CESC Limited Power Distribution for the Future August 2016 www.cesc.co.in [email protected] 1 1 BCC & I - Power Distribution for the Future 25 Aug 2016
Transcript
Page 1: CESC Limited Power Distribution for the Future · 2016-08-31 · debasis.gupta@rp-sg.in 1 25 Aug 2016 BCC & I - Power Distribution for the Future 1. Power Distribution for the Future

CESC Limited

Power Distribution for the FutureAugust 2016

www.cesc.co.in

[email protected]

1

1BCC & I - Power Distribution for the Future 25 Aug 2016

Page 2: CESC Limited Power Distribution for the Future · 2016-08-31 · debasis.gupta@rp-sg.in 1 25 Aug 2016 BCC & I - Power Distribution for the Future 1. Power Distribution for the Future

Power Distribution for the Future

2

In the coming years, Utilities would need to:

Expand the network to meet growing demand – within available space

Ensure reliable and quality power

Enhance Customer Delight

Adopt Renewables, Microgrids, E-Vehicles, Storage

Make the Grid Smarter

Integrate with Smart City services

BCC & I - Power Distribution for the Future 25 Aug 2016

Page 3: CESC Limited Power Distribution for the Future · 2016-08-31 · debasis.gupta@rp-sg.in 1 25 Aug 2016 BCC & I - Power Distribution for the Future 1. Power Distribution for the Future

Smart Grid

Energy Storage

Smart Meters

Renewable Energy

Water & Waste Management

Sanitation

Green Transport

Railways

ICT

Security & Surveillance

Disaster Management

Smart Cities – Smart Grid

3BCC & I - Power Distribution for the Future 25 Aug 2016

Page 4: CESC Limited Power Distribution for the Future · 2016-08-31 · debasis.gupta@rp-sg.in 1 25 Aug 2016 BCC & I - Power Distribution for the Future 1. Power Distribution for the Future

Integrated Control Centre

4BCC & I - Power Distribution for the Future 25 Aug 2016

RIO control centre integrates 30 Departments

Page 5: CESC Limited Power Distribution for the Future · 2016-08-31 · debasis.gupta@rp-sg.in 1 25 Aug 2016 BCC & I - Power Distribution for the Future 1. Power Distribution for the Future

Data Visualization… Situational Awareness

A Modern Command & Control Centre

5BCC & I - Power Distribution for the Future 25 Aug 2016

Page 6: CESC Limited Power Distribution for the Future · 2016-08-31 · debasis.gupta@rp-sg.in 1 25 Aug 2016 BCC & I - Power Distribution for the Future 1. Power Distribution for the Future

Network Expansion with Space constraints

6

Conversion of Outdoor EHV

SS to Indoor GIS SS

Integrated SS at New

Cossipore with 220, 132 & 33

kV GIS

Underground 132 kV SS at

`Quest Mall’

Underground GIS at `Quest

Mall’

Compact Unit Cooled Power

Transformers being procured

Space is scarce in Kolkata which has only 6% Road Surface Area

India’s tallest Power

Transmission Towers across

Hoogly River (236m tall)

BCC & I - Power Distribution for the Future 25 Aug 2016

Page 7: CESC Limited Power Distribution for the Future · 2016-08-31 · debasis.gupta@rp-sg.in 1 25 Aug 2016 BCC & I - Power Distribution for the Future 1. Power Distribution for the Future

Enhancing Reliability – 2-pronged Strategy

SCADACondition Based

Monitoring & MtcModified PBs

1. PREVENTION Initiatives Network

Reinforcement

Planning Tools

Proactive

Maintenance

Enhanced

Specifications

Result: HT faults down by 60% & LT faults down by 50% in last 5 years

7

2. Rapid RESTORATION Initiatives

RMU AutomationAuto LT

ChangeoverPower on Wheels Shift

Operations

Vehicle

Tracking

Field Force

Automation

BCC & I - Power Distribution for the Future 25 Aug 2016

Page 8: CESC Limited Power Distribution for the Future · 2016-08-31 · debasis.gupta@rp-sg.in 1 25 Aug 2016 BCC & I - Power Distribution for the Future 1. Power Distribution for the Future

Outage Management Systems

Prediction of location Prioritizing restoration efforts Providing information on extent of outages Estimation of restoration times.

Crew management

8BCC & I - Power Distribution for the Future 25 Aug 2016

Page 9: CESC Limited Power Distribution for the Future · 2016-08-31 · debasis.gupta@rp-sg.in 1 25 Aug 2016 BCC & I - Power Distribution for the Future 1. Power Distribution for the Future

Focus on LT – CESC LT Control Centre

LT Pillar Box with MFMs

Consumer end Power

Fail Indicator

LT Fusing Alerts

over SMS

over OFC

over SMS

Call Centre with LT Outage Details

GIS based LT Outage

Management

• GIS-centric LT Control Room

• Field Force equipped with Tabs

Outage Monitoring & Tracking

Supply Quality

Monitoring

Energy Audit Operations

Loss Control Measures

VehiceleTracking

Crew Management

Oversees Regional Reporting Centres

GPS integrated GIS map

9BCC & I - Power Distribution for the Future 25 Aug 2016

Page 10: CESC Limited Power Distribution for the Future · 2016-08-31 · debasis.gupta@rp-sg.in 1 25 Aug 2016 BCC & I - Power Distribution for the Future 1. Power Distribution for the Future

Customer – Centricity & Digitization

Web & Mobile Apps

Virtual Office

Social Media Connect

Tablet based Meter

Reading

10

Payment Options

Real Time Displays

Business Intelligence &

Analytics

Customer Engagement -

OPower

Online Chat with MD

BCC & I - Power Distribution for the Future 25 Aug 2016

Page 11: CESC Limited Power Distribution for the Future · 2016-08-31 · debasis.gupta@rp-sg.in 1 25 Aug 2016 BCC & I - Power Distribution for the Future 1. Power Distribution for the Future

Internet of Things - Grid of Things - Telecommunications

Telecommunications Optical Fibre Backbone

Last Mile - WirelessRF Mesh Canopy Data Centres

11BCC & I - Power Distribution for the Future 25 Aug 2016

Page 12: CESC Limited Power Distribution for the Future · 2016-08-31 · debasis.gupta@rp-sg.in 1 25 Aug 2016 BCC & I - Power Distribution for the Future 1. Power Distribution for the Future

Smart Meters

Private FAN/ NAN

RF Mesh

PLC

GPRS etc.

Private WAN

Optical

Fibre

Smart Home with Smart Meter, HAN, RES

MDMS

To

Control

Centre

AMI = Advanced Metering Infrastructure

DCU or

AP

Smart Meters– BIS 16444

12

2-way communication

Remote Connect/

Disconnect

Last Gasp

HAN

Big Data

Analytics

BCC & I - Power Distribution for the Future 25 Aug 2016

Page 13: CESC Limited Power Distribution for the Future · 2016-08-31 · debasis.gupta@rp-sg.in 1 25 Aug 2016 BCC & I - Power Distribution for the Future 1. Power Distribution for the Future

Interactive Energy

Platform

Demand Response

Energy

Agent DER

Agent

Consumer Premises

At

Utility

Consumer Portal

1.5 MW Pilot

Project going

on.

13

Skewed Load Duration Curve –

DR can help !

BCC & I - Power Distribution for the Future 25 Aug 2016

Page 14: CESC Limited Power Distribution for the Future · 2016-08-31 · debasis.gupta@rp-sg.in 1 25 Aug 2016 BCC & I - Power Distribution for the Future 1. Power Distribution for the Future

A simple VPN +

Firewall Solution

is not enough.

Smart Grid Cyber Security - `Defense in Depth’

14BCC & I - Power Distribution for the Future 25 Aug 2016

Page 15: CESC Limited Power Distribution for the Future · 2016-08-31 · debasis.gupta@rp-sg.in 1 25 Aug 2016 BCC & I - Power Distribution for the Future 1. Power Distribution for the Future

IT + OT Integration

RTUs - SS RTUs - DS

FRTUs - RMUs

OMS GIS CIS AM IT Apps

MDMS

Storage

EMS ADMS

Distributed Generation

FANRF, RF Mesh, PLC, 3G,

4G, WiFi, Zigbee etc

Demand Response

EVs

Smart Meters/

Homes

Enterprise Service Bus

Master Unified Control Centre

Backup Control Centre

Regional

Control

Centres

IT

OT

WANOptical Fibre

(Gigabit Ethernet,

SDH, MPLS) ,

Microwave, Leased

Line etc

DTS

15BCC & I - Power Distribution for the Future 25 Aug 2016

Page 16: CESC Limited Power Distribution for the Future · 2016-08-31 · debasis.gupta@rp-sg.in 1 25 Aug 2016 BCC & I - Power Distribution for the Future 1. Power Distribution for the Future

Thank You