27
Johnstaff Projects November 2016 The New Museum, Parramatta — Flood Study 161372 Appendix B Development Proposals Taylor Thomson Whiling (NSW) Pty Ltd Appendix B © Taylor Thomson Whiling
Transcript
Page 1: maasbusinesscase.commaasbusinesscase.com/business case/Blue attachments/Word file… · Web viewJohnstaff Projects November 2016 The New Museum, Parramatta — Flood Study 161372

Johnstaff Projects November 2016The New Museum, Parramatta — Flood Study 161372

Appendix B

Development Proposals

Taylor Thomson Whiling (NSW) Pty Ltd Appendix B© Taylor Thomson Whiling

Page 2: maasbusinesscase.commaasbusinesscase.com/business case/Blue attachments/Word file… · Web viewJohnstaff Projects November 2016 The New Museum, Parramatta — Flood Study 161372

p a g e . 2 01 .3 GROUND LEVEL

PEDESTRI

15 Retai l 557 m2

I N Ar t

34 Riser

Non-Art/StaffLift 35 Riser1 100 m2

18 Circulation 36 Plant OUTDOOR ENTRANCE AREAPEDESTRCIRCULAT

LANDSCAPED OUTDOOR ARR4 /11/4 14PUBLIC SPACE RivE-,0

20al Arrivals Foyer 19 Circulation

Page 3: maasbusinesscase.commaasbusinesscase.com/business case/Blue attachments/Word file… · Web viewJohnstaff Projects November 2016 The New Museum, Parramatta — Flood Study 161372

R 15,000 — /

L _RETAIN /N.G USS TO EXISTING

CONTENTS PHILLIP STREET

_GROUND FLOOR PLAN 1:500 @ A3 0

OPTION 1 I GROUND LEVEL I 2/11/2016

858 m2 118m2c Office in Learning Labs

50 m2 ''''' 1,210 m2mil Bag Check is Resource Centre

50 m2 ""'' 398 m2tii Ticketing IN Arrivals Foyer

s9 m2 200 m2Afti Security is Resident Offices

43 m2 197 m2e Central Gallery895 m2 24 Production2 Studio 0 r /

7 Tech. Space gig Security + First Aid /19 m2 40 m2 /

8 Cafe 26 Loading Dock i588 m2 250 m2 /

g Cafe Kitchen im WC i175 m2 132 rn2

10 Kitchen Store ll WC22 m2 '" 80 m2 ' ' ' -

ii Events Kitchen m Public Lift154 m2 13 m2 a Visible Collections., Public Uft88 m2 28 m2

Touring Gallery 1111,1olArt/Staff Lift

1,083 m2 4 MI Touring Retail 1111 Art Lift

loo rn.2 — 50 m2

Page 4: maasbusinesscase.commaasbusinesscase.com/business case/Blue attachments/Word file… · Web viewJohnstaff Projects November 2016 The New Museum, Parramatta — Flood Study 161372

37LANDSCAPED BASEMENT

p/IRR/1/14,17-7-4 page.

PEDESTRI PEDESTR

CONTEN BASEMENT PLAN 1:500 @ A3

37 Public Space4,948 m2

33 Security +

1 - 0 1 1 r i n g H a l l P r e p . S p a c e 2 5 0 m 2

40 Circulation + Processing

42 Public Lift40 Art Lift

' 50 m2

44 5Aort,,2Lift

46 -t/Staff Lift

47 49

ACCESS FROM

/

OPTION 1 I BASEMENT LEVEL I 2/11/2016

Page 5: maasbusinesscase.commaasbusinesscase.com/business case/Blue attachments/Word file… · Web viewJohnstaff Projects November 2016 The New Museum, Parramatta — Flood Study 161372

LEV page. · . . - - -„ 0 . 1 ; 4 '

OPTION 1 I 3D MASSING I

MIWwun d

1 .9 3D Option One is a value managed option of the

FDB scope. This option omits Touring GalleryB, the Omnimax and has reduced collections LEVEL 3storage. The briefed floor area for Option 01 Plantis less than the current space occupied by the Collection Storage

LEVEL 2Collection

Storage

Main

LEVEL 1 Main Galleries

LEVEL 0 GROUND

CommerciaVRetail Touring

LEVEL -1 BASEMENT

LEVWorks

Bio

LEVEL 2 Collection Storage

Circula

LEVEL 1Main Galleries - Large ScaleCollection Storage

Circula

LEVEL 0 GROUNDArrivals Hall, Security + Ticketing

Education

CirculationLEVEL -1 BASEMENT

Security +

Page 6: maasbusinesscase.commaasbusinesscase.com/business case/Blue attachments/Word file… · Web viewJohnstaff Projects November 2016 The New Museum, Parramatta — Flood Study 161372

GROUND LANDSCAPED OUTDOOR

PUBUC SPACE 131R/3/1/144 17;1 R/1/&-R

page. 36

20

3

1

26 36— 7 - -

P 5 / 1 \

L _KENN ACCESS TO EXISTING CARP-

ARK

OUTDOOR ENTRANCE AREA

GRO UND FLOO R PLAN 1 : 500 @ A3 0

Adak

PEDESTRI_

PHILLIP

1 Arrivals Foyer 986 m2

2 Office

50 m2

3. Bag Check 50 m2

4 6Ticketingo m 2

5 Secu r i t y 50 m2

6 Central Gallery 895 m2

7 Tech. Space19 m28 Cafe

568 m2

9 Cafe Kitchen166 m2

10 Kitchen Store 20 m2

-20 2 r2 Learn ing Labs ,o n i t t Resource Cent re

398 m2

Arrivals FoyerZoo m2

23 Resident Offices197 m2

24 Production Studio

210 m228 Security40 2 /

+ First Aid 26 Loading

Dock250 m2

ri WC

132 m2in WC

80 m2

21 PEDESTRIANCIRCULATION

11 Events Kitchen 150 m212 Visible Collections 94 m2

Touring Gallery 1,504 m2

iii-T,(L:Zg Retail15 Retail

468 m2

16 laX

17 3B8u7srn2Bay

18 Circulation154 m2

19 Circulation247 m2

CONTENTS Public Lift

Public13m2 Lift 2 , r n 2

2; Non-Art/Staff Lift m2

Art Lift 50 m2

· A5ortnii2:1 ft

34 1R4i7sem2r

35 Riser100 m2

· P l a n t r n ,

· 2· Non-Art/Staff Lift 14 m2

OPTION 2 I GROUND LEVEL I 2/11/2016

Page 7: maasbusinesscase.commaasbusinesscase.com/business case/Blue attachments/Word file… · Web viewJohnstaff Projects November 2016 The New Museum, Parramatta — Flood Study 161372

PEDESTRI PECOCULATI

BASEMENT LEVEL' - _39

LANDSCAPED OUTDOOR

PUBLIC SPACEPqR13/111447-1,1

R11/1?

page. 38

38 l m2e

Security + Ticketing

Ali Public Space4,949 m2

TouringiT2r: Hall Prep.

Space 241 Circulation +

Processing2,112 m2

42 Ca pzking (20 CARS)

9 2 3 Public Lift13 m2

Atrt r,L,"j"

ilrimLj"44 Non-Art/Staff Lift

Non-Art/Staff Lift14 m2

48 Riser49 m2 CONTENTS

BASEMENT LEVEL PLAN 1:500 @ A3 0

OPTION 2 I BASEMENT LEVEL I 2/11/2016

Page 8: maasbusinesscase.commaasbusinesscase.com/business case/Blue attachments/Word file… · Web viewJohnstaff Projects November 2016 The New Museum, Parramatta — Flood Study 161372

OPTION 2 I 3D MASSING I

M I

2.9 3D

Option 2 captures the base requirements of the FDB, with the omission of the Touring Gallery B. This concept envisages utilisation of the entire site andc' 'knot retain the heritage items of

1Ar Grove or St George's Terrace. The

P

LEVEL 3

Collection Storage

Offices

LEVEL 2

Collection Storage Main

Galleries

LEVEL 3

WorkshopsBioBox

Circulation

Auditori

ums

LEVE

LEV page.

LEVEL 1Main Galleries - Large ScaleCollection Storage Children's Gallery

I

I I , I_______________________Arrivals Hall, Security + Ticketing4 - , , 1 . 4 . 1 1 1 C - - ; . . 0 4 1 1 1 . 1 1 : I

LEVEL -1 BASEMENT Circulation + Processing

I LEVEL 0 I

Education

LEV

Main

LEVEL 0

Commercial/Retail

Omnimax

LEVEL -1

Carparking

Page 9: maasbusinesscase.commaasbusinesscase.com/business case/Blue attachments/Word file… · Web viewJohnstaff Projects November 2016 The New Museum, Parramatta — Flood Study 161372

PHILLIP

page.

PARRA MA 77-4 LANDSCAPED OUTDOOR3.3 GROUND

3 Arrivals Foyer988 rrQ

g▪ ff rize

Bag Check50 m2

it] Ticketingtnr2

§ Security

7 Tech.

8

9 Cafe Kitchen

188 m2

10 Kitchen Store20

m2

Security + First

26 Loading Dock /

MI

3

••

R

2 1

3

1

2

ig Visible Collections Public

1

2

— L _BEA& AOUSS TO

PEDESTRI

RL

1in Touring Gallery

1,504 m2Touring Retail

100 15 Retail

488 m2

16 Omnimax

17 Bus Bay 367 m2

Non-Art/Staff Lift 1

m2

11 Art Lift

34 Riser1 4 7 m2

in Plant

298 m2

1A

I 1

1

PEDESTRI

6

2

2

2

si Learning

Is Resource

si Arrivals

in Resident

24 TV

80

al Public

CONTEN

A

OUTDOOR ENTRANCE

____GROUND LEVEL PLAN 1:500 @ A3

OPTION 2A I GROUND LEVEL I 2/11/2016

Page 10: maasbusinesscase.commaasbusinesscase.com/business case/Blue attachments/Word file… · Web viewJohnstaff Projects November 2016 The New Museum, Parramatta — Flood Study 161372

BASEMENT LEVEL39

LANDSCAPED OUTDOOR PUBUC SPACE P/IRRAMA71/1 RIV69

page. 54

PEDESTRIAN PEDESTRIAN

3 9 m 2Security + Ticketing8 0 3 9

P u b l i c S p a c e4,849 m2

T 0 1 . 1 r i n g H a l l P r e p . S p a c e 25 0 m 2

41 Circulation + Processing1,929 m2

42 Car2rking (20 CARS)9 2 3

4 3 P u b l i c L i f t

1 3 m 2

44 Art Lift50 m2

45 Art Lift50 m2

46 1/Staff Lift47 Non-Art/Staff Lift

-- 14 m2

48 Rse.,;.

49 n

BASEMENT LEVEL PLAN 1:500 @ A3 0OPTION 2A I BASEMENT LEVEL I 2/11/2016

Page 11: maasbusinesscase.commaasbusinesscase.com/business case/Blue attachments/Word file… · Web viewJohnstaff Projects November 2016 The New Museum, Parramatta — Flood Study 161372

OPTION 2A I 3D MASSING I

ML`

3.9 3D

Option 2A captures the base requirements of the FDB, with the omission of the Touring Gallery B, as in Option 2. This concept envisages utilisation of the entire site and does not retain the heritage items of Willow Grove or St. George's Terrace. This option includes additional gallery space to that of Option 2.

page. LEVEL 4

Rant

LEVEL 3 WorkshopsBioBox

Circulation

LEVEL 2Collection Storage

LEVE

R

LEVEL 3

Offic

LEVE

Main

LEVE

Main

LEVEL 0

Commercial/Retail

Omnimax

LEVEL -1

Carparking

LEVEL 1Main Galleries - Large ScaleCollection Storage

LEVEL 0 GROUND

Loading Dock + Bus Bay

Education Labs

LEVEL -1

Security +

_

Page 12: maasbusinesscase.commaasbusinesscase.com/business case/Blue attachments/Word file… · Web viewJohnstaff Projects November 2016 The New Museum, Parramatta — Flood Study 161372

Pgriy3/1 page.

PEDESTRIAN CIRCULATION

n Art Lift 37 Bus Drop-off50 m2 309 m2

1111Nori-Art/Staff Lift Public Lift

7m2 //Staff Lift Public Lift14 m2

Non-Art/Staff Lift 49 2 4Riser14

20 Circulationrt 130 m2

Circulation Plant 4 _21013ol m2

(

4.3 GROUND LEVELLANDSCAPED OUTDOOR

PUBLIC SPACE MA 7-7-A PEDESTRIAN/3/1/L-

0 3CIRCULATION

1 Central Gallery IA Learning Labs791 m2 1,152 m2

2 space gi Resource Centre414 m2

3 O m n i M A X 2 4 P r o d u c t i o n S t u d i o 4 7 0 m 2

Touringri2iur rg Gallery B 25 Resident Offices

953 Touring B Retail • 81 m2 .174Cm2

Touring Gallery Gallery A 27 Bag Check21 m2

Touring A Retail AR Arrivals Foyer102 m2 149 m2

Arrivals Foyer 29 Loading Dock868 m2 265 m2

e; Office 30 Security + First Aid /s1 m2 33 m2

10 Bag Check 31 Cafe50 m2 124 m2

11 5Ticketing 32 Cafe Kitchen /139 m2 _--.o rn2 ..- t

12 Security 33 Kitchen , Store 4 ___ 50 m2 i 4 rn2 .

is Cafe 34 Events Kitchen L - \ i 265 m2 155 m2 _BUNN gcc_ESS TO "V/ I

EXISTING CARFARK IIIIWC 35 o m2 Retail + I i

1 2 7 m 2 1 i

NI Art Lift 40 Visible Collections I /

5.2 m2 /

CONTENTS PHILLIP STREET GROUND LEVEL PLAN 1:500 @ A3 0OPTION 3 I GROUND LEVEL I 3/11/2016

Page 13: maasbusinesscase.commaasbusinesscase.com/business case/Blue attachments/Word file… · Web viewJohnstaff Projects November 2016 The New Museum, Parramatta — Flood Study 161372

4.4 BASEMENT page. 43LANDSCAPED

PEDESTRI

43 Public rSpace

3344 Security + Ticketing47 m2

gm Touring Hall Prep. Space

253 m2

46 Circulation + Processing

Ail Art

0,9 Art

50 25

ist Non-Art/Staff Lift

52 Non-Art/Staff Lift 14 m2

es Non-Art/Staff

CONTENT BASEMENT LEVEL PLAN 1:500 @ A3

OPTION 3 I BASEMENT LEVEL I 3/11/2016

Page 14: maasbusinesscase.commaasbusinesscase.com/business case/Blue attachments/Word file… · Web viewJohnstaff Projects November 2016 The New Museum, Parramatta — Flood Study 161372

I

LEVEL

4

Pl

a

nt

LEVEL 3

Collection Storage

Circulation

LEVEL 1

Service

Core

4. I 0 3D MASSINGOption Three captures the entire requirements of the FDB, including both the Omnimax and. Touring Gallery B. This concept envisages util'-ation of the Willow Grove and

eorge's Terrace. The total briered floor area for this concept is greater than the current space of the Powerhouse Museum.

Circulation in this option has been increased, as the main entrance and arrivals hall has been pushed to the east of Willow Grove, separating it further from the museum spaces on the west of the site. The entire built form has moved forward towards the river to accommodate the retention of Willow Grove and St. George's Terrace, decreasing the river bank area available for public space and .access. LEVEL 0 GROUND

Arrivals Hall, Security + Ticketing

Willow Grove: Cafe + Kitchens St. Georges Terraces: Retail

Touring Gallery AOmnimax

LEVEL -1 BASEMENT

Touring Gallery Prep. Space

Carparking

LEVEL 4 page. 81PlantCirculation

BioBox

LEVEL 3 Collection

StorageOffices

AuditoriumsLEVEL 2

Collection Storage

Offices

Main GalleriesLEVEL 1

WorkshopsChildren's Gallery

Main Galleries

LEVEL 0 GROUND

Loading Dock + Bus BayEducation Labs

Touring Gallery B

LEVEL -1 BASEMENT

Circulation + Processing

Public Space

ecurity +

Ticketing

Page 15: maasbusinesscase.commaasbusinesscase.com/business case/Blue attachments/Word file… · Web viewJohnstaff Projects November 2016 The New Museum, Parramatta — Flood Study 161372

Mt

JOHNSTAFF FENDER KATSALIDIS MIRAMS ARCHITECTSOPTION 3 I 3D MASSING I 3/11/2016

Page 16: maasbusinesscase.commaasbusinesscase.com/business case/Blue attachments/Word file… · Web viewJohnstaff Projects November 2016 The New Museum, Parramatta — Flood Study 161372
Page 17: maasbusinesscase.commaasbusinesscase.com/business case/Blue attachments/Word file… · Web viewJohnstaff Projects November 2016 The New Museum, Parramatta — Flood Study 161372
Page 18: maasbusinesscase.commaasbusinesscase.com/business case/Blue attachments/Word file… · Web viewJohnstaff Projects November 2016 The New Museum, Parramatta — Flood Study 161372
Page 19: maasbusinesscase.commaasbusinesscase.com/business case/Blue attachments/Word file… · Web viewJohnstaff Projects November 2016 The New Museum, Parramatta — Flood Study 161372

CARPARK —_____

LANDSCAPED OUTDOOR — _ --------------

_______PublicSfia

PEDESTRIAN PEDESTRIAN

Circulation +

wAsym ems zemsopygifty 7/fri I S f i f t y e l f r iatirgeP; 7f/V4464Z-VSYSV / 11.1/ Sir

MN

Hv,wm of

SKETCHES I CARPARK OPTION I

Page 20: maasbusinesscase.commaasbusinesscase.com/business case/Blue attachments/Word file… · Web viewJohnstaff Projects November 2016 The New Museum, Parramatta — Flood Study 161372

Johnstaff Projects November 2016The New Museum, Parramatta — Flood Study 161372

Appendix C

Council Flood Maps

Taylor Thomson Whiffing (NSW) Pty Ltd Appendix C© Taylor Thomson Whitting

Page 21: maasbusinesscase.commaasbusinesscase.com/business case/Blue attachments/Word file… · Web viewJohnstaff Projects November 2016 The New Museum, Parramatta — Flood Study 161372

I

ihn&F/Whillifr _

erdiel 4

a- ?its

1 : 3 , 0 0

a_C

o

-

UC0

d l O M I N M E

Page 22: maasbusinesscase.commaasbusinesscase.com/business case/Blue attachments/Word file… · Web viewJohnstaff Projects November 2016 The New Museum, Parramatta — Flood Study 161372

10NOTE: The Upper and Lower Partamatta River Flood

Legend

- Ground Contours (metre AND)- Upper Parramatta River Cross Section- Lower Panama' River Cross Section· Stornwrater Pits- Stormwater Pipe Network§ 20 Year Flood (Upper Portman River)

§ 20 Year Flood (Lower Parramalta River) MI 100 Year Flood (Upper Parramatta River) I§ 100 Year Flood (Lower Pummels River)

®PMF River) J`..orf.

PMF (Upper Parramatta River)MF (Lower Pa

1 1 % 1 0 1 . 1 .

f t * I N A A * * t i l l

'1,aNyo 71111114 /11-411.

\ •4 1 4

AHD) (me Flood LorMECIII1111131111=1--- 'd ) t r e s

mamma= mcmiEnrifiabo---EMAIII33111=1118211iirli 27231 642 ®EMz 030 1111EMIECIE m m a

' 530ME:111E114

1=1111011111111111NECC 0ECIII0EEIr NEEMIIIIEUEMEXI IMEENEE111111EMEEll11E=1111111EMINE111111•331 IEZINE1311111E111111ENIMICSMIMICMMENEEN111=IN00ESII MEIIIIIIICUINIECIII

Page 23: maasbusinesscase.commaasbusinesscase.com/business case/Blue attachments/Word file… · Web viewJohnstaff Projects November 2016 The New Museum, Parramatta — Flood Study 161372

NOTE: The Upper and Lower Parramatta River Flood Studies are currently hem°. u. dated. H draulic hazard extents in this area ma chan.e.

U C0

Page 24: maasbusinesscase.commaasbusinesscase.com/business case/Blue attachments/Word file… · Web viewJohnstaff Projects November 2016 The New Museum, Parramatta — Flood Study 161372

4

Legend- Ground Contours (metre AHD)- Upper Parrsmatta River Cross Subon - Lower Pa rramatta River Cross Section· Stormwater Pits.......Stormwater Pipe Network

Hiph Hazard (Lower Parramatta River) 1111. High Huard (Upper Parramatta River) Low Hazard (Upper Parramatta River) Low Hazard (Lower Parramatta River)


Recommended