FOR THE PROPOSED CEMENT PLANT AT VILLAGES UKIR & BHOA, TALUKA ABADASA, DISTRICT KACHCHH, GUJARAT RELIANCE CEMENT COMPANY PRIVATE LIMITED (RCC) ,MUMBAI ENVIRONMENTAL IMPACT ASSESSMENT
Transcript
Page 1: Cement Industry EIA

FOR THE PROPOSED CEMENT PLANT AT VILLAGES UKIR

& BHOA, TALUKA ABADASA, DISTRICT KACHCHH, GUJARAT

RELIANCE CEMENT COMPANY PRIVATE LIMITED (RCC) ,MUMBAI

ENVIRONMENTAL IMPACT

ASSESSMENT

Page 2: Cement Industry EIA

EIA Process Involved in the Case:  Screening  Scoping and consideration of alternatives  Baseline data collection   Impact prediction  Assessment of alternatives, delineation of mitigation   measures and environmental impact   

statement    Public hearing   Environment Management Plan   Decision making   Monitoring the clearance conditions 

Page 3: Cement Industry EIA

INTRODUCTION

Reliance Cement Company Private Limited (RCC)proposing to setup a green field integrated cement plant including captive power plant in  Kachchh district, Gujarat.As per Environment Impact Assessment Notification dated 14th September 2006, new projects or activities, or the expansion or modernization of existing projects proposed in any part of India shall obtain prior environmental clearance from Ministry of Environment & Forests.The proposed project is classified “Category-A” type of project under 3(b) and 1(d ) Type Activity by Ministry of Environment & Forests, New Delhi as per the EIA Notification .The proposed cement plant with clinker and captive power plant are considered as an Integrated Project and is being submitted to the “Industry Committee”.Based on the market demand,  RCC is planning to develop a green field cement plant complex which mainly comprises cement plant with production  capacity of 3.6 MTPA clinker and 5.5 MTPA cement and a coal based captive power plant of 75 MW at Villages Ukir & Bhoa, Taluka Abadasa, District Kachchh, Gujarat. 

Purpose of the Report :

Page 4: Cement Industry EIA

INTRODUCTION

The estimated cost of the proposed green field cement plant complex is Rs. 2500 Crores.The proposed integrated cement plant complex is located at Villages Ukir & Bhoa, Taluka Abadasa, District Kachchh, Gujarat.

Brief Description of Project:

Page 5: Cement Industry EIA

Scope of the Study

The scope of study broadly includes:

To conduct literature review and to collect data relevant to the study area; Establishing the baseline environmental aspects in and around the project area; Identifying various existing pollution loads;Predicting incremental levels of pollutants in the study area due to the proposed project;Evaluating the predicted impacts on various environmental attributes in the study area by using scientifically developed and widely accepted environmental impact assessment methodologies;

To prepare an Environment Management Plan (EMP), outlining the measures for improving the environmental quality in view of proposed project & allied activities for environmentally sustainable development; and

Identifying critical environmental attributes that are required to be monitored in the post-project scenario.

Page 6: Cement Industry EIA
Page 7: Cement Industry EIA

STUDY AREA MAP

Page 8: Cement Industry EIA

Scope of the Study

Page 9: Cement Industry EIA
Page 10: Cement Industry EIA

PHOTOGRAPHS OF PROJECT AREA

Page 11: Cement Industry EIA
Page 12: Cement Industry EIA
Page 13: Cement Industry EIA

HEAT AND ENERGY BALANCE

Page 14: Cement Industry EIA

FLOW DIAGRAM FOR CPP

Page 15: Cement Industry EIA

Sources of PollutionAir Pollution :

Gaseous Emissions       Stack Emissions -Proposed Cement Plant complex

The emissions of particulate matters from all the stacks will be limited to 50 mg/Nm3.

       Stack Emissions -Proposed CPPThe design of steam generator and 

electrostatic precipitator would ensure emission level of particulate matter 

within 100mg/Nm3.

Suspended Particulate Matter      Sulphur Dioxide-The main advantage 

of energy efficient boilers is low emission of SO2and NOx.

     Oxides of NitrogenGeneration of Nitrogenous Oxides (NOx) from the coal is very limited in the energy efficient as the low combustion temperature of about (850-900)C.

     These include:A]  Low NOx burners; andB]  Air staging in furnace e.g. over fire air.

The environmental pollution due to the cement plant in general, could be broadly classified into the following categories:

Page 16: Cement Industry EIA
Page 17: Cement Industry EIA

Wastewater Generation and Treatment : The total fresh water requirement for the proposed plant  is about 5000 m3/day which will be sourced from  Ground Water/Desalination Plant.

Wastewater Generation at PlantAs the proposed cement plant will be operated on the dry process and air is used as cooling media, no wastewater will be generated. • Wastewater Generation from Sanitary UsesThe sewage wastewater from the proposed phase-II will be treated in theexisting Sewage Water Treatment Plant (SWT) having design capacity of 250m3/day.

No process wastewater will be generated from proposed plant operations. Treated sewage water will be used for watering the greenbelt. The plant will be operated on “Zero Discharge Basis”. 

Page 18: Cement Industry EIA

WATER BALANCE

Page 19: Cement Industry EIA

Thank U…….