Date post: | 14-Apr-2018 |
Category: |
Documents |
Upload: | sakthivisalakshi |
View: | 218 times |
Download: | 0 times |
of 34
7/27/2019 Case Study New
1/34
INTRODUCTION Taj club house a business class hotel
Business environment
Comfort living environmentTo suit the needs of corporate, executives and officials
Five star rating for the corporate kindled services.
Located in chennai,
In the midst of busiest
Environment.
Owned by GVK Group,
Hyderabad.
ABOUT .
Ground area: 75 centsGround coverage area: 81,176 sq.ft
Total number of rooms: 229 rooms
Guest entry: 2 ways
Vehicular entry: 2 ways
Service entry: 1 way
Exits: @ rear side
7/27/2019 Case Study New
2/34
RECREATIONAL FACILITIESGYM
SWIMMING POOL
GYM
2
located in the 7th floor of the
hotel .
Two spaces
equipment workout space
manual workout space
Along with a store room.
1
Glass front @ exteriorside
Swimming pool view
on the other side.
LAUNDRY LINKAGE
3
FACILITIES
Non slippery rubber floor.
Wooden flooring in themanual workout area.
High intense a/c.
Clean movement vision.
Waiting space.
4
Link to the main
laundry space from
gym area via laundry
hole.
7/27/2019 Case Study New
3/34
SWIMMING POOL21 m length
9 m width
1.2 m depth
No slope even depth
No diving allowed.
Capacity: 1,75,000
litres of water.
Child pool is not specific.
Safety precautions are given.
Wooden platform mark the
floor area.
Set back8 @ the parappet
And 6 @ swimming pool
side.
Pool side bar.
Fire exit star way:Located @ the entry
reception.
Hose reel unit @ the
entry space.
Seating spaces, pool side
allotments are provided in
required numbers(10 15)
number of persons.
Access is through lift,
stairway
Services are done thro
service spaces near by(20m).
7/27/2019 Case Study New
4/34
INTERNET ROOM
Attached with the meeting room
Entry from open lounge
Booked on request.No specific attention.
8 boards in capacity.
Interiors with woodWooden partitions
No separate way/entry
individualized.
Conditioned server space
within common to the wi-fi
enabled meeting space.
SMOKING SPACES
Separate smoking area
near the lounge in theoutdoor to facilitate
smoking activity.
ALL THE SPACES ARE NON
SMOKING AREAS OTHER
THAN
SMOKING OUTDOOR
FIRST FLOOR OF THE
HOTEL
smoking alarms are
regulated with every 12
and detectors in the main
monitoring board.
7/27/2019 Case Study New
5/34
LOBBY SPACE
Provided with three reception units
Travel desk
Open type lounge
With column segregations to attain
A level of privacy.
A coffee lounge
Easy access to bar/ restaurants
To smoking outdoors
Fire exits and guest lifts corner
Total area:
Circulation movement is direct and linear
approach.
A small private lobby for premier guest
with levels of secrecy are given.
7/27/2019 Case Study New
6/34
BLEND - BAR
A 100 seating capacity bar
With private chambers
Not a uniform seating arrangement.
Central drink preparation counter
Audio video systems
Wooden flooring
Carpet floor segregation
Glass exteriors
Outdoor party spaceLinen cushioned acoustical absorbers
Separate wet kitchen for bar
Wooden bottle racks clinging to wall.
7/27/2019 Case Study New
7/34
BEHIND INDUS A MULTI CUSINE RESTAURANT.
open to public restaurant
small in size, about
Seating spaces for 48 persons
Cloak room @ the entry for
Refreshment.Reception space and welcome
Table is provided.
Linked with the club house
Restaurant.
Separate entry for the guest @
the building level.
A small preparatory kitchen is provided within the
kitchen.
With the small Temporary store and freezer.
A chamber of non smoke kitchen cabinet is
provided.With waste disposal unit.( manual).
Staff flow is through the guest way of club house
dining a serious disadvantage.
A level difference between the dining area.
Immediate food service with kitchen top seating
provisions.
7/27/2019 Case Study New
8/34
CLUB HOUSEMajor restaurant area for the guest
Accommodates about 130 150
guests @ the same time.
Dining area on a raised platform.
Select variants on buffet display.
Involves a display area .
Separate juice and chat counter .
Separate beverages counter. The kitchen is attached to
the main kitchen and themain basement store.
Kitchen area is 1500 sq. ft.
and it has the cooking
areas inclusive of it.
Washing of utensils is
done within the kitchen
area.
Ducts for exhaust are
linked to the basementexterior
7/27/2019 Case Study New
9/34
KEFIA Greece style restaurant
Traffic flow adjusted between evening
timings.
Roof top restaurant with a bar in theexterior.
Service lift is near the kitchen to facilitate
easy services.
Smoking kitchen type is found here.
Outdoors are available
Indoor wash unit is provided.Stucco finished walls and ceilings to match
the morocco style.
Interiors to suite the Greece detail.
White bluish tint color of interiors.
7/27/2019 Case Study New
10/34
PREMIUM BANQUET HALL
Located in the first floor of the hotel
With lavish interiors and an area of about
Can be changed with the seating
arrangements.Fully air conditioned and lit by glazing
artificial lighting.
Red carpet area with a reception, welcome
drink area and food serving area.
Along with a preparatory space.
Provided near the fire exit and a businesstable on request @ entry.
Directly connected to the main kitchen
Separate dining space is provided
Linked on close proximity to the
elevators and stairs.
7/27/2019 Case Study New
11/34
SUITE
Suite are of four types
Business class point of view
Adhering to comfort
Provided with common facilities
One presidential suite on thewhole
Comfortable interiors
Clean , open spaces.
Linear mode of
Distribution.
No cluster type
Free flow for service
access.Carpeted, compact
area.
Glazed, concealed
openings with blind folds.
Services made simple.Mechanized building
systems.
Intelligence operations
Control over the main
sensor display board.
7/27/2019 Case Study New
12/34
SUPERIOR SUITE ROOM
Provided only in the 5th floor of the
building termed as premier suite/floor.
Provided with a
small pantry,work table,
living area,
bed space,
Dressing room,
Toilet,
Bath,Jacuzzi.
Located in the non smoking floor of the
hotel with about 43 superior suites in
number.
Marble flooring along with
carpet covers.
Finish is of wood, carpet.
Anti-slippery tiles @ wet spaceGlazing to the exterior side
with blinds.
No natural ventilation
Lighting is achieved naturally.
Remote sensitized operations
in the room.
Eyehole provisions
Privacy through television
chamber.
Toilet ventilation is through
ducts.
No specific reception space
within the room.Open planning.
7/27/2019 Case Study New
13/34
SUPERIOR ROOMArea of about 345 square feet.
Number of rooms are about 110.
Basic executive type of room.
Provided.
Given with a small working table,
A bed space,
A seating lounge,
Bath and closet space,
A mini bar,
A dress wardrobe.
Compact, clean
space.
Glazing is the main
source of light.Covered with blinds
and wooden floor
area @ the bed
space.
7/27/2019 Case Study New
14/34
DELUXE ROOMArea of about : 365
sq.ft.
81 rooms of this type.
Wooden, cushionpaneling found .
Wooden floor with a
carpet cover.
With a small work out
table.
Ironing table stand isprovided.
c
Rooms are placed adjacent in
grouping of rooms.
Common duct for two bath spaces
are provided.A small preparatory pantry is
provided.
And a mini refrigerator
A tall unit @ the entry near the toilet
door for wardrobe.
7/27/2019 Case Study New
15/34
DELUXE SUITE ROOM
Each suite is of 662 sq.ft
Same like the superior suite room
but with an additional reception
space.Privacy is hindered
Open planning with no partitions in
the dwelling space.
Provision for physically challenged
persons.
A small pantry with cooking provisions
is provided.
Special laundry storage is provided
Space provision for cleaning ofmattresses within the room.
7/27/2019 Case Study New
16/34
ORGANISATION OF SPACES
BARATHIS BUBBLE FIGURE
IT IS WITH BARATHI..JUST REFER HER..
7/27/2019 Case Study New
17/34
SPATIAL ORGANISATION
Clear picture of the entire space.
Closer proximity to the spaces.
Open type of planning @ public areas
with minimal degree of privacy.Visual treatment with materials and
colors and interior elements.
Transparency is emphasized in design.
Maximum spatial utility is achieved in
the design. Put a view from lobby
From restaurant
7/27/2019 Case Study New
18/34
CIRCULATION
Vertical circulation is mainly thro lifts
Guest lifts are two in number
With a capacity of 6-8 persons of about450-625 kg.
Located near to the banquets, meeting
halls and common spaces in the hotel.
With a distance of 30 m between the fire
exit stair case and lift lobby.
Lobby with a waiting space @ each floor.
Corridor spaces are
about 8 in the
room area and
about 10 in the
public interactivespaces.
Stair ways are minimally used
For services purpose used.
Width of the stairways is about 4.
Provided in caution to fire safety.
7/27/2019 Case Study New
19/34
MAIN KITCHENThere is no such common
kitchen.
But separate kitchens for each
of the restaurants.But there exists a common
store,
Freezer, processing space for
the
raw materials.
And preparatory areas in themain kitchen located on the
ground floor.
Various preparatory spaces
are:
Food and beverages
Confectioneries
Sea food processing units
Meat processing unit
Vegetable cutting unit
Chicken processing unit
Florist department
Chocolate unit
Common amenities are:
Store for vegetables, meat,
Chicken and sea foods.
Processing units separate
for veg. and non-veg.
Freezer for the processed
foods.
Waste disposal unit.
Rice boiling unit.Cutlery store.
Kitchen office.
7/27/2019 Case Study New
20/34
WORK PROCESS
Dry storage
Work table
parcel
Already prepared
food
Receiving
food
PREPARATORY SPACES
Each of these spaces are rectilinear
Partitions in plan.
Area vary according to the usage of space.
Glazing is provided@ the exterior
Vents are provided to evacuate then heat.
Each of these units
are provided with a
small store,
Freezer, processing
area apart from the
main.
A small work triangle is obtained in
working.
Efficient use of space.
A TYPICAL PLAN
1. COOK TOP WITH OVEN
2. COOKING PROVISION
3. FOOD PROCESSING
AREA.
4. FREEZER
5. CLEANING AREA
6. CUTLERY STORE
7. TALL UNITS FOR
STORAGE
8. WORK TOP
9. PULL OUT CABINETS @
THE TOP.
7/27/2019 Case Study New
21/34
PREPARATORY SPACE
7/27/2019 Case Study New
22/34
MAIN KITCHEN UNIT ZONING PLAN
PUT ZONING PLAN IF AVAILABLE ELSE GIVE SOME PICTURES
7/27/2019 Case Study New
23/34
TAJ CLUB HOUSE KITCHEN
provided with smoking cooking area
non smoking kitchen
juice cornercutlery store
separate washing unit
individual store
link to main store @ the basement
cabin for the chef to monitor
separate freezer room for storage
waste disposal unit
mechanised vents
glass partitions within
separate processing areanear the service lifts to serve the
banquet halls @ 1st floor
7/27/2019 Case Study New
24/34
STAFF KITCHEN AND DINING
Separate staff kitchen with cooking facilities
Is provided.
Zoned with a preparatory counter, cooking
Area and washing area within.
Area of about 3000 square feet inclusive of
staff dining space for 60 people at a time.
Hand wash area is provided within.
No natural lighting and ventilation is felt.
Could have provided it separately.
Than @ the mid of boh services.
Food serving area is very small to encourageSo many people @ same time.
Closely associated with house keeping
Department and staff flow area.
7/27/2019 Case Study New
25/34
BACK OF THE HOUSE
separate entry for the ASSOCIATE OFFICES
services frOm the other side of the hotel
upto single level of basement
associate entry is to the other side of
the building
provided with a reception
Provided with several departments.
Adequate spaces are addressed.
Not much attention to the interiors butClean, well maintained spaces.
Circulation made transparent thro the
Indications, not a open type of planning.
Staff area is interrupting in between the
Office.
7/27/2019 Case Study New
26/34
BACK OF THE HOUSE
GIVE A ZONING PLAN DONE IN CAD
7/27/2019 Case Study New
27/34
BACK OF THE HOUSE
PUT THE PICTURES OF L AND D ,
HR,
ACCOUNTS,
FINANCE, STAFF,
HOUSE KEEPING,
7/27/2019 Case Study New
28/34
BACK OF THE HOUSE
PUT THE PICTURES OF L AND D ,
HR,
ACCOUNTS,
FINANCE, STAFF,
HOUSE KEEPING,
7/27/2019 Case Study New
29/34
SERVICES
Inclusive of
Water management systems.
Plumbing features.
Electrical control room.Display board room.
Fire safety chamber.
Laundry services.
Parking amenities.
Service flow(traffic).Service floor to incorporateplumbing and electrical lines is
provided.
Service floor is located
between the ground and first
floor.
This derives the equal
attention of supply to all the
floors.
And the HVAC elements are
carried on to the top most floor.
No proper control system over
the board of services.
Service floor drops down
to 8 in height.
Water distribution pipes
are done thro duct spaces
in toilets seems efficient.Electrical supply are
remote operated and
controlled by the main
board.
7/27/2019 Case Study New
30/34
WATER MANAGEMENT SYSTEMS
Involves the storage and distribution
of water for general use.
Water plant room in the ground floor.
With compressors.
Storage tanks with processing units.
Addition water storage tanks: 4
Water capacity:
Additional tanks are kept for fire safetymeasures.
Digital monitoring of water is done to
know about the inflow of water.
7/27/2019 Case Study New
31/34
FIRE SAFETY MEASURES
Fire alarms, smoke detectors are
provided at spacing of
every 12.
Fire exits and hose reel provisions on
each floor are indicative.
Common access by service areas is
encouraged in case of fire exits.
PARKING @ THE HOTEL
Parking provisions are provided around the
building.
No specific parking lots and numbers are
followed.
experience serious difficulty in case of
banquets, meetings.
7/27/2019 Case Study New
32/34
LAUNDRY SPACE
7/27/2019 Case Study New
33/34
WASTE MANAGEMENT SYSTEMS
Segregation of waste based on their components
as
Organic
Inorganic
Plastic
Three sectors are disposed in different ways.
Through the vehicular entry in the basement
that is specifically for the services.
SEWAGE DISPOSAL PLANT
PROVIDED IN THE BASEMENT OF THE
BUILDING.
7/27/2019 Case Study New
34/34
MERITS
suits to the context of business class hotel.
circulation of spaces is made direct and according to the needs of the people.
Transparency is achieved in the design helps in movement through the spaces.
Business class environment in every part of the hotel.
Lobby space is provided with lounge seating to accommodate business meetings.
Provision of spacious lift lobby houses the waiting activity.
Service entry being separate facilitates easy flow of services in vehicular means.