CASE STUDYPRODUCTIVITY IMPROVEMENT
Kalpesh.B.Prajapati.HPGD/AP14/0932
SPECIALIZATION: OPERATIONS
WELINGKAR INSTITUTE OF MANAGEMENT &
DEVELOPMENT RESEARCH
YEAR OF SUBMISSION: FEBRUARY 2016
1
Case Study – Productivity Improvement
ACKNOWLEDGEMENTS
I am highly obliged to and express my gratitude and thanks to My project guide Mr.
Ashimkumar Goswami, DGM- Central Engineering Services , Dahanu Plant for his
guidance and co-operation, also to Mr.Bipin Patel & Mr.Girish Krishnani (Colleague)
for the assistance as an when required in getting in deep the methodology as worked in
ACG Worldwide in the topic selected, who have helped me in the project with their
expert advice.
Also, I would like to thanks ACG worldwide to give me opportunity to enhance
educational qualification through further study at Welingkar Management Institute.
Lastly I would like to thank all who have directly and indirectly helped me in making
this project successful.
2
Case Study – Productivity Improvement
CERTIFICATE FROM THE GUIDE
This is to certify that the Project work titled
CASE STUDY: PRODUCTIVITY IMPROVEMENT is a bonafide work carried out by
MR. Kalpesh.B.Prajapati. (HPGD/AP14/0932) candidate for the PGDBA (Operation
Management) of the Welingkar Institute of Management under my guidance and
direction.
SIGNATURE OF THE GUIDE:
Name: Ms. Ashimkumar Goswami.
Designation : DGM, Engineering Services Dept.
Address: ACG Worldwide-
Associated Capsules Pvt.Ltd
Ashagad, Dahanu , Palghar , Maharastra
DATE: 22nd, Feb. 2016.
PLACE: DAHANU ROAD
3
Case Study – Productivity Improvement
CONTENTS
Sr. No. Topic Page No.
1. Introduction to the Topic under study ( Productivity Improvement) 5 to 17
Definition of Production & Productivity
Strategies For Improving Productivity
Types of Productivity Measures
Factors Influencing Productivity
Concepts & Suggestions on Productivity Improvements
6 to 9
10 to 12
13 to 14
15
16 to 17
2. Introduction to ACG Associated Capsules Pvt. Ltd. 18 to 28
Introduction of ACG Worldwide 18 to 20
ACG Value & Beliefs 21 to 23
Mission of the Company, Quality/ Environment, Health & Safety
Policy
24 to 26
Organization Chart 27
Org. Chart (PFD) 28
3. Introduction to Process of Empty hard gelatin capsule
manufacturing.
29 to 32
Hard Gelatin capsule manufacturing process 29
Capsule Printing – A cometitive advantage to pharma industry 30 to 32
5. METHODOLOGY 33 to 86
Introduction of Productivity improvement through Six sigma
methodology at ACPL printing.
33 to 34
Phases of RDAMIC six sigma
Recognize phase
Define Phase
Measure Phase
Analyze Phase
Improve phase
Control Phase
35
35
36 to 45
46 to 54
55 to 68
69 to 79
80 to 86
6. Achievements & Learning from the project 87
7. Conclusion 88
8. Recommendation 89
9. Bibliography 90
4
Case Study – Productivity Improvement
INTRODUCTION TO PRODUCTIVITY IMPROVEMENT
What is Productivity?
Productivity is the amount of result ( out put) an organization gets for a given amount of
input( man, machine, money, material ). Productivity isn’t half the things people (who should
know better) say it is .It does not mean
Working harder – unless people are loafing on the job;
Cutting cost – unless this can be done with out affecting quality;
Reducing staff & workers – unless your market is shrinking;
Extra work for managers - it’s part of their job;
Employing specialist – it’s a job for everyone.
There is nothing new about productivity, if go as far back as 400 BC & AD 1400 an efficient
assembly line was working in Venice. By 1800’s role of the worker in productivity had been
recognized but it was not until 1900’s that the modern approach to the productivity of
industrial process really come in to being.
Since the word “Productivity” has become best – used (abused) word manager’s and
politician’s vocabulary. Many people become confuse production and productivity. Whilst
both are important to any business they are really quite different in meaning. So let’s clear up
misunderstanding.
5
Case Study – Productivity Improvement
PRODUCTION
Production is the process of converting resources into products or services. It is usually
measured in terms of output per time period (e.g. boxes per hour, kgs per day, booking per
month) or cost per unit of output (e.g. Rs.100 per box, Rs.50 per kg, etc).The objective of
production operations is to meet the forecasted needs of the market in which they perform at
the lowest possible cost.
RESOURCES CONVERSION OUTPUTManpower Agriculture Products Machinery Mining ServicesMaterials IndustryMoney Services
The output of a production process can be improved by increasing the input of resources or
by changing the process or both.
RESOURCES CONVERSION OUTPUT1 man day Carrying bricks by hand 500 bricks per day
1 man day with overtime carrying bricks by hand 550 bricks per day
If we increase the resources by making a worker work overtime we will increase the output of
the process and so meet our market needs. However we may not have improved our cost in
doing so.
RESOURCES COST INPUT OUTPUT COST PER OUTPUT
1 man x 8 hours @ Rs.20 / hour Rs.160 Rs.160
500 bricks Rs.0.32 per brick
1 man x 8 hours @ Rs.20 /hour = Rs.160
Rs.120 Rs.240 550 bricks Rs.0.48 per brick2 hours O.T.
@ Rs.40/hour = Rs.80
If we can modify process to enable the man to produce more without working harder or
longer we may be meet our target and reduce cost the cost of output as well.
6
Case Study – Productivity Improvement
RESOURCES COST INPUT OUTPUT COST PER OUTPUT
1 man x 8 hours @ Rs.20 /hour = Rs.160
Rs.240 Rs.240 1000 bricks Rs 0.24 per brick1 wheelbarrow x 8 hours
@ Rs.10 / hour = Rs.80
By adding to the resources and changing the process we have increased production by 100 %
& reduced cost by 50 %
Service OperationsIn our examples so far we have tended to concentrate on the more traditional conversion
processes which occur in manufacturing , agriculture, mining etc. and which, until recently
formed the major part of business revenue.
Today, they have been overtaken by the service industry, which in some western countries
forms as much as 80% of all industry. Service operations make use of resources to create
products just the same as does manufacturing industry although frequently the product is hard
to visualize. Airline, hotels, markets, chemist shops and garages are all examples of service
operations, which use manpower, machinery, material & money to creat a product or
products, which meet the needs of their customers.
When you arrive safely and comfortably at your destination your flight has been the product
of process, which buys airplanes, maintains them, trains people to fly them and provide in-
flight service, use millions of units of fuel, food & toilet paper and handles millions of items
of baggage. The production of an airline can be measured in “Passenger / miles” and cost
and contribution of each resource can be similarly measured.
Exactly the same principle applies to the service divisions of the company such as personnel,
finance and marketing. The product they produce must be defined and the resources involved
must be used effectively. It is no more difficult to measure the output of an accounts clerk
than a machine operator. Both has contribution to make the productivity of the company.
7
Case Study – Productivity Improvement
PRODUCTIVITY
Productivity is simply a measure ratio between the output of a process and the input of
resources needed for it. It is usually expressed as output divided by input,
Output can be expressed in terms of unit or volume (e.g., tones, nos, liters, boxes etc.) and
these units have usually been determined for production planning purposes. In cases where
outputs cannot be individually defined a monetary total can be used (e.g.Rs.of production,
Rs.of sales etc.)
Inputs are usually separated into Manpower, Machinery and Materials. Incases where
inputs cannot be segregated a monetary value can be substituted (e.g.Rs.of raw material).
INPUTS UNIT OF MEASURMENTS
Manpower Per man-hour Machinery Per machine hour Materials Per materials unit Money Per Rs. Of unit
The most commonly used measure of productivity is Manpower and it is the one usually
referred to in the press when comparing our productivity with that of other countries.
However, since manpower often forms a relatively low component of the total cost of a
product it is vital to consider the productivity of all resource inputs when studying the
productivity process.
In a large printing operation the relative costs of inputs expressed as a percentage of total
direct cost were
* Manpower -- 25 %
* Materials -- 40 %
* Machinery -- 35 %
A newly – appointed manager considered the operation overstaffed and, after a long and
damaging conflict with works union, succeeded in reducing labor by 10% thus reducing
overall cost by 2.5% for which he warmly congratulated by the board.
However, both the manager and the Board apparently overlooked the fact that materials
wasted and spoiled in the process amounted to 10% (or 4% of total cost), whilst set up and
cleaning time on process amounted to 30% of machine time (10.5% of total cost).
8
Case Study – Productivity Improvement
If the manger had devoted the same energy to improving the productivity of materials and
machinery by reducing wastages and down time but at least 50% as he had done in reducing
labour, he would have reduced total cost by more than 7% without running the risk of costly
labour stoppages.
The term “Machinery” is used to cover all machines, equipment and transport used in the
process. Similarly “Materials “is used to cover not only raw or semi finished material but also
power, light, steam and other utility consumed.
IMPROVING PRODUCTIVITY
The cost of any product or service is the sum of the costs of the resources used in producing
it. The more productive each of those resources can be made the lower the final cost of the
product. In a free market the lower cost of a product, the greater the demand it generates and
more profitable the enterprise, with ultimately a beneficial effect on the living standard of
everyone.
Categories of Wastages --- Directly effecting on productivity.
1. Work-in-process------- Stocking items not immediately needed2. Quality -------------------- Producing defective products.3. Facilities ------------------ Having idle machinery and breakdowns, taking too long for
setup.4. Expenses ------- ---------- Over investing for required output.5. Indirect labor ------- ------Excess personnel due to bad indirect labor system.6. Talent ----- ---------------- Employing people for jobs that can be mechanized or
assigned to less skilled people.7. Motion -------------------- Not working according to the best work standards.8. Product Design ---------- Producing products with more functions than necessary.9. New-product run-up ---- Making a slow start in stabilizing the production of a new
product
9
Case Study – Productivity Improvement
SEVERAL STRATERGIES FOR IMPROVING PRODUCTIVITY
1. Increased output for the same input.2. Decreased input for the same output.3. Proportionate increase in output is more than the proportionate increase in the input.4. Proportionate decrease in input is more than the proportionate decrease in output.5. Simultaneous increase in the output with decrease in the input.
1. Increased output for the same input
In this strategy, the output is increased while keeping the input constant. Let us assume that in a steel plant, the layout of he existing shops is not proper. By slightly altering the location of the billet-making section, i.e. bringing it closer to the furnace which produces hot metal, the scale formation at the top of ladles can be reduced to a greater extent. The molten metal is usually carried in ladles to the billet-making section. In the long run, this would give more yields in terms of tons of billet produced. In this exercise, there is no extra cost involved. The only task is the relocation of the billet-making facility by shifting it closer to the furnace which involves significant cost.
2. Decreased input for the same output
In this strategy, the input is decreased to produce the same output. Let us assume that there exists a substitute raw material to manufacture a product which has the required properties and it is available at a lower price. If we can identify such material and use it for manufacturing the product, then certainly it will reduce the input cost. In this exercise, the job of the purchase department is to identify an alternate substitute material. The process of identification does not involve any extra cost. So, naturally, the productivity ratio will increase because of the decreased input by way of using the cheaper raw material to produce the same output.
3. Proportionate increase in output is more than the proportionate increase in the input
Consider the example of introducing a new product into the existing product mix of an organization. Let us assume that the existing facilities are not fully utilized. So, the R&D wing of the company has identified a new product which has a very good market and which can be manufactured with the surplus facilities of the organization. If the new product is taken up for production, then the following will result.
(a)There will be an increase in the revenue of the organization by way of selling the new product in addition to the existing product mix.(b)There will be an increase in the material cost, and operation and maintenance cost of machineries because of producing the new product.
If we closely examine these two increases, we find that the proportionate increase in the revenue will be more than the proportionate increase in the input cost. Hence, there will be a net increase in the productivity ratio.
10
Case Study – Productivity Improvement
4. Proportionate decrease in the input is more than the proportionate decrease in the output
5.
Let us consider the reverse case of the previous example, i.e. dropping an uneconomical product from the existing product mix. This will result in the following:
(a)There will be a decrease in the revenue of the organization because of dropping a product from the existing product mix.(b)There will be decrease in the material cost, and operation and maintenance cost of machineries because of dropping an existing product from the product mix.
If we closely examine these two decreases, we find that the proportionate decrease in the input cost will be more than the proportionate decrease in the revenue. Hence, there will be a net increase in the productivity ratio.
6. Increase in the output with decrease in the input:
Let us assume that advanced automated technologies like, Robot, Automated Guided Vehicle System (AGVS), etc., are available in the market which can be employed in the organization of our interest. The outcome of these modern tools can be summarized as followings.
(a)There will be a drastic reduction in the operation cost. Initially, the cost on equipment would be very high. But, in the long run, the reduction in the operation cost would break-even the high initial investment and offer more savings on the input.(b)These advanced facilities would help in producing more number of goods because they don’t experience fatigue. The increased production will therefore yield more revenue.In this example, there is an increase in the revenue while there is a decrease in the input in the long run. Hence, the productivity ratio will increase at a faster rate.
11
Case Study – Productivity Improvement
Productivity Improvement in Assembly operation of Household Fans
In a factory making domestic appliances the assembly operation for household fans
comprised three workers. One attached the rotating mechanism to the base; one attached the
motor and threaded the flex through the base; one fitted fan blades and guard assembly. The
complete fan then went off to the inspection department. The work was monotonous, labour
turnover high and number of rejects which had to be reworked was also high.
The factory manger attended a course on improving the content of work and, when he
returned, decided to try out some of the things he had learned. He selected two workers and
made each responsible for all assembly operations – each turning out complete fan
assemblies. He also made them inspect their own work and sign the guarantee label which
was attached to the fan.
After a big learning period they began to compete each other and to take a pride in the
quality of the work they turned out. The daily productivity figures change dramatically.
SystemOutpu
tRejects %age Net output
Man-
hoursProductivity
Old 60 10 16 50 24 2.1 / hour
New 48 2 6 45 16 2.8 / hour
So by decreasing the manpower by 33% the decreasing output by only 10% Productivity
increased by 33 %. A smaller decrease resulted in the cost of labour and materials per item
thus making the product more profitable and/or more competitive. The spare worker could
either be used full time or part time to increase production (If the lower price increase
demand) or could be employed in some other productive capacity.
Today, as ever, no organization, public or private, can afford to ignore the constant need to
improve productivity nor can any employee evade his/her responsibility for playing their part
in the work of productivity improvement. It’s not difficult to do once you know the basics
involved in measurement, standard setting and method improvement. The two most difficult
parts of the operation are, firstly starting it and secondly keeping it going.
12
Case Study – Productivity Improvement
Productivity Improvement is not a job for specialist only – It should be part of every job
in the organization.
DIFFERENT PRODUCTIVITY MEASURES
Material productivity
It shows the quantitative relationship between the total output and the material input
Material productivity =Total output / Material input
Labour productivity
It shows the quantitative relationship between the total output and the material inputLabour productivity =Total output/Labour input
Capital productivity
It shows the quantitative relationship between the total output and the Capital input
Capital productivity =Total output/Capital input
Energy productivity
It shows the quantitative relationship between the total output and the Energy input
Energy productivity =Total output/Energy input
Other manufacturing productivity
It shows the quantitative relationship between the total output and the other manufacturing expenses Other manufacturing expenses productivity = Total output / other manufacturing expenses input
Total productivity
It shows the quantitative relationship between the total output and the total resources input (material, labour, capital, energy, and other manufacturing expenses)
Total productivity = Total output / (Material +labour+ capital +energy+ other manufacturing expenses) input
Productivity Trend Analysis
13
Case Study – Productivity Improvement
Productivity is an important field for the production and financial management. In production analysis the direction of change over a period of time is of crucial importance. It is therefore, very essential for a production manager to make a study about the trend and direction of productivityFor the productivity analysis, the indices of Material input, Labour input, Capital input, Energy input, other manufacturing input and Total output have been calculated
Break even analysis
Break even analysis is the method of studying relationship between revenue and cost in relation to sales volume of a business enterprise.According to Matz Curry & Frank “a break even analysis determine at what level cost and revenue are in equilibrium”.
Terminologies used in Break even analysis:
Contribution
It is a difference between sales and the variable cost of sales.
Contribution = Sales - variable cost.
Profit Volume Ratio
It expresses the relationship of contribution to sales. It is popularly known as P/V Ratio.
P/V Ratio = Contribution / Sales X 100
Break even point It may be defined as that point of sales volume at which total revenue is equal to total cost. It is the point of NO Profit and No Loss. If sales are increased behind this level there shall be profit to the organization.
Break even point (Sales volume) = Fixed cost / P/V Ratio Margin of Safety
It indicates the value/volume of sales directly contribute to profit, as fixed cost have already been recovered at Break even point.
Margin of Safety = Actual Sales – Break even sales.
Margin of Safety ratio = Margin of Safety / Actual sales X 100
Break even Chart It shows the inter relationship between cost, volume and profit. It is considered to be a most useful graphical representation of accounting data.
14
Case Study – Productivity Improvement
FACTOR INFLUENCING PRODUCTIVITY
Factors influencing productivity can be classified broadly into two categories
1. Internal factor and 2. External factor
INTERNAL FACTOR
Product factor Plant and equipment Technology Material Energy Human factor Work method Management style
EXTERNAL FACTOR
Government policies Infrastructure Natural resources
Methodology to Improve Productivity
PDCA cycle Quality circles Continuous Improvement Kaizen Concurrent Engineering Just in Time manufacturing Bench Marking Business Process re-engineering Total Quality Management Six Sigma approach
15
Case Study – Productivity Improvement
Concepts & Suggestion on Productivity Improvement
JAPANESE SHISEIDO CORPORATION
Suggestion for increase the productivityCompanies can increase productivity in a variety of ways. The most obvious methods involve automation and computation which minimize the tasks that must be performed by employees. Recently, less obvious techniques are being employed that involve ergonomic design and worker comfort. A comfortable employee, the theory maintains, can produce more than a counterpart who struggles through the day. In fact, some studies claims that measures such as drastic effect on office done by productivity. They suggest that productivity could be increased by means of perfuming or deodorizing the air conditioning system of work place. Increase the productivity also can influence society more broadly, by improving living strands, and creating income.
NEW CONCEPTS OF PRODUCTIVITY AND ITS IMPROVEMENT
Arturo L. Tolentino
The globalization of manufacturing and the increased concern about social and ecological issues make productivity improvement more important. At the same time, a broader meaning of productivity calls for a wider set of indicators to catch and reflect the new elements and parameters involved. The broader conception of productivity is incorporating wider definitions of what the outputs and inputs are of the production-distribution process. The social and ecological impacts are now increasingly considered as outputs of the production process in addition to the traditional physical and value measures of outputs. Similarly, the social and ecological costs are now also being recognized as inputs in the productivity equation. With increasing concerns on the social and ecologic impacts of the operations of enterprises, the definitions of what are inputs and outputs are changing. Social and ecological inputs and outputs are increasingly being factored-in the efficiency and effectiveness performance of the enterprise.
16
Case Study – Productivity Improvement
European productivity agency
Productivity is an attitude of mind. It is the mentality of progress, of the constant improvement of that which exists. It is the certainty of being able to do better today than yesterday and continuously. A major problem with productivity is that it means things to many people. Economists determine it from Gross National Product (GNP), managers view it as cost cutting and speed up, engineers think of it in terms of more output per hour. But generally accepted meaning is that it is the relationship between goods and service produced and there sources employed in their production.
Régis Bonnelli - Ministry of Economy
From the point of view of global manpower productivity - measured by the production/ potentially active population ratio - it is only possible to increase its value in the medium term by increasing production (numerator of the fraction). The solution of deliberately reducing the denominator fortunately has not been considered since the defeat of Nazism. It is an elementary question that to maintain constant the number of busy or employed people and at the same time to increase the manpower productivity it is necessary to increase the production in the same proportion. For a country with a growing potentially active population it is necessary to grow even more in order to maintain the occupation rate. Exporting workers - which in a way we are already doing - does not seem a desirable solution for a country with natural resources like Brazil.
17
Case Study – Productivity Improvement
INTRODUCTION OF THE ORGANISATION
ACG Worldwide has been serving the pharmaceutical industry for five decades and is the second largest manufacturer of empty hard capsules in the world. The group comprises of 13 companies, including subsidiaries in China, USA, Indonesia, Brazil and Europe.
ACG Worldwide has a presence in over 100 countries with its products and services, employing approximately 3,200 members that strive to provide world-class technology across multiple domains. We offer a complete range of solutions beginning with empty hard capsule shell ; granulation and coating; capsule filling; tabletting; packaging films; blister packing and carton packing to the end-of-line solutions. With over 20,000 machine installations worldwide, it speaks lengths of the high quality standards we follow at ACG as well as complying with major international quality certifications or legislations.
ACG Worldwide is committed to a core corporate competence. Our research teams strive to develop innovative technology in order to continually give our customers the benefit of a cost competitive edge plus world-class technology. 'SciTech Centre', the group's 50,000 sq. ft. R & D center located at Jogeswari in the heart of Mumbai, is a government-recognized research institution. Especially in the last 25 years, it has witnessed breakthroughs in dosage form development-including controlled-release-pharmaceutical engineering, veterinary and agricultural research, emphasizing on delivery systems.
ACG Worldwide. We are your global partners for manufacturing, packaging and R&D solutions.We began our operations with the manufacture of hard gelatin capsules. Fifty years hence, we
have expanded our operations to blister packing, encapsulating, cartooning, packaging, line
solutions & the works. An expansive range of products is available under the parent name of
ACG Worldwide. We intend to be total solution providers in the pharmaceutical industry. A
broad framework of operations fit into the brand name of ACG Worldwide, making it a truly
Global & comprehensive company in this industry.
18
Case Study – Productivity Improvement
In five decades we have moved from a small beginning to partnering with the best in the
world. With a worldwide presence in over 100 countries, today we are second largest
manufacturers of gelatin capsules.
Renowned for having the world’s strongest value chain system, we have branched out
through our group companies to offer an unmatched range of products and services like
capsule filling, packaging, cartooning and new machine innovations.
ACG Worldwide provides world-class technology, the complete package of solutions – from
empty capsules to granulation and coating, to capsule filling, packaging films, blister packing
and carton packing. Our products are exported to more than 100 countries and we have
installed over 20,000 machines worldwide. We have set high standards of quality, with most
of our group companies acquiring major international quality certifications.
ACG Worldwide is committed to Research and Development for continuous delivery of
innovative solutions. Our research teams continuously strive to develop innovative
technology to offer our customers the competitive edge.
There are multiple companies under the ACG Worldwide umbrella. With the decentralization
of operations, individual companies are able to provide undivided attention to their respective
line of products yet work seamlessly together to offer customers "end-to-end" solutions.
19
Case Study – Productivity Improvement
The companies that comprise ACG Worldwide are ACG-Associated Capsules Pvt.Ltd , ACG-
Pampac, ACG-Pharmapack, ACG-Pam, Pam Glatt and ACG-Inspection.
Foreign subsidiaries include ACG Europe, ACG North America, ACG Lukaps (Croatia),
ACG Shanghai (China), ACG Brazil , ACG Thailand and PT UCI.
All group companies' work harmoniously to provide seamless end-to-end solutions for the
pharmaceutical manufacturing industry on a global basis.
SciTech Centre, the group’s 50,000 sq. ft. R & D Center in the heart of Mumbai, is a
government recognized research institution. Over the last 25 years it has been actively
engaged in research in the areas of dosage form development including controlled release,
pharmaceutical engineering, veterinary and agricultural research, particularly in delivery
systems.
ACG Associated Capsules Pvt. Ltd. (ACG ACPL) is one of the largest producers of empty
hard capsule shell in the world. Close to the international airport and the seaport, our three
plants in Mumbai, Dahanu and Shirwal in the state of Maharashtra, one at Pithampur, Indore
( Madhya.Pradesh) service approximately 1,000 customers worldwide.
The entire range of capsule sizes are manufactured, including special features such as two &
four color printing, across a diverse range that includes gelatin, cellulose, fish gelatin and
special capsules for double-blind trials, each designed to serve a specific purpose and
marketing promise. The company is known for its precision in manufacturing, intensive in-
process controls reinforced by rigorous statistical techniques and analysis. ACG ACPL
practices Six Sigma, 5S and Process Analytical Technology (PAT) to ensure consistency,
uniformity and conformance to specifications. All systems comply with ISO 9001:2008, ISO-
14001:2004, DMF and WHO standards. In addition to this, the Quality Assurance Program
implements numerous process quality initiatives to help reduce or eliminate defects and
enhance the overall quality of our products.
ACG Associated Capsules serves its customers through a wide network of offices,
representatives and agents. ACG Associated Capsule's mission is to find solutions to its
customers' problems through expertise derived from servicing both large and small needs.
20
Case Study – Productivity Improvement
ACG - Values and Beliefs
Businesses prosper and survive not only because of what they do, but also because of how they do it.
The 'means' by which a business operates is governed by certain fundamental values and beliefs existing within the business. This inturn is derived from the ethics and principles of the founders and the people involved in the start up of the business.
VALUES, BELIEFS, ETHICS and PRINCIPLES are the touchstones of a business. They form the fundamental attributes to which people relate. They are what cause people to be loyal, to love the company and to give of their unselfish best.
We would like to share with you the "Beliefs" dear to us at ACG Worldwide that we hope you will also value and honor and pass on to the people who work with you.
We believe that it is our duty to contribute to the prosperity and the progress of our nation. We manufacture products that help in improving the health of our population. We improve our country's image and economy through exports and import substitution. We work for the social up-liftment of the community wherever we are located.
We have had a long and close association with the pharmaceutical industry and we endeavor to remain a key supplier of products and services to them.
We believe that we must constantly interact with our customers to learn how we can serve them better. We make certain that people from all parts of our organization are exposed to such interaction.
Our organisation continually invest in quality improvements to ensure that our products and services are on par with rising customer expectations and equal to international standards.
We always treat whomsoever we do business with, in a just and fair manner and as equals.
Our business strategy is to maintain our leadership in the domestic market and to strive for leadership in the international market.
We believe that it is in the long-term interest of our business to optimize productivity by various means available to us.
We place our products in specific market segments, use fair pricing, carefully control costs and strive for excellence and innovation in products, quantity and service to command a premium for our products.
21
Case Study – Productivity Improvement
During work we behave like one family, where each member is treated with dignity, trust
and respect.
We firmly believe that an open culture and participative style of management works well for us.
We believe in being impartial and unbiased. We recruit people based on merit; reward people based on performance and promote people based on ability.
We believe that the most valuable resource we have is the combined strengths of our people working for a common purpose. With this in mind, we will structure jobs so that they provide challenge and develop individual capability, offer opportunities of job rotation and continually expose people to new thoughts and ideas to augment their knowledge and skills.
We truly believe in and value the creative talents of our people. This has been the key to our success in the past and we greatly rely on internal talent to develop the technology and systems needed to keep us competitive in future.
We always have a close regard and concern for the welfare of our people and their families.
22
Case Study – Productivity Improvement
THE SIGNIFICANCE OF THE GROUP’S LOGO
The ACG Worldwide logo shows three stripes join together to form a triangle, rising like a sail
filled with wind. They represent ACG Worldwide energy, movement and growth. Crowning the
triangle is the stripe for vision and innovation. Below it is the stripe that represents technology.
And holding the two up is the stripe that represents the people who make it possible. Together
as one they surge ahead. The new ACG Worldwide.
Together with energetic resolution, they surge ahead from a firm foundation, represented by
the monolith square. The earthy red reflects the strength and character born from years of
experience and understanding of the pharmaceutical industry. Together they form the forces
that bring change.
ACG Worldwide is ready to redefine the future, along with you.
23
Case Study – Productivity Improvement
Mission of the Company:
"It is our intention to become a global market leader in capsules and related machinery,
packaging films and packaging systems and to concentrate on the health care business as our
core area for growth.
We will use our technical expertise to create wealth in other parts of the world by becoming a
Transnational Company.
Our Internal Values are reflected in the image we portray. We would always like to be
identified with Quality, Service and Fairness"
24
Case Study – Productivity Improvement
QUALITY POLICY
We at ACG Associated Capsules Pvt. Ltd. shall strive for leadership position in global
market for capsule shells.
We shall achieve the above policy through
• Continual improvement in all spheres of activities
• Enhancement of customer satisfaction
• Involved stakeholders adapting process approach
• Process and equipment competent employees
• Surpassing Safety, Health and Environmental norms
• Positive Economic Value Addition.
To continue our world class manufacturing status, we will ensure compliance to cGMP,
applicable regulatory requirements and ISO 9001: 2008 standards. We will continue to
invest in other related quality management systems.
The quality policy and objectives are reviewed in every management review meeting for their continuing suitability. It is ensured that they are understood, implemented and maintained at all levels in the organization.
25
Case Study – Productivity Improvement
A member of ACG Worldwide
ENVIORNMENT, HEALTH & SAFETY POLICY
AT ACG ASSOCIATED CAPSULES PVT. LTD. PROTECTING PEOPLE AND THE
ENVIORNMENT WILL BE PART OF EVERYTHING WE DO AND EVERY
DECISION WE MAKE.
EACH EMPLOYEE HAS A RESPONSIBILITY IN ENSURING THAT OUR
PRODUCTS AND OPERATIONS MEET APPLICABLE GOVERNMENT OR ACPL
STANDARDS WHICHEVER IS MORE STRINGENT.
OUR GOAL IS TO ELIMINATE ALL INJURIES, PREVENT ADVERSE
ENVIORNMENT & HEALTH IMPACTS, REDUCE WASTE AND EMISSIONS AND
PROMOTE RESOURCE CONSERVATION AT EVERY STAGE OF THE LIFE
CYCLE OF OUR PRODUCTS. WE WILL REPORT OUR PROGRESS AND BE
RESPONSIVE TO THE PUBLIC.
26
Case Study – Productivity Improvement
ACG Associated Capsules Pvt. Ltd.,
Organization Chart
27
HOD – Gelatin
MGT: 14WORKMEN: 12
HOD – Prod.
MGT: 28WORKMEN: 31
HOD – Offline Latin
MGT: 8WORKMEN: 17
General Manager
HOD -Utility
HOD -PFD
MGT: 13WORKMEN: 20
MGT: 16WORKMEN: 46
HOD – GelatinHOD – Project Latin
HOD – Stores
HOD – HPMCGelatin
HOD – I.T.
MGT: 3WORKMEN: 0MGT: 3WORKMEN: 0
MGT: 3WORKMEN: 1
MGT: 9WORKMEN: 14
MGT: 1WORKMEN: 0
HOD – HR& Admn.
HOD – Finance
HOD – Purchase
HOD – Q&A Archas
MGT: 9WORKMEN: 0
MGT: 6WORKMEN: 0MGT: 6WORKMEN: 0
MGT: 2WORKMEN: 0
MGT: 18WORKMEN: 32
Case Study – Productivity Improvement
ACG Associated Capsules Pvt. Ltd.,
ORGANIZATION CHART – PFD
28
Asst.ManagerLogistics & Dispatches
HOD - PFD
Dispatch supervisiors
Shift Incharge & Supervisors
Printing & Packing Operators
Asst.ManagerPRINTING &
PACKING (WIP)
Operators
Case Study – Productivity Improvement
PROCESS OF EMPTY HARD GELATIN CAPSULE MANUFACTURING
Empty Hard Gelatin capsules are manufacturing from Gelatin granules, D.I water & food grade colorants. Moulds of cap & body are getting dipped in coloured gelatin solution, dipped moulds are passed through drying hood for drying of gelatin film, Caps & bodies are stripped out from mould & are joining partially.
Partially joined capsules are counted as per required packed size & transfer for printing or final packing operation as per customer’s requirements.
Capsules are manufactured in sizes 000, 00, 00el, 0, 0el, 1,2,3,4 and 5, Size “000” is the biggest size & Size “5” is the smallest size of the capsules.
Process flow of Capsule manufacturing
Approved by the major listed customer:Pfizer Dr.Ready Lab RanbaxyMerckKV Pharma USAWyeth USACiplaLundbeck, DenmarkAstra-Zeneca , SwedenPliva, CroatiaUnited Labs, PhilippinesAnd many more
•Product approval received with ACG capsules & products commercialized in USA & EU.•• Some of the approved molecules are - Amoxicillin - Cephalexin - Gabapentin
Gelatin solution preparation
Capsule moulding process
Capsule counting & Inspection
Capsule Printing
Final inspection & packing
Final QA clearance
Dispatches to customers
29
Case Study – Productivity Improvement
- Zonisamide
CAPSULES PRINTING - A COMPETITIVE ADVANTAGE FOR PHARMA INDUSTRY.
Since last five years, Pharma Industries are demanding printed capsules as a protection from spurious drugs and brand security of their products.
ACG having huge range & capacity for printing of capsules in all sizes from bigger size “000” to smaller size “5”Basically two types printing takes place on capsules – Linear Printing & Circular Printing.
ACG is a far ahead in Capsules printing technology globaly.ACG pioneered different varieties in capsules printing like,
Oriented Printing is a technology to print capsule with printing text of cap remains on cap & printing text of body remains on body only.
Double colour circular printing is a technology to print the capsules with different colours on cap & body around the circumference.
Brand Shield - 360º Printing is a unique technology, which helps in creating and retaining brand identity right up to the consumer.The technology enables to have capsules printed with two colours, around the circumference with very high accuracy.
Brand shield four colour printing that feature four-colour, circular oriented printing. This printing technique allows differentiating brand and also doubles up as an effective anti-counterfeit measure. Brand shield 4C technology enables to have imprint brand logo, brand name and graphics on the capsule, providing experiential branding opportunity.This technology allows printing two unique colours on the cap and on two colours on the body of the capsule.
The unique colours of capsules with individual identity printed on it help set brand apart from competition
30
Case Study – Productivity Improvement
PROCESS MAPPING – CAPSULE PRINTING OPERATION
Start
End
Load Capsules on machine Start Printing Check for Quality
If O.K
Rework
If Not O.K
Give to Packing
Offer to Q.C
If O.K
If O.K
If Not O.K
31
Case Study – Productivity Improvement
SCHEMATIC DIAGRAM OF CAPSULE PRINTING MACHINE
32
Case Study – Productivity Improvement
METHODOLOG Y
Study of Productivity improvement for printing operations through Lean Six Sigma projects at ACG ACPL, Dahanu
Productivity Improvement is a challenge to every industry.
There has to be continuous efforts for productivity improvement so as to sustain and grow. Productivity Improvement means efficiency improvement at all stages I.e. man power, energy, machinery, process and money etc. The profits of any company depend upon productivity.
Productivity is a relationship between the output (product/services) and the input (resources consumed in providing them) of a business system.
OutputProductivity = ------------------- Input
For the survival of any organization, this productivity ratio must be at least one. If it is more than one, the organization is in a comfortable position. So, the objective of the organization should be to identify ways and means to improve productivity to the highest possible level.
ACG Associated capsules – Dahanu plant is a biggest capsules manufacturing unit in Asia till date, having production capacity 650 lacs capsules per day. Avg.75 % of Produced capsules is getting printed for world’s top most Pharma companies.
Printing department of ACPL, Dahanu having 21 nos. high speed capsules printing machines, having printing capacity of all sizes capsules with all types of printing.
This study is mainly undertaken to identify the different productivity level of ACPL printing department.
ACG ACPL practices Six Sigma, Kaizen, 5S and Process Analytical Technology (PAT) to ensure consistency, uniformity and conformance to specifications.
33
Case Study – Productivity Improvement
Introduction of Six Sigma Methodology
Six Sigma is a methodology, tool set, and mindset that accelerate the implementation of business strategies.
Six Sigma is:A quality discipline that focuses on product and serviceExcellence to create a culture that demands perfection on target, every time!
The Greek letter “σ” or sigma is a mathematical term that represents a measure of standard deviation, or variability within a given population around the mean.Mathematically, six sigma refers to the population that falls within plus or minus six standard deviations.The term “six sigma” is used as a measurement standard in defining a normal curve of statistical data. Motorola engineers expanded on the term in the 1980s when they decided that the traditional quality levels (measuring defects in thousands of opportunities) were inadequate. Instead, they wanted to measure the defects per million opportunities.By using statistical analysis to minimize variation, Six Sigma enables data-based process improvements
The six sigma team is chosen based on domain knowledge needed to solve the problem. A cross functional team is recommended since most of the process improvements may need many functional inputs.
Primary Objective
Printing volume % is increasing w.r.t capsule manufacturing & also increasing productivity & efficiency of capsule manufacturing stage.Now it is mandatory to maintain online printing with capsule manufacturing process and enable ACPL, Dahanu to increase on time delivery & customer satisfaction. This will help us to maintain inventory within one day w.r.t dipped qty.
This can be achieved by only increasing printing machine productivity
Methodology/Approach
By applying Six Sigma and Lean principles, the team identified the current situation that the printing operations were in as well as determining the maximum possible output. The team identified methods to increase production output while finding the optimum annual labor costs per unit for possible future situations.
34
Case Study – Productivity Improvement
Phases of RDMAIC Six Sigma.
Recognize --- Selection of Meaning full Project Define ---- Define the project purpose and scope
Determine customer’s CTQs and performance standard
Measure ---- Measure Current Process capability Analyze ---- Determine & validate root cause
Improve ---- Determine & Implement solutions
Control ---- Sustain the improvements
RECOGNIZE PHASE
Mantra for Project selection “Meaningful and Manageable”
A holistic approach to identify lean six sigma project is to drill down from organization strategy to specific projects. A widely used mechanism to create the linkage is provided by balance score card help us to articulate by developing objectives in four perspectives (Customer, Financial, Inter process and Learning & growth).Initiatives chartered against an objective can lead to projects, which have a link with organizations success.
The six sigma team is chosen based on domain knowledge needed to solve the problem. A cross functional team is recommended since most of the process improvements may need many functional inputs.
Projects Prioritization & Project Teams are finalized by top management of the organization with consideration of organization’s Vision, Strategy & SWOT.
ACG top management has selected Printing process for Lean six sigma projects, As a strategy move to take competitive advantage with improving productivity of printing process by
1. Printing Productivity Improvement --- Increasing in First Time Right quality.
2. Printing Productivity Improvement --- Increasing in Printing machine availability, speed & efficiency.
35
Case Study – Productivity Improvement
DEFINE PHASE
Properly defining the objective the most important part of solving the problem. The Define Phase as the name implies is intended to bring clarity in the project at the outset so that there is a common understanding of why this project is worth doing. Define phase aims at understanding the customer requirement, identify the process that requires to be re-engineered and preparing a project charter, which act as a reference for the project team.
Define phase aims at bringing clarity with respect to benefit to the customer and the business.
Steps:
1. Voice of Customer (VOC) or Voice of Business (VOB)2. Project Selection
3. Project Identification – Process Mapping (SIPOC)
4. Project Charter
Tools:
1. Survey2. Focus Groups
3. Interviews
4. Data collection
5. KANO Model
6. Affinity Diagram
7. Tree Diagram
8. Pareto Chart
9. I - Chart
Key Deliverables:
36
Case Study – Productivity Improvement
1. Project Metrics & Targets2. CTQ drill down
3. Stake Holder Analysis
4. Communication Plan
ROAD MAP – DEFINE PHASE
DEFINE PHASE
Customer Business
Voice of Customer (VOC)
Critical to Customer (CTC) Voice of Business (VOB)
Defect opportunity (DO) Critical to Business (CTB)
Project Selection
Process Identification - SIPOC
Project Charter
Data Collection;
Primary Sources
37
Case Study – Productivity Improvement
1. Data are collected through personal discussions with the operators, supervisors & manager of printing department, accountant of ACPL.
Secondary Sources
1. Daily & monthly reports maintained by the printing department.2. Data are collected from the company’s website.3. Books & journals pertaining to the project.
PERIOD OF STUDY
Historical Data for Project selection – December 2013 to October 2014
Data collected during project – December 2014 to May 2015
Sustenance Data after Project completion – Jun 2015 to October 2015
Historical Data of Printing machine Productivity, Machine speed & Avilability before Project start.
Month Actual Running speed in
RPM
Machine Available
Hrs
Machine running
Hrs
% age availability
Expected Output in
Lacs
Actual Output in lacs
Productivity in % age
Dec-13 68.00 8463 4097 48.41 12337 8758 70.99 Jan-14 66.45 8190 4555 55.62 13859 10131 73.10 Feb-14 68.36 7644 4083 53.41 12497 9128 73.04 March-14 64.50 8463 4834 57.12 14753 11295 76.56 April 14 65.63 8190 4585 55.98 13723 10300 75.06 May- 14 64.00 8463 3990 47.15 11822 9467 80.08 Jun - 14 65.80 8190 3814 46.57 11176 8664 77.52 July- 14 63.86 8463 4547 53.73 13641 10821 79.33 August-14 61.27 8463 4784 56.53 14307 11308 79.04 Sept - 14 63.68 8190 4921 60.09 14492 11567 79.82 Oct -14 64.00 8463 4826 57.02 14342 11053 77.07Average 65.05 53.78 76.51
38
Case Study – Productivity Improvement
GRAPH TO BE CHANGED
I Chart – Productivity %age (Before)
39
Case Study – Productivity Improvement
I Chart – Machine speed in RPM (Before)
GRAPH TO BE CHANGED
.
PROJECT CHARTER
40
Case Study – Productivity Improvement
41
Case Study – Productivity Improvement
42
Case Study – Productivity Improvement
MICRO LEVEL PROCESS MAPPING (SIPOC)
43
Case Study – Productivity Improvement
STAKE HOLDER ANALYSIS
44
Case Study – Productivity Improvement
45
Case Study – Productivity Improvement
MEASURE PHASE
The Measure phase intention is to establish the baseline performance of existing process. The measure phase aims to identify the following;
1. Key out put measures or Key Performance Indicators.2. Validate the measurement system.
3. Collect data pertaining to the project identified in the define phase.
4. Determine the baseline performance of process or Process capability ( Defect per Million opportunity or Sigma level )
ROAD MAP – MEASURE PHASE
What to Measure? Correlation matrix for the CTC/CTB's and Output
How To Measure? Operational Definition
Source of Data
Types of data
Measurement system (MSA /AAA)
Sampling Plan
Data stratification
Data collection Data collection plan
Check sheets
Screening of Data & Test for stability
Graphical tools
Histogram
Pareto chart
Run chart ( time series plot)
46
Case Study – Productivity Improvement
Control chart
Box plot diagram
Process Capability DPMO calculator /Sigma level calcualtion
Types of Measures
Input Measure
The measures pertaining to key inputs to the process.
Process Measure
These are the measures internal to a company’s process. It include quality measures, productivity measures, deliver measures that are important to a company’s internal customer as well as waste and cycle time measure. They are correlated to pertinent output measures.
Output Measures
Output measures are used to determine how well customer’s requirements and wants are met. Generally they are the project “y”
Effectiveness Measures
The degree to which customer needs and requirements are met and exceeded.
Example - %age defective, response time, billing accuracy
Efficiency Measures
The amounts of resources are allocated in meeting and exceeding customer requirements
Example – employee productivity, turnaround time, amount rework, time per activity.
47
Case Study – Productivity Improvement
Types of Data
Variable / continuous Data
Data is measures on a continuum scale and can be expressed in decimal place.
Example; Length, Height, Weight
Attribute / discrete Data
Data can be categorized or designated as either or and can not be expressed in a decimal number.
Types of attribute data.
Scale Description Example
Binary It is classified into one or two categories Yes or No, Correct or not correct
Unordered category
There is no ranking of the data collected Types of products
Ordered category
Ranking of the data is possible Customer satisfaction rating.
Count Data is counted discretely Nos. of errors in the application.
48
Case Study – Productivity Improvement
Operational Definition:
For Defining the Measure
An operational definition is clear, concise description of a measurement and the process by which it is to be collected.
To remove ambiguity – Every one have consistent under standing.
To prove clear way to measure the characteristic
Identifies what to measure.
Identifies how to measure
Makes sure that no matter who does the measuring. The result is Consistent.
PROCESS CAPABILITY
Process capability is the measure of how capable a process is of meeting customer specifications. It is expressed in terms of yield. The capability of process can be measured in four methods.
1. Throughput Yield.
Percentage of units that pass through an operation first time without any defects. It is a measurement taking into account the total number of defects and numbers of units under study.
Defects per Unit (DPU) = Defects / Unit
2. Parts Per Million.
Parts per Million is commonly used for measuring the quality of the product. A unit is considered defective even when there is one defect in it whereby it is irrelevant whether the unit has 1 or 100 defects, it is considered as a single defective unit.
Parts per Million = (Defectives / Total units) * 1000000
3. Defects per Million Opportunity
Performance level of a process can also be expressed in defects per million opportunities. DPMO simply indicates how many defects would be show up, If the process has million defects opportunities.
Steps for calculating DPMO
49
Case Study – Productivity Improvement
Total Number of Units processed (N) Total Number of Defects made (D)
Total Number of Defect opportunities per unit (O)
DPMO = 1,000,000 * ( D / N * O )
Relationship between sigma level, defect rate & yield.
Sigma level DPMO Yield (%)
2 σ 308770 69.1230
3 σ 66811 93.3189
4 σ 6210 99.3790
5 σ 233 99.9767
6 σ 3.4 99.99967
4. Process Sigma by Normal Approximation
Process sigma calculation using normal approximation method is more applicable, when the data is continuous and it satisfies the condition normality.
DATA COLLECTION PLAN
50
Case Study – Productivity Improvement
51
Case Study – Productivity Improvement
DOT PLOT DIAGRAM
52
Case Study – Productivity Improvement
BOX PLOT DIAGRAM
53
Case Study – Productivity Improvement
INTERVAL PLOT DIAGRAM OF MACHINE SPEED
DPMO CALCUALTOR FOR DISCETE DATA
54
Case Study – Productivity Improvement
55
Case Study – Productivity Improvement
ANALYZE PHASE
The Analyze phase of six sigma methodology analyzes the process to find out the causes for the problem. The analysis is intended to identify and understand causal relationship and find the root cause of variation.
ROAD MAP – ANALYZE PHASE
ANALYSIS
Defect Speed
Data Door Process Door
Cause & Effect VSM / Process mapping
Graphical Validation Value / time analysis
Test of hypothesis Process cycle efficiency
Regression
Design Of experiments (DOE) Failure Mode effect analysis (FMEA)
Vital Root cause
Cause & Effect Diagram:
The cause & effect or Fish Bone diagram was first used by Dr.Ishikawa .It is also called Ishikawa Diagram.
Fishbone diagram is used to identify the root cause likely to be causing a problem. This tool helps to recognize the root cause of the problem under a set of genera categories. Mainly six “M” – Man, Machine, Mother Nature, Measurement, Material and Method
56
Case Study – Productivity Improvement
WHY... WHY analysis
Why…Why Analysis method is used to move past symptoms and finds the real root cause for a problem. It is said that asking why five times successively one can penetrate into the root cause of a problem.
57
Case Study – Productivity Improvement
Process Mapping and value stream mapping
“Process is a set of inter related or interrelated or interacting activities which transforms inputs into outputs”
Cross Functional Mapping
58
Case Study – Productivity Improvement
Cross functional map creates a common understanding in the team for the problem or problem in the process. It depicts the flow of work across various functions.
Value Stream Mapping
All activities required in bringing a product/service from raw material into the arm of customer is called value stream.
Value stream mapping is a visual tool to understand the material and information flow of a product / service.
Value stream map follows the flow of product from supplier to customer.
Value Analysis
Value is a measure of the customer willingness to pay for the activity.
A work activity adds value when the product / service are transformed or it is performed correctly for the first time.
Process Simplification
Non Value Added activities – Activities that consume resources but not create any value are non value added activities. These activities are also called waste. So it is necessary to eliminate waste and simplify the process.
Process mapping chart of Product change over of Printing Machine at ACPL
NVA – Non value added activity
BVA – Value added activity, which can be clubbed with VA or do it externally.
VA – Value added activity
59
Case Study – Productivity Improvement
IMPROVE PROCESS MAPPING CHART OF PRODUCT CHANGE OVER AFTER ELIMINATING NVA
60
Case Study – Productivity Improvement
FAILURE MODE EFFECT ANALYSIS ( FMEA)
It is an advanced quality planning tool, used to evaluate potential failure mode and their cause. FMEA presents an opportunity to identify the problem but does not solve them. The use of FMEA, helps in identifying the weak points or links in the as is process.
61
Case Study – Productivity Improvement
Failure – means a component or system not meeting or not functioning its design
point.
Failure Mode – is the manner in which a component or system failure occurs.
Effect – The consequences of the failure.
Severity – Assessment of the seriousness of the effect of the potential failure mode. In a scale of 1-10, Higher the number indicates higher the severity.
Occurrence – Likelihood that a specific cause will occur. In a scale of 1-10, Higher the number indicates the probability of occurrence of the event is higher.
Detection – Ability of the system to detect potential cause. In a scale of 1-10 the higher the number indicates the detection of the cause is difficult.
Risk Priority Number (RPN) –
This number is used to place priority on items that require additional quality planning.
RPN = Severity x Occurrence x Detection
CAUSE PRIORITIZATION MATRIX OF PRINTING MACHINE SPEED & AVAILABILITY (FMEA)
62
Case Study – Productivity Improvement
63
Case Study – Productivity Improvement
64
Case Study – Productivity Improvement
DESIGN OF EXPERIMENTS (DOE)
DOE is
Structured proactive process for finding relationship between input and output factors.
Multiple input factors are considered and controlled simultaneously to ensure that effect on the output is significant
DOE is valuable tool
To optimize product and process designs. To accelerate the development cycle
To reduce development costs.
To improve the transition of products from research and development to manufacturing.
To effectively trouble shoot manufacturing problems
DOE is a quality tool to achieve product excellence at lowest possible overall cost.
65
Case Study – Productivity Improvement
DOE - Results of 16 Trials conducted on capsule printing machine
DOE Ink Viscocity Solvent QTY M/c Speed Rollercl fr Additives L ight Dark Incomplete B roken C ondition1 70 50 80 30 10 0 0 0 02 70 150 50 40 5 3 1 0 03 50 150 50 30 10 22 0 0 04 50 50 50 40 10 3 0 0 05 70 50 50 30 5 4 2 0 06 50 150 80 30 5 7 0 0 07 70 150 80 40 10 0 0 0 08 50 50 80 40 5 2 0 0 09 70 150 50 40 5 2 0 0 0
10 70 50 50 30 5 4 0 0 011 70 50 80 30 10 0 0 0 012 50 50 50 40 10 5 0 0 013 50 150 50 30 10 15 3 0 014 50 150 80 30 5 4 0 0 015 70 150 80 40 10 0 0 0 016 50 50 80 40 5 0 0 0 0
Without Vis cometer
With Vis cometer
66
Case Study – Productivity Improvement
DOE – Optimization Plot after 16 trials conducted on printing Machine.
67
Case Study – Productivity Improvement
IMPROVE PHASE
Improve phase aims to generate solutions, evaluate the solutions and arrive at an implementation plan for these solutions.
ROAD MAP – IMPROVE PHASE
Generation of solutions Brain storming
Pull system
5 s
Mistake Proofing ( Poka Yoke)
Set up time reduction
Selection of solutions Multi Voting
SCAMPER Analysis
Evaluate the solutions Solution Prioritization Matrix
New Process Risk Analysis FMEA
Piloting Solution
Implementation Solution Implementation Action Plan
68
Case Study – Productivity Improvement
Generation of Solutions
Brain storming
Brainstorming is a team centered process used to generate new and creative ideas to solve a problem. The foundation of brainstorming is that thee is no criticism involved in generating ideas. The keys to a successful brainstorming are
Objectives of the brainstorming are clear Ideas are welcome without criticism
Lean Management Tools
5 S – work place optimization used to govern the house keeping of workplace. 5s can be translated into Sort, Simplify, Shine, Standardize, Sustain
Mistake Proofing (POKA YOKE) - Mistake proofing is a technique for eliminating errors and focuses on the error happening in the source. It is based on the assumption, that it is good to do things right the first time.
69
Case Study – Productivity Improvement
Selection of Solutions
Multi Voting – During solution generating process, a list of ideas are generated, which will be too extensive to be addressed at once, so it is necessary to select the solution and reduce the list to manageable one. The tool is used this phase is Multi Voting.
Steps for multivoting
1. Generate List of Ideas 2. Assign a letter to each idea to minimize confusion during voting.
3. Vote
4. Tally the votes
5. Select top most five ideas through voting.
SCAMPER Analysis – is a helpful tool for complimenting the creativity techniques. It fosters creativity in identifying solution and supports the structuring when developing solution ideas.
70
Case Study – Productivity Improvement
SCAMPER ANALYSIS
SR.NO. KEY ROOT CAUSES Substitute Combine Adapt Modify Put to use Eliminate Re-arrange
Sr.No. Key Root Cause Substitute Combine Adapt Modify Put to Use Eliminate Re arrange
1
Reduced speed to avoid printing letter cut during
Linear printing
Convert roller with circular dimensions
Replace bewel gear transmision
hardness of rubber roller should be 12
2
Reduced speed due to worn out Gears (42 & 53)
Adopt the deluxe m/c principle
Change the hardness of
gear material
Re make the sop for replacement
3Reduced speed due to Improper alignment of
fix a position & do
4Reduced speed due to
Motor pully key way worn Replace with taper lock
Re make the sop for
5Reduced speed to avoid printing letter cut during
Replace old links with
Replace bewel gear
fix a position & do
hardness of rubber roller
6Reduced speed due to
chain elongationRe make the sop for
7Reduced speed due to
lack of Operational Re make the sop for Training
8Reduced speed due to
communication gap Re make the sop for Training
SCAMPER ANALYSIS FOR MACHINE SPEED
ControlImproveAnalyzeMeasureDefine
58
71
Case Study – Productivity Improvement
SCAMPER ANALYSIS
SR.NO. KEY ROOT CAUSES Substitute Combine Adapt Modify Put to use Eliminate Re-arrange
1
Loss of time due to Lack of quick roller change training
to operator
Process Maping product change
SOP Rewriting
1)Un wanted Air use for all m/c clean
VA / NVA Activity Identifing1)Increase External activity from internal
Marking on marking roller to use at the time of setting on printing machine
1)Gauge for sycronistion of marking roller & rubber roller w.r.t. link (Pressur checking)
1)Provide all tools to operators.2)Arrange Gears ,shafts ,ink,roller etc.
Time Study
1)Increase External activity from internal
2
Loss of time due to no hand over / take over on
machine. SOP RewritingUse reliver in Shift changes.
3
Loss of time due to non availability of next batch Roller / Ink / tools before
batch completetion
1)Provide all tools to operators.2)Arrange Gears ,shafts ,ink,roller etc.
Re make the sop for Training
4
Loss of time due to lack of Operational defination of
print defect .to supervisor,operator &
Q.A.InspectorRe make the sop for Training
5
Loss of time due to communication gap between operator &
supervisor.Re make the sop for Training
6
Loss of time due to non availability of QC person /
supervisor. Provide schedule of L.C.
SCAMPER ANALYSIS FOR MACHINE AVILABILITY
ControlImproveAnalyzeMeasureDefine
59
72
Case Study – Productivity Improvement
Evaluation of Solutions
Solution Prioritization Matrix – Helps to evaluate the solution based on criteria. Criteria based selection will help to reduce the list of solutions and prioritize them based on criteria.
Steps for prioritization matrix
1. Draw the list of solution2. Criteria Identification
3. Weigh the criteria
4. Rating of each solution against criteria
5. Identification of Preferred solution
Effort –Benefit Analysis – represents the relationship between benefit and the effort (expenses) of a solution, so as to reduce the number of prospective solutions.
73
Case Study – Productivity Improvement
SR NO. SOLUTION GENRATION COST EASY TO
IMPLEMENTEASY TO
CONTROL TOTAL
1 Convert linear print roller with circular dimensions 8 9 9 648
2 Replace old links with New Links with less float 2 4 7 56
3 Replace bewel gear transmision with timer belt transmision.
8 8 8 512
4 Adopt the deluxe m/c principle external Gear 2 2 6 24
5 Replace with taper lock pully / ring fitter 8 8 8 512
6 Change the hardness of gear material 8 7 7 392
7 fix a position & do dowelling 9 9 9 729
8 hardness of rubber roller should be 16-18 hrc 8 8 8 512
9 Make schedule of replacement of gear & chain 9 9 9 729
10 Make the schedule for Training 9 9 9 729
SOLUTION PRIORTISATION METRIX FOR SPEEDControlImproveAnalyzeMeasureDefine
60
74
Case Study – Productivity Improvement
SR NO. SOLUTION GENRATION COST EASY TO
IMPLEMENTEASY TO
CONTROL TOTAL
1 Increase External activity from internal of product change. 9 9 9 729
2 Marking on marking roller to use at the time of setting on printing machine 8 2 8 128
3 Modify SOP of line clearance.9 9 9 729
4Gauge for sycronistion of marking roller & rubber roller w.r.t. link. 2 2 8 32
5 Arrange Gears ,shafts ,ink,roller etc.9 9 9 729
6 Provide all tools to operators. 9 9 9 729
7 Use reliver in Shift changes. 2 5 5 50
8 Provide schedule of L.C. 8 8 8 512
9 Avoid un wanted Air use for all m/c clean. 8 4 4 12810 Make the schedule for Training 9 8 7 50411 Convert roller with circular dimensions12 hardness of rubber roller should be 12 hrc13 Replace old links with New Links with less float
SOLUTION PRIORTISATION METRIX FOR AVAILABILITY
ControlImproveAnalyzeMeasureDefine
61
PROBLEM & SOLUTION TREE
75
Case Study – Productivity Improvement
SolutionsType of Cause
Root CauseSr.no.
BehavioralFear of financial loss11
BehavioralCommunication gap between management & union on productivity
10
Modify the SOPProcessImproper & precise communication & monitoring of supervisior
9
Modify the SOP ProcessOperational definition of print defect not clear to the operators
8
Modify the SOP ProcessNo AAA analysis for operators7
Replace bevel gear transmission with timer belt transmission .
TechnicalReduced speed due to chain elongation6
Replace old links with New Links with less floatTechnicalReduced speed to avoid printing letter cut during 360* printing
5
Replace with taper lock pulley / ring fitter TechnicalReduced speed due to Motor pulley key way worn out4
fix a position & do dowelling of print.headTechnicalReduced speed due to Improper alignment of printing head
3
Adopt the deluxe m/c principle external Gear
Replace bevel gear transmission with timer belt transmission.
Changed the hardness of gear material from 56 to 60 hrc.
TechnicalReduced speed due to worn out Gears (42 & 53) 2
hardness of rubber roller should be 16-18 hrc
Replace old links with New Links with less float
Convert linear print roller with circular dimensions TechnicalReduced speed to avoid printing letter cut during Linear printing
1
PROBLEM & SOLUTION TREE FOR SPEED
ControlImproveAnalyzeMeasureDefine
BehavioralFear of financial loss10
BehavioralCommunication Gap between management & union on productivity
9
Replace old links with New Links with less floatTo avoid printing letter cut during 360* printing 8
hardness of rubber roller should be 16-18 hrc
Replace old links with New Links with less float Technical
Convert linear print roller with circular dimensions TechnicalTo avoid printing letter cut during Linear printing7
Provide schedule of L.C.Loss of time due to non availability of QC person / supervisor.6
Make the schedule for TrainingLoss of time due to communication gap between operator & supervisor.
5
Modify SOP. ProcessLoss of time due to lack of Operational definition of print defect .to supervisor,operator & Q.A.Inspector
4
Provide all tools to operators.
Arrange Gears ,shafts ,ink,roller etc.ProcessLoss of time due to non availability of next batch Roller / Ink / tools before batch completion
3
Use reliever in Shift changes.ProcessLoss of time due to no hand over / take over on machine.2
Avoid un wanted Air use for all m/c clean.
Gauge for synchronization of marking roller & rubber roller w.r.t. link
Marking on marking roller to use at the time of setting on printing machine
Increase External activity from internal of product change.
VA / NVA Activity Identifying,Time Study
Process Mapping product change ProcessLoss of time due to Lack of quick roller change training to operator
1
SolutionsType of causeRoot CauseSr.No
PROBLEM & SOLUTION TREE FOR AVAILABILITY
ControlImproveAnalyzeMeasureDefine
76
Case Study – Productivity Improvement
ControlImproveAnalyzeMeasureDefine
1Replace bewel gear transmision with timer belt transmision.
2 Adopt the deluxe m/c principle external Gear3 Replace old links with New Links with less float4 Convert linear print roller with circular dimensions5 Replace with taper lock pully / ring fitter 6 hardness of rubber roller should be 16-18 hrc7 Change the hardness of gear material8 fix a position & do dowelling9 Make schedule of replacement of gear & chain
10 Make the schedule for Training
64
1 35
46
2
7
8 9
EFFORT BENEFIT ANALYSIS FOR SPEED
10
ControlImproveAnalyzeMeasureDefine
1Marking on marking roller to use at the time of setting on printing machine
2 Replace old links with New Links with less float3 Gauge for sycronistion of marking roller & rubber roller w.r.t. link.4 Use reliver in Shift changes.5 hardness of rubber roller should be 16 - 18 hrc6 Increase External activity from internal of product change.7 Modify SOP of line clearance.8 Arrange Gears ,shafts ,ink,roller etc.9 Provide all tools to operators.
10 Provide schedule of L.C.11 Avoid un wanted Air use for all m/c clean.12 Make the schedule for Training13 Convert roller with circular dimensions
65
1 3 54 62
7 8 9
10
EFFORT BENEFIT ANALYSIS FOR AVAILABILITY
1211 13
77
Case Study – Productivity Improvement
CONTROL PHASE
The Intent of control phase is to sustain the improvements identified in the improve phase. Implementing process control systems ensures that process performance is maintained at a level that satisfies customer needs, and drives the ongoing improvement of process performance.
ROAD MAP – CONTROL PHASE
Documentations Control Plan
Monitoring Control Charts
78
Case Study – Productivity Improvement
Response Plan
Documentations
Documentations ensure that improvements are institutionalized across the organization and standardized.
Control Plan – is a structured approach for the design, selection, and implementation of the value added control methods for the total system. It summarizes the entire control strategy for system. It is integral part of a process and is a document.
Standard Operating Procedure (SOP) – is a set of instructions written providing detailed step by step sequences of activities carried out in a process. Well documented SOP reduces the time spent in training resources and facilitates consistency in the process.
Monitoring of achieved Results
79
Case Study – Productivity Improvement
It is important to understand that identified causes can be only controlled for that to happen, it is necessary to monitor achieved results. The primary tool is used for monitoring is Control Charts.
Control Charts –
Provides Information as to whether special or common causes are responsible for the variation in the process.
Provide a basis to evaluate the stability of the variation and the mean.
TRAINING PLAN & SCHEDULE
80
Case Study – Productivity Improvement
74
Training plan & Schedule ( Calendar)
Sr. No
Type of Training Targeted Audience By Whom( Internal /
External resource for Trg.)
By When( Tentative
Month or date)
1 Operational definitions of printing defect & AAA analysis of operators
Printing & QC operators
QA & Printing supervisors
2nd week of every alternate month
2 Product change over activity
Printing operators & supervisors
Printing In charge 1st week of month
3 Printing operation at Higher speed ( 80 RPM)
Printing operators & supervisors
Printing In charge 1st week of month
ControlImproveAnalyzeMeasureDefine
81
Case Study – Productivity Improvement
PROCESS MANAGEMENT CHART
ControlImproveAnalyzeMeasureDefine
Daily analysis of data & check for any abnormality
print.supervisor
If machine speed go below 70 RPM
I – ChartEvery shiftPrint.operator / Print.supervisor
RPMMachine speed
Printing of capsules
Data Analysis of one week & check for any abnormality
print.supervisor
If availability go below 65 %
I – ChartEvery shiftPrint.operator / Print.supervisor
Hours.Machine running time
Continuity of printing machine
Data Analysis of one week & check for any abnormality
print.supervisor
If product change over time go beyond Mins.
I – ChartEach Product change
Print.operator / Print.supervisor
Hours.Total change over time
Product change over
What will they do(Corrective actions initiated)
Who is going to respond
When to Respond
Type of control chart
Freq. Of data collection
Responsibility(Who will record)
Unit of measure
MetricsY=o/pX=I/p
Process Steps
PROCESS MANAGEMENT CHART
73
MONITORING OF PROJECT AT DIFFERENT STAGES
PRINTING MACHINE - KEY PERFORMANCE INDICATORS
PRODUCTIVITY (%age) M/c SPEED (RPM)
AVAILABILITY (%age)
BEFORE
82
Case Study – Productivity Improvement
Month
Actual Running Speed in RPM
Machine
Available Hrs.
Machine
running
hours.
% age avaibilit
y
Expected
output in lacs
Actual
output in lacs
Productivity in %age
Dec-13 68.0 8463 4097 48.41 12337 8758 70.99 Jan-14 66.5 8190 4555 55.62 13859 10131 73.10 Feb-14 68.4 7644 4083 53.41 12497 9128 73.04 March-14 64.5 8463 4834 57.12 14753 11295 76.56 April 14 65.6 8190 4585 55.99 13723 10300 75.06 May- 14 64.0 8463 3990 47.15 11822 9467 80.08 Jun - 14 65.8 8190 3814 46.56 11176 8664 77.52 July- 14 63.9 8463 4547 53.72 13641 10821 79.33August-14 61.3 8463 4784 56.53 14307 11308 79.04 Sept - 14 63.7 8190 4921 60.09 14492 11567 79.82 Oct -14 64.0 8463 4826 57.03 14342 11053 77.07AVERAG
E 65.05 53.78 76.51DURING
Nov -14 69.09 8060 4747 58.9 14055 10728 76.33 Dec-14 70.27 8060 5173 64.18 15267 11906 77.99 Jan-15 69.7 7280 4927 67.68 14587 11756 80.59 Feb-15 69.04 8060 4821 59.82 14035 10898 77.65 March-15 70.11 7020 4499 64.09 13205 10833 82.04 April 15 70.79 7254 4749 65.47 13974 11441 81.87 May- 15 70.05 7410 4902 66.15 14335 11753 81.99AVERAG
E 69.86 63.76 79.78AFTER
Jun - 15 71.78 8060 5520 68.49 16123 13164 81.65 July- 15 72.6 6786 4716 69.50 13895 11376 81.87August-15 73.1 6786 4538 66.87 13604 11022 81.02 Sept - 15 73.35 6175 4342 70.32 12802 10573 82.59 Oct -15 73.15 7410 5322 71.82 15608 13147 84.23AVERAG
E 72.80 69.39 82.27
ACHIEVEMENTS & LEARNINGS FROM THE PROJECT
Achievements -
Project Goals Achievement of Project (Last six month average )
Productivity of printing machine increase from 76% to 85%
Print. machine Avg.Productivity increased up to - 82.27 %
Printing machine speed increase from 64 rpm to 80 rpm
Print. Machine Avg.Speed increased up to - 72.8 rpm
83
Case Study – Productivity Improvement
Printing machine availability
increase from 58 % to 85% Print. machine Avg.availability
increased up to - 69.39 %
Leanings -
A Problem can be stated in terms of measurable defects so that it can calculate the potential improvement opportunities.
Six Sigma Methodologies taught that inputs & outputs of any process can be precisely observed, measured and reported using statistical tools.
Six Sigma Projects have helped to measure and improve process capabilities of various functions in the company.
The systematic data driven approach reduced the resistance to change and helped sound decision making.
Six Sigma has changed the mindset of people towards performance excellence.
Alignment of People and Processes is a must keeping Customer Focus in mind to meet their requirements – stated and implied.
Six sigma has Improved Analytical ability & presentation skill.
Six Sigma Tools – Cause & Effect Matrix, Failure Modes & Effect Analysis, T-Test, and Design of Experiments & Control Charts are the effective tools to solve any “PROBLEM”.
84
Case Study – Productivity Improvement
CONCLUSION
In the modern era of 21st century Customer Satisfaction is the only “Mantra” for world class
organization.
ACG is continuously learning & applying the quality philosophies such as Customer Focus,
waste elimination, Process Improvement etc.
I am privileged that, I got an opportunity to work at ACG Worldwide where I was inspired to
go for the Post-Graduate course in Operations. It has been a great learning experience to got
an opportunity to learn about the continuous improvement techniques and world class
manufacturing practices within the company . This is an added knowledge to my theoretical
studies from Welingkar Institute.
I have covered the application of productivity & process improvements methodology & tools
in ACG ACPL during my study.
Every effort has come to true to the satisfaction as every body is involved in this continuous
improvement process. In last ten years due to atomization and update technology the picture
has been changed drastically in whole organisation. Management involvement and
contribution to drag the organization to achieve leadership position across the globe as
world’s largest manufacturer of capsules will be fulfilled in near future .
This study helped me in depth learning of the subject and Importance of Productivity
improvement for any organization in today’s competitive world.
85
Case Study – Productivity Improvement
RECOMMENDATIONS
ACG is continuously adopting new strategy in keeping CUSTOMER at center. Still there are
some recommendations to be made which remain after the study & can be a Competitive
edge for ACG in future.
Effectiveness of training – behavioral & technical
People empowerment & engagement
Rewards & reorganizations.
86
Case Study – Productivity Improvement
BIBLIOGRAPHY
Martand Telsang “Industrial Engineering & Production Management” S Chand & Co. R.Paneerselvam “Production & Operations Management” Prentice hall Of India
Private Ltd. B.M. Lall Nigam I.C. Jain “Cost Accounting” Prentice hall Of India Private Ltd. Web sites - www.acg-world.com, www.sixsigmaalchemy.com
UNDERTAKING BY CANDIDATE
I declare that project work entitled CASE STUDY- PRODUCTIVITY IMPROVEMENT”is my own work conducted as part of my syllabus .I further declare that project work presented has been prepared personally by me and it is not sourced from any outside agency. I understand that, any such malpractice will have very serious consequence and my admission to the program will be cancelled without any refund of fees.I am also aware that, I may face legal action, if I follow such malpractice.
Kalpesh.B.Prajapati.
signature of Candidate
87