolio]

7

Grey is the new greenSuresnes garden competition 2010

Setting : school competition / Tecomah

Surface : 12 m2 on slab surface

Location : suresnes near paris - April 2010

Terms : 2 month design - 1 week construction

Supervisor : O. Berger

Layout drawing

area to relaxopening views on the effeil tower

Variations of grey, green and red

With a batch of antracit grey slabs, we had to design a terrasse of 12m².

We opted for a brownfield ambiance, using 5 recycled barils and some different size volcano rocks.

The plant holder were shaped in a way to create depth and generate intimacy. A lightweight and scattered vegetation were selected with a great range of shades to contrast with the structure and the stones.

Our team won the Jury’s First Prize and the Public’s Heart-throb prize.

Page 8: Camilla Duffy [english protfolio]

8

Step by stepprivate garden design

Setting : prep school exercise

Surface : 74 m2

Location : tourette sur loup, south of france

Terms : 2 month - february 2013

Supervisor : L. delassale

Team

: C

amill

a D

uffy

, Jor

is M

asaf

ont,

Ken

Nov

elas

// p

rof :

Lau

relie

Del

assa

le //

Sch

ool :

Pre

pa V

ert A

zure

Ant

ibes

//

Hand made layout drawing for the project

Pergola ment to give some shade

Recalling the aesthetic exterior of the village bye creating different levels, the project unites modernity with the spirit of the region.

1m

Presentation pannel of the project

Allying mineral lines with vegetal curves, the atmosphere is homely and relaxing. Step by step, the residents can enjoy the different levels, each one proposing a unique atmosphere, specific uses and large panoramic views across the valley.

Page 9: Camilla Duffy [english protfolio]

9

Complete experience, from visiting the site for the first time to the inauguration of the project. We work with three administrative localities on the revalurisation of tourism of Mont Brouilly.

The first steps were to do a survey of its actual condition, to pinpoint the zones needing to be worked on and to draw up our project which we then presented at a public enquiry. After this rich experience, discovering what was missing and the good things found, we planned the work site and carried out our projects.

All the propose projects were carried out under the philosophy of recyling and a collaborative work site. No waste was thrown away and no materials were brought in.

Ground layout of the mont

Hazel hut Stones reapearing Alive hut Weavering the branches

Team

: C

amill

a D

uffy

, Lau

rian

Gas

con,

Que

ntin

D’a

mal

ric, /

/Pro

f: F.

Rou

met

, R.B

oque

t, O

.Jaq

uem

in //

Sch

ool :

EN

SP V

ERSA

ILLE

S

Ephemerical villageBuilding with the living

Setting : ENSP Versailles, 1st year, 3rd Workshop

Surface : 96 m2

Location : mont brouilly, Saint lager, bourgogne

Terms : 1 month design - 1 week construction -March 2014

Supervisor : F. Roumet, R. Bocquet, S, Auray

Propose a transversal axis Offer some places to rest and play

Page 10: Camilla Duffy [english protfolio]

10

0 5 15 m10

Jardiner l’espace ouverthabiter la lisière et le verger

Camilla Duffy et Etienne Vazzanino - DPLG2 - Ecologie - La Lisière -

François Roumet et Anne Cecile Jacquot

residential Edgewood Ecological lifestyle

Setting : ENSP Versailles - 2nd year ecologie project

Surface : 7670m2 of wasteland

Location : Sevran - Est of Paris

Terms : 3 days - May 2015

Supervisor : F.Roumet, AC.Jacquot

The demand was to propose the implantation of an alternative residential area. One that could disappear without wasting the land.

This proposition, offers 10 housing units of 50m² with a 30m² private garden each. They were disposed in a way to group the energy entries and to benefit of a good sun exposition.

In between them two community kitchen garden hold the open space. Around them, public spaces for children to play or for gathering are disposable.

The vegetation is the main structure of our limits playing with different stratum.

In between forest, residential areas and cultivated lands

Connecting Before intervention

Edgewood consolidation method non impacting Houses - implantation method

combining public, community and private spaces

Real

isat

ion

: Cam

illa

Duf

fy, E

. Vaz

zani

no /

/Pro

f: F.

Rou

met

// S

choo

l : E

NSP

VER

SAIL

LES

Page 11: Camilla Duffy [english protfolio]

11

Public space

Page 12: Camilla Duffy [english protfolio]

12

Children playground under different colored tree stratums, next to the primary shcoolResting space under a few large trees mixing shadow and sun

My part was to cut with the fragmentation leading to a disuse of the plaza and answer to the population needs of outdoor activities.

Therefore, I transformed the plaza from a divided, fenced, overcrowded to an open space, proposing five different ambiance, each one, calling for different outdoor activities. No physical display are separating them. I used topography and tree density to mark the sensation of different places.

Most importantly, I proposed to spin the outdated underground swimming pool by 43°. That way, it proposed a new grid to the plaza, and offered new possibilities to organise the city square. I could also offer a new dimension of the pool more adapted to parisian needs.

Remove the causes of disfonctionCuts and isolation existing plaza

opening spin 43°pushing out the walls of a public space

Setting : ENSP Versailles, 1st year, 4th Workshop

Surface : 2,2ha

Location : Paris, 14th arrondissement

Terms : 2 month - June 2014

Supervisor : F. Garnier, B. Blanchon

Spin the swimmingpool - open the space

Page 13: Camilla Duffy [english protfolio]

13

12 3

45

6

1 : Parvis of the theater and swimmingpoolTall stems and dense treetops to contraste with the building aligning the main road.

2 : Underground swimmingpool building Organising the different spaces of the plazaIt’s dimension can propose a pool of 50m long

3 : Underground youth sports areaThis sport area propose two city stadium and skating devices, 3m under the plaza level.

4 : Central staircasseThis display is ment to seperate by sensationthe plaza and propose sitting space.

5 : Market and street cafeThe trees are planted to guide the installation of market stands also give shade to the street café

6 : Childrens playgroundThis playground is standing just in front of the primary school and planted with low trees.

Real

isat

ion

: Cam

illa

Duf

fy, /

/Pro

f: Be

rnad

ette

Bla

ncho

n et

Fré

dériq

ue G

arni

er //

Sch

ool :

EN

SP V

ERSA

ILLE

S

Page 14: Camilla Duffy [english protfolio]

14

Sending up the hillcontry side mutation

Setting : ENSP Versailles, 2nd year, 7th Workshop

Surface : 10,8ha total, 1,9ha zoom proposition

Location : Vitry sur seine, south of paris

Terms : 2 weeks - June 2015

Supervisor : F. Cremel, C. Trapenard

«Parc des Lilas» up the hill

Towers in between the hill and the town

Vitry - Main boulvard

open spaces :enclosed......................

uncoupled.....................

Isolated.......................

New «Vitry centre» subway

Vitry is a dense city in the south of Paris métropole. It was an important agricultural land in the green belt of Paris before the rural exodus.

Today, from this past a Agricultural park remaines untouched above the hill. It has kept a contry side atmosphere and is an experimental place for landscape designers for 40 years.

My project is to open the town to it, make it more accessible and visible from the main road. I had to find my self the area and have chosen to work from the new «vitry centre» subway, linking the town to paris, to the park des Lilas.

The plaza leads to the park

Generating meeting and gathering spaces and people

Connexion town/park,daily/unusual

Vitry centre subwayPolarisation between here and elsewhere

Diagnostic

Zoom proposition - central plaza to send up the hill

Page 15: Camilla Duffy [english protfolio]

15

Real

isat

ion

: C. D

uffy

,r //

Prof

: Fra

nçoi

se C

rem

el, C

laire

Tra

pena

rd //

EN

SP V

ersa

illes

The plaza opens the view on the hill and leads us to the lilas contryside Park

The directions are given through the high buldings that are integrated in the space

The plaza combine contryside and town envirronement.To connect with its past but living in the present

These perspectives have been realised by hand then photoshoped. They talk about space and atmosphere.

Page 16: Camilla Duffy [english protfolio]

16

Team

: JB

. Grie

smar

, F.B

erla

nda,

Cam

illa

Duf

fy, M

. Bio

ndo,

A. M

alle

upoc

h //

Inte

rn s

hip

at G

riesm

ar A

rchi

tect

ure

Experimental model of the main building Contest pannel

In 2013, I had the occasion to enrol in the Europan 12 contest during a six-week internship at Griesmar Architecture Agency in Nice (south of France). Our team was composed by French, Italian, Lithuanian Architects and two Spanish Landscape Designer. We worked in English most of the time.

My work concerned the integration of some buildings. I studied the architectural customs of Finland leading me to use the source rock and the topography as part of the building..

Also, I chose to work on the green axis expension between the two most important parks of Helsinki. Finally, I have produced the different layout explanation sketches presented on the project panel. (Adobe Illustrator)

Europan Laakso AuroraHospital requalification, «multi-mix»

Setting : Internship project at griesmar architecture

Surface : 18 ha

Location : Helsinki

Terms : 6 weeks - MaY 2013

Supervisor : JB. Griesmar, F.Berlanda

Page 17: Camilla Duffy [english protfolio]

17

Urban planning territory programation

Page 18: Camilla Duffy [english protfolio]

18

GraduationReconnectiing with the river

Setting : ENSP Versailles

Surface : 22 ha

Location : Verneuil sur seine - North of Paris

Terms : 2 month - November 2014

Supervisor : a.Brauns, C.alliod

This city outback has a strong post industrial identity, and the river which gave its name to the town is completely hidden from view.

According to the geographical particularities, the ecosystems and history proper to the site.

I decided to concentrate the dwellings on the southern part of the site, making sure that they would all have a good location and views but without losing the magical «else where» impression you can experience, 10 min away from the city center. The project honors the river side and the industrial past.

First Sketch from the town to the river

Layout drawing of the presented project

Real

isat

ion

: Cam

illa

Duf

fy //

Prof

: Alic

e Br

auns

et C

laire

Alli

od //

Sch

ool :

EN

SP V

ERSA

ILLE

S

Topographie

Resurch model

BB section - In between the two ponds, looking towards the Seine

AA Section of the Highly urbanised space

Page 19: Camilla Duffy [english protfolio]

19

«Airgriculture»Europeen workshop

Setting : ENSP Versailles, 2nd year

Surface : 800 ha

Location : Areoport le bourget - Est of Paris

Terms : 1 week, March 2015

Supervisor : K.Helms, R.Stange, A.Kucan, A. Rocca

Team "Brain storming" model Real

isat

ion

: C. D

uffy

, C. L

ecur

u, H

.Zha

ng, G

. Rou

chie

r //P

rof:

K.H

elm

s, R

.Sta

nge,

A.K

ucan

, A. R

occa

We have been asked to work on a cultivated plot, today used not for agriculture but to maintain an open space in the north part of the airport. Quickly, we felt that we had to think wider, taking care of the urban fringe and the Bourget airport, today used for private flights. That way, we proposed an urban park to re-qualify the urban fringe, to value the stream and transform the highway into a tramway and cycling axis.

Urban parkway regiving a natural bed to the river and offering

relaxing spots for the inhabitants

Transforme the Highway in a Tramway

Keep the airport structure but deflect it's use. For exemple as a

water lane.

Propose new uses for the original buldings or reorganise them in a way to adapt to new activities

Link the parkway with the "parc de la Courneuve" giving

a new corridor to nature

Project layout 4 hours hand drawing on a A1 format

Also, we have chosen to maintain agricultural activities on the upper part and expend it on the airport plots between the runways, making it an «Aero-agricultural» park. There we could imagine new activities and new ways of doing agricultural work, maybe using drones., linking the air with the ground.

Clement and hang Thats me!

Page 20: Camilla Duffy [english protfolio]

20

Deform to formUrban planningSetting : ENSP Versailles, 2nd year, 6th workshop

Surface : 27 Ha

Location : Neuilly sur Marne, Est of Paris

Terms : 2 month, February 2015

Supervisor : N. Gilsoul, A. Faucheux

There, is a 69,8ha unused land available (black shape). This plot is located on the flood plain of the Marne river.

Here, I was asked to think about a new residential area on a fallow ground of 27ha. I decided to mix different type of housing, with public spaces, cultural and leisure devices, offices, and a multimodal transportation station leading to Paris. More importantly, I had to deal with the flood risk and decided to make it a spectacale more than a obstacle using topography.

Building Layout Trees grid

Rain water layoutFlooding impact

Marne

Canal

Main road

Between town grids and nature connection

General situation

Page 21: Camilla Duffy [english protfolio]

21

Real

isat

ion

: Cam

illa

Duf

fy //

Prof

: Nic

olas

Gils

oul a

nd A

lexi

s Fa

uche

ux //

Sch

ool :

EN

SP V

ERSA

ILLE

S

Sketch of the central boulvard breaking with the strong highway image of the original boulvard

Intermodal underground station

Towards the parc

Retention basin Retention basin Cycling road

For this project I also wanted to experience the possibilities of creating different types of space with the building’s shape and orientation.. Then I concentrated on the main boulevard, making it less a highway road, and more as a connecting public space in between two residential areas.,

Work cen

ter

Main Bou

levard

intermo

dal sta

tion

Flood l

iving pa

rc

Layout 1/500 for an A0 made with Autocad then Photoshop

Residential parc

ecological corridor

Public spaceCollective housing

connecting boulevard

Layout model showing the topography of the flood management

Plazas in between buildings

Project section from the ecologic coridor to the boulvard

Page 22: Camilla Duffy [english protfolio]

22

territorial expertiseLandscape diagnostic on an administrative territory

Setting : ENSP Versailles

Surface : 161,8km2

Location : Canton d'Ouzouer-sur-loire, near orleans

Terms : 6 month, september 2014 to march 2015

Supervisor : A. Freytet, M. Toublanc, A. Sauter

During the third semester at ENSP Versailles, I studied the landscape of a French administrative sector, the «canton.» of Ouzouer-sur-Loire. The one I chose is a rural region with 6 villages, Orléans Domanial forest on the north part, the Loire river in the south and a Nuclear power station. During 6 month, I observed these landscapes, studied their origins, and talked to the local inhabitants and those employed on the land.

3 cows, 4 chimneys

Drawing to understand the landscape

Draw and compare skylines, find the particularities and differences, here in the lowlandDefine landscape entities

Lowland

Orleans forestHillsideLoire

Conton's location 3 cows, 4 chimneys

Page 23: Camilla Duffy [english protfolio]

23

Once I took stock of the region, I was able to profile and pinpoint the landscape and territorial issues, highlight the opportunities and point to the problematic changements. That way, I was able to debate about this land’s future and to propose some visions that would conscile landscape identity with the urban and touristic pressure as far as the disappearance of the Nuclear power station in the «near» future.

Explaining the human implantation according to the flood menace

Drawing of the Canton with Aquarelle picturing the human installation in the lowland and on the hills

Page 24: Camilla Duffy [english protfolio]

24

Arts projects

Page 25: Camilla Duffy [english protfolio]

25

connecting peoplelinking space along the axis

Setting : Prep school, Art in situ project

Location : Nice, south of france

Terms : 3 days, january 2013

Supervisor : A. Goldtsimmer

Real

isat

ion

: Cam

illa

Duf

fy//

pro

fess

or :

Alai

n G

oldt

sim

mer

// S

choo

l : P

repa

Ver

t Azu

re A

ntib

es

To link three public plazas in the center of Nice, I manufactured 30 little «Iron men»that I disposed all along the axis. They were all playing with the space, acting like invaders. I fixed them in a way that when you see one, you will see an other. People became curious and started to play and find them. In that way they have linked the space.

Humans and metal figures interacting General Marshall Plaza

on the way to invade the axe

Page 26: Camilla Duffy [english protfolio]

26

On an iron bar, that recalls the ancient railway that existed there, I marked out the noticeable limits along the path. If one portion of the corridor is an open space above the city roofs, the other is densely wooded and swallowed up beneath the skyline of the town. The spiral created by the iron thread translates the mouvements of my eyes depending on the limits and configuration of the space.

To counterbalance the spiral I used a patch of grassland as a control for the density of the vegetation in the shape and sensation of this walkway.

The spiral floating on iron bar

Real

isat

ion

: Cam

illa

Duf

fy, /

/Pro

f:O.M

arty

, L.C

rem

el S

choo

l : E

NSP

VER

SAIL

LES

Relations between the promenade and the art work

suspended mobile

SuspentionAlong the «coulée verte» of paris

Setting : ENSP Versailles, "bring back the site" project

Location : Paris, quartier bastille

Terms : 3 days, 1rst year, september 2013

Supervisor : O. Marty, L. Cremel

Page 27: Camilla Duffy [english protfolio]

27

Sketch of the gravel pit

Intention sketshes made on the grounds

With eighteen other students from l’ENSP Versailles, we were invited to reinstate the original slope that had disappeared due to its exploitation as a gravel pit.

To do so, we collected some blue plastic thread used in vinyards all over the region and which we used in 38 meter-long stretches of thread to recreate the impression of a slope from the top of the pit to the other side of the road.

This structure was not only visible from inside the gravel pit but also from the top and along a path leading to the top of the pit.

The construction of this structure has been exalting. The energy that everyone put into carrying out this huge piece of work made it possible to complete it in a day. The result was more than satisfying and the impression of the slope was palpable. More over, entering the installation from road level was a really sensitive experience. The impression of having a roof over our head and being under the slope delighted the public, even more so when ,by suprise the threads disappeared along with the clouds, allowing us to see the blue sky.

Real

isat

ion

: Cam

illa

Duf

fy, /

/Pro

f:O.M

arty

// S

choo

l : E

NSP

VER

SAIL

LES

View from the road

Thin tensionThe graft

Setting : ENSP Versailles, "the graft"" project

Location : Mont brouilly, burgundy region

Terms : 3 days, 1rst year, March 2014

Supervisor : O. Marty

Coupe de principe du cordage / Principale section of the installation

How to proceed?

the slope goes on Sunset from under the slope

Page 28: Camilla Duffy [english protfolio]

28

Page 29: Camilla Duffy [english protfolio]

29

All documents were produced by Camilla DUFFY

Many project aren't presented in this portfolio but could be discused during an interview.

Camilla DUFFY+33 6 27 14 23 [email protected]


Recommended