CAMUS Are they really Equal? VS CAMUS It can be a little grey if you dont have all the information....

Date post: 11-Dec-2015
Category:
Upload: donald-thomerson
View: 216 times
Download: 1 times
Share this document with a friend
29
Are they really Equal? VS CAMUS CAMUS It can be a little grey if you don’t have all the information. RBI has worked hard to develop a worry free INDUSTRIAL boiler design. Are you’re equals truly keeping up?
Transcript
Page 1: CAMUS Are they really Equal? VS CAMUS It can be a little grey if you dont have all the information. RBI has worked hard to develop a worry free INDUSTRIAL.

Are they really Equal?

VS

CAMUSCAMUS

It can be a little grey if you don’t have all the information. RBI has worked hard to develop a worry free INDUSTRIAL

boiler design. Are you’re equals truly keeping up?

Page 2: CAMUS Are they really Equal? VS CAMUS It can be a little grey if you dont have all the information. RBI has worked hard to develop a worry free INDUSTRIAL.

On the ‘outside’ it would seem so:

COPPER FIN DESIGN

DOWN-FIRED CONCEPT

FULL MODULATION

STAINLESS STEEL CABINETS

EFFICIENCY FROM 88% TO 92% PLUS

MANTLE TYPE BURNER

SMALL ‘FOOTPRINT’

CAMUS DYNAFLAME

RBI FUTERA FUSION

Page 3: CAMUS Are they really Equal? VS CAMUS It can be a little grey if you dont have all the information. RBI has worked hard to develop a worry free INDUSTRIAL.

A closer look though….

THE IGNITION SYSTEM:

The ignition system shall be a commercial / industrial design utilizing an interrupted spark ignition system independent of the main burner. The system shall provide UV flame monitoring (sensor eye) with 100% shut off upon failure during the trial for ignition period. The use of glow coil ignition systems shall not be permitted.

CAMUS DYNAFLAME

RBI FUTERA FUSION

Page 4: CAMUS Are they really Equal? VS CAMUS It can be a little grey if you dont have all the information. RBI has worked hard to develop a worry free INDUSTRIAL.

A closer look though….Flame safeguard Control:

The boiler shall be equipped with a Honeywell RM7800 series commercial / industrial flame safeguard system independent of the boiler sequencing controls. The flame safeguard shall be a solid state digital diagnostic control with a removable display screen. Control shall monitor run hours, faults, fault timing, and keep a minimum of the last 5 faults in history. Control shall continually monitor and display boiler status, and flame signal on a multi line LCD screen.

CAMUS DYNAFLAME

RBI FUTERA FUSION

Page 5: CAMUS Are they really Equal? VS CAMUS It can be a little grey if you dont have all the information. RBI has worked hard to develop a worry free INDUSTRIAL.

Modulation and Reset:

The boiler shall be fully equipped with boiler management controls equal to HeatNet (A Mestek Company). Controls shall…

• networkable

• Outdoor reset, stand alone, network, 4-10ma or 0-10vdc signal acceptable

• Operate multiple boiler modulation on the highest efficiency curve (intercommunication required)

• Not third party

• Log running errors and conditions continually.

• Firmware updateable through USB port and internet download.

• Communicate LonWorks, BacNet, and Modbus.

• Basic Tekmar single boiler modulation is not acceptable.

• Have hybrid technology to control various volume and efficiency type boilers.

CAMUS DYNAFLAME

RBI FUTERA FUSION

Not equal. No network. Simple

Tekmar control cut into panel. Third party

control, limited input. No point reporting

outputs.

Complete Management

‘system’ on board!

Page 6: CAMUS Are they really Equal? VS CAMUS It can be a little grey if you dont have all the information. RBI has worked hard to develop a worry free INDUSTRIAL.

Separating RBI as an Equal is critical if these items are important to you! RBI FUTERA FUSIONAnalog InputsAnalog InputsMonitor SafetiesMonitor Safeties

Control InputsControl InputsRelay OutputsRelay Outputs

Digital InputDigital Input

Heat Net LinkHeat Net Link

VFD SignalVFD Signal

Hand ShakeHand Shake

Page 7: CAMUS Are they really Equal? VS CAMUS It can be a little grey if you dont have all the information. RBI has worked hard to develop a worry free INDUSTRIAL.

Separating RBI as an Equal is critical if these items are important to you! RBI FUTERA FUSION

• Domestic Hot Water Priority• On board HeatNet and Modbus

connections• Low Fire Hold Switch• ‘U’ Shaped Socket for direct

mounted protocessor module• Support for Dual Fuel Option• Flash Drive Updateable• Control Pro Compatible• Set point signal control (reduce

points and external requirements).• On board outdoor reset and night

set back.• Digital or Analog• Local AND system pump

coordination control.• Combustion air damper

Sequencing.• Multi-boiler efficiency

maximization.

Mestek Made – Mestek Mestek Made – Mestek SupportedSupported

Manufactured in Westfield, MA

Page 8: CAMUS Are they really Equal? VS CAMUS It can be a little grey if you dont have all the information. RBI has worked hard to develop a worry free INDUSTRIAL.

Separating RBI as an Equal is critical if these items are important to you! RBI FUTERA FUSION

SET POINT CONTROL OPTIONS INCLUDE:

• Boiler to Boiler Communication – Heat Net

• Multiple Heat Bands• Add Boiler Delay Timing• Shed Boiler Delay Timing• Adaptive Modulation – prevents

short cycling• Modulate Delay Time (Low Fire

Hold)• Mod Max – ‘till last boiler fire’• Promote True Rotation

(Sequencing)• CONDITION MEMORIZATION• BMS full integration

Mestek Made – Mestek Mestek Made – Mestek SupportedSupported

Manufactured in Westfield, MA

Page 9: CAMUS Are they really Equal? VS CAMUS It can be a little grey if you dont have all the information. RBI has worked hard to develop a worry free INDUSTRIAL.

Separating RBI as an Equal is critical if these items are important to you! RBI FUTERA FUSION

• Min/Max VFD – Load Match (low fire); Input Adjustment (Elevation, Direct Vent)

• Log Entry – Troubleshoot and Diagnostic Tool

•Records major activity •Monitor Min Return Temp

• Heat Exchanger Delta T (Limits to half fire)

• Fail Safe Mode – Member Boilers• First Boiler mode – Set up to

optimize proper Venting• Min Boiler Off Time

Page 10: CAMUS Are they really Equal? VS CAMUS It can be a little grey if you dont have all the information. RBI has worked hard to develop a worry free INDUSTRIAL.

Separating RBI as an Equal is critical if these items are important to you! Camus

• THIRD PARTY, NOT SELF MANUFACTURED NOR SELF SUPPORTED.

• BOILER TO BOILER CANNOT MAXIMIZE MODULATION EFFICIENCY

• DOES NOT COMPLETELY INTEGRATE WITH BMS.

• VERY LIMITED INPUT/OUTPUT ABILITY.• SIMILAR CONTROL USED ON OUR BASIC

85% HORIZONTAL DOMINATOR BOILER (APPRX. 50% OF THE COST OF A FUSION.)

• LONWORKS AND BACNET VERY DIFFICULT TO APPLY, CONDITION, WIRE AND INTEGRATE.

Page 11: CAMUS Are they really Equal? VS CAMUS It can be a little grey if you dont have all the information. RBI has worked hard to develop a worry free INDUSTRIAL.

Still thinking “equal”?

CAMUS DYNAFLAMERBI FUTERA FUSION

Page 12: CAMUS Are they really Equal? VS CAMUS It can be a little grey if you dont have all the information. RBI has worked hard to develop a worry free INDUSTRIAL.

CONSTRUCTION - RBI FUTERA FUSION

Condensing “Package”:

The boiler shall be completely packaged and tested as a package by the factory. Boiler shall have the boiler ‘package’ listed and tested as per UL/CSA and ASME section IV standards. Each boiler shall be fire-tested as a package in the factory prior to shipment. Test report shall show all combustion settings at various points of modulation, as well as corresponding delta T. A single primary pump shall be supplied, sized, piped and wired within the manufacturers control sequence by the manufacturer. A three way tempering valve shall be piped and wired to allow for return temperatures as low as 40F directly to a single water inlet.The use of independent secondary heat exchangers and/or economizers will not be permitted.

Page 13: CAMUS Are they really Equal? VS CAMUS It can be a little grey if you dont have all the information. RBI has worked hard to develop a worry free INDUSTRIAL.

CONSTRUCTION & DESIGN - RBI FUTERA FUSION

Fully packaged, means :

1. Three way bypass valve keeps the primary heat exchanger at the required 140F (copper).

2. Flow Switch (ILO LWCO)3. Primary pump sized for both

the primary/secondary hX.4. ASME relief valve for ‘both’

primary/secondary HX.5. Approved T & P gauge.6. Vessel drain valves as

required by OHIO code.

“all factory provided, mounted, wired, and tested”

Page 14: CAMUS Are they really Equal? VS CAMUS It can be a little grey if you dont have all the information. RBI has worked hard to develop a worry free INDUSTRIAL.

CONSTRUCTION & DESIGN - RBI FUTERA FUSION

Single System inlet/outlet

Single Primary pump mounted and wiredComplete ‘quick latch’ access to all heat exchangers.

Non-electric bypass valve set and mounted. All

stainless steel jackets (no plastic tops)

HeatNet on board and ready to go

Pallet jack fork lift ready!

Page 15: CAMUS Are they really Equal? VS CAMUS It can be a little grey if you dont have all the information. RBI has worked hard to develop a worry free INDUSTRIAL.

CONSTRUCTION & DESIGN – Dynaflame Camus

Can one boiler be everything to everybody? You do the math..

Dynaflame Modulation Non-Condensing boiler

Stack Economizer

Dynaflame Fully condensing boiler

Page 16: CAMUS Are they really Equal? VS CAMUS It can be a little grey if you dont have all the information. RBI has worked hard to develop a worry free INDUSTRIAL.

CONSTRUCTION & DESIGN – Dynaflame Camus

Step one: Read the manual!

All the ‘packaged’ items on the RBI already handle that so the boiler can be put in, and simply hooked up!

Page 17: CAMUS Are they really Equal? VS CAMUS It can be a little grey if you dont have all the information. RBI has worked hard to develop a worry free INDUSTRIAL.

CONSTRUCTION & DESIGN – Dynaflame Camus

Step one: Read the manual!

Rbi includes the non-electric thermostatic valve in their design.

Page 18: CAMUS Are they really Equal? VS CAMUS It can be a little grey if you dont have all the information. RBI has worked hard to develop a worry free INDUSTRIAL.

CONSTRUCTION & DESIGN – Dynaflame Camus

Step one: Read the manual!

Does this sound like a true condensing design? Let’s see Non-condensing can return 115F but condensing 130F?????

Page 19: CAMUS Are they really Equal? VS CAMUS It can be a little grey if you dont have all the information. RBI has worked hard to develop a worry free INDUSTRIAL.

CONSTRUCTION & DESIGN – Dynaflame Camus

Step one: Read the manual!

Absolutely untrue. We represent Cat. II and IV boilers that have NO minimum and some that have a 60F limit. It’s about design, not ‘official’ listing!

Page 20: CAMUS Are they really Equal? VS CAMUS It can be a little grey if you dont have all the information. RBI has worked hard to develop a worry free INDUSTRIAL.

CONSTRUCTION & DESIGN – Dynaflame Camus

Step one: Read the manual!

So, they give us the CHRM separate and ‘we’ have to protect it (flow and temp), shed the load with it, monitor temperatures and be responsible for any misapplication?Again, not a ‘packaged’ condensing boiler!

Page 21: CAMUS Are they really Equal? VS CAMUS It can be a little grey if you dont have all the information. RBI has worked hard to develop a worry free INDUSTRIAL.

CONSTRUCTION & DESIGN – Dynaflame Camus

Step one: Read the manual!

Finally, a drawing! Of course, this is typical.. Since you have to design and pipe it, I guess you can do it however you want. Bottom line is, you need to pipe both HX, and control the primary temperature. If you don’t.. Warranty is void!

Page 22: CAMUS Are they really Equal? VS CAMUS It can be a little grey if you dont have all the information. RBI has worked hard to develop a worry free INDUSTRIAL.

CONSTRUCTION & DESIGN – Dynaflame Camus

Experience Knows Better!

Page 23: CAMUS Are they really Equal? VS CAMUS It can be a little grey if you dont have all the information. RBI has worked hard to develop a worry free INDUSTRIAL.

CONSTRUCTION & DESIGN – Dynaflame Camus

Step one: Read the manual!

Secondary HX in vent. add the flow switch, valves, and a second pump. Be sure to get the GPM from this HX and size the pump for it. Also add temp controls and sequencing.

Primary HX separate. Don’t forget 140F, 130F, 120F, or 115F… not sure which they really want but it’s up to you to keep it warm! Oh, and another primary pump!

Below 140F, you better use a three way bypass system. Of course you need to design it and have it installed.

Page 24: CAMUS Are they really Equal? VS CAMUS It can be a little grey if you dont have all the information. RBI has worked hard to develop a worry free INDUSTRIAL.

Still thinking “equal”?

CAMUS DYNAFLAMERBI FUTERA FUSION

Page 25: CAMUS Are they really Equal? VS CAMUS It can be a little grey if you dont have all the information. RBI has worked hard to develop a worry free INDUSTRIAL.

So far we have some serious cost differences making your equal a ‘sure bet’!

Honeywell RM7800 series with screen vs Fenwell control:

Three way thermostatic bypass valve installed and designed:

Heat net management vs. Tekmar

Primary pump installed, sized, wired and controlled.

Turbo pilot with UV scanner, ignition transformer vs. glow coil.

Access panels with quick release latches:

If you are the contractor, you have no choice!

CAMUS DYNAFLAME

RBI FUTERA FUSION

$1000.00 cost

$1148.00 cost

$ 760.00 cost

$1378.00 cost

$ 496.00 cost

$ 297.00 cost

$5079.00 additional cost per boiler

Page 26: CAMUS Are they really Equal? VS CAMUS It can be a little grey if you dont have all the information. RBI has worked hard to develop a worry free INDUSTRIAL.

Still, you’ll find some of the math won’t add up. Why?

Well, there will be a realization that all the equal

products are far more expensive. Camus then had

a ‘cap’ to bid up to.

This is the result of the last 2000MBH condensing boiler

design we bid vs Camus:

CAMUS DYNAFLAME

RBI FUTERA FUSION

$46.500.00 For two boilers

including freight, start up, warranty

labor.

$39.800.00 For two boilers

including freight, start up, they did NOT include factory labor

warranty.

NOTE THAT ‘COSTS’ ARE CALCULATED BEFORE ANY MARGINS REQUIRED BY

THE REP, DISTRIBUTOR, OR WHOLESALER.

Page 27: CAMUS Are they really Equal? VS CAMUS It can be a little grey if you dont have all the information. RBI has worked hard to develop a worry free INDUSTRIAL.

On the ‘outside’ the contractor seemed to have saved $6,700.00. Had he not used this price on bid day, he could have

lost the project. That’s only $3,350.00 per boiler.

Problem is, the END USER sacraficed $5,079.00 per boiler in equipment, trim and features or a total of $10,158.00 over all.

Was the investment wise?

Additionally, chances are the contractor was not aware he had additional cost in piping, pumping, design work, trim and safety

controls. That closes the gap very quickly.

If the contractor didn’t know it, as an engineer you must know it because these items can easily slip by the submittal if you are

not careful. The end user actually suffers from the very competition we think is healthy!

CAMUS DYNAFLAME

RBI FUTERA FUSION

Page 28: CAMUS Are they really Equal? VS CAMUS It can be a little grey if you dont have all the information. RBI has worked hard to develop a worry free INDUSTRIAL.

“The basis of design shall be the RBI Fusion series packaged condensing boiler. Sizes, quantities and capacities as listed on the

drawings.

Acceptable equal manufacturers shall still meet the performance and intent of this specification completely. Installation must completed in

accordance to the requirements of the manufacturer.

Any additional cost incurred by using one of the following approved manufacturers shall be that of the installing contractor. This includes, but is not limited to venting, piping, electrical, and/or any needed as

built drawings.

In accordance with the above, you may provide a product equal to the requirements of this specification as manufactured by:”

A: Aerco Benchmark

B: Lochinvar Intellifin

C: Laars Rihos

The ‘real’ EqualsRBI FUTERA FUSION

Page 29: CAMUS Are they really Equal? VS CAMUS It can be a little grey if you dont have all the information. RBI has worked hard to develop a worry free INDUSTRIAL.

Allowing the Camus Dynaflame to be an acceptable equal to a packaged condensing boiler opens the

door for the following:

•Any copper boiler manufacturer should be permitted to provide his ‘base’ boiler design with a separately

shipped stack economizer.

•Base boilers should be allowed a light commercial residential flame safeguard and ignition system.

•Any form of boiler controls become acceptable because of the limitations of this equal product.

The ‘real’ EqualsRBI FUTERA FUSION


Recommended