CBA Results Files Filling in the templates
Transcript
Page 1: CBA Results Files Filling in the templates. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015

CBA Results FilesFilling in the templates

Page 2: CBA Results Files Filling in the templates. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015

2

We highly encourage you to

> Read the CBA Methodology: Annex F on Methodology of TYNDP 2015

http://www.entsog.eu/public/uploads/files/publications/TYNDP/2015/TYNDP022-150316_Annex_F_lowres.pdf

And ESW-CBA Methodology

http://www.entsog.eu/public/uploads/files/publications/CBA/2015/INV0175-150213_Adapted_ESW-CBA_Methodology.pdf

> Read the TYNDP 2015

http://www.entsog.eu/publications/tyndp#ENTSOG-TEN-YEAR-NETWORK-DEVELOPMENT-PLAN-2015

Getting started

Page 3: CBA Results Files Filling in the templates. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015

3

Overview of CBA

Capacity-based Indicators (excl. Bidirect)

Modelling results

Disruption rate& Remaining Flexibility

Indicators

Monetization (EU level)

Monetized results(country level)

Fin. TemplateFNPVFRRF C/B ratio

Qual. Template

Econ. TemplateENPVERRE C/B ratio

CBA

JRCMethodology

ENTSOG Promoters JRC

Page 4: CBA Results Files Filling in the templates. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015

4

Result files – General information

Page 5: CBA Results Files Filling in the templates. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015

5

12 Result files provided to all promoters for each Group of projects > DISRUPTED RATE> DISRUPTED QUANTITY> REMAINING FLEXIBILITY> INDICATORS> MONETIZATION> MARGINAL PRICE> GPI> FLOWS> CO2 and demand

> IMPORT ROUTE DIV> N-1 ESW CBA

> Economic Template

Result files

Modelling results

Capacity-based indicators results

Economic Template

Page 6: CBA Results Files Filling in the templates. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015

6

Units of the files

Result files

UnitsDISRUPTED RATE % of country (or balancing zone* ) demand daily basisDISRUPTED QUANTITY GWh/d daily basisREMAINING FLEXIBILITY % of country (or balancing zone* ) demand daily basisINDICATORS SSPDi = % of supply price diversification on country Gas Bill yearly basis

SSPDe= % of supply price dependence of country Gas Bill yearly basisUSSD/CSSD= % of country demand on yearly basis yearly basis

MONETIZATION EUR/d daily basisMARGINAL PRICE EUR/GWhGPI EUR/GWhFLOWS GWh/d daily basisCO2 and demand CO2= in tons daily basis

demand= in GWh daily basisIMPORT ROUTE DIV no unit (HHI index)N-1 % of country demand daily basisEconomic template Bill components= 10̂ 6 EUR/year yearly basis

*: for country having more than 1 balancing zone

Page 7: CBA Results Files Filling in the templates. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015

7

Result files

Results provided atDISRUPTED RATE country (or balancing zone* ) levelDISRUPTED QUANTITY country levelREMAINING FLEXIBILITY country (or balancing zone* ) levelINDICATORS country level

country levelcountry level

MONETIZATION EU levelMARGINAL PRICE country (or balancing zone* ) levelGPI country (or balancing zone* ) levelFLOWS EU levelCO2 and demand EU levelIMPORT ROUTE DIV country (or balancing zone* ) levelN-1 country levelEconomic template EU level

*: for country having more than 1 balancing zone

Page 8: CBA Results Files Filling in the templates. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015

8

1 CBA (Economic + Qualitative + Financial) per Group of projects

> For each Group of projects, the same modelling results have been provided to all promoters in the Group of projects

> For each Group of projects, promoters have to coordinate to fill the Group CBA Share cost and revenue data to fill in the Economic and Financial Templates Discuss the modelling results to fill in the Qualitative Template

CBA Templates

Page 9: CBA Results Files Filling in the templates. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015

9

Economic Template

Page 10: CBA Results Files Filling in the templates. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015

10

Benefits> already filled in by ENTSOG> In EPI_Calculation Sheet> Based on monetized benefits referring to MONETIZATION> Unit: 10^6 EUR/year> Filled in for

GREEN and GREY global contexts LOW and HIGH Infrastructure Scenario The 13 Price Configurations

Costs> To be filled in by promoters> In Inputs Sheet> Aggregated CAPEX and OPEX for all projects within the Group of projects> Unit: 10^6 EUR/year

Economic Template

Page 11: CBA Results Files Filling in the templates. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015

11

Qualitative Template

Page 12: CBA Results Files Filling in the templates. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015

12

Group Benefits> 2 sub-sections, Specific Criteria and Other Benefits, based on TEN-E Regulation, Art 4

– 2 (b):

Qualitative Template – Section 2.

Page 13: CBA Results Files Filling in the templates. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015

13

Specific criteria> to fill in Specific criteria sub-section based on simulation results, refer to the below

matrix of the ESW-CBA Methodology (**)

(**) http://www.entsog.eu/public/uploads/files/publications/CBA/2015/INV0175-150213_Adapted_ESW-CBA_Methodology.pdf

Qualitative Template – Section 2.

Cf. ESW-CBA Methodology p64&65

Page 14: CBA Results Files Filling in the templates. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015

14

Section 2. Group Description

Qualitative Template – Section 2.Apply to MS accessing a single supply source in the Initial Situation.In such cases, Refer to increases in INDICATORS / SSPDi

In initial situation, bottleneck between 2 neighbouring countries (or BZ) are reflected by differences in the value of indicators.In such cases, refer to decreased difference between 2 neighbouring countries for - INDICATORS : CSSD, SSPDe, SSPDi- MARGINAL PRICE

Refer to REMAINING FLEXIBILITY

Refer to increase in INDICATORS / SSPDi

Refer to decrease in IMPORT ROUTE DIV

CO2 Emissions: refer to decrease in tons of CO2 in CO2 and demandOther items: refer to your answer to section 4.4. and 4.5. of the Qualitative Template

Page 15: CBA Results Files Filling in the templates. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015

15

Section 4.1. Identification of the significantly impacted countries and the Area of Analysis

Qualitative Template – Section 4.1.

Results provided atDISRUPTED RATE country (or balancing zone* ) levelDISRUPTED QUANTITY country levelREMAINING FLEXIBILITY country (or balancing zone* ) levelINDICATORS country level

country levelcountry level

MONETIZATION EU levelMARGINAL PRICE country (or balancing zone* ) levelGPI country (or balancing zone* ) levelFLOWS EU levelCO2 and demand EU levelIMPORT ROUTE DIV country (or balancing zone* ) levelN-1 country levelEconomic template EU level

*: for country having more than 1 balancing zone

Refer to Result Files providing results at country or balancing zone level to identify the Impacted Area based on simulation results

Page 16: CBA Results Files Filling in the templates. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015

16

Section 4.2. Comments on the Quantitative and Monetary Analysis of the TYNDP Step of ESW-CBA

Qualitative Template – Section 4.2. (1/3)

Refer to DISRUPTED RATEDISRUPTED QUANTITY REMAINING FLEXIBILITY Under- normal situation- any meaningful route disruption scenario

Comment on- complementarity with other projects- competition with other projects

Refer to INDICATORS- CSSD (Cooperative Supply Source Dependence)- and/or USSD (Uncooperative Supply Source Dependence)For- any meaningful supply source

Comment on- complementarity with other projects- competition with other projects

Page 17: CBA Results Files Filling in the templates. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015

17

Section 4.2. Comments on the Quantitative and Monetary Analysis of the TYNDP Step of ESW-CBA

Qualitative Template – Section 4.2. (2/3)

Refer to INDICATORS- SSPDe (Supply Source Price Dependence)For- any meaningful supply source

Comment on- complementarity with other projects- competition with other projects

Refer to INDICATORS- SSPDi (Supply Source Price Diversification)For- any meaningful supply source

Comment on- complementarity with other projects- competition with other projects

Page 18: CBA Results Files Filling in the templates. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015

18

Section 4.2. Comments on the Quantitative and Monetary Analysis of the TYNDP Step of ESW-CBA

Qualitative Template – Section 4.2. (3/3)

Refer toMARGINAL PRICEFor any meaningful Price Configuration

Price convergence refers to the spread between EU countries Marginal Prices. Comment on the impact of the Group on this spread, if any.

Comment on- complementarity with other projects- competition with other projects

Refer toMONETIZATION (and potentially GPI)For any meaningful Price Configuration

Comment on- complementarity with other projects- competition with other projects

Page 19: CBA Results Files Filling in the templates. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015

19

Section 4.3. Capacity Based Indicator Results and Comments

Qualitative Template – Section 4.3.

Refer to N-1 ESW CBA

Refer to IMPORT ROUTE DIV

Indicator to be calculated and commented upon by promoters

Page 20: CBA Results Files Filling in the templates. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015

20

Bi-Directional Project Indicators (1/3)> to be calculated by promoters

> Refer to ESW-CBA Methodology (**) p 34&35 http://www.entsog.eu/public/uploads/files/publications/CBA/2015/INV0175-150213_Adapted_ESW-CBA_Methodology.pdf

> 2 indicators BDPi at Interconnection Point level BDPz at cross-zone level

(**) http://www.entsog.eu/public/uploads/files/publications/CBA/2015/INV0175-150213_Adapted_ESW-CBA_Methodology.pdf

Qualitative Template – Section 4.3.

Page 21: CBA Results Files Filling in the templates. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015

21

Bi-Directional Project Indicators (2/3) > BDPi

Qualitative Template – Section 4.3.

Cf. ESW-CBA Methodology p34&35

Page 22: CBA Results Files Filling in the templates. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015

22

Bi-Directional Project Indicators (3/3) > BDPz

Qualitative Template – Section 4.3.

Cf. ESW-CBA Methodology p34&35

Page 23: CBA Results Files Filling in the templates. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015

23

Financial Template

Page 24: CBA Results Files Filling in the templates. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015

24

No modelling results needed to fill in the Template

Explanations to fill in the template> Refer to Tutorial Sheet included in the provided file

Financial Template

Page 25: CBA Results Files Filling in the templates. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015

Thank You for Your Attention

ENTSOG -- European Network of Transmission System Operators for GasAvenue de Cortenbergh 100, B-1000 Brussels

EML:WWW: www.entsog.eu

[email protected]; [email protected]


Recommended