+ All Categories
Home > Documents > Caring for Your A34 - The Grace Company · For Technical Support or any other correspondence...

Caring for Your A34 - The Grace Company · For Technical Support or any other correspondence...

Date post: 03-Jun-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
23
TABLE OF CONTENTS CARE, FINISHING AND STORAGE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 WARRANTY. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 PARTS LIST. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-4 ASSEMBLY STEPS STEP 1: LAMPHOLDER TO POLE MOUNT END ASSEMBLY. . . . . . . . . . . . . . . . . . . . . . .5 STEP 2: HARDWARE TO LEG ASSEMBLY. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 STEP 3: LEGS TO POLE MOUNT END ASSEMBLY. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 STEP 4: BRACE ASSEMBLY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8 STEP 5: BRACE TO FRAME ASSEMBLY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10 STEP 6: POLE ASSEMBLY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 STEP 7: POLE TO FRAME ASSEMBLY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13 STEP 8: FINAL FRAME ADJUSTMENTS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 FOLDING AND STORING YOUR A34 TM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14 USE OF ACCESSORIES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 QUILTING INSTRUCTIONS AND TIPS MAKING AND USING CLOTH LEADERS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .17 PREPARING THE FABRIC LAYERS FOR INSTALLATION. . . . . . . . . . . . . . . . . . . . . . . . . . 19 FABRIC INSTALLATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .19 TROUBLE SHOOTING. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 SPECIAL TIPS TYING QUILTING. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 COPYRIGHT MAY 2003 REPRODUCTION PROHIBITED JIM M. BAGLEY GRACEWOOD, INC. PATENT PENDING
Transcript
Page 1: Caring for Your A34 - The Grace Company · For Technical Support or any other correspondence concerning your A34 TM Quilting Frame, call 1-800-264-0644 ~ OR ~ E-mail: robin@graceframe.com

TABLE OF CONTENTS CARE, FINISHING AND STORAGE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 WARRANTY. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 PARTS LIST. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-4 ASSEMBLY STEPS

STEP 1: LAMPHOLDER TO POLE MOUNT END ASSEMBLY. . . . . . . . . . . . . . . . . . . . . . .5 STEP 2: HARDWARE TO LEG ASSEMBLY. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 STEP 3: LEGS TO POLE MOUNT END ASSEMBLY. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 STEP 4: BRACE ASSEMBLY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8 STEP 5: BRACE TO FRAME ASSEMBLY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10 STEP 6: POLE ASSEMBLY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 STEP 7: POLE TO FRAME ASSEMBLY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13 STEP 8: FINAL FRAME ADJUSTMENTS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

FOLDING AND STORING YOUR A34TM. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14 USE OF ACCESSORIES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 QUILTING INSTRUCTIONS AND TIPS MAKING AND USING CLOTH LEADERS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .17 PREPARING THE FABRIC LAYERS FOR INSTALLATION. . . . . . . . . . . . . . . . . . . . . . . . . . 19 FABRIC INSTALLATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .19 TROUBLE SHOOTING. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 SPECIAL TIPS TYING QUILTING. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 COPYRIGHT MAY 2003 REPRODUCTION PROHIBITED JIM M. BAGLEY GRACEWOOD, INC. PATENT PENDING

Page 2: Caring for Your A34 - The Grace Company · For Technical Support or any other correspondence concerning your A34 TM Quilting Frame, call 1-800-264-0644 ~ OR ~ E-mail: robin@graceframe.com

2

Caring for Your A34TM Your A34TM Quilting Frame is a sturdy frame that can be used finished or unfinished. For extra protection, or to give it a finished look, you may seal, stain and/or finish the frame using a number of different applications. This is best done BEFORE YOU ASSEMBLE your frame. To seal the wood, we recommend an application of tung oil that will help preserve the wood and will help to prevent warping. To add a certain color to your frame, you may use a Danish Oil finish. We recommend the DeftTM or WatcoTM brands. Some prefer to use a urethane coat to add a more glossy finish. Test stain on an inconspicuous place. Many different finishes and/or stains may be suitable for sealing and beautifying your frame. You may want to consult your local paint retailer for finishes that are easy to apply and dry hard–not oily. Use and Storage Tips --Store frame in a dry place. If not assembled, store with poles and braces in vertical position. (This will prevent floor moisture from seeping into the poles). --Do not carry the assembled frame by the quilting poles. Hold the braces instead. --Do not drop the frame or let it twist out of square. Lifetime Limited Warranty GraceWood, Inc. will replace or repair, at our choosing, any part of the Grace A34 TM Quilting Frame, which may be shown to be defective. This Lifetime Warranty does not cover parts damaged through misuse, improper storage, improper assembly, loss, natural events and willful or accidental destruction. Defective parts may be returned only with a valid RMA# which may be obtained by calling GraceWood, Inc. at 1-800-264-0644. Warranty card must be filled out, stamped and mailed to the address on the card within 30 days of purchase. Contact Information For Technical Support or any other correspondence concerning your A34 TM Quilting Frame, call 1-800-264-0644 ~ OR ~ E-mail: [email protected] ~ OR ~ Fax: (801) 485-4388 ~ OR ~ Write to: The Grace Company P.O. Box 27823

Salt Lake City, UT 84127 For details on accessories and other information, see us online at www.graceframe.com For shipping of materials to the Grace Company address package (postage prepaid) to: The Grace Company, 2275 South 3200 West, SLC, UT 84119. Materials may be returned only with a valid RMA# or Returned Merchandise Authorization Number which may be obtained by calling GraceWood, Inc. at 1-800-264-0664. If you call after business hours (M-F 8:00 a.m. – 5 p.m., MST) be assured that your call will be returned the next business day if you leave a message. Please report any errors in these instructions or make constructive comments to the following: [email protected]

Grace Quilting Frames and Hoops: Innovation and Evolution

Grace Quilting Systems have been developed over the past two decades with several original design innovations. Additionally, because feedback from many of the thousands of quilters who have purchased and use the GraceFrameTM, we have been able to make a frame that will truly enhance the entire process of hand quilting from beginning to end. If you have any suggestions that will help us to improve our product or service, please tell The Grace Company by corresponding to us using one of the above methods.

Page 3: Caring for Your A34 - The Grace Company · For Technical Support or any other correspondence concerning your A34 TM Quilting Frame, call 1-800-264-0644 ~ OR ~ E-mail: robin@graceframe.com

3

1-Wing Grip Tool

3-Ratchet Stop

3-Pole Cap

6-Guide Dowel 3-Quick Release

Pole Hook3-40 Tooth

Ratchet Wheel

A34 Parts List

1-Right Pole mount End

1-Left Pole Mount End

1-Right Front Leg

1-Left Front Leg

1-Right Back Leg

4-B

race

s

1-Left Back Leg

Pole Parts

1-Left Accessory Tray

1-Right AccessoryTray

3-Springs

Page 4: Caring for Your A34 - The Grace Company · For Technical Support or any other correspondence concerning your A34 TM Quilting Frame, call 1-800-264-0644 ~ OR ~ E-mail: robin@graceframe.com

4

8-5/16 X 2"Carriage Bolt

4-1/4" X 60mmConnector Bolt

***Drawings display hardware in actual size***

12-1/4" X 35mmConnector Bolt

4-5/16 X 1 1/2"Hex Bolt

3-1/4 X 1 1/2"Truss Bolt

6-1 1/4" GrabberScrew

4-5/16" WingNut

6-1/4" Rectangle Nut

8-Plastic Rollers

4-1 1/4" Fender Washer

6-Nylon Washer

8-5/16" FlatWasher

8-1/4" FlatWasher

4-5/16"Nylock Nut

8-5/16" Jamb Nut

Pole List

3-55 1/2" Pole

3-48 1/2" Pole

3-22" Pole 3-19 1/2" Pole

2-1/4" X 55mmConnector Bolt

1-4mmAllen Wrench

Hardware Parts List

Page 5: Caring for Your A34 - The Grace Company · For Technical Support or any other correspondence concerning your A34 TM Quilting Frame, call 1-800-264-0644 ~ OR ~ E-mail: robin@graceframe.com

5

Assembly of the A34TM Quilting Frame BEFORE YOU BEGIN Using the preceding parts list as a reference, take the parts out of the box and make sure your package is complete. (If there is something missing or damaged, do not call the store or dealer from whom you purchased the product. Please contact The Grace Company directly at 1-800-264-0644). TOOLS NEEDED To assemble your frame, you will need the following common tools: 1. One ½" wrench 2. Phillips Head Screw Driver 3. Wing Grip Tool (to easily tighten and loosen wing nuts--provided) 4. Allen Wrench (provided)

Note: To help you distinguish between wood parts, all Left Side parts are marked with an “L” grooved into the wood on the inside of the part. Right side parts are also marked with an “R” on the inside. The first four steps will involve installing hardware into parts and performing other sub-assemblies in preparation for further steps.

This is a new product! We welcome your feedback on this product or these instructions. If you

encounter a problem during assembly or use of the Grace A34TM, and you can’t seem to overcome it, call us before frustration sets in! ☺ 1-800-264-0644.

NOTE! Read each step all the way through before actually assembling parts in that step.

STEP 1: LAMPHOLDER TO POLE MOUNT END ASSEMBLY PARTS NEEDED: 1 – LEFT POLE MOUNT END

1 – RIGHT POLE MOUNT END 2 – ACCESSORY TRAY

2 – LAMPHOLDER 2 – ¼” X 55MM CONNECTOR BOLT 2 – RECTANGLE NUT

Attach the Lamp Holder to the Left Pole Mount End by placing a ¼” x 35mm connector bolt through

the hole at the front of the Pivot Section, with the head of the bolt on the outer side. Place a ¼” rectangle nut in the cross slot of the Lamp Holder and thread the bolt through the nut (see

close-up below).

Left Pole Mount EndInside View

Left AccessoryTray

1/4" Rectangle Nut

1/4" X 55mmConnector Bolt

Page 6: Caring for Your A34 - The Grace Company · For Technical Support or any other correspondence concerning your A34 TM Quilting Frame, call 1-800-264-0644 ~ OR ~ E-mail: robin@graceframe.com

6

Tighten the 35mm bolt completely, using the allen wrench provided. Repeat these instructions for the Right Pole Mount End.

STEP 2: HARDWARE TO LEG ASSEMBLY PARTS NEEDED: 1 – LEFT FRONT LEG 1 – RIGHT FRONT LEG

1 – LEFT BACK LEG 1 – RIGHT BACK LEG 8 – 5/16” X 2” CARRIAGE BOLT 8 – ¼” FLATWASHER

8 – 5/16” JAMB NUT

Put two 5/16” x 2” carriage bolts into the two upper holes of left side legs, as pictured (see right).

NOTE! The head of the bolt should

be on the outer side of the leg (opposite the side marked “L”).

Next put a ¼” flat washer and a

5/16” jamb nut onto each carriage bolt and completely tighten the jamb nut onto the bolt.

NOTE! Failing to tighten jamb nuts in these initial steps will lead to assembly problems in further steps. Be sure to completely tighten each jamb nut as instructed!

Repeat these instructions for the right side legs

(see left).

Right Pole Mount EndInside View

1/4" X 55mmConnector Bolt

1/4" Rectangle Nut

Right Accessory Tray

Left Front LegInside View

5/16" Jamb Nut

5/16 X 2"Carriage Bolt

1/4" Flat Washer

Right Front LegInside View

5/16" Jamb Nut

1/4" Flat Washer

5/16 X 2"Carriage Bolt

Left Back LegInside View

5/16 X 2"Carriage Bolt

5/16" Jamb Nut

1/4" Flat Washer

Right Back LegInside View

5/16 X 2"Carriage Bolt

5/16" Jamb Nut

1/4" Flat Washer

Page 7: Caring for Your A34 - The Grace Company · For Technical Support or any other correspondence concerning your A34 TM Quilting Frame, call 1-800-264-0644 ~ OR ~ E-mail: robin@graceframe.com

7

STEP 3: LEGS TO POLE MOUNT END ASSEMBLY PARTS NEEDED: 1 – LEFT FRONT LEG 1 – RIGHT FRONT LEG

1 – LEFT BACK LEG 1 – RIGHT BACK LEG 1 – LEFT POLE MOUNT END 1 – RIGHT POLE MOUNT END 4 – ¼” FENDER WASHER 4 – 5/16” FLAT WASHER 4 – 5/16” WING NUT 4 – 5/16” NYLOCK NUT

8 – PLASTIC ROLLERS

First, put two plastic rollers on the lower bolt in the Left Front Leg and two on the upper bolt of the Left Back Leg.

Next, line up the parts and slide the Left Pole Mount

End onto the four carriage bolts as pictured above. The top front bolt goes through the hole near the top of the front slot. The bottom front bolt goes through the front slot itself.

The top back bolt goes through the back slot, while the

bottom back bolt goes through the hole near the bottom of the back slot.

With the Pole Mount End properly in place, place a 1 ¼” fender washer (largest) and a 5/16” wing nut

onto the two bolt in the slots,

Next, place a 5/16” flatwasher and a 5/16” nylock nut (nylon side out) onto the other two bolts.

NOTE! The nylon lock nuts look just like jamb nuts, except for the thin nylon ring inside. This keeps the bolt from eventually working itself off of a bolt. When tightening nylock nuts at movable points like this one, it is important not to over-tighten! Tighten this nylock just enough to hold the washer against the wood, but loose enough to allow the washer to turn with your finger.

Repeat these instructions for the right side assembly (see right).

Right Side of FrameOutside View

Right Back Leg Assembly

Right FrontLeg Assembly

Plastic Rollers

Right Pole Mount Assembly

Plastic Rollers

5/16" NylockNut

1 1/4" Fender Washer

5/16" Flat Washer

1 1/4" Fender Washer

5/16" Flat Washer

5/16" WingNutLeft Side of Frame

Inside View

Left Front Leg Assembly

Left Back Leg Assembly

Left Pole Mount End

Plastic Rollers

5/16" NylockNut

1 1/4" Fender Washer

5/16" Wing Nut

5/16" Flat Washer

Page 8: Caring for Your A34 - The Grace Company · For Technical Support or any other correspondence concerning your A34 TM Quilting Frame, call 1-800-264-0644 ~ OR ~ E-mail: robin@graceframe.com

8

STEP 4: BRACE ASSEMBLY PARTS NEEDED: 4 – BRACES 4 – 5/16” X 1 ½” HEX BOLT 4 – 5/16” FLATWASHER

In this step, you will pair the brace pieces together to form the upper and lower braces.

Take two braces and line them up with each other as pictured. (Now is the time to select the size of frame you want to initially assemble. See the chart on the following page for guidance. Crib size is pictured on this page).

IMPORTANT! Be sure the inserted metal T-Nut on the end of each brace is facing away from the other

brace (toward the outside)!

Place a 5/16” x 1 ½” hex bolt with 5/16” (larger) flat washer through the selected long slot of the one brace and into the hole and T-nut of the other brace.

Repeat these instructions for the other set of braces.

LEAVE THE HEX BOLTS LOOSE AT THIS POINT, ALLOWING THE BRACES TO TELESPCOPE IN AND OUT. Brace Assembly

5/16 X 1 1/2"Hex Bolt

5/16" Flat Washer

5/16 X 1 1/2"Hex Bolt

5/16" Flat Washer

T-Nuts Should Face Out

(Crib Size Upper Brace Shown)

Page 9: Caring for Your A34 - The Grace Company · For Technical Support or any other correspondence concerning your A34 TM Quilting Frame, call 1-800-264-0644 ~ OR ~ E-mail: robin@graceframe.com

9

144 1/4"

145 7/8"

126 3/8"

124 3/4"

110 3/4"

112 3/8"

98 3/8"

96 3/4"

76 3/8"

74 3/4"

62 3/8"

60 3/4"

Crib Size(59" quilting space)Upper Brace Assembly

Lower Brace Assembly

Upper Brace Assembly

Lower Brace Assembly

Upper Brace Assembly

Lower Brace Assembly

Upper Brace Assembly

Lower Brace Assembly

Upper Brace Assembly

Lower Brace Assembly

Upper Brace Assembly

Lower Brace Assembly

Queen Size(95" quilting space)

Twin Sizes(73" quilting space)

King Size(109" quilting space)

*****Optional Super King Size(123" quilting space)*****

*****Optional Extra Long Super King Size(143" quilting space)*****

Brace Sizes

Page 10: Caring for Your A34 - The Grace Company · For Technical Support or any other correspondence concerning your A34 TM Quilting Frame, call 1-800-264-0644 ~ OR ~ E-mail: robin@graceframe.com

10

STEP 5: BRACE TO FRAME ASSEMBLY PARTS NEEDED: 1 – LEFT FRAME END 1 – RIGHT FRAME END

2 – ASSEMBLED BRACE SET 4 – ¼” X 60MM CONNECTOR BOLT 4 – ¼” RECTANGLE NUT

Note that the two sets of braces are interchangeable as the upper and lower sets.

Begin with the lower brace. Align the keyed end of the brace into the slots located on the inside of the Back Legs.

Place a 60mm connector bolt through the hole of the Back Leg (from the outside) and into the keyed end

of the brace.

Place a rectangle nut in the cross slot of the brace so that its threaded hole lines up with the bolt. Thread the bolt through the rectangle nut and completely tighten using the allen wrench. Repeat these instructions for both ends of the brace.

Now position the Upper Brace assembly into the slots of the Pole Mount End, as pictured.

Repeat the steps above using the 60 mm bolts and rectangle nuts, completely tightening all connector

bolts with the allen wrench.

NOTE! CONTINUE TO LEAVE THE HEX BOLTS THAT CONNECT THE BRACES TO EACH OTHER LOOSE AT THIS POINT.

Braces and Frame Sides Assembly

1/4" RectangleNut1/4" X 60mm

Connector Bolt

1/4" X 60mmConnector Bolt

Page 11: Caring for Your A34 - The Grace Company · For Technical Support or any other correspondence concerning your A34 TM Quilting Frame, call 1-800-264-0644 ~ OR ~ E-mail: robin@graceframe.com

11

STEP 6: POLE ASSEMBLY PART A: “F” and “E” Pole Assembly PARTS NEEDED: 3 – “F” POLE 3 – “E” POLE

6 – GUIDE DOWEL 6 – 1 ¼” GRABBER SCREW 6 – NYLON WASHER

First, you will assemble the “F” (55 ½") and “E” (19 ½") poles. Gather these poles together along with

the grabber screws and Guide Dowels.

Insert a Guide Dowel into the ends of each “F”, and “E” poles WITH THE SMALLER HOLE OF THE GUIDE DOWEL INWARD.

Insert a grabber screw into a

Guide Dowel. Using a Phillips Screwdriver, screw the grabber completely into the rail.

Place a nylon washer onto the end of each “F” and “E” pole. PART B: “D” Pole Assembly PARTS NEEDED: 3 – “D” POLE 3 – 50-TOOTH RATCHET WHEEL

3 – SPRING 3 – QUICK RELEASE POLE HOOK 3 – POLE CAP 3 – NYLON WASHER

First attach the Quick Release Springs to the ends of the Quick Release Hooks. This is done by slipping

the springs over the knob, as pictured.

Place the Quick Release Hook

assembly into the slots that are cut into the end of each “D” Pole.

Next place a plastic Pole Cap onto

the end of each “D”Pole. The slotted side of the Pole Cap goes in the inside.

You will put the ratchet wheel and nylon washer on the end this assembly later.

Nylon Washer

1 1/4" Grabber Screw

Guide Dowel

A

Pole Spring

B

Nylon Washer

40 Tooth Ratchet Wheel

Pole CapQuick Release Pole Hook

A

B

CPole Assembly

Page 12: Caring for Your A34 - The Grace Company · For Technical Support or any other correspondence concerning your A34 TM Quilting Frame, call 1-800-264-0644 ~ OR ~ E-mail: robin@graceframe.com

12

PART C: Connecting Pole to Pole PARTS NEEDED: POLES AND ¼” X 35 MM CONNECTOR BOLTS

(NUMBER DEPENDING ON WHAT SIZE YOU ARE ASSEMBLING (SEE CHART BELOW)

First match the rail assembly size with the size you selected for the braces. Look at the chart below to see which poles are needed for the desired size.

Align the slanted ends of the pole parts together

and insert each bolt into the outside hole. Continue inserting the bolt through to the metal T-nut insert.

Begin all the bolts by hand, then, while holding

the wood poles together, align it squarely on all sides. Now use the allen wrench to completely tighten all bolts. Continue bolting together all slanted ends of poles until you have three quilting poles of identical size.

Crib Size: 2 connector bolts per pole assembly Twin Size: 4 connector bolts per pole assembly Queen Size: 2 connector bolts per pole assembly King Size: 4 connector bolts per pole assembly

(Multiply the amount of connector bolts x 3 pole assemblies for total needed connector bolts—multiply by 4 if you have the 4th Pole Kit)

STEP 7: POLE TO FRAME

60"

POLE ASSEMBLY ( BY LENGTH OF QUILTING SPACE )Quilt must be at least 1" smaller than the overall length of pole.

Crib Size D EF = 55 1/2D = 48 1/2G = 22E = 19 1/2

74"

Twin Size D G E

96"

Queen Size D

110"

King Size D

F

G F

124"

**Optional Super King SizeD

GG F

143 1/2"

**Optional Extra Long Super King SizeD

FX

C

1/4" X 35mmConnector Bolt

Page 13: Caring for Your A34 - The Grace Company · For Technical Support or any other correspondence concerning your A34 TM Quilting Frame, call 1-800-264-0644 ~ OR ~ E-mail: robin@graceframe.com

13

ASSEMBLY PARTS NEEDED: 3 – ASSEMBLED POLES

3 – RATCHET STOPS 3 – ¼” X 1 ½” TRUSS BOLT ***IMPORTANT: Before completing the next step, keep in mind that the truss bolt should be about 1/4" too long. THE BOLT SHOULD NOT BE TIGHTENED WITH ANY TOOL. TO AVOID DAMAGE, ONLY FINGER-TIGHTEN THIS BOLT.

Install the three

ratchet stops as illustrated using the truss bolt into the metal inserts of the Right Pole Mount End.

TIP: Observe the direction of the Ratchet

Wheel teeth as illustrated and follow while assembling the quilting poles to the Pole Mount Ends.

Slip a Ratchet Wheel onto the end of one “D”

Pole. Slip a nylon washer onto each end of the pole assembly. Position the end of the pole that does not have the Ratchet Wheel on it into the LEFT FRONT HOLE in the Left Pole Mounting End (just inside the lamp holder). (NOTE: There are three hole options giving you slight height adjustment. Be sure to place each end in the same level hole).

As you position the Ratchet Wheel end of the pole

into the Right Pole Mounting End, pull the Quick Release Hook back, then release it into the hole. Test the ratchet stop to make sure it fits snug into the teeth of the wheel. If it does not, slip the wheel off and flip it around so the teeth go the other direction.

Pole Insertion

Front PoleMiddle PoleBack Pole

Pole Assembly Wheel Direction

Back PoleMiddle Pole Front Pole

Ratchet Stop Insertion

1/4 X 1 1/2"Truss Bolt

Page 14: Caring for Your A34 - The Grace Company · For Technical Support or any other correspondence concerning your A34 TM Quilting Frame, call 1-800-264-0644 ~ OR ~ E-mail: robin@graceframe.com

14

Complete the above steps for the two other poles with Ratchet Wheels. Remember, the wheel rotation will be opposite from the wheel on the front pole.

STEP 8: FINAL FRAME ADJUSTMENTS

After all the poles are in place, adjust the Upper Brace so that all the poles will roll freely but will not move from much side to side.

Tighten the 5/16" hex-head bolts that are in the slots on the Upper Brace. Adjust the Lower Brace so that the tilt action will move smoothly and easily. Tighten the 5/16" hex-head bolts that are in the slots on the Lower Brace. Double-check the Brace to Stand Assembly, making sure all connections are completely tightened. NOTE! For best results while quilting, be sure to use the wing-grip tool to completely tighten the four

wing nuts connecting the legs to the end pieces. This will prevent the bolts from sliding in the grooves. FOLDING AND STORING THE A34 TM

Folding the A34 is a very basic, tool-free process.

Loosen the wing nut at each leg/end piece connection on the inside of the Right and Left Ends.

As you tighten the last

wing nut, you will want to stabilize the frame to prevent it from collapsing.

With all four

wing nuts loosened, grip the frame by the front and middle (or back) rails and lift up.

Gently let the frame down, allowing the legs to fold in, parallel with

the end pieces.

Retighten the four wing nuts so the legs hold their folded position.

The A34 can be stored leaning against a wall, or lying flat on the floor. If lying the frame flat, be cautious about floor moisture affecting the frame.

Frame Folded with 4th Pole

Page 15: Caring for Your A34 - The Grace Company · For Technical Support or any other correspondence concerning your A34 TM Quilting Frame, call 1-800-264-0644 ~ OR ~ E-mail: robin@graceframe.com

15

Assembly & Use of Accessories (Available from the Grace Company: 1-800-264-0644)

Assembly and Use of 4th Pole Kit

4-1/4" X 45mmConnector Bolt

2-1/4" X 55mm Connector Bolt

6-1/4" Flat Washer

6-1/4" Nylock Nut

2-2" NylonWasher

1-Pole Cap

1-Guide Dowel1-Quick Release Pole Hook

1-1 1/4" Grabber Screw

1-19 1/2" Pole 1-22" Pole

1-48 1/2" Pole

1-55" Pole

4-1/4" X 35mmConnector Bolt

1-Spring

1- Right StraightWood Bracket

1- Right LWood Bracket

1- Left StraightWood Bracket

1- Left LWood Bracket

1-4th PoleHand Wheel

Fourth Pole Parts Lists

Page 16: Caring for Your A34 - The Grace Company · For Technical Support or any other correspondence concerning your A34 TM Quilting Frame, call 1-800-264-0644 ~ OR ~ E-mail: robin@graceframe.com

16

First connect the “L” wood brackets to the Left and Right End pieces. The short leg of the “L” connects to the End piece using the 45 mm connector bolt, washer and nylock

nut (as pictured) with the longer leg of the “L” pointing down.

Next connect the Straight Wood Bracket to the Left and Right back Legs using the 55mm connector bolt, washer and nylock nut (see right).

Be sure the cut-out surrounding the bottom hole of the Straight Bracket faces toward the inside of the

frame.

Now connect the Straight and “L” Wood Brackets together using the 45mm connector bolt, washer and nylock nut.

With this bracket assembly in place on both the Left and Right Ends, you are ready to insert your rail. Follow rail assembly instructions on pages 11 and 12 (Assemble the 4th Rail so it is the same length as the other three). Be sure to put a nylon washer on each end of the rail.

Completely tighten all nylock nuts in this assembly.

4th Pole Mounting Brackets on Left Side

Outside View

1/4" X 45mmConnector Bolt

1/4" X 55mmConnector Bolt

1/4" Flat Washer

1/4" Nylock Nut

1/4" Nylock Nut

1/4" Flat Washer

1/4" X 45mmConnector Bolt

1/4" X 55mmConnector Bolt

4th Pole Mounting Brackets on Right Side

Inside View

4th Pole Installed Back of frame

Page 17: Caring for Your A34 - The Grace Company · For Technical Support or any other correspondence concerning your A34 TM Quilting Frame, call 1-800-264-0644 ~ OR ~ E-mail: robin@graceframe.com

17

Application and Use of EdgeMasterTM The EdgemasterTM keeps the side tension of the

quilting fabric even. Slide the hooks around the back side of the front and middle poles. The bar with the cloth sleeve should rest on top of the two poles, with the sleeve facing toward the work area.

There are four tightness settings available. The

best one will depend on the angle of your poles as they rotate around. (Example: If you are clamping down on the corner of the front pole, you will need to clamp down in a less tight setting).

To test the appropriate tightness setting, lift the handle up

to the unlocked position and move it to a different notch and gently pull down to the locking position. If it strongly resists locking down, DO NOT FORCE. The setting is too tight. (typically, the cloth sleeve bar will bend under the pressure of a setting that is too tight).

Pin the quilt edge to the muslin strip. Next, as you lock in

the appropriate tightness setting, pull gently away from the work area to achieve desired side tension. Do not distort fabric by pulling it too tautly.

SuperKingTM and Extra Long SuperKingTM Extension Assembly

These kits extend your frame to 123” (S.K.) and 143” (Extra Long S.K.) to handle over-sized quilts.

The assembly configuration pictures for the SuperKingTM Extension Pole are located on page 14. The Brace assembly configuration pictures for the SuperKingTM Extension set-up are located on page 9. Follow those pictures and directions as you set up the frame into the SuperKingTM or Extra Long SuperKing lengths.

Super King Extension Kit Extra Long Super King Extension Kit

2-Super King Brace Extension

4-22" Pole

2-XL Super King Brace Extension

4-55" Double Cut Pole

4-5/16" Flat Washer

4-5/16" Flat Washer

8-1/4" X 35mmConnector Bolt

8-1/4" X 35mmConnector Bolt

4-5/16 X 1 1/2"Hex Bolt

4-5/16 X 1 1/2"Hex Bolt

Super King Brace Assembly

5/16 X 1 1/2"Hex Bolt

5/16" FlatWasher

4-5/16 X 1 1/2"Hex Bolt

5/16" FlatWasher

Page 18: Caring for Your A34 - The Grace Company · For Technical Support or any other correspondence concerning your A34 TM Quilting Frame, call 1-800-264-0644 ~ OR ~ E-mail: robin@graceframe.com

18

Installing Fabric and Quilting with your A34TM

Use of Optional Cloth Leaders Your quilt fabrics may be tacked directly to the poles. However, using cloth leaders is a much better way to attach your quilt. Leaders are easy to make and allow the quilter to move the last few inches of the quilt forward from the rear pole to the front quilting area. This is a suggestion for making one kind of cloth leaders. There are many ways and ideas for making these leaders. Don’t be worried about trying your own idea. Just remember that the longest strip of fabric should be applied to the rear pole. This allows the whole quilt to come up into the area of quilting without stopping and adjusting the quilt top to the second pole in order to finish it. The best cloth selection for making cloth leaders is unbleached muslin. Purchase: 1 ½ yards for 58" pole (crib) 2 yards 72" pole (twin) 2 2/3" yards for 94" pole (queen) 3 yards for 108" pole (king) � The best way to reduce the amount of tacking and un-tacking of cloth leaders as you change frame sizes is to make a cloth

leader for each individual pole piece. Have it run from the straight end of the pole to about half-way through the slant (or cut) end. –OR– After you know the frame size you want, make a cloth leader for that size as shown below and add about 7" to its length. This will give you the extra material you need to make a header that the pole can slide into. This will eliminate the need for tacking the leader or having separate leader pieces.

� Step 1. Cut the fabric as shown in illustration above. � Step 2. Finish the cut edges of the leaders with either a serge stitch or with a very straight 1/2" hem allowance. Press the

leader cloth with a warm iron. � Step 3. Draw straight, dark, solid line 1" from one edge of each of the leader cloths. � Step 4. Thumbtack the cloth leaders to the poles as shown on illustration below. � Step 5. Pin or baste your quilt fabrics to the cloth leaders. Use the dark, straight line that you marked on your leaders in Step 2

to align your quilt fabrics with. � Step 6. Roll the Cloth Leaders and Quilt Fabrics up on Poles. � Step 7. You are now ready to begin quilting.

36

99

18

Attach to Back Pole

Attach to Middle Pole

Attach to Front Pole

Cut Along Line

Cut Along Line

B

M

F

Page 19: Caring for Your A34 - The Grace Company · For Technical Support or any other correspondence concerning your A34 TM Quilting Frame, call 1-800-264-0644 ~ OR ~ E-mail: robin@graceframe.com

19

B

M

F

Mark Each Leader Cloth With A Solid Reference Line 1 or 2 Inches From the Edge

189

9

Attach Fabric To Poles With Large Head Thumb TacksB

Pin or Baste Fabric Layers to the 1" Reference LineM

F

Page 20: Caring for Your A34 - The Grace Company · For Technical Support or any other correspondence concerning your A34 TM Quilting Frame, call 1-800-264-0644 ~ OR ~ E-mail: robin@graceframe.com

20

Installing Fabric on the A34TM Step 1. BACKING FABRIC The first fabric that will be applied to the quilting frame is the Backing. The Backing is also known as the lining fabric. This piece of fabric will be the under side of the finished quilt. It is recommend that this piece of fabric be 2" to 4" larger than the top on all four sides, especially if your top is a pieced top. (A pieced top may possibly stretch out and become larger than the backing if you do not make this allowance). The Backing fabric can be one continuous piece of fabric or can be made by sewing fabric together. Piecing the Backing fabric:

Cut the selvedges before you piece the back fabric together. The selvedge is woven more tightly than the rest of the fabric and won’t have the same “give” as the rest of the fabric, which can cause the seam to be too tight. Use a slightly larger machine stitch than used in normal sewing when piecing the lengths of the back fabric together. Many quilts have Back fabrics that are not one continuous piece of fabric and are pieced together using two fabric pieces with a seam down the middle or three fabric pieces with two seams having been sewn. You can also sew your back fabrics together using crosswise piecing.

Front Pole–Backing fabric

1. Mark the center of Backing fabric with a pin or a pencil mark. 2. Tack the center mark to the center of the front pole. (The Backing fabric is put on with the wrong side of the fabric up and visible.) 3. Lay the fabric naturally and evenly along the straight edge of the pole. Do not stretch the fabric. Tack the corners of the fabric to the pole. 4. Add a few more tacks to hold the

material on the pole. Middle Pole–Backing fabric

1. Tack the other end of the Backing fabric to the middle quilting pole, centering with the mark as directed on the front pole.

2. Tack the center mark to the center of the middle pole. 3. Lay the fabric naturally and evenly along the straight edge of the middle pole. Do not stretch the fabric. Tack the corners of the fabric to the pole. 4. Measure the amount of wood showing at the edges of the fabric to the end boards. This measurement should equal the amount showing on the front pole. 5. Securely tack the Backing fabric along the entire edge of the middle pole, using plenty of tacks. Rolling the Backing fabric onto the middle pole

Middle Pole

Front PoleBack Pole

Backing

Front Pole

Middle PoleBack Pole

Backing

Thumb Tacks

Page 21: Caring for Your A34 - The Grace Company · For Technical Support or any other correspondence concerning your A34 TM Quilting Frame, call 1-800-264-0644 ~ OR ~ E-mail: robin@graceframe.com

21

1. Roll the material onto the middle pole, making a smooth roll. Be sure there are no wrinkles present. 2. Smooth the quilt from the center to the outside edges of the pole as it is being rolled. At this point do not roll the fabric tightly, just roll it nicely smooth and even.

3. Roll until there is very little slack between the two poles. IMPORTANT: Now, from the front of the frame, look at the fabric and readjust the fabric on the front pole if necessary. Sometimes, due to an uneven grain line of the fabric, the fabric will be loose in one area and tighter in another. First, try rolling the fabric completely from the middle pole to the front pole and then back to the middle pole again. Then if this did not adjust the fabric, simply even the tension by adjusting the tacks on the front pole. After adjusting the tension insert additional tacks to hold the fabric on the front pole. NOTE! Fabrics should never be tight. For best results, use as little tension as possible without letting the Quilt sag.

Batting and Quilt Top 1.Lay the Quilt Top face down on the floor and line your batting directly over it. 2. Mark the center of the Top. 3. Line up the edge of the Quilt Top/Batting to the inside rear pole as shown. 4.Tack the center the Top/Batting to the center of the rear pole. Tack the corners. Make sure that the Quilt Top is centered with the Backing already installed on the middle and front rails. 5. Now completely tack the fabric

edge. 6. Roll the Top/Batting up and onto the rear pole by rolling the rail away from the front of the frame. Make sure it rolls smoothly. 7. When you reach the end of the fabric, pull the loose end of the Top/Batting over the backing and line it up on the front rail. 8. Completely tack the Batting and Quilt Top moving from the center out to each corner. 9. Remember to smoothly and evenly lay the Quilt Top to the Front Pole without stretching from corner to corner during the tacking process. 10. On the rear pole, measure the wood from quilt edge to End Board. This measurement should be equal to the Quilt Top edge to End Board measurement of the Front Pole. Adjust the tension to the Backing Fabric and Batting and Quilt Top Fabrics until you get the desired tensions. DO NOT OVER TIGHTEN!

OPTIONAL 4th POLE BATTING INSTALLATION 1. Center the batting on the front pole over the backing and tack down with a few tacks. Smooth batting over the back to the middle pole and let the batting drape to the floor between the middle pole and the 4th pole. 2. At this point, leave the batting draped to the floor. You will roll it onto the fourth pole after applying the quilt top.

Back Pole Middle Pole

Front Pole

4th Pole

Top Fabric

Backing

Batting

Back PoleMiddle Pole

Front Pole

Backing

Top Fabric

Batting

Thumb Tacks

Page 22: Caring for Your A34 - The Grace Company · For Technical Support or any other correspondence concerning your A34 TM Quilting Frame, call 1-800-264-0644 ~ OR ~ E-mail: robin@graceframe.com

22

Happy Quilting!

Trouble Shooting

Problem: Fabric sags on one side or in middle. Solution: Fabric may not be cut evenly straight or the grain of the cloth may not be square. Take it off and square it up or pull (gently) to square. Problem: Sides of quilt have a concave edge. (See illustrations on top of next page) Solution: The fabric was stretched along the pole. Take the fabric off and let it relax until it is not misshapen and then re-install, without stretching it along this edge. Problem: Quilt backing is much longer than quilt top, after quilting. Solution: Monitor tension of backing and quilt top. Mark on edges of fabrics every six inches on backing and quilt top and as you roll you will be able to monitor the tension. Problem: Batting tears or separates during the tightening of the ratchet wheels. Solution: The batting was stretched and stressed. The batting should be longer than the quilt that you are making and there should not be tension applied to it. Check the 4th pole to make sure that it is rolling smoothly and easily. Problem: Poles are bowing in.

Top View

Front Stra

ight

Cor

rect

Top View

Incorrectly Stretched Along Poles

Concave Edge

Page 23: Caring for Your A34 - The Grace Company · For Technical Support or any other correspondence concerning your A34 TM Quilting Frame, call 1-800-264-0644 ~ OR ~ E-mail: robin@graceframe.com

23

Solution: The causes may be: 1. Seam down the center of the fabrics may be sewn too tight and is not giving with the rest of the fabric. If the seam is the problem the quilt may be attached sideways. 2. Fabric is not cut evenly. 3. Too much tension has been applied. 4. Fabric has been stretched along the poles instead of smoothly laid along the pole then attached. Problem: Fabric pulls/tears out at the thumbtacks when tension is applied. Solution: Seat the tack all the way in. The head of the tack, not the post of the tack, should hold the fabric. Use a tack hammer to seat the tacks if your hand is not strong enough. Problem: Poles squeak as they roll or they do not roll freely. Solution: The frame is not square! Square it up with the floor using a carpenter’s square or an uncut piece of poster board or a picture frame. If the quilting frame still squeaks after making sure that the frame is in good square alignment, rub some paraffin or candle wax on the dowel ends of the poles. Helps for Quilting, and Especially Tying: Before installing the quilt onto the frame, mark both the quilt top and backing in similar increments along the two side edges. (The sides that are not tacked onto the poles). While rolling the quilt during the tying process watch the marks. This will help you to keep an equal tension on the top and backing fabrics so you won’t over tighten one or the other of your fabrics. When rolling into a new area of tying, allow your last row of ties to remain in the new area of tying. Also, tie your knots tight. Do not roll past you last row of ties. The preceding are tips for common questions and problems that are easily solved based on years of experience and understanding of no-baste quilting. If you are experiencing continued difficulties using your GraceFrame, please know that we we are eager and able to help! Call us at 1-800-264-0644. Office Hours: Mon-Fri 8 am – 5 pm

Incorrect Correct

6

12 18 24 30 36 42 48 54

Quilt TopBoth Layers of Fabric

Chalk Mark Every 3 to 6 Inches

Backing or Lining


Recommended