CHAMPAIGN PARK DISTRICT 706 Kenwood Road Champaign, IL 61821 INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be received at the office of Clark Dietz of Champaign at 125 West Church Street, Champaign, Illinois 61820, until 10:00 a.m. prevailing time on Thursday, February 21, 2019, and publicly opened and read aloud at 10:05 a.m. prevailing time of same day. The project is located within Zahnd Park and along Staley Road between Curtis Road and Windsor Road. The proposed improvements will include a new 6-foot-wide PCC path with 2 foot earth shoulders within the park. The project also includes excavation, culverts, trench drain, PCC Curb, sidewalk removal, pavement marking, grading and shaping and seeding. Bid documents for this project may be examined at the office of Clark Dietz, Inc., 125 West Church Street, Champaign, Illinois 61820. State statutes and local ordinance require the payment of prevailing wage by all contractors and subcontractors on this job. The plans and specifications were prepared by Clark Dietz at 125 West Church Street, Champaign, Illinois 61820. For a non-refundable fee of $25.00, prospective bidders may obtain bid documents on Clark Dietz’s website at www.clarkdietz.com. Access the documents by clicking on the “Bidding Documents” icon located on the top of the page, then selecting “Browse Projects” to find “Zahnd Park ADA / Mobility Enhancements (Quest Project # 6117484)” bid documents. Click on the project title, you will be directed to a web page where the bid documents can be downloaded. The bidding services are provided by QuestCDN.com where you can complete a free membership registration to Quest. Please contact Clark Dietz, Inc. at (217) 373-8900 if you have any questions regarding the registration or download process. Bidders must be prequalified with the Illinois Department of Transportation to perform the type and magnitude of construction work for the project. The Champaign Park District reserves the right to reject any or all bids or portions thereof and to waive any formality or technicality in any bids in the interest of the Park District. The bid award will be made by the Park District and their decision will be final. Champaign Park District Joe DeLuce Executive Director Publication Date: ________________________
Transcript
Page 1: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

CHAMPAIGN PARK DISTRICT 706 Kenwood Road

Champaign, IL 61821

INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be received at the office of Clark Dietz of Champaign at 125 West Church Street, Champaign, Illinois 61820, until 10:00 a.m. prevailing time on Thursday, February 21, 2019, and publicly opened and read aloud at 10:05 a.m. prevailing time of same day. The project is located within Zahnd Park and along Staley Road between Curtis Road and Windsor Road. The proposed improvements will include a new 6-foot-wide PCC path with 2 foot earth shoulders within the park. The project also includes excavation, culverts, trench drain, PCC Curb, sidewalk removal, pavement marking, grading and shaping and seeding. Bid documents for this project may be examined at the office of Clark Dietz, Inc., 125 West Church Street, Champaign, Illinois 61820. State statutes and local ordinance require the payment of prevailing wage by all contractors and subcontractors on this job. The plans and specifications were prepared by Clark Dietz at 125 West Church Street, Champaign, Illinois 61820. For a non-refundable fee of $25.00, prospective bidders may obtain bid documents on Clark Dietz’s website at www.clarkdietz.com. Access the documents by clicking on the “Bidding Documents” icon located on the top of the page, then selecting “Browse Projects” to find “Zahnd Park ADA / Mobility Enhancements (Quest Project # 6117484)” bid documents. Click on the project title, you will be directed to a web page where the bid documents can be downloaded. The bidding services are provided by QuestCDN.com where you can complete a free membership registration to Quest. Please contact Clark Dietz, Inc. at (217) 373-8900 if you have any questions regarding the registration or download process. Bidders must be prequalified with the Illinois Department of Transportation to perform the type and magnitude of construction work for the project. The Champaign Park District reserves the right to reject any or all bids or portions thereof and to waive any formality or technicality in any bids in the interest of the Park District. The bid award will be made by the Park District and their decision will be final. Champaign Park District Joe DeLuce Executive Director Publication Date: ________________________

Page 2: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be
Page 3: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

2GENERAL NOTES AND TYPICAL SECTIONS

SCALE : NTS

THIS WORK SHALL ALSO INCLUDE CLEANING ALL DRAINAGE FACILITIES OF FOREIGN MATERIALS IN ACCORDANCE WITH ARTICLE 602.15 OF THE STANDARD SPECIFICATIONS.

THIS WORK SHALL BE DONE AS DIRECTED BY THE ENGINEER AND NO ADDITIONAL COMPENSATION WILL BE ALLOWED.

2. WHEREVER IN THE PLANS OR SPECIFICATIONS THE TERM "STANDARD SPECIFICATIONS" IS USED IT SHALL BE UNDERSTOOD BY THE CONTRACTOR TO MEAN

THE "STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION" AS PREPARED BY THE DEPARTMENT OF TRANSPORTATION OF THE STATE OF ILLINOIS

5. IT IS THE CONTRACTOR’S RESPONSIBILITY TO ASCERTAIN EXISTING FIELD CONDITIONS BEFORE BIDDING ON THE PROJECT.

6. THE CONTRACTOR WILL BE REQUIRED TO COMPLY WITH STATE REGULATIONS REGARDING AIR, WATER, AND NOISE POLLUTION.

SUCH MONUMENTS ARE REMOVED. THE CONTRACTOR SHALL PROTECT AND CAREFULLY PRESERVE ALL MONUMENTS UNTIL AN ILLINOIS REGISTERED LAND

SURVEYOR OR AGENT HAS WITNESSED OR OTHERWISE REFERENCED THEIR LOCATION. THE CONTRACTOR WILL BE RESPONSIBLE FOR HAVING AN ILLINOIS

4. ANY REFERENCE TO STANDARDS THROUGHOUT THE PLANS SHALL BE INTERPRETED TO BE THE LATEST STANDARDS OF THE DEPARTMENT AS SHOWN ON

BE ALLOWED.

7. THE CONTRACTOR SHALL TAKE CARE NOT TO STORE OR DISPOSE OF DEBRIS OR UNSUITABLE MATERIALS WITHIN LIMITS OF THE IMPROVEMENT AND TAKE CARE

TO LIMIT CONSTRUCTION TO WITHIN THE RIGHT-OF-WAY AND EASEMENT AREAS. UNNECESSARY ENCROACHMENTS ONTO PRIVATE OR PUBLIC AREAS WILL NOT

*

3. WHEREVER IN THE PLANS OR SPECIFICATIONS THE TERM "STANDARD SPECIFICATIONS FOR WATER MAIN AND SEWER CONSTRUCTION" IS USED IT SHALL BE

UNDERSTOOD BY THE CONTRACTOR TO MEAN THE "STANDARD SPECIFICATIONS FOR WATER AND SEWER MAIN CONSTRUCTION IN ILLINOIS" AS PREPARED BY

1. ALL ELEVATIONS SHOWN ARE REFERRED TO THE N.A.V.D. 88 DATUM.

GENERAL NOTES

PERMITTED AROUND TREES AS DETERMINED BY THE ENGINEER. THE CONTRACTOR WILL ALSO BE RESPONSIBLE FOR AVOIDING CONFLICTS BETWEEN OVERHEAD TREE LIMBS

IT IS THE CONTRACTOR’S RESPONSIBILITY TO MAINTAIN CENTERLINE CONTROL POINTS OR BENCHMARKS AND SET ADDITIONAL POINTS AND TIES AS NECESSARY TO

INSURE THAT CONTROL POINTS AND BENCHMARKS CAN BE ACCURATELY REPLICATED DURING CONSTRUCTION.

9. TREES TO BE SAVED OR PRUNED: PARTICULAR EFFORT SHALL BE MADE TO SAVE ALL DESIRABLE EXISTING TREES OR SHRUBS. ONLY A MINIMUM OF GRADING WILL BE

AND THE EQUIPMENT USED FOR EXCAVATING. ANY NECESSARY TREE PRUNING SHALL BE DONE BY A CERTIFIED ARBORIST EMPLOYED BY THE CONTRACTOR AND APPROVED

BY THE ENGINEER. THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR UNNECESSARY DAMAGE TO TREES, SHRUBS, OR LANDSCAPING INTENDED TO BE SAVED.

AMEREN ILLINOIS

BE RESPONSIBLE FOR AVOIDING CONFLICTS BETWEEN OVERHEAD UTILITY LINES AND THE EQUIPMENT USED FOR EXCAVATING. SEE "STATUS OF UTILITIES" SHEET WITHIN

OTHERWISE BY THE ENGINEER. THIS WORK WILL NOT BE PAID FOR SEPARATELY AND SHALL BE INCLUDED IN THE UNIT PRICES BID.

SAFETY, OR DAMAGE TO THE PUBLIC ARISE FROM CONSTRUCTION OPERATIONS. WATER SHALL BE USED AS A DUST SUPPRESSANT AND CLEANING AGENT UNLESS DIRECTED

BY THE ENGINEER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING ALL DUST OR AIRBORNE EROSION FROM ADJACENT PROPERTIES IF CONCERNS OF HEALTH,

STANDARD SPECIFICATIONS. DUST CONTROL SHALL BE USED FOR THE EARTHWORK OR ANY OTHER OPERATIONS THAT WARRANT DUST CONTROL MEASURES AS DIRECTED

20. PRIOR TO THE START OF CONSTRUCTION THE CONTRACTOR SHALL PROVIDE TO THE ENGINEER A DUST CONTROL PLAN IN ACCORDANCE WITH ARTICLE 107.36 OF THE

14. EXISTING PAVEMENTS, CURBS AND GUTTERS, AND SIDEWALKS IN WHICH THE TOP SURFACE IS TO BE JOINED TO THE PROPOSED WORK SHALL BE SO JOINED

19. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANUP OF THE SITE PRIOR TO FINAL ACCEPTANCE IN ACCORDANCE WITH ARTICLE 104.06 OF THE STANDARD SPECIFICATIONS.

I.S.P.E., A.G.C.I., I.M.L., AND U.C.A., ADOPTED JULY 2014.

THE SPECIAL PROVISIONS FOR ADDITIONAL INFORMATION REGARDING KNOWN UTILITY RELOCATIONS OR ADJUSTMENTS REQUIRED FOR THE PROPOSED CONSTRUCTION. THE

1406 CARDINAL COURT

URBANA, ILLINOIS 61801

(217) 373-3258

FORSYTH, ILLINOIS 62535

102 EAST SHAFER ST.

WINDSTREAM

(319) 790-1464

602 HIGH POINT LANE

(309) 670-0400

ITV3

EAST PEORIA, ILLINOIS 61611

CONTRACTOR’S ATTENTION IS DIRECTED TO ARTICLE 105.07 OF THE STANDARD SPECIFICATIONS ENTITLED "COOPERATION WITH UTILITIES".

8. WHERE SECTION OR SUBSECTION MONUMENTS, BENCHMARKS, OR PROPERTY MONUMENTS ARE ENCOUNTERED, THE ENGINEER SHALL BE NOTIFIED BEFORE

REGISTERED LAND SURVEYOR RE-ESTABLISH ANY MONUMENTS DESTROYED BY THEIR OPERATIONS.

15. ALL SAW CUTS FOR REMOVALS SHALL BE FULL DEPTH WITH AN APPROVED SAW.

16. ALL SAW CUTS, NECESSARY TO COMPLETE THE WORK DETAILED IN THESE PLANS SHALL BE INCLUDED IN THE COST FOR VARIOUS PAY ITEMS INVOLVED.

AND ADOPTED ON APRIL 1, 2016 INCLUDING THE SUPPLEMENTAL SPECIFICATIONS AND RECURRING SPECIAL PROVISIONS.

THE HIGHWAY STANDARDS AND LEGEND SHEET NO. 1.

INDICATES J.U.L.I.E. MEMBER

(217) 383-7280

URBANA, ILLINOIS 61801

1112 ANTHONY DRIVE

(ELECTRICAL DIST./GAS)

ILLINOIS-AMERICAN WATER COMPANY

(217) 367-3409

URBANA, ILLINOIS 61803

P.O. BOX 669

URBANA-CHAMPAIGN SANITARY DISTRICT

303 FAIRLAWN DRIVE

URBANA, ILLINOIS 61801

(217) 384-2510

CHAMPAIGN, ILLINOIS 61820

(217) 398-7990

*

*

*

*

*

COMCAST

201 S. NEIL STREET

AT&T

(309) 838-0788

*PAETEC (FORMERLY MCLEOD USA)

30486 EAST 400 NORTH ROAD

STRAWN, ILLINOIS 61775

CHAMPAIGN, ILLINOIS 61820

(217) 403-4710 (800) 604-6688

CITY OF CHAMPAIGN

702 EDGEBROOK DRIVE

LIGHT CORE

1151 CENTURY TEL DRIVE, BLDG A

WENTZVILLE, MISSOURI 63385

* *

18. HORIZONTAL BASELINE CONTROL POINTS AND VERTICAL BENCHMARKS ARE SHOWN FOR THE CONTRACTOR TO PHYSICALLY LOCATE MONUMENTATION IN THE FIELD.

OF THE STANDARD SPECIFICATIONS. THE JULIE NUMBER IS 800-892-0123. A MINIMUM OF 48 HOURS ADVANCE NOTICE IS REQUIRED.

13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING UTILITY PROPERTY FROM CONSTRUCTION OPERATIONS AS OUTLINED IN ARTICLES 107.37, 107.38, 107.39, AND 107.40

TYPICAL SECTIONS\

\

STA 208+00.00 TO STA 209+25.00

\

STA 400+00.00 TO STA 403+02.84

STA 300+00.00 TO STA 303+36.43

STA 222+78.29 TO STA 223+28.40

STA 209+25.00 TO STA 215+75.00

STA 200+00.00 TO STA 208+00.00

STA 101+52.42 TO STA 102+60.85

STA 100+00.00 TO STA 101+10.43

2.0’6.0’2.0’

1.5% (2% MAX)(V:H)

1:4

(V:H)

1:4 MATCH EXISTING

MATCH EXISTING

PCC SIDEWALK 6"

EXISTING GRADE

6.0’ 2.0’2.0’

MATCH EXISTING

PCC SIDEWALK 6"

(V:H)

1:4

(V:H)

1:4

MATCH EXISTING

EXISTING GRADE 1.0’

MATCH EXISTING2.0’6.0’2.0’

MATCH EXISTING

PCC SIDEWALK 6"EXISTING GRADE

(V:H)

1:4

(V:H)

1:4

\

2.0’6.0’2.0’

MATCH EXISTING

EXISTING GRADE

STA 500+00.00 TO STA 501+68.87

STA 215+75.00 TO STA 221+35.50

STA 600+00.00 TO STA 600+58.96

(V:H)

1:4

4.0%4.0%

GRADE TO DRAIN

MATCH EXISTING

PCC SIDEWALK CURB*

ADDITIONAL SIDEWALK CURB INFORMATION

*SEE MISCELLANEOUS DETAILS SHEET FOR

1.5% (2% MAX)

4.0%

4.0%

4.0%4.0%4.0%

4.0% 4.0%

1.5% (2% MAX)

1.5% (2% MAX)

MAY BE ADJUSTED AS DIRECTED BY THE ENGINEER.

SHALL BE INSTALLED AT ALL INLETS AS DIRECTED BY THE ENGINEER. AN ESTIMATED QUANTITY FOR THE EROSION CONTROL ITEMS HAS BEEN INCLUDED IN THE PROJECT AND

AND SEDIMENT FROM LEAVING THE SITE. THE LOCATIONS FOR THE INLET AND PIPE PROTECTION SHALL BE AT ALL DRAINAGE STRUCTURES LOCATED IN SAGS. INLET FILTERS

AND IN ACCORDANCE WITH STD. 280001. A PERIMETER EROSION CONTROL BARRIER SHALL BE INSTALLED AT LOCATIONS AS DIRECTED BY THE ENGINEER TO PREVENT SILT

17. THE CONTRACTOR WILL BE REQUIRED TO PROVIDE PERIMETER EROSION BARRIER, INLET AND PIPE PROTECTION, AND INLET FILTERS AS DIRECTED BY THE ENGINEER

THROUGH SAW CUT JUNCTURES. 1/2" EXPANSION JOINT MATERIAL SHALL BE PLACED AT THESE JUNCTURES AS DIRECTED BY THE ENGINEER.

SOD REMOVAL 6"

PCC SIDEWALK 6"

**

***

SIDEWALK GRADE COMPARED TO EXISTING.

BE USED WHEN REQUIRED TO RAISE PCC

***AGGREGATE BASE COURSE, TY A SHALL

THE PROJECT.

OR IN PLACE OF ALL PCC SIDEWALK FOR

**SOD REMOVAL OF 6" IS REQUIRED UNDER

RAISE PCC SIDEWALK GRADE COMPARED TO EXISTING.

21. SOD REMOVAL OF 6" IS REQUIRED UNDER OR IN PLACE OF ALL PCC SIDEWALK FOR THE PROJECT. AGGREGATE BASE COURSE, TY A SHALL BE USED AS FILL WHEN REQUIRED TO

22. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL CITY OF CHAMPAIGN PERMITS.

ENGINEER. EXISTING TURF WHICH IS DAMAGED SHALL BE REESTABLISHED WITH SOD OR SEED AS DIRECTED BY THE ENGINEER AT THE CONTRACTOR’S EXPENSE.

11. ALL DISTURBED AREAS SHALL BE SEEDED AS SHOWN ON THE PLANS. SEEDING AND MULCHING SHALL BE DONE AS NOTED ON THE PLANS AND AS DIRECTED BY THE

12. UTILITY LOCATIONS WERE PLOTTED FROM INFORMATION FURNISHED BY THE VARIOUS UTILITY COMPANIES AND THEIR ACCURACY SHOULD BE CONSIDERED APPROXIMATE.

NO RESPONSIBILITY IS ACCEPTED FOR THE LOCATIONS AS SHOWN OR THAT ALL UTILITY FACILITIES ARE SHOWN. UTILITY LOCATIONS SHOWN IN THE PLANS AND PROFILES

ARE APPROXIMATE AND REPRESENT LOCATIONS PRIOR TO ANY UTILITY RELOCATIONS REQUIRED TO ACCOMMODATE THE PROPOSED CONSTRUCTION. IT SHALL BE THE

RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE UTILITY LOCATIONS AT THE TIME OF CONSTRUCTION AND TO PROTECT SAME. THE CONTRACTOR WILL ALSO

AGG BASE COURSE

THE ADJUSTMENT OF QUANTITIES AS SPECIFIED IN ARTICLE 440.07 OF THE STANDARD SPECIFICATIONS SHALL NOT APPLY.

23. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED FOR PAVEMENT REMOVAL ITEMS DUE TO VARIATIONS IN PAVEMENT TYPES., THICKNESSES OR AMOUNT OF REINFORCEMENT.

25. THE FOLLOWING RATES OF APPLICATION HAVE BEEN ASSUMED IN CALCULATING PLAN QUANTITIES:

AGGREGATE MATERIALS 1.8 TON/CU YD

PLACED AS DIRECTED BY THE ENGINEER.

24. TRANSVERSE TOOLED JOINTS SHALL BE PLACED AT INTERVALS THAT MATCH THE SIDWALK WIDTH, BUT SHALL NOT EXCEED 6’ CENTERS. 1/2" EXPANSION JOINTS SHALL BE

26. POSSIBLE UTILITY OWNERS:

INCLUDED IN THE COST OF EXCAVATION SPECIAL.

10. THE FINISHED EARTHWORK SHALL HAVE VEGITATIVE SUSTAINING TOPSOIL 4" THICK COVERING THE AREAS TO BE SODDED OR SEEDED. THE TOPSOIL REQUIRED SHALL BE

TOPSOIL, SEEDING AND MULCH (TYP)

TOPSOIL, SEEDING AND MULCH (TYP)

MULCH (TYP)

SEEDING AND

TOPSOIL,

MULCH (TYP)

SEEDING AND

TOPSOIL,

P:\

C1170030_

CP

D - Z

ahnd P

ark\Pla

ns\s

heets\C

1170030-0

2.G

N.d

gn

12/6/2018 8:29:03 AM

COUNTY

ILLINOIS

SHEETS

TOTAL

DATE

DESIGNED

CHECKED

DRAWN

-

-

-

-

REVISED -

-

-

-

REVISED

REVISED

REVISED

PLOT DATE =

No. 184-000450

DESIGN FIRM REGISTRATIONwww.clarkdietz.com

PHONE : 217.373.8900

CHAMPAIGN, IL 61820

125 WEST CHURCH STREET

FIL

E

NA

ME

=

NO

SHEET

PROJECT NO C1170030

ADG

ADG

CHAMPAIGN PARK DISTRICT

ZAHND PARK

9CHAMPAIGN

Nov 2018

SMW

Page 4: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

3

SUMMARY OF QUANTITIES SCHEDULE OF QUANTITIESX0000000 EXCAVATION SPECIAL28000500 INLET AND PIPE PROTECTION

THESE ITEMS WILL NOT BE PAID FOR SEPERATELY.

AND ARE PROVIDED FOR INFORMATION PURPOSES ONLY.

EXCAVATION SPECIAL INCLUDES THE ITEMS LISTED ABOVE 42400300 28000500 PCC SIDEWALK 6"

LEGEND

W

W G

W

W

G

E

E

E

E

T

T

CO

DS

EXISTING PROPOSED EXISTING PROPOSED

DECIDUOUS TREE

CONIFEROUS TREE

BUSH

TREE STUMP

FLOOD LIGHT

FLAG POLE

GATE POST

FENCE POST

BOLLARD

DOWNSPOUT

CLEANOUT

MAILBOX

YARD LIGHT

PARKING LOT LIGHT

DELINEATOR

TRAFFIC SIGN

STREET SIGN

RIGHT-OF-WAY MARKER

IRON PIN/PIPE FOUND

MONUMENT

TELEPHONE PEDESTAL

TELEPHONE MANHOLE

TELEPHONE POLE

GUY WIRE

GUY POLE

ORNAMENTAL STREET LIGHT

ROADWAY STREET LIGHT

ROADWAY LIGHTING CONTROLLER

POWER POLE W/TRANSFORMER

POWER POLE W/LIGHT

POWER POLE

ELECTRIC JUNCTION BOX

ELECTRIC PEDESTAL

ELECTRIC METER

ELECTRIC MANHOLE

GAS METER

FIRE HYDRANT

WATER METER

WATER MANHOLE

VALVE

SERVICE BOX SHUTOFF

UTILITY WARNING SIGN

MANHOLE

INLET OR CATCH BASIN

FOUNDATION DRAIN

STORM SEWER WATER MAIN QUALITY

STORM SEWER

SANITARY SEWER

FIBER OPTIC LINE

COMMUNICATION LINE

CABLE TELEVISION

UNDERGROUND TELEPHONE

OVERHEAD TELEPHONE

UNDERGROUND ELECTRIC

OVERHEAD ELECTRIC

GAS LINE

WATER LINE

AND LEGEND

SUMMARY AND SCHEDULE OF QUANTITIES

ADDITIONAL 2 FOOT OF WIDTH FOR EACH SHOULDER.

THE ENTIRE LENGTH AND WIDTH OF THE PATH PLUS AN

EARTH EXCAVATION ASSUMES 6 INCHES OF REMOVAL ALONG

THE PLANS.

THE PATH AND TO THE CONSTRUCTION LIMITS AS SHOWN ON

ALONG EACH 2 FOOT SHOULDER FOR THE ENTIRE LENGTH OF

FURNISHED EXCAVATION ASSUMES 6 INCHES OF PLACEMENT

VOIDS UNDER PCC SIDEWALK AT A WIDTH OF 7 FOOT.

AGGREGATE BASE COURSE QUANTITY IS ASSUMED FOR ALL -

-

-

-

P:\

C1170030_

CP

D - Z

ahnd P

ark\Pla

ns\s

heets\C

1170030-0

3.S

OQ.d

gn

2/1/2019 5:24:47 PM

COUNTY

ILLINOIS

SHEETS

TOTAL

DATE

DESIGNED

CHECKED

DRAWN

-

-

-

-

REVISED -

-

-

-

REVISED

REVISED

REVISED

PLOT DATE =

No. 184-000450

DESIGN FIRM REGISTRATIONwww.clarkdietz.com

PHONE : 217.373.8900

CHAMPAIGN, IL 61820

125 WEST CHURCH STREET

FIL

E

NA

ME

=

NO

SHEET

PROJECT NO C1170030

ADG

ADG

CHAMPAIGN PARK DISTRICT

ZAHND PARK

9CHAMPAIGN

Nov 2018

SMW

Page 5: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

SCALE : 1"=40’

SCALE: 1" = 40’

80’0’ 40’

HORIZONTAL ALIGNMENT LAYOUT AND CONTROL 4

FOR CONTRATOR USE

CAD ALIGNMENT FILE

ENGINEER WILL PROVIDE

TCE #2

TCE #1 TCE #9

TCE #7

TCE #8

TCE #4

TCE #3

TCE #5

TCE #6TCE #11TCE #10

TCE #12

1.00’ RT501+67.8612

7.00’ RT501+67.8611

11.55’ RT500+71.8710

6.07’ RT500+69.89

10.17’ LT207+80.288

16.09’ LT207+81.247

13.00’ LT211+38.696

23.00’ LT211+38.695

23.00’ LT211+53.694

13.00’ LT211+53.693

21.51’ LT214+81.002

16.04’ LT214+83.001

OFFSETSTA TCE #

TEMPORARY CONSTRUCTION EASEMENT

EX ROWTEMP CONSTRUCTION EASEMENTTEMP CONSTRUCTION EASEMENT

EX ROW

EX

RO

W

EX

RO

W

P:\

C1170030_

CP

D - Z

ahnd P

ark\Pla

ns\s

heets\C

1170030-0

4.Align.d

gn

12/6/2018 8:29:07 AM

COUNTY

ILLINOIS

SHEETS

TOTAL

DATE

DESIGNED

CHECKED

DRAWN

-

-

-

-

REVISED -

-

-

-

REVISED

REVISED

REVISED

PLOT DATE =

No. 184-000450

DESIGN FIRM REGISTRATIONwww.clarkdietz.com

PHONE : 217.373.8900

CHAMPAIGN, IL 61820

125 WEST CHURCH STREET

FIL

E

NA

ME

=

NO

SHEET

PROJECT NO C1170030

ADG

ADG

CHAMPAIGN PARK DISTRICT

ZAHND PARK

9CHAMPAIGN

Nov 2018

SMW

P

C

ST

A 402

+39.8

5

PT

STA 40

2+88.0

2

P

T

ST

A 208

+15.0

8

P

C

ST

A 214

+48.0

1 PT STA 215+59

.71

PC STA 216+31

.65

PT STA 220+22.19

PC STA 220+59.94

P

C S

TA 222+45.0

7

PT STA 102+39.02

P

C ST

A 302+76.0

3

PT STA 221+01.83

POT STA

403+

02.84

PO

T

ST

A 223

+28.4

0

PO

T

ST

A 600

+58.9

6

PO

T

ST

A 600

+00.0

0

PO

T

ST

A 101+10.4

3

POT STA 300+00.00

PT ST

A 302+03.2

9 POT STA 303+36.43

PO

T

ST

A 501+68.8

7

PO

T

ST

A 200

+00.0

0

PO

T

ST

A 101+52.4

2

PC

C

ST

A 101+94.8

2

PO

T

ST

A 400

+00.0

0

PI

ST

A 402

+10.0

0

PI S

TA 22

1+35.50

PT

ST

A 223

+00.5

7

P

OT ST

A 10

0+00.0

0

POT STA 102+60.85

PC STA 100+23.83

PT

ST

A 100

+96.0

9

PC

ST

A 101+66.7

6

P

RC ST

A 219

+14.19

PT

ST

A 202+76.8

6

PC

ST

A 203+01.0

3

PC

ST

A 201+89.6

0

PT STA 204+68.58

PC STA 206+08.37

PT ST

A 206+63.10

PC ST

A 206+75.4

6

PC STA 301+61.40

PT STA 303+24.20

PT

ST

A 500

+90.2

7

PC STA 500+50.13

PO

T

ST

A 211+49.6

7

POT STA 220+83.89

500

501

400401

402

403

200

201

202203

204

205

206

207

208209210211212213214

215

216

217

218

219

220

221

222

223

100

101

102

600

300

301

302

303

T = 138.56

R = 80.00

L = 167.55

E = 80.00

T = 44.08

R = 250.00

L = 87.27

E = 3.86

T = 28.07

R = 100.00

L = 54.72

E = 3.86

R = 46.00

T = 21.45

L = 40.14

E = 4.76

T = 72.79

R = 200.00

L = 139.63

E = 12.84

T = 26.56

R = 46.00

L = 48.17

E = 7.12

R = 40.00

T = 23.09

L = 41.89

E = 6.19

E = 24.43

T = 67.13

R = 80.00

L = 111.70

T = 158.51

R = 250.00

L = 282.54

E = 46.02

T = 54.86

R = 250.00

L = 108.01

E = 5.95

T = 23.09

R = 40.00

L = 41.89

E = 6.19

T = 26.56

R = 46.00

L = 48.17

E = 7.12

T = 29.91

R = 60.00

L = 55.50

E = 7.04

R = 46.00

T = 46.00

L = 72.26

E = 19.05

T = 46.00

R = 46.00

L = 72.26

E = 19.05

PI STA 102+12.76

PC STA = 101+66.76

PT STA = 102+39.02

PI STA 100+69.83

PT STA = 100+96.09

PC STA = 100+23.83

PI STA 402+66.41

PT STA = 402+88.02

PC STA = 402+39.85

PI STA 220+83.03

PC STA = 220+59.94

PT STA = 221+01.83

PI STA 219+69.04

PC STA = 219+14.19

PT STA = 220+22.19

PI STA 222+74.98

PC STA = 222+45.07

PT STA = 223+00.57

PI STA 204+39.59

PC STA = 203+01.03

PT STA = 204+68.58

PI STA 202+33.68

PC STA = 201+89.60

PT STA = 202+76.86

PI STA 217+90.16

PC STA = 216+31.65

PT STA = 219+14.19

PI STA 206+36.44

PC STA = 206+08.37

PT STA = 206+63.10

PI STA 301+84.49

PT STA = 302+03.29

PC STA = 301+61.40

PI STA 303+02.59

PC STA = 302+76.03

PT STA = 303+24.20

PI STA 207+48.25

PC STA = 206+75.46

PT STA = 208+15.08

PI STA 215+15.14

PT STA = 215+59.71

PC STA = 214+48.01

PI STA 500+71.58

PC STA = 500+50.13

PT STA = 500+90.27

PC

C

ST

A 100

+68.0

3

POT STA 500+00.0

0

Page 6: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

SCALE : 1"=40’

SCALE: 1" = 40’

80’0’ 40’

5PLAN VIEW

924 SQ FT

SIDEWALK REMOVAL,

TO DRAIN

GRADE

CURB (126.0’)

PCC SIDEWALK

ADJACENT TO SIDEWALK.

REMOVE AND SALVAGE TIMBERS

EXISTING MULCH TO SIDEWALK.

PLACE NEW MULCH TO MATCH

TIMBER TO PROPOSED SIDEWALK.

EXTEND TIMBERS WITH SALVAGED

60.0’

1.0’

1.0’

DETENTION

DRAINAGE TO

VERIFY POSITIVE

CONTRACTOR TO

EL 704.25

10.8’ LT

STA 215+78.73

EL 708.41

10.7’ LT

STA 303+08.3

10.6’ LT

STA 303+07.2

EL 708.18

4.7’ RT

STA 303+13.3

4.6’ RT

STA 303+12.5

EX ROWEX ROW

EX

RO

W

CONSTRUCTION LIMITS (TYP)

12.0’

CONSTRUCTION LIMITS (TYP)

CONSTRUCTION LIMITS (TYP)

FROM 6" TO 0"

TRANSITION CURB

12 FT @ 1.3%

TRENCH DRAIN,

18 FT @ 1.3%

CL D, TY 1 18",

PIPE CULVERTS,

16 FT @ 1.4%

CL D, TY 1 8",

2-PIPE CULVERTS,

EL 711.16

7.9’ LT

STA 300+33.4EL 711.01

1.9’ RT

STA 300+40.2

EL 704.49

4.8’ RT

STA 215+69.6

PARKING BLOCK, 1 EA

REMOVE EXISTING

DRAIN

GRADE TO

6.0’

6.0’

TEMP CONSTRUCTION EASEMENT TEMP CONSTRUCTION EASEMENT

42 SQ FT

SIDEWALK REMOVAL,

14 SQ FT

DETECTABLE WARNING,

17 SQ FT

WARNING,

DETECTABLE

MARKING LINE 4", 55 FT

WHITE PAINT PAVEMENT

FOOTBALL FIE

LD

HM

AH

MA

FIR

ESTATIO

N #6

YM

CA

YM

CA

PCC

PAVILIO

N

BA

TTIN

G

CA

GE

SOFTBALL FIE

LD

BASEBALL FIE

LD

PCC

PCC

WIN

DS

OR

RO

AD

PAVILIO

N

PLAYGROUND

CONSTRUCTION LIMITS (TYP)

6.0’ TYP

6.0’

TYP

6.0’ TYP

6.0’ TYP

6.0’

TYP

6.0’

TYP

5.0’

PCC SIDEWALK 6"

PCC SIDEWALK 6"

PCC SIDEWALK 6"

PCC SIDEWALK 6"

PCC SIDEWALK 6"

PCC SIDEWALK 6"

PCC SIDEWALK 6"

ZAHND PARK

P:\

C1170030_

CP

D - Z

ahnd P

ark\Pla

ns\s

heets\C

1170030-0

5.Pln.d

gn

12/6/2018 8:29:08 AM

COUNTY

ILLINOIS

SHEETS

TOTAL

DATE

DESIGNED

CHECKED

DRAWN

-

-

-

-

REVISED -

-

-

-

REVISED

REVISED

REVISED

PLOT DATE =

No. 184-000450

DESIGN FIRM REGISTRATIONwww.clarkdietz.com

PHONE : 217.373.8900

CHAMPAIGN, IL 61820

125 WEST CHURCH STREET

FIL

E

NA

ME

=

NO

SHEET

PROJECT NO C1170030

ADG

ADG

CHAMPAIGN PARK DISTRICT

ZAHND PARK

9CHAMPAIGN

Nov 2018

SMW

E

W

E

E

E

RIS

ER

TA

NK

SEPTIC

500

501

400401

402

403

200

201

202203

204

205

206

207

208209210211212213214

215

216

217

218

219

220

221

222

223

100

101

102

600

300

301

302

303

Page 7: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

SCALE : 1"=20’ SHEET NO 1 OF 2 SHEETS STA 200+00 TO STA 218+00

6

705

710

715

720

725

705

710

715

720

725

715

710

705

700

695

715

710

705

700

695

BASELINE 200

SIDEWALK PROFILES

CASE SHALL THE RUNNING SLOPE EXCEED 5.0%.

DESIRED RUNNING SLOPE IS BETWEEN 0.4% AND 4.5%. IN NO

DRAINAGE ACROSS PATHWAY.

TO MORE CLOSELY FOLLOW EXISTING GRADE AND TO MAINTAIN

CONTRACTOR RESPONSIBLE TO MAKE ADJUSTMENTS AS REQUIRED

PROFILES PROVIDED AS REFERENCE FOR VERTICAL ALIGNMENT.

NOTE:

705

710

715

720

725

705

710

715

720

725

ALONG PROPOSED BASELINE

EXISTING GROUND PROFILE

ALONG PROPOSED BASELINE

EXISTING GROUND PROFILE

ALONG PROPOSED BASELINE

EXISTING GROUND PROFILE

ALONG BASELINE 200

PROPOSED PROFILE

ALONG BASELINE 200

PROPOSED PROFILE

ALONG BASELINE 200

PROPOSED PROFILE

P:\

C1170030_

CP

D - Z

ahnd P

ark\Pla

ns\s

heets\C

1170030-0

6.Prf_1.d

gn

12/6/2018 8:29:14 AM

COUNTY

ILLINOIS

SHEETS

TOTAL

DATE

DESIGNED

CHECKED

DRAWN

-

-

-

-

REVISED -

-

-

-

REVISED

REVISED

REVISED

PLOT DATE =

No. 184-000450

DESIGN FIRM REGISTRATIONwww.clarkdietz.com

PHONE : 217.373.8900

CHAMPAIGN, IL 61820

125 WEST CHURCH STREET

FIL

E

NA

ME

=

NO

SHEET

PROJECT NO C1170030

ADG

ADG

CHAMPAIGN PARK DISTRICT

ZAHND PARK

9CHAMPAIGN

Nov 2018

SMW

+1.19% +2.31%

+2.31%+3.71

%

+3.71%

+3.07%+3.07% +1.13% -2.70%

-2.70%-3.26%

-3.26%-1.59%

-1.59% +0.72%

VPI

ST

A 203

+00.0

0

VPI

ST

A 203

+50.0

0

VPI

ST

A 203

+75.0

0

VPI

ST

A 204

+25.0

0

EL

EV

ATIO

N 720.0

0

EL

EV

ATIO

N 720.2

8

EL

EV

ATIO

N 718.9

3

EL

EV

ATIO

N 718.4

6

VPI

ST

A 201+50.0

0

EL

EV

ATIO

N 714.2

2

VPI

ST

A 202

+45.0

0

VPI

ST

A 204

+75.0

0

VPI

ST

A 205

+50.0

0

EL

EV

ATIO

N 717.3

0

EL

EV

ATIO

N 716.4

2

EL

EV

ATIO

N 716.1

0

EL

EV

ATIO

N 716.9

9S

TA 200

+00.0

0S

TA 101+94.8

2

=

BA

SE

LIN

E 100

200+00 200+50 201+00 201+50 202+00 202+50 203+00 203+50 204+00 204+50 205+00 205+50 206+00

712.4

4

712.7

0

713.0

6

713.2

6

713.3

3

713.5

5

713.8

2

714.1

0

714.3

7

714.8

5

715.3

3

715.8

3

716.3

0

716.9

7

717.7

1

718.4

5

719.1

7

719.7

1

720.1

6

720.0

7

719.5

7

719.0

4

718.3

9

717.7

8

717.2

3

716.9

0

716.4

6

716.1

7

716.1

0

716.1

6

716.3

5

712.4

4

712.6

8

712.9

1

713.1

5

713.3

9

713.6

3

713.8

7

714.1

0

714.4

5

714.9

2

715.3

8

715.8

4

716.3

0

716.9

8

717.7

2

718.4

6

719.0

7

719.6

9

720.1

1

720.1

5

719.6

1

719.0

7

718.4

4

717.7

9

717.2

2

716.9

0

716.5

8

716.2

6

716.1

8

716.3

2

716.4

7

+0.72% +2.34%

+2.34% +0.88% +0.88% -2.67%-3.27%

-3.27%-1.47%

-1.47% -2.51%-3.21%

-3.21%-1.73%

VPI

ST

A 207

+50.0

0

VPI

ST

A 208

+00.0

0

VPI

ST

A 208

+25.0

0

VPI

ST

A 209

+50.0

0

VPI

ST

A 209

+75.0

0

EL

EV

ATIO

N 718.8

0

EL

EV

ATIO

N 718.1

3

EL

EV

ATIO

N 718.3

6

EL

EV

ATIO

N 715.4

0

EL

EV

ATIO

N 714.7

7

VPI

ST

A 210

+75.0

0

EL

EV

ATIO

N 711.5

6

VPI

ST

A 207

+00.0

0

VPI

ST

A 208

+75.0

0

EL

EV

ATIO

N 717.1

9

EL

EV

ATIO

N 716.5

0

EL

EV

ATIO

N 710.2

7S

TA 211+49.6

6S

TA 303

+36.4

3

=

BA

SE

LIN

E 300

EL

EV

ATIO

N 716.9

9S

TA 206

+72.2

8S

TA 500

+00.0

0

=

BA

SE

LIN

E 500

206+00 206+50 207+00 207+50 208+00 208+50 209+00 209+50 210+00 210+50 211+00 211+50 212+00

716.3

5

716.5

4

716.7

6

716.9

2

717.1

4

717.1

9

717.4

7

717.9

7

718.1

4

718.4

8

718.4

2

718.3

7

717.8

4

717.2

2

716.7

7

716.3

4

716.0

4

715.7

4

715.1

7

714.6

3

713.9

1

713.2

2

712.7

6

712.0

8

711.4

4

711.1

5

710.7

7

710.4

7

710.1

4

709.7

7

709.3

4

716.4

7

716.6

1

716.7

6

716.9

0

717.0

4

717.1

9

717.6

6

718.1

3

718.4

5

718.6

2

718.8

0

718.2

7

717.6

4

716.9

9

716.4

3

716.1

3

715.8

4

715.5

5

715.1

5

714.6

1

713.9

7

713.3

3

712.6

9

712.0

4

711.4

7

711.1

3

710.7

8

710.4

4

710.0

9

709.7

5

709.4

0

-1.73% -0.41%-0.41% -1.04%

-1.04% -0.42%-0.42% +0.72%

+0.72% -0.88%

-0.88% +0.40% +0.40% +1.07%

VPI

ST

A 214

+00.0

0

VPI

ST

A 216

+65.0

0

EL

EV

ATIO

N 707.6

0

EL

EV

ATIO

N 706.8

2

VPI

ST

A 212

+75.0

0

VPI

ST

A 214

+75.0

0

VPI

ST

A 215

+95.0

0

VPI

ST

A 217

+30.0

0

VPI

ST

A 217

+80.0

0

EL

EV

ATIO

N 706.3

2

EL

EV

ATIO

N 708.1

1

EL

EV

ATIO

N 706.8

2

EL

EV

ATIO

N 706.4

5

EL

EV

ATIO

N 706.2

5

STA 215+72.5

? EL 704.42

CL D, TY 1, 18"

PIPE CULVERTS

212+00 212+50 213+00 213+50 214+00 214+50 215+00 215+50 216+00 216+50 217+00 217+50 218+00

709.3

4

708.8

8

708.4

9

708.2

1

707.9

4

707.8

4

707.8

2

707.6

7

707.5

4

707.4

4

707.1

5

707.1

2

707.2

0

707.0

5

706.7

3

706.6

8

706.6

2

706.5

6

705.4

9

704.6

3

706.3

1

706.5

1

706.6

0

706.7

9

706.6

5

706.5

5

706.3

9

706.3

2

706.4

4

706.4

7

706.7

0

709.4

0

709.0

6

708.7

1

708.3

7

708.0

9

708.0

1

707.9

3

707.8

4

707.7

6

707.6

8

707.6

0

707.3

9

707.1

8

706.9

8

706.8

0

706.7

2

706.6

3

706.5

5

706.4

7

706.3

8

706.3

6

706.5

0

706.6

4

706.7

9

706.6

9

706.5

1

706.3

4

706.2

9

706.3

7

706.4

5

706.6

6

Page 8: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

SCALE : 1"=20’ SHEET NO 2 OF 2 SHEETS

7

705

710

715

720

725

705

710

715

720

725

715

710

705

700

695

715

710

705

700

695

BASELINE 200, 300 AND 400

SIDEWALK PROFILES

CASE SHALL THE RUNNING SLOPE EXCEED 5.0%.

DESIRED RUNNING SLOPE IS BETWEEN 0.4% AND 4.5%. IN NO

DRAINAGE ACROSS PATHWAY.

TO MORE CLOSELY FOLLOW EXISTING GRADE AND TO MAINTAIN

CONTRACTOR RESPONSIBLE TO MAKE ADJUSTMENTS AS REQUIRED

PROFILES PROVIDED AS REFERENCE FOR VERTICAL ALIGNMENT.

NOTE:

705

710

715

720

725

705

710

715

720

725

ALONG PROPOSED BASELINE

EXISTING GROUND PROFILE

ALONG PROPOSED BASELINE

EXISTING GROUND PROFILE

ALONG PROPOSED BASELINE

EXISTING GROUND PROFILE

ALONG BASELINE 200

PROPOSED PROFILE

ALONG BASELINE 300

PROPOSED PROFILE

ALONG BASELINE 400

PROPOSED PROFILE

P:\

C1170030_

CP

D - Z

ahnd P

ark\Pla

ns\s

heets\C

1170030-0

7.Prf_2.d

gn

12/6/2018 8:29:15 AM

COUNTY

ILLINOIS

SHEETS

TOTAL

DATE

DESIGNED

CHECKED

DRAWN

-

-

-

-

REVISED -

-

-

-

REVISED

REVISED

REVISED

PLOT DATE =

No. 184-000450

DESIGN FIRM REGISTRATIONwww.clarkdietz.com

PHONE : 217.373.8900

CHAMPAIGN, IL 61820

125 WEST CHURCH STREET

FIL

E

NA

ME

=

NO

SHEET

PROJECT NO C1170030

ADG

ADG

CHAMPAIGN PARK DISTRICT

ZAHND PARK

9CHAMPAIGN

Nov 2018

SMW

+1.07% -0.40% -0.40% -1.71%

-1.71% -0.47% -0.47% +0.46% +0.46%

+1.85% +0.99%

VPI

ST

A 218

+65.0

0

VPI

ST

A 219

+10.0

0

VPI

ST

A 221+04.5

0

EL

EV

ATIO

N 707.3

6

EL

EV

ATIO

N 707.1

8

EL

EV

ATIO

N 706.8

5

VPI

ST

A 219

+65.0

0

VPI

ST

A 220

+20.0

0

VPI

ST

A 220

+70.0

0

EL

EV

ATIO

N 705.9

8

EL

EV

ATIO

N 706.2

1

EL

EV

ATIO

N 706.2

4 +1.85%

EL

EV

ATIO

N 706.4

7S

TA 220

+83.8

9S

TA 403

+02.8

4

=

BA

SE

LIN

E 400

707.1

6

218+00 218+50 219+00 219+50 220+00 220+50 221+00 221+50 222+00 222+50 223+00 223+50

706.7

0

706.9

1

707.1

5

707.3

5

707.3

9

707.3

1

707.0

0

706.6

0

706.2

6

706.1

7

706.0

5

705.9

9

706.1

0

706.1

2

706.4

4

706.8

2

707.0

0

707.1

6

707.1

9

707.2

4

707.3

8

707.6

0

707.8

6

708.1

6

708.6

1

708.8

6

709.6

0

710.7

3

706.6

6

706.8

8

707.0

9

707.3

1

707.3

0

707.2

2

707.0

1

706.6

7

706.3

3

706.1

7

706.0

7

705.9

8

706.0

7

706.1

7

706.4

0

706.7

7

707.0

0

VPI

ST

A 300

+30.0

0

-4.50%-0.42%

713.0

6

VPI

ST

A 300

+55.0

0

+2.36%

VPI

ST

A 300

+83.0

0

+0.42%

VPI

ST

A 300

+95.0

0

-0.40%V

PI

ST

A 301+61.4

0-0.40% -1.20%

VPI

ST

A 302

+03.2

9

-1.20% -3.33%

-3.33%

+0.41%

+3.89%

VPI

ST

A 303

+24.2

0

VPI

ST

A 303

+31.4

3

+4.43%

+0.64%

EL

EV

ATIO

N 711.7

1

EL

EV

ATIO

N 711.6

0

EL

EV

ATIO

N 712.3

1

EL

EV

ATIO

N 712.2

6

EL

EV

ATIO

N 712.0

4

EL

EV

ATIO

N 711.5

4

EL

EV

ATIO

N 710.2

4

EL

EV

ATIO

N 709.9

2

VPI

ST

A 302

+88.0

0

EL

EV

ATIO

N 708.7

2

VPI

ST

A 302

+94.0

0

EL

EV

ATIO

N 708.7

4

STA 300+39.0

? EL 711.04

TRENCH DRAIN

STA 303+12.17

STA 303+11.33

? EL 708.28

CL D, TY 1, 8"

2-PIPE CULVERTS

710.2

7

300+00 300+50 301+00 301+50 302+00 302+50 303+00

713.0

6

712.0

7

711.1

1

711.7

1

712.2

0

712.3

0

712.2

3

712.1

3

712.1

3

711.8

8

711.5

9

710.9

3

710.5

7

710.3

2

709.1

2

708.4

0

709.1

0

713.0

6

712.1

6

711.6

6

711.7

2

712.1

9

712.2

9

712.2

1

712.1

3

712.0

5

711.8

2

711.5

8

710.9

8

710.3

2

709.6

5

708.9

9

708.9

8

709.7

6

VPI

ST

A 401+71.0

0

VPI

ST

A 401+90.0

0

VPI

ST

A 402

+32.5

0

VPI

ST

A 402

+50.0

0

VPI

ST

A 402

+85.0

0

VPI

ST

A 402

+97.8

4

EL

EV

ATIO

N 707.9

7

EL

EV

ATIO

N 707.5

8

EL

EV

ATIO

N 705.8

3

EL

EV

ATIO

N 705.9

7

EL

EV

ATIO

N 705.6

7

EL

EV

ATIO

N 706.3

9

-0.55% -2.06%-4.50%

-4.50%

VPI

ST

A 402

+38.5

0

+1.36%

708.9

2

+1.50%

+3.26%+0.40%

EL

EV

ATIO

N 705.6

7

+0%

706.4

6

708.0

3

708.0

0

707.7

8

707.3

6

706.3

2

705.7

5

705.8

8

705.9

4

706.2

8

400+00 400+50 401+00 401+50 402+00 402+50 403+00

708.9

2

708.8

1

708.7

0

708.5

9

708.4

8

708.3

7

708.2

6

708.1

5

708.0

3

707.7

9

707.1

3

706.2

3

705.6

9

705.8

7

705.9

5

706.4

2

Page 9: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

SCALE : 1"=5’

8ENLARGED PLANS

SCALE: 1" = 5’

10’0’ 5’

CONSTRUCTION LIMITS (TYP)

CONSTRUCTION LIMITS (TYP)

0.3%

LEGEND

PROPOSED ELEVATION

EXISTING ELEVATION

PROPOSED SLOPE

DETECTABLE WARNING

FLOW ARROW

P:\

C1170030_

CP

D - Z

ahnd P

ark\Pla

ns\s

heets\C

1170030-0

8.P

vmtJt.dgn

12/6/2018 8:29:17 AM

COUNTY

ILLINOIS

SHEETS

TOTAL

DATE

DESIGNED

CHECKED

DRAWN

-

-

-

-

REVISED -

-

-

-

REVISED

REVISED

REVISED

PLOT DATE =

No. 184-000450

DESIGN FIRM REGISTRATIONwww.clarkdietz.com

PHONE : 217.373.8900

CHAMPAIGN, IL 61820

125 WEST CHURCH STREET

FIL

E

NA

ME

=

NO

SHEET

PROJECT NO C1170030

ADG

ADG

CHAMPAIGN PARK DISTRICT

ZAHND PARK

9CHAMPAIGN

Nov 2018

SMW

2.0

%

0.3%

2.0

%

1.9%

0.8

%

8.2%

1.1

%

7.9%

1.7%1.7%

0.1

%

1.5%

1.7

%1.7%

0.2

%

1.3%

1.5

%

4.4%

1.5%

1.0%

0.2

%

4.5%

1.5

%

1.6

%

1.4

%

1.6

%

1.5

%

1.5

%

1.0

%1.2%

0.6

%

1.3

%4.3%

4.2%

1.5

%

4.5%

3.8%

0.2%

0.3%

1.5%

0.4

%

0.4

%

3.8

%

4.3

%

4.0%

4.5%

1.5

%

1.5

%

1.4%

1.6%

6.0’

6.0’ TYP

5.0’

TY

P

4.3’

4.3’

5.3’

4.3’

7.0’

6.0’

6.0’

21.8’

6.0’

20.1’

5.0’ TYP

4.5’ TYP

6.2’

5.2’

5.2’

6.0’

6.0’ TYP

6.0’ TYP 6.0’ TYP

9.0’3.8’

6.0’

TY

P

5.4’ TYP6.0’

5.0’

5.0’

5.0’

10.0’R

5.0’

R

5.0’R

10.0’R

4.8’4.8’

4.8’

5.2’

AND TO GRADE TO DRAIN

PLACE FILL AS REQUIRED

710.97

712.50

711.30

708.91

710.08

AND TO GRADE TO DRAIN

PLACE FILL AS REQUIRED

5.0’RR

5.0’

PAVILIO

N

BASEBALL FIE

LD

HM

A

PARKIN

G LOT

PCC SID

E

WALK

AND TO GRADE TO DRAIN

PLACE FILL AS REQUIRED

713.28

713.28

713.16

713.16

710.87

709.58710.87

709.60

709.43

710.61

709.36

711.19

709.27

711.08

710.07

710.39

710.37

710.37

711.01

710.80

710.97

710.97

711.04

711.04

711.09

711.09

711.06

711.06

711.08

711.08

710.98

710.91

710.82

710.98 710.71

710.87

710.64

710.81

710.89

710.98

710.28

710.29 709.92

710.30

709.17

711.03

711.30

709.63

711.10

709.41

709.13

711.01

709.34

710.03 710.12

709.52

710.45

710.19

710.05

710.10

710.89

710.89

710.72

710.32

710.24

710.68

710.83

710.83

710.06

710.06

709.78

710.04

710.25

710.10

708.99

708.77

708.85

708.90

708.58

708.58

708.67

708.67

710.13

710.11

SID

EW

AL

K

PCC

Page 10: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

TOPSOIL

BACKFILL WITH

NOTES:

3/4" CHAMFER

#4 REBAR @ 12" CENTERS

3" CLR.

EVENLY SPACED

3-#4 REBAR

2"

3/4"

KEYWAY

15"

1-1/2"

6" P.C. CONCRETE SIDEWALK CURB

6"

TO MATCH FINISHED GRADE

TOP OF CURB ELEVATIONS

2% MAX.

1.5% DES.

4.

3.

2.

1.

NOTE:

6"

1" R

MONOLITHIC WITH SIDEWALK

CONCRETE CURB CONSTRUCTED

INCLUDED IN THE COST OF THE SIDEWALK.

OF CONSTRUCTING THE CURB TO THE HEIGHT SHOWN SHALL BE

AREA INCLUDING THE TOP SURFACE AREA OF THE CURB. THE COST

AT THE CONTRACT UNIT PRICE PER SQUARE FOOT OF TOP SURFACE

THIS WORK WILL BE PAID FOR AS P.C. CONCRETE SIDEWALK, 6"

SIDEWALK MONOLITHIC CURB DETAIL

VARIES

6"

P.C. CONCRETE SIDEWALK 6"7" MAX

VARIES 0" TO

2.0% MAX

1.5% DES

VA

RIES 7"

TO 1’-

4"

PAID FOR SEPARATELY.

THE PORTLAND CEMENT CONCRETE SIDEWALK ADJACENT TO THE SIDEWALK CURB WILL BE

COMPENSATION WILL BE ALLOWED. THE REINFORCEMENT BARS SHALL BE EPOXY COATED.

COST OF THE PORTLAND CEMENT CONCRETE SIDEWALK CURB, AND NO ADDITIONAL

CURB AND FURNISHING AND INSTALLING THE #4 REBARS SHALL BE INCLUDED IN THE

THE COST OF CONSTRUCTING THE ADDITIONAL SIDEWALK WIDTH BELOW THE SIDEWALK

THE REINFORCEMENT BARS SHALL BE OMITTED WHERE THE CURB HEIGHT IS 7" OR LESS.

KEYWAY WILL NOT BE REQUIRED.

SIDEWALK CURB MAY BE POURED MONOLITHIC WITH SIDEWALK IN WHICH CASE THE

AND AS DIRECTED BY THE ENGINEER.

CONSTRUCT CURB HEIGHTS GREATER THAN 7" TO MEET FINISHED GRADE ELEVATIONS

SIDEWALK CURBS SHALL BE CONSTRUCTED AT LOCATIONS WHERE IT IS NECESSARY TO

SCALE : NTS

9MISCELLANEOUS DETAILS

LOCATION: STA 208+00.00 TO STA 209+25.00 LOCATION: AS DIRECTED BY THE ENGINEER

TRENCH DRAIN DETAIL

NOTE:

A

A

SECTION A-A

B

B

P.C. CONCRETE SIDEWALK CURB DETAIL

SIDEWALK

P.C. CONCRETE

SECTION B-B

PCC SIDEWALK, 6"

TRENCH DRAIN

MATCH DEPTH OF TRENCH DRAIN

6"

6"

TRANSITION DEPTH IN ONE FULL PANEL (TYP)

PCC SIDEWALK, 6"

TRENCH DRAIN

PCC SIDEWALK, 6"

12.0’

6.8’

TRENCH BOX SHALL BE INCLUDED IN THE COST OF THE PCC SIDEWALK, 6".

COST OF CONSTRUCTING THE TRANSITIONAL HEIGHT FROM 6" TO MATCH THE

ADDITION TO THE TOP SURFACE AREA OF THE FINISHED SIDEWALK AT GRADE. THE

UNIT PRICE PER SQUARE FOOT OF TOP SURFACE AREA OF THE "SLEEPER SLAB" IN

THIS WORK WILL BE PAID FOR AS P.C. CONCRETE SIDEWALK, 6" AT THE CONTRACT

TRENCH DRAIN

PCC SIDEWALK, 6"

P:\

C1170030_

CP

D - Z

ahnd P

ark\Pla

ns\s

heets\C

1170030-0

9.M

sc

Detail.d

gn

12/6/2018 8:29:17 AM

COUNTY

ILLINOIS

SHEETS

TOTAL

DATE

DESIGNED

CHECKED

DRAWN

-

-

-

-

REVISED -

-

-

-

REVISED

REVISED

REVISED

PLOT DATE =

No. 184-000450

DESIGN FIRM REGISTRATIONwww.clarkdietz.com

PHONE : 217.373.8900

CHAMPAIGN, IL 61820

125 WEST CHURCH STREET

FIL

E

NA

ME

=

NO

SHEET

PROJECT NO C1170030

ADG

ADG

CHAMPAIGN PARK DISTRICT

ZAHND PARK

9CHAMPAIGN

Nov 2018

SMW

12.0’

3.4’

3.4’

6.8’

4.7’

4.2’

2.9’

1.0’

2.9’

6.0’

6.0’

6.0’

Page 11: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be
Page 12: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

RETURN WITH BID

Printed 2/1/2019 Page 2 of 6 BLR 12200 (01/08/14)

NOTICE TO BIDDERS

County Champaign

Local Public Agency Champaign Park Dist

Section Number

Route Zahnd Park

Sealed proposals for the improvement described below will be received at the office of CLARK DIETZ,

125 WEST CHURCH STREET until 10:00 AM on February 21, 2019 Address Time Date

Sealed proposals will be opened and read publicly at the office of CLARK DIETZ

125 WEST CHURCH STREET at 10:05 AM on February 21, 2019 Address Time Date

DESCRIPTION OF WORK

Name ADA / Mobility Enhancements Length: 3485.00 feet ( 0.66 miles)

Location Zahnd Park, Champaign IL

Proposed Improvement consists of pcc sidewalk, earthwork, grading and seeding.

1. Plans and proposal forms will be available in the office of Clark Dietz, Inc. 125 W. Church Street, Champaign, IL 61820 For a non-refundable fee of $25.00, prospective bidders may obtain the bidding documents from the Clark Dietz website

at www.clarkdietz.com. Access the bidding documents by clicking on the “Bidding Documents” icon located on the top of the page, then selecting “Browse Projects” to find the “Zahnd Park” bidding documents (Quest Project #6117484). Click on the project title and you will be directed to a web page where the bidding documents can be downloaded. The bidding services are provided by QuestCDN.com where you can complete a free membership registration to Quest. Please contact Clark Dietz at (217) 373-8900 if you have any questions regarding the registration or download process.

2. Prequalification

If checked, the 2 low bidders must file within 24 hours after the letting an “Affidavit of Availability” (Form BC 57), in duplicate, showing all uncompleted contracts awarded to them and all low bids pending award for Federal, State, County, Municipal and private work. One original shall be filed with the Awarding Authority and one original with the IDOT District Office.

3. The Awarding Authority reserves the right to waive technicalities and to reject any or all proposals as provided in BLRS Special Provision for Bidding Requirements and Conditions for Contract Proposals.

4. The following BLR Forms shall be returned by the bidder to the Awarding Authority:

a. BLR 12200: Local Public Agency Formal Contract Proposal b. BLR 12200a Schedule of Prices c. BLR 12230: Proposal Bid Bond (if applicable) d. BLR 12325: Apprenticeship or Training Program Certification (do not use for federally funded projects) e. BLR 12326: Affidavit of Illinois Business Office

5. The quantities appearing in the bid schedule are approximate and are prepared for the comparison of bids. Payment to the Contractor will be made only for the actual quantities of work performed and accepted or materials furnished according to the contract. The scheduled quantities of work to be done and materials to be furnished may be increased, decreased or omitted as hereinafter provided.

6. Submission of a bid shall be conclusive assurance and warranty the bidder has examined the plans and understands all requirements for the performance of work. The bidder will be responsible for all errors in the proposal resulting from failure or neglect to conduct an in depth examination. The Awarding Authority will, in no case be responsible for any costs, expenses, losses or changes in anticipated profits resulting from such failure or neglect of the bidder.

7. The bidder shall take no advantage of any error or omission in the proposal and advertised contract.

8. If a special envelope is supplied by the Awarding Authority, each proposal should be submitted in that envelope furnished by the Awarding Agency and the blank spaces on the envelope shall be filled in correctly to clearly indicate its contents. When an envelope other than the special one furnished by the Awarding Authority is used, it shall be marked to clearly indicate its contents. When sent by mail, the sealed proposal shall be addressed to the Awarding Authority at the address and in care of the official in whose office the bids are to be received. All proposals shall be filed prior to the time and at the place specified in the Notice to Bidders. Proposals received after the time specified will be returned to the bidder unopened.

9. Permission will be given to a bidder to withdraw a proposal if the bidder makes the request in writing or in person before the time for opening proposals.

Page 13: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

RETURN WITH BID

Printed 2/1/2019 Page 3 of 6 BLR 12200 (01/08/14)

PROPOSAL

County Champaign

Local Public Agency Champaign Park Dist

Section Number

Route Zahnd Park

1. Proposal of

for the improvement of the above section by the construction of placing a PCC sidewalk path throughout Zahnd Park,

including all earthwork and grading required, sidewalk removal, culvert placment, seeding,

mulching and other items of construction.

a total distance of 3485.00 feet, of which a distance of 3485.00 feet, ( 0.660 miles) are to be improved.

2. The plans for the proposed work are those prepared by Clark Dietz, Inc and approved by the Champaign Park District on

3. The specifications referred to herein are those prepared by the Department of Transportation and designated as “Standard Specifications for Road and Bridge Construction” and the “Supplemental Specifications and Recurring Special Provisions” thereto, adopted and in effect on the date of invitation for bids.

4. The undersigned agrees to accept, as part of the contract, the applicable Special Provisions indicated on the “Check Sheet for Recurring Special Provisions” contained in this proposal.

5. The undersigned agrees to complete the work within working days or by 06/14/2019 unless additional time is granted in accordance with the specifications.

6. A proposal guaranty in the proper amount, as specified in BLRS Special Provision for Bidding Requirements and Conditions for Contract Proposals, will be required. Bid Bonds will be allowed as a proposal guaranty. Accompanying this proposal is either a bid bond if allowed, on Department form BLR 12230 or a proposal guaranty check, complying with the specifications, made payable to:

Treasurer of Champaign Park District

The amount of the check is Ten Percent (10%) of the Bid ( ).

7. In the event that one proposal guaranty check is intended to cover two or more proposals, the amount must be equal to the sum of the proposal guaranties, which would be required for each individual proposal. If the proposal guaranty check is placed in another proposal, it will be found in the proposal for: Section Number .

8. The successful bidder at the time of execution of the contract will be required to deposit a contract bond for the full amount of the award. When a contract bond is not required, the proposal guaranty check will be held in lieu thereof. If this proposal is accepted and the undersigned fails to execute a contract and contract bond as required, it is hereby agreed that the Bid Bond or check shall be forfeited to the Awarding Authority.

9. Each pay item should have a unit price and a total price. If no total price is shown or if there is a discrepancy between the product of the unit price multiplied by the quantity, the unit price shall govern. If a unit price is omitted, the total price will be divided by the quantity in order to establish a unit price.

10. A bid will be declared unacceptable if neither a unit price nor a total price is shown.

11. The undersigned submits herewith the schedule of prices on BLR 12200a covering the work to be performed under this contract.

12. The undersigned further agrees that if awarded the contract for the sections contained in the combinations on BLR 12200a, the work shall be in accordance with the requirements of each individual proposal for the multiple bid specified in the Schedule for Multiple Bids below.

Page 14: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

RETURN WITH BID

County

Local Public Agency

Section

Route

Total

Item No. Items Unit Quantity Total

20101700 SUPPLEMENTAL WATERING UNIT 87

25000400 NITROGEN FERTILIZER NUTRIENT POUND 54

25000500 PHOSPHORUS FERTILIZER NUTRIENT POUND 54

25000600 POTASSIUM FERTILIZER NUTRIENT POUND 54

25100115 MULCH, METHOD 2 ACRE 0.6

28000250 TEMPORARY EROSION CONTROL SEEDING POUND 60

28000305 TEMPORARY DITCH CHECKS FOOT 60

28000400 PERIMETER EROSION BARRIER FOOT 60

28000500 INLET AND PIPE PROTECTION EACH 4

42400300 PORTLAND CEMENT CONC SIDEWALK 6" SQ FT 21205

42400800 DETECTABLE WARNINGS SQ FT 31

44000600 SIDEWALK REMOVAL SQ FT 938

542D0213 PIPE CULVERTS, CLASS D, TYPE 1 8" FOOT 32

542D0223 PIPE CULVERTS, CLASS D, TYPE 1 18" FOOT 18

54262708 METAL FLARED END SECTIONS 8" EACH 4

54262718 METAL FLARED END SECTIONS 18" EACH 2

67100100 MOBILIZATION L SUM 1

78001110 PAINT PAVEMENT MARKING - LINE 4" FOOT 55

X0000000 EXCAVATION SPECIAL L SUM 1

X2500900 SEEDING, CLASS 1 (SPECIAL) ACRE 0.6

X0301339 REMOVE EXISTING PARKING BLOCKS EACH 1

X0327680 TRENCH DRAIN FOOT 12

Z0013798 CONSTRUCTION LAYOUT L SUM 1

Z0042300 PORTLAND CEMENT CONC SIDEWALK CURB FOOT 126

Bidder's Proposal for making Entire Improvements

Schedule for Single Bid

TOTAL :

Schedule for Multiple BidsSections Included in Combinations

Unit Price

Combination Letter

Champaign

(For complete information covering these items, see plans and specifications)

SCHEDULE OF PRICES

Zahnd Park

Champaign Park District

Printed 12/5/2018 Page 4 of 6 BLR 12200a (01/08/14)

Page 15: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

RETURN WITH BID

Printed 2/1/2019 Page 5 of 6 BLR 12200 (01/08/14)

CONTRACTOR CERTIFICATIONS

County Champaign

Local Public Agency Champaign Park Dist

Section Number

Route Zahnd Park

The certifications hereinafter made by the bidder are each a material representation of fact upon which reliance is placed should the Department enter into the contract with the bidder.

1. Debt Delinquency. The bidder or contractor or subcontractor, respectively, certifies that it is not delinquent in the payment of any tax administered by the Department of Revenue unless the individual or other entity is contesting, in accordance with the procedures established by the appropriate revenue Act, its liability for the tax or the amount of tax. Making a false statement voids the contract and allows the Department to recover all amounts paid to the individual or entity under the contract in a civil action.

2. Bid-Rigging or Bid Rotating. The bidder or contractor or subcontractor, respectively, certifies that it is not barred from contracting with the Department by reason of a violation of either 720 ILCS 5/33E-3 or 720 ILCS 5/33E-4.

A violation of Section 33E-3 would be represented by a conviction of the crime of bid-rigging which, in addition to Class 3 felony sentencing, provides that any person convicted of this offense or any similar offense of any state or the United States which contains the same elements as this offense shall be barred for 5 years from the date of conviction from contracting with any unit of State or local government. No corporation shall be barred from contracting with any unit of State or local government as a result of a conviction under this Section of any employee or agent of such corporation if the employee so convicted is no longer employed by the corporation and: (1) it has been finally adjudicated not guilty or (2) if it demonstrates to the governmental entity with which it seeks to contract and that entity finds that the commission of the offense was neither authorized, requested, commanded, nor performed by a director, officer or a high managerial agent in behalf of the corporation.

A violation of Section 33E-4 would be represented by a conviction of the crime of bid-rotating which, in addition to Class 2 felony sentencing, provides that any person convicted of this offense or any similar offense of any state or the United States which contains the same elements as this offense shall be permanently barred from contracting with any unit of State or local government. No corporation shall be barred from contracting with any unit of State or local government as a result of a conviction under this Section of any employee or agent of such corporation if the employee so convicted is no longer employed by the corporation and: (1) it has been finally adjudicated not guilty or (2) if it demonstrates to the governmental entity with which it seeks to contract and that entity finds that the commission of the offense was neither authorized, requested, commanded, nor performed by a director, officer or a high managerial agent in behalf of the corporation.

3. Bribery. The bidder or contractor or subcontractor, respectively, certifies that it has not been convicted of bribery or attempting to bribe an officer or employee of the State of Illinois or any unit of local government, nor has the firm made an admission of guilt of such conduct which is a matter of record, nor has an official, agent, or employee of the firm committed bribery or attempted bribery on behalf of the firm and pursuant to the direction or authorization of a responsible official of the firm.

4. Interim Suspension or Suspension. The bidder or contractor or subcontractor, respectively, certifies that it is not currently under a suspension as defined in Subpart I of Title 44 Subtitle A Chapter III Part 6 of the Illinois Administrative Code. Furthermore, if suspended prior to completion of this work, the contract or contracts executed for the completion of this work may be cancelled.

Page 16: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

RETURN WITH BID

Printed 2/1/2019 Page 6 of 6 BLR 12200 (01/08/14)

SIGNATURES

County Champaign

Local Public Agency Champaign Park Dist

Section Number

Route Zahnd Park

(If an individual)

Signature of Bidder

Business Address

(If a partnership)

Firm Name

Signed By

Business Address

Inset Names and Addressed of All Partners

(If a corporation)

Corporate Name

Signed By

President

Business Address

President

Insert Names of Officers Secretary

Treasurer

Attest: Secretary

Page 17: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

Page 1 of 1 BLR 12230 (Rev. 7/05 Printed on 12/3/2018 4:09:24 PM

Local Agency Proposal Bid Bond

RETURN WITH BID

Route

County

Local Agency

Section

Zahnd Park

Champaign

Champaign Park Dist

PAPER BID BOND

WE as PRINCIPAL,

and as SURETY,

are held jointly, severally and firmly bound unto the above Local Agency (hereafter referred to as “LA”) in the penal sum of 10% of the total bid price, or for the amount specified in the proposal documents in effect on the date of invitation for bids whichever is the lesser sum. We bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly pay to the LA this sum under the conditions of this instrument.

WHEREAS THE CONDITION OF THE FOREGOING OBLIGATION IS SUCH that, the said PRINCIPAL is submitting a written proposal to the LA acting through its awarding authority for the construction of the work designated as the above section.

THEREFORE if the proposal is accepted and a contract awarded to the PRINCIPAL by the LA for the above designated section and the PRINCIPAL shall within fifteen (15) days after award enter into a formal contract, furnish surety guaranteeing the faithful performance of the work, and furnish evidence of the required insurance coverage, all as provided in the “Standard Specifications for Road and Bridge Construction” and applicable Supplemental Specifications, then this obligation shall become void; otherwise it shall remain in full force and effect.

IN THE EVENT the LA determines the PRINCIPAL has failed to enter into a formal contract in compliance with any requirements set forth in the preceding paragraph, then the LA acting through its awarding authority shall immediately be entitled to recover the full penal sum set out above, together with all court costs, all attorney fees, and any other expense of recovery.

IN TESTIMONY WHEREOF, the said PRINCIPAL and the said SURETY have caused this instrument to be signed by their

respective officers this day of

Principal

(Company Name) (Company Name)

By: By: (Signature and Title) (Signature and Title)

(If PRINCIPAL is a joint venture of two or more contractors, the company names, and authorized signatures of each contractor must be affixed.)

Surety

By: (Name of Surety) (Signature of Attorney-in-Fact)

STATE OF ILLINOIS,

COUNTY OF

I, , a Notary Public in and for said county, do hereby certify that ( Insert names of individuals signing on behalf of PRINCIPAL & SURETY)

who are each personally known to me to be the same persons whose names are subscribed to the foregoing instrument on behalf of PRINCIPAL and SURETY, appeared before me this day in person and acknowledged respectively, that they signed and delivered said instruments as their free and voluntary act for the uses and purposes therein set forth.

Given under my hand and notarial seal this day of My commission expires

(Notary Public)

ELECTRONIC BID BOND Electronic bid bond is allowed (box must be checked by LA if electronic bid bond is allowed)

The Principal may submit an electronic bid bond, in lieu of completing the above section of the Proposal Bid Bond Form. By providing an electronic bid bond ID code and signing below, the Principal is ensuring the identified electronic bid bond has been executed and the Principal and Surety are firmly bound unto the LA under the conditions of the bid bond as shown above. (If PRINCIPAL is a joint venture of two or more contractors, an electronic bid bond ID code, company/Bidder name title and date must be affixed for each contractor in the venture.)

Electronic Bid Bond ID Code (Company/Bidder Name)

(Signature and Title) Date

Page 18: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

Printed 11/26/2018 Page 1 of 2 BLR 12325 (Rev. 4/07)

Apprenticeship or Training Program Certification

Route Zahnd Park Return with Bid County Champaign

Local Agency Champaign Park Dist Section

All contractors are required to complete the following certification:

For this contract proposal or for all groups in this deliver and install proposal.

For the following deliver and install groups in this material proposal:

Illinois Department of Transportation policy, adopted in accordance with the provisions of the Illinois Highway Code, requires this contract to be awarded to the lowest responsive and responsible bidder. The award decision is subject to approval by the Department. In addition to all other responsibility factors, this contract or deliver and install proposal requires all bidders and all bidders’ subcontractors to disclose participation in apprenticeship or training programs that are (1) approved by and registered with the United States Department of Labor’s Bureau of Apprenticeship and Training, and (2) applicable to the work of the above indicated proposals or groups. Therefore, all bidders are required to complete the following certification: I. Except as provided in paragraph IV below, the undersigned bidder certifies that it is a participant, either as an

individual or as part of a group program, in an approved apprenticeship or training program applicable to each type of work or craft that the bidder will perform with its own employees.

II. The undersigned bidder further certifies for work to be performed by subcontract that each of its subcontractors

submitted for approval either (A) is, at the time of such bid, participating in an approved, applicable apprenticeship or training program; or (B) will, prior to commencement of performance of work pursuant to this contract, establish participation in an approved apprenticeship or training program applicable to the work of the subcontract.

III. The undersigned bidder, by inclusion in the list in the space below, certifies the official name of each program

sponsor holding the Certificate of Registration for all of the types of work or crafts in which the bidder is a participant and that will be performed with the bidder’s employees. Types of work or craft that will be subcontracted shall be included and listed as subcontract work. The list shall also indicate any type of work or craft job category for which there is no applicable apprenticeship or training program available.

Page 19: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

Printed 11/26/2018 Page 2 of 2 BLR 12325 (Rev. 4/07)

IV. Except for any work identified above, any bidder or subcontractor that shall perform all or part of the work of the contract or deliver and install proposal solely by individual owners, partners or members and not by employees to whom the payment of prevailing rates of wages would be required, check the following box, and identify the owner/operator workforce and positions of ownership.

The requirements of this certification and disclosure are a material part of the contract, and the contractor shall require this certification provision to be included in all approved subcontracts. The bidder is responsible for making a complete report and shall make certain that each type of work or craft job category that will be utilized on the project is accounted for and listed. The Department at any time before or after award may require the production of a copy of each applicable Certificate of Registration issued by the United States Department of Labor evidencing such participation by the contractor and any or all of its subcontractors. In order to fulfill the participation requirement, it shall not be necessary that any applicable program sponsor be currently taking or that it will take applications for apprenticeship, training or employment during the performance of the work of this contract or deliver and install proposal.

Bidder: By: (Signature) Address: Title:

Page 20: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

RETURN WITH BID

Printed 11/26/2018 BLR 12326 (01/08/14)

Affidavit of Illinois Business Office

County Champaign Local Public Agency Champaign Park Dist

Section Number Route Zahnd Park

State of ) ) ss. County of ) I, of , ,

(Name of Affiant) (City of Affiant) (State of Affiant

being first duly sworn upon oath, states as follows:

1. That I am the of .

officer or position bidder

2. That I have personal knowledge of the facts herein stated.

3. That, if selected under this proposal, , will maintain a (bidder)

business office in the State of Illinois which will be located in County, Illinois.

4. That this business office will serve as the primary place of employment for any persons employed in the construction contemplated by this proposal.

5. That this Affidavit is given as a requirement of state law as provided in Section 30-22(8) of the Illinois Procurement Code.

(Signature)

(Print Name of Affiant)

This instrument was acknowledged before me on day of , .

(SEAL)

(Signature of Notary Public)

Page 21: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

Champaign Park District Zahnd Park

Project No.: C1170030

1 C1170030

TECHNICAL SPECIFICATIONS The following technical specifications supplement the "Standard Specifications for Road and Bridge Construction" adopted April 1, 2016, the latest edition of the "Illinois Manual on Uniform Traffic Control Devices for Streets and Highways", in effect on the date of invitation for bids, the "Manual of Test Procedures for Materials", in effect on the date of invitation for bids, the "Supplemental Specifications and Recurring Special Provisions" indicated on the Check Sheet included herein, the “Bureau of Design & Environment Special Provisions (BDE)” included herein, which apply to and govern the construction of Zahnd Park ADA / Mobility Enhancements for the Champaign Park District, in the City of Champaign, Champaign County, and in case of conflict with any part or parts of said Specifications, the said Special Provisions shall take precedence and shall govern. Work items detailed in these specifications refer to Illinois Department of Transportation coded pay items numbering system. When applicable, the coded pay item number is listed at the beginning of the title of the work item. Example: 42400300 PORTLAND CEMENT CONCRETE SIDEWALK 6 INCH. LOCATION AND DESCRIPTION OF WORK The proposed improvements are located within the Zahnd Park in the southwest part of the City of Champaign, in Champaign County, Illinois. Proposed ADA and mobility improvements will be done within the park for a total distance of 3,485 feet. The work under this contract shall consist of the construction of the following elements:

- Earth excavation, topsoil placement, and seeding; - Grading and subgrade preparation for new pathway construction; - Portland Cement concrete sidewalk; - Aggregate base course as required to raise sidwalk grade; - Portland Cement concrete sidewalk curb; - Pipe culverts and trench drain; - Various removals, excavations, landscaping and other work necessary to complete the construction as shown in the plans and required by the specifications.

The work shall include all labor, materials, tools and equipment necessary for the proper execution and completion of the work as shown in the plans and as specified. It shall also include all work not specifically mentioned, but which is reasonably and properly inferable and necessary for the completion of the work.

Page 22: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

Champaign Park District Zahnd Park

Project No.: C1170030

2 C1170030

PROJECT COMPLETION DATE/TIME OF THE ESSENCE Time is an essential element of the Contract and the Engineer will be monitoring the Contractor's progress toward completion. The assessment of liquidated damages shall be in accordance with Article 108.09 of the Illinois Department of Transportation Standard Specifications and shall be defined with respect to the following project completion date and not the number of available working days. Project Completion Date This construction work for the project shall commence on or before Monday March 25th, 2019 and shall be completed by midnight Friday, June 14th, 2019. The full amount of liquidated damages specified in Article 108.09 of the Standard Specifications shall be assessed per calendar day in accordance with Article 108.09 should the Contractor fail to complete the specified work on or before Friday, June 14th, 2019. ILLINOIS DEPARTMENT OF TRANSPORTATION PREQUALIFICATION Bidders must be prequalified with the Illinois Department of Transportation to perform the type and magnitude of construction work. Bidders shall include a copy of their Illinois Department of Transportation “Certificate of Eligibility: with their bid. TRAFFIC CONTROL AND PROTECTION Description This work shall consist of providing the necessary traffic control personnel and devices and the installation, maintenance, relocation and removal of these devices during construction of the improvement. The Contractor shall take care in not disturbing park activities with construction work. Traffic Control Plan Traffic control shall be in accordance with the applicable sections of the Standard Specifications and Supplemental Specifications, the applicable guidelines contained in the "Illinois Manual on Uniform Traffic Control Devices for Streets and Highways", these Special Provisions, and the special details and Highway Standards contained herein and in the plans. The Contractor shall take care in keeping pedestrians out of the work zone. The Contractor shall install, maintain, and remove necessary signs and barricades needed to direct pedestrians to usable sidewalks and walkways during the construction and as directed by the Engineer. Measurement and Payment The work will not be measured or paid for separately and should be included in the cost of the various proposed pay items and no additional compensation will be allowed.

Page 23: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

Champaign Park District Zahnd Park

Project No.: C1170030

3 C1170030

CONSTRUCTION ON PRIVATE PROPERTY Whenever excavation is made within a temporary or permanent construction easement, including tree planting easements, on private property for driveways, sidewalks, steps, retaining walls, utility connections, tree plantings or other construction, the topsoil disturbed by the excavation operations shall be restored as nearly as possible to its original position and the whole area involved in the construction operation shall be left in a neat and presentable condition. The Contractor shall use reasonable care to avoid disturbing portions of private property not necessary to the construction operations. If, in the judgment of the Engineer, areas are disturbed unnecessarily, the Contractor shall restore these areas at his own expense. The Contractor shall not pile excavated material outside the limits of the project, upon adjacent private property, without the written consent of the property owner and the Engineer. The cost of compliance with this Special Provision will not be paid for separately but shall be considered, as included in the cost of the EXCAVATION SPECIAL pay item and no additional compensation will be allowed. CURB AND GUTTER TRANSITIONS AND THICKNESS Whenever it is necessary to make a smooth connection between the proposed curb and gutters and the existing curb and gutter the Contractor shall vary the horizontal and/or vertical dimensions of the proposed gutter or curb as directed by the Engineer. This work will not be paid for separately but will be considered as included in the contract unit prices for the various combination curb and gutter pay items and no additional compensation will be allowed. CUTTING EXISTING PAVEMENT, DRIVEWAY PAVEMENT, SIDEWALK, OR CURB AND GUTTER At locations where it is necessary to cut asphalt surfaces, concrete pavement, concrete or asphalt driveway pavement, concrete sidewalk, or concrete curb and gutter, where it will abut the proposed new construction, a uniformly straight full depth cut shall be obtained by the use of a concrete saw with a diamond blade. The use of pneumatic tools to make these cuts will not be allowed. This work shall be considered as included in the contract unit prices for the various pay items of the proposed construction involved and no additional compensation will be allowed. DUST CONTROL Prior to the start of construction, the Contractor shall provide to the Engineer a dust control plan in accordance with article 107.36 of the standard specifications. Dust control shall be used for any operations that warrant dust control measures as directed by the Engineer. The Contractor shall be responsible for cleaning all dust or airborne material originating from the project from adjacent properties if concerns of health, safety, or damage to the public or property arise from construction operations as determined by the Engineer. Water shall be used as a dust suppressant and cleaning agent unless directed otherwise by the Engineer. This work will not be paid for separately and shall be included in the unit prices bid including furnishing and applying water.

Page 24: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

Champaign Park District Zahnd Park

Project No.: C1170030

4 C1170030

HAND GRADING Grading shall be done by hand around light poles, utility poles, sign posts, shrubs, trees or other natural or man-made objects where shallow fills or cuts are adjacent to the items. It is the intent that the limits of construction be such as to preserve in the original state as much area of temporary easements as possible. The decision as to items to remain in place shall be as directed by the Engineer. This work will not be paid for separately and should be included in the cost of the earthwork. PRESERVING PROPERTY MARKERS The Contractor shall protect the existing property corner markers within the project limits. Any such monuments destroyed by the Contractor's operations shall be replaced by a registered Illinois Land Surveyor at the Contractor's expense. Any expense, inconveniences or delays caused the Contractor in complying with this Special Provision will be considered as included in the unit bid prices of the contract and no additional compensation will be allowed. REMOVAL OF UNCLASSIFIED MATERIAL Debris or unclassified materials shall be removed at the locations shown on the Plans or as designated by the Engineer. The material removed as required in this Special Provision shall be disposed of outside the limits of the right-of-way in accordance with Article 202.03 of the Standard Specifications and as directed by the Engineer. This work will not be paid for separately and is considered to be included in the cost of the various removal items. SALVAGEABLE MATERIALS All materials deemed salvageable by the Engineer shall remain the property of the Champaign Park District and shall be delivered as directed by the Engineer unless specified otherwise herein. The Contractor shall dispose of any materials off site that the Engineer determines should not be salvaged. This work will not be paid for separately and is considered to be included in the cost of the various removal items. STOCKPILE AREAS Short-term stockpile of backfill and crushed stone material will be allowed only where directed by the Engineer. Temporary stockpiles of materials shall not interfere with local and through traffic as directed by the Engineer. Stockpiles of materials shall not be allowed on private property (unless permission is granted by owner in writing), outside street rights-of-way; and shall not be allowed to block private driveways or sidewalks. Any grass area that is damaged by stockpiled material shall be repaired by either seeding or sodding as determined by the Engineer. These areas shall not be measured for payment and the Contractor shall repair them at his/her own expense.

Page 25: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

Champaign Park District Zahnd Park

Project No.: C1170030

5 C1170030

20101700 SUPPLEMENTAL WATERING 25100115 MULCH, METHOD 2 X2500900 SEEDING, CLASS 1 (SPECIAL) Description This work shall consist of preparing the seed or sod bed, furnishing, transporting, and placing the topsoil, fertilizer, seed, mulch or sod as required. The work shall be in accordance with the applicable articles of Sections 211, 250, 251 and 252 of the Standard Specifications except as modified herein. Excavation Special topsoil shall be placed at locations shown on the plans. Seeding, Class 1 (Special) shall be used for seeding lawns at locations shown on the plans. Mulch, Method 2 shall be used for areas that receive Seeding, Class 1 (Special). The areas for seeding and mulching or sodding shall be any area disturbed beyond the existing condition by the Contractor's construction operations. The plan quantity for seeding and mulching or sodding includes the entire area within the construction limits. The Contractor is advised that payment for seeding and mulching or sodding will be made for only those areas which were necessarily disturbed by construction operations as determined by the Engineer. Turfed areas which are needlessly disturbed by construction operations shall be seeded and mulched or sodded as directed by the Engineer at the Contractor's expense. To prevent erosion, seeding and mulching or sodding should be completed as soon as possible after the completion of the work. The seed planting times shall be in accordance with Article 250.07 of the Standard Specifications or as directed by the Engineer. The Contractor will be responsible for the seeded and mulched or sodded areas until they are fully established which may require re-seeding or re-sodding bare or dead areas until growth is established. The Contractor shall maintain the seeded and mulched or sodded areas. The Contractor shall guarantee 75% uniform growth of grass over the entire site for one growing season. Materials All materials shall meet the requirements of Sections 211, 250, 251 and 252 of the Standard Specification except for the following: The topsoil shall meet the requirements of Article 1081.05(a) of the Standard Specifications except that the topsoil shall be sifted, and all deleterious material removed including dirt clods greater than 1” in diameter. The seed mixtures shall be as follows. Weights shown are in LBS per ACRE. Seeding is to be at a rate 50% greater than required in the Standard Specifications. Seeding, Class 1 (Special) KY Bluegrass 150 lbs. Perennial Ryegrass 90 lbs. Creeping Red Fescue 60 lbs. TOTAL 300 lbs.

Page 26: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

Champaign Park District Zahnd Park

Project No.: C1170030

6 C1170030

When seeding occurs between June 1 and August 15 the above mixtures shall also include 50 lbs./acre of Annual Ryegrass. The seed shall be free of foreign varieties of seed and noxious weeds in accordance with Article 1081.04 of the Standard Specifications. The Contractor shall supply the proper certifications and weight tickets for the seed, fertilizer and mulch materials. Construction Requirements Before any seeding and mulching or sodding begins, the Contractor shall be responsible for the removal of all debris and other deleterious material that would interfere or complicate the future maintenance of the restored surfaces and adjacent areas. After cleanup and power raking of the area to be seeded or sodded has occurred, all areas to be seeded or sodded shall have an agricultural grade topsoil graded to the shape shown on the plans. All areas prepared and ready for seeding or sodding shall be inspected and approved by the Engineer prior to any seed or sod application. The mulch or mulch and fertilizer mixture shall promote and replicate the following:

1. Immediate germination and rapid root development without burning. 2. Expand and provide soil surface coverage to promote young seedling establishment and

greatly reduce soil erosion. Five (5) Supplemental Watering’s shall be applied under this contract for both seeded and sodded areas as directed by the Engineer. One application of water will be required every two days or as directed by the Engineer. Depending upon weather conditions, more or fewer supplemental watering’s may be necessary. All watering described shall be done with a spray application. Water shall be applied at the rate of two (2) gallons per square yard per application. An open-ended hose will not be acceptable. The method of watering shall meet the acceptance of the Engineer. The Contractor shall provide certifications and weight tickets for the seed and fertilizer materials as directed by the Engineer. Measurement and Payment This work will be measured and paid for at the contract unit price per acre for SEEDING, CLASS 1 (SPECIAL) and MULCH METHOD 2; in accordance with Sections 211, 250, 251 and 252 of the Standard Specifications. The supplemental watering will be measured and paid for at the contract price per unit for SUPPLEMENTAL WATERING, with one unit equaling 1000 gallons of water applied. Any additional seeding and mulching or sodding of bare or dead areas after the initial seeding and mulching or sodding operation will not be paid for separately but will be considered as included in the cost of the seeding and mulching or sodding pay items. The Contractor is advised that payment for seeding and mulching or sodding will be made for only those areas which were necessarily disturbed by construction operations as determined by the Engineer. Turfed areas beyond the construction limits which are unnecessarily disturbed by construction operations shall be seeded and mulched or sodded as directed by the Engineer at the Contractor's expense.

Page 27: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

Champaign Park District Zahnd Park

Project No.: C1170030

7 C1170030

67100100 MOBILIZATION Description This work shall consist of all preparatory work and operations to initiate the project in accordance with Section 671 of the Standard Specifications with the following additional requirements. Basis of Payment Article 671.02 of the Standard Specifications shall be modified in that the maximum payment for mobilization will be limited to six percent of the Contract Base Bid Total price. Any amount exceeding six percent of the Contract Base Bid Total price or for the Alternate Bid work will not be paid for. X0000000 EXCAVATION SPECIAL Description This work shall consist of all Earth Excavation, Furnished Excavation, Embankment and Aggregate Base Course, Type A as required to achieve proper elevations and grades shown in the plans. This wok shall consist of excavating, stockpiling, transporting, furnishing, placing, grading and shaping earth. All furnished earth shall be of agricultural topsoil quality. Earth Excavation shall be in accordance with Section 202 as specified in the Standard Specifications. Furnished Excavation shall be in accordance with Section 204 as specified in the Standard Specifications. Embankment shall be in accordance with Section 205 as specified in the Standard Specifications. Aggregate Base Course, Type A shall be in accordance with Section 351 as specified in the Standard Specifications. Construction Requirements The earth excavation and embankment shall be performed to meet the lines and grades shown on the plans. Additional agricultural grade topsoil material required for the site embankment shall be furnished by the contractor and approved by the Champaign Park District. The furnished topsoil shall meet the requirements of Article 1081.05(a) of the Standard Specifications except that the topsoil shall be tilled and raked, and all deleterious material removed including dirt clods greater than one (1) inch in diameter. If earth material is encountered within the construction limits that is contaminated with trash, vegetation, bushes, stumps, roots and debris it shall be removed and disposed of off site at no additional cost. Sod shall be removed to a depth of six (6) inches within the limits of all PCC SIDEWALK 6” placement locations to remove the organic material subject to settling. Aggregate Base Course, Type A is the only fill material that shall be used to achieve proper shape, lines and grades as shown in the plans and as required to meet ADA standards of the required PCC

Page 28: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

Champaign Park District Zahnd Park

Project No.: C1170030

8 C1170030

subgrade elevations. Aggregate Base Course, Type A shall be placed to the width necessary to achieve proper compactions within the limits of PCC SIDEWALK 6”. Sod excavated within the project may be reused for embankment alongside the path and within the project site if properly processed to remove all clods greater than one (1) inch, grass, roots and foreign materials and as approved by the Champaign Park District. Any material not approved for reuse must be hauled from the site. Timbers bordering the playground equipment and proposed sidewalk shall be removed and salvaged as shown in the plans. The salvaged timbers shall then be used to connect the existing timbers to the proposed sidewalk. Contractor to fill the void between the existing much playground to the new sidewalk with mulch to match the existing playground area. The work to prepare the site and supplies required shall be included in the EXCAVATION SPECIAL pay item and no additional compensation shall be allowed. Basis of Payment This work will be paid for at the contract unit price per lump sum for EXCAVATION SPECIAL. No additional payment shall be allowed for items of Earth Excavation, Furnished Excavation, Embankment and Aggregate Base Course, Type A in which the pay item EXCAVATION SPECIAL includes. X0301339 REMOVE EXISTING PARKING BLOCKS Description This work shall consist of removal and proper disposal of existing parking block as directed by engineer. Basis of Payment This work will be paid for at the contract unit price of each for REMOVE EXISTING PARKING BLOCKS. X0327680 TRENCH DRAIN Description This work shall consist of all preparatory work and operations to install a light-duty Type M Trench Frame with grated cover and open ends as shown in the plans and per manufacturer recommendations. Product shall be a Neenah R-4995-A1 or approved equal. Construction Requirements Contractor shall submit shop drawings for approval. Basis of Payment This work will be measured and paid for along the centerline of the trench at the contract unit price per foot for TRENCH DRAIN.

Page 29: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

Champaign Park District Zahnd Park

Project No.: C1170030

9 C1170030

Z0013798 CONSTRUCTION LAYOUT Description This work shall consist of performing construction layout for all work associated with the entire project. The construction layout work for the projects shall be in accordance with the recurring special provision for “Construction Layout Stakes Except for Bridges”. Basis of Payment For all work associated with the project as listed on the Summary of Quantities sheets in the plans, the work will be paid for at the contract lump sum price for CONSTRUCTION LAYOUT in accordance with the recurring special provision for “Construction Layout Stakes Except for Bridges”. Z0042300 PORTLAND CEMENT CONCRETE SIDEWALK CURB Description This work shall consist of constructing reinforced concrete sidewalk curb in accordance with Section 606 of the Standard Specifications, the details in the plans, and the following additions or exceptions. Construction Requirements The portland cement concrete sidewalk curb shall be constructed in accordance with the details in the plans. The sidewalk curb may be poured monolithically with the sidewalk but will be measured and paid for separately. The epoxy coated reinforcement bars shall be in accordance with Article 1006.10 of the Standard Specifications and shall be included in the cost of the sidewalk curb. Measurement and Payment This work will be measured along the top of the curb and will be paid for at the contract unit price per foot for PORTLAND CEMENT CONCRETE SIDEWALK CURB, which price shall include all labor, equipment, and material necessary to complete the work as specified, including all excavation, backfilling, and reinforcement bars. A quantity has been included in the plans for the purpose of establishing a unit bid price. Backfilling the excavated area will be paid for separately. STATUS OF UTILITIES TO BE ADJUSTED All utilities that interfere with this construction will be moved by others at no cost to the Contractor. Contractor will be required to cooperate with the Utility Companies while they perform their work. Utility adjustments or relocations are not anticipated for this project. The Illinois Underground Utility Facilities Damage Prevention Act requires persons excavating to contact the one call system (J.U.L.I.E 800-892-0123 or 811) before digging.

Page 30: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

BDE SPECIAL PROVISIONSFor the January 18, 2019 and March 8, 2019 Lettings

The following special provisions indicated by a “check mark” are applicable to this contract and will be included by the Project Coordination and Implementation Section of the BD&E. An * indicates a new or revised special provision for the letting.

File Name # Special Provision Title Effective Revised80099 1 Accessible Pedestrian Signals (APS) April 1, 2003 Jan. 1, 201480274 2 Aggregate Subgrade Improvement April 1, 2012 April 1, 201680192 3 Automated Flagger Assistance Device Jan. 1, 200880173 4 Bituminous Materials Cost Adjustments Nov. 2, 2006 Aug. 1, 201780241 5 Bridge Demolition Debris July 1, 20095026I 6 Building Removal-Case I (Non-Friable and Friable Asbestos) Sept. 1, 1990 April 1, 20105048I 7 Building Removal-Case II (Non-Friable Asbestos) Sept. 1, 1990 April 1, 20105049I 8 Building Removal-Case III (Friable Asbestos) Sept. 1, 1990 April 1, 20105053I 9 Building Removal-Case IV (No Asbestos) Sept. 1, 1990 April 1, 2010

* 80404 10 Coarse Aggregate Quality for Micro-Surfacing and Cape Seals Jan. 1, 201980384 11 Compensable Delay Costs June 2, 201780198 12 Completion Date (via calendar days) April 1, 200880199 13 Completion Date (via calendar days) Plus Working Days April 1, 200880293 14 Concrete Box Culverts with Skews > 30 Degrees and April 1, 2012 July 1, 2016

80311 15 Concrete End Sections for Pipe Culverts Jan. 1, 2013 April 1, 201680277 16 Concrete Mix Design – Department Provided Jan. 1, 2012 April 1, 201680261 17 Construction Air Quality – Diesel Retrofit June 1, 2010 Nov. 1, 201480387 18 Contrast Preformed Plastic Pavement Marking Nov. 1, 201780029 19 Disadvantaged Business Enterprise Participation Sept. 1, 2000 April 2, 201880402 20 Disposal Fees Nov. 1, 201880378 21 Dowel Bar Inserter Jan. 1, 2017 Jan. 1, 2018

* 80405 22 Elastomeric Bearings Jan. 1, 201980388 23 Equipment Parking and Storage Nov. 1, 201780229 24 Fuel Cost Adjustment April 1, 2009 Aug. 1, 201780304 25 Grooving for Recessed Pavement Markings Nov. 1, 2012 Nov. 1, 201780246 26 Hot-Mix Asphalt – Density Testing of Longitudinal Joints Jan. 1, 2010 Aug. 1, 2018

* 80406 27 Hot-Mix Asphalt – Mixture Design Verification and Production Jan. 1, 2019(Modified for I-FIT Projects)

* 80398 28 Hot-Mix Asphalt – Longitudinal Joint Sealant Aug. 1, 2018 Jan. 1, 201980399 29 Hot-Mix Asphalt – Oscillatory Roller Aug. 1, 2018 Nov. 1, 201880347 30 Hot-Mix Asphalt – Pay for Performance Using Percent Nov. 1, 2014 Aug. 1, 2018

Within Limits – Jobsite Sampling* 80383 31 Hot-Mix Asphalt – Quality Control for Performance April 1, 2017 Jan. 1, 2019

80376 32 Hot-Mix Asphalt – Tack Coat Nov. 1, 201680392 33 Lights on Barricades Jan. 1, 201880336 34 Longitudinal Joint and Crack Patching April 1, 2014 April 1, 2016

* 80393 35 Manholes, Valve Vaults, and Flat Slab Tops Jan. 1, 2018 Jan. 1, 201980400 36 Mast Arm Assembly and Pole Aug. 1, 201880045 37 Material Transfer Device June 15, 1999 Aug. 1, 201480394 38 Metal Flared End Section for Pipe Culverts Jan. 1, 2018 April 1, 201880165 39 Moisture Cured Urethane Paint System Nov. 1, 2006 Jan. 1, 201080349 40 Pavement Marking Blackout Tape Nov. 1, 2014 April 1, 201680371 41 Pavement Marking Removal July 1, 201680390 42 Payments to Subcontractors Nov. 2, 201780389 43 Portland Cement Concrete Nov. 1, 201780359 44 Portland Cement Concrete Bridge Deck Curing April 1, 2015 Nov. 1, 201780401 45 Portland Cement Concrete Pavement Connector for Aug. 1, 2018

Bridge Approach Slab

Page 31: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

80300 46 Preformed Plastic Pavement Marking Type D - Inlaid April 1, 2012 April 1, 201680328 47 Progress Payments Nov. 2, 20133426I 48 Railroad Protective Liability Insurance Dec. 1, 1986 Jan. 1, 200680157 49 Railroad Protective Liability Insurance (5 and 10) Jan. 1, 2006

* 80306 50 Reclaimed Asphalt Pavement (RAP) and Reclaimed Nov. 1, 2012 Jan. 1, 2019 Asphalt Shingles (RAS)

* 80407 51 Removal and Disposal of Regulated Substances Jan. 1, 201980395 52 Sloped Metal End Section for Pipe Culverts Jan. 1, 201880340 53 Speed Display Trailer April 2, 2014 Jan. 1, 201780127 54 Steel Cost Adjustment April 2, 2004 Aug. 1, 2017

* 80408 55 Steel Plate Beam Guardrail Manufacturing Jan. 1, 201980397 56 Subcontractor and DBE Payment Reporting April 2, 201880391 57 Subcontractor Mobilization Payments Nov. 2, 201780317 58 Surface Testing of Hot-Mix Asphalt Overlays Jan. 1, 2013 April 1, 201680298 59 Temporary Pavement Marking April 1, 2012 April 1, 201720338 60 Training Special Provisions Oct. 15, 197580403 61 Traffic Barrier Terminal, Type 1 Special Nov. 1, 2018

* 80409 62 Traffic Control Devices - Cones Jan. 1, 2019* 80410 63 Traffic Spotters Jan. 1, 2019

80318 64 Traversable Pipe Grate for Concrete End Sections Jan. 1, 2013 Jan. 1, 2018 80288 65 Warm Mix Asphalt Jan. 1, 2012 April 1, 2016

80302 66 Weekly DBE Trucking Reports June 2, 2012 April 2, 201580071 67 Working Days Jan. 1, 2002

The following special provisions are in the 2019 Supplemental Specifications and Recurring Special Provisions.

File Name Special Provision Title New Location(s) Effective Revised80382 Adjusting Frames and Grates Articles 602.02(s) and (t), 1043.04,

and1043.05April 1, 2017

80366 Butt Joints Article 406.08(c) July 1, 201680386 Calcium Aluminate Cement for Class PP-5

Concrete PatchingArticle 1001.01(e) Nov. 1, 2017

80396 Class A and B Patching Articles 442.06(a)(1) and (2) Jan. 1, 2018 Nov. 1, 201880377 Portable Changeable Message Signs Articles 701.20(h) and 1106.02(i) Nov. 1, 2016 April 1, 201780385 Portland Cement Concrete Sidewalk Article 424.12 Aug. 1, 2017

The following special provisions require additional information from the designer. The additional information needs to be submitted as a separate document. The Project Coordination and Implementation section will then include the information in theapplicable special provision.

Bridge Demolition Debris Building Removal-Case IV Material Transfer DeviceBuilding Removal - Case I Completion Date Railroad Protective Liability InsuranceBuilding Removal – Case II Completion Date Plus Working Days Training Special ProvisionsBuilding Removal - Case III DBE Participation Working Days

Page 32: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be
Page 33: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be
Page 34: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be
Page 35: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be
Page 36: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

PORTLAND CEMENT CONCRETE (BDE) Effective: November 1, 2017 Revise the Air Content % of Class PP Concrete in Table 1 Classes of Concrete and Mix Design Criteria in Article 1020.04 of the Standard Specifications to read:

“TABLE 1. CLASSES OF CONCRETE AND MIX DESIGN CRITERIA

Class

of Conc.

Use

Air

Content %

PP Pavement Patching Bridge Deck Patching (10)

PP-1

4.0 - 8.0” PP-2 PP-3 PP-4 PP-5

Revise Note (4) at the end of Table 1 Classes of Concrete and Mix Design Criteria in Article 1020.04 of the Standard Specifications to read:

“ (4) For all classes of concrete, the maximum slump may be increased to 7 in (175 mm) when a high range water-reducing admixture is used. For Class SC, the maximum slump may be increased to 8 in. (200 mm). For Class PS, the maximum slump may be increased to 8 1/2 in. (215 mm) if the high range water-reducing admixture is the polycarboxylate type.”

80389

Page 37: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

SUBCONTRACTOR MOBILIZATION PAYMENTS (BDE) Effective: November 2, 2017 Replace the second paragraph of Article 109.12 of the Standard Specifications with the following:

“ This mobilization payment shall be made at least 14 days prior to the subcontractor starting work. The amount paid shall be at the following percentage of the amount of the subcontract reported on form BC 260A submitted for the approval of the subcontractor’s work.

Value of Subcontract Reported on Form BC 260A Mobilization Percentage

Less than $10,000 25% $10,000 to less than $20,000 20% $20,000 to less than $40,000 18% $40,000 to less than $60,000 16% $60,000 to less than $80,000 14%

$80,000 to less than $100,000 12% $100,000 to less than $250,000 10% $250,000 to less than $500,000 9%

$500,000 to $750,000 8% Over $750,000 7%”

80391

Page 38: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

METAL FLARED END SECTION FOR PIPE CULVERTS (BDE) Effective: January 1, 2018 Revised: April 1, 2018 Revise the first sentence of Article 542.07(c) of the Standard Specifications to read:

“ (c) Metal Flared End Sections. Metal flared end sections shall be fabricated of aluminum or steel, and all component parts shall be of the same material.”

Revise the eighth and ninth paragraph of Article 542.11 of the Standard Specifications to read:

“ When specified on the plans, steel end sections and aluminum end sections will be paid for at the contract unit price per each for STEEL FLARED END SECTIONS and ALUMINUM FLARED END SECTIONS, respectively, of the diameter or equivalent round size specified.

End sections for polyvinylchloride (PVC) and polyethylene (PE) culvert pipes will be paid for

at the contract unit price per each for METAL FLARED END SECTIONS, of the diameter or equivalent round size specified.” 80394

Page 39: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

Check Sheet For Recurring Special Provisions

Page 1 of 2 BLR 11300 (Rev. 10/26/18)Printed 11/26/18

The Following Recurring Special Provisions Indicated By An “X” Are Applicable To This Contract And Are Included By Reference:

Recurring Special Provisions

Check Sheet # Page No.

1 Additional State Requirements for Federal-Aid Construction Contracts 75 2 Subletting of Contracts (Federal-Aid Contracts) 78 3 EEO 79 4 Specific EEO Responsibilities Non Federal-Aid Contracts 89 5 Required Provisions - State Contracts 94 6 Asbestos Bearing Pad Removal 100 7 Asbestos Waterproofing Membrane and Asbestos HMA Surface Removal 101 8 Temporary Stream Crossings and In-Stream Work Pads 102 9 Construction Layout Stakes Except for Bridges 103 10 Construction Layout Stakes 106 11 Use of Geotextile Fabric for Railroad Crossing 109 12 Subsealing of Concrete Pavements 111 13 Hot-Mix Asphalt Surface Correction 115 14 Pavement and Shoulder Resurfacing 117 15 Patching with Hot-Mix Asphalt Overlay Removal 118 16 Polymer Concrete 120 17 PVC Pipeliner 122 18 Bicycle Racks 123 19 Temporary Portable Bridge Traffic Signals 125 20 Work Zone Public Information Signs 127 21 Nighttime Inspection of Roadway Lighting 128 22 English Substitution of Metric Bolts 129 23 Calcium Chloride Accelerator for Portland Cement Concrete 130 24 Quality Control of Concrete Mixtures at the Plant 131 25 Quality Control/Quality Assurance of Concrete Mixtures 139 26 Digital Terrain Modeling for Earthwork Calculations 155 27 Reserved 157 28 Preventive Maintenance - Bituminous Surface Treatment 158 29 Reserved 164 30 Reserved 165 31 Reserved 166 32 Temporary Raised Pavement Markers 167 33 Restoring Bridge Approach Pavements Using High-Density Foam 168 34 Portland Cement Concrete Inlay or Overlay 171 35 Portland Cement Concrete Partial Depth Hot-Mix Asphalt Patching 175

Page 40: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

Printed 11/26/18 BLR 11300 (Rev. 10/26/18)

The Following Local Roads And Streets Recurring Special Provisions Indicated By An “X” Are Applicable To This Contract And Are Included By Reference:

Local Roads And Streets Recurring Special Provisions

Check Sheet # Page No.

LRS 1 Reserved 179 LRS 2 Furnished Excavation 180 LRS 3 Work Zone Traffic Control Surveillance 181 LRS 4 Flaggers in Work Zones 182 LRS 5 Contract Claims 183

LRS 6 Bidding Requirements and Conditions for Contract Proposals       184

LRS 7 Bidding Requirements and Conditions for Material Proposals       190 LRS 8 Reserved 196 LRS 9 Bituminous Surface Treatments 197 LRS 10 Reserved 198 LRS 11 Employment Practices 199 LRS 12 Wages of Employees on Public Works       201 LRS 13 Selection of Labor 203 LRS 14 Paving Brick and Concrete Paver Pavements and Sidewalks 204 LRS 15 Partial Payments 207 LRS 16 Protests on Local Lettings       208

LRS 17 Substance Abuse Prevention Program       209 LRS 18 Multigrade Cold Mix Asphalt 210

Page 41: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

LR107-4Page 1 of 1

State of Illinois Department of Transportation

Bureau of Local Roads and Streets

SPECIAL PROVISION FOR

INSURANCE

Effective: February 1, 2007 Revised: August 1, 2007

All references to Sections or Articles in this specification shall be construed to mean specific Section or Article of the Standard Specifications for Road and Bridge Construction, adopted by the Department of Transportation.

The Contractor shall name the following entities as additional insured under the Contractor’s general liability insurance policy in accordance with Article 107.27:

The entities listed above and their officers, employees, and agents shall be indemnified and held harmless in accordance with Article 107.26.

Champaign Park District

Clark Dietz, Inc.

Page 42: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

LR 109 Page 1 of 1

State of Illinois Department of Transportation

Bureau of Local Roads and Streets

SPECIAL PROVISION FOR

EQUIPMENT RENTAL RATES

Effective: January 1, 2012

All references to Sections or Articles in this specification shall be construed to mean a specific Section or Article of the Standard Specifications for Road and Bridge Construction, adopted by the Department of Transportation.

Replace Article 109.04(b)(4) with the following:

"(4) Equipment. For any machinery or special equipment (other than small tools) the use of which has been authorized by the Engineer, the Contractor will be paid according to the latest revision of “SCHEDULE OF AVERAGE ANNUAL EQUIPMENT OWNERSHIP EXPENSE” and latest index factor as issued by the Illinois Department of Transportation. The equipment should be of a type and size reasonably required to complete the extra work.”

Page 43: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

3

3

2

2

1-1-19

(Sheet 1 of 9)

mm

m

XSECT

CSE

CH

CNTY

CMP

CORR

COR

CONT

CONTD

CONST

CONC

CE

C

COMB

CT

CLID

CLSD

CP

CS

CHSLD

CERT

CTS

CL-F

CL-E

CL

C-C

CB

CIP

BLDG

BBOX

BRK

BLVD

BTM

BIT

BIND

BM

BGN

BARR

B

BKPL

B-B

BK

AX

AVE

AGS

AUX

ASPH

APT

AH

AGG

AS

ADJ

AC

A/C

ABV

CUBIC MILLIMETER

CUBIC METER

CROSS SECTION

COURSE

COUNTY HIGHWAY

COUNTY

CORRUGATED METAL PIPE

CORRUGATED

CORNER

CONTINUOUS

CONTINUED

CONSTRUCT

CONCRETE

COMMERCIAL ENTRANCE

COMMERCIAL BUILDING

COMBINATION

COAT OR COURT

CLOSED LID

CLOSED

CLAY PIPE

CITY STREET

CHISELED

CERTIFIED

CENTERS

CENTERLINE TO FACE

CENTERLINE TO EDGE

CENTERLINE OR CLEARANCE

CENTER TO CENTER

CATCH BASIN

CAST IRON PIPE

BUILDING

BUFFALO BOX

BRICK

BOULEVARD

BOTTOM

BITUMINOUS

BINDER

BENCHMARK

BEGIN

BARRICADE

BARN

BACKPLATE

BACK TO BACK

BACK

AXIS OF ROTATION

AVENUE

AUXILIARY GAS VALVE (SERVICE)

AUXILIARY

ASPHALT

APARTMENT

AHEAD

AGGREGATE

AERIAL SURVEYS

ADJUST

ACRE

ACCESS CONTROL

ABOVE

HATCH

HH

GW

GP

GUT

GND

GRVL

GR

GRAN

GV

GM

G

GALV

GAL

FRWAY

F&G

FR

FDN

FB

FL

FH

FE

FP

FAUS

FAS

FAP

FAI

FA

F-F

E

E

EXPWAY

EX

EXC

ENTR

EL

E-E

E-CL

EOP

EB

EA

DCT

DRV

DI

DR

DSFL

DSEL

DBL

DOM

DIST

DIA

DET

DC

D

C&G

CULV

CU YD

HATCHING

HANDHOLE

GUY WIRE

GUY POLE

GUTTER

GROUND

GRAVEL

GRATE

GRANULAR

GAS VALVE

GAS METER

GARAGE

GALVANIZED

GALLON

FREEWAY

FRAME & GRATE

FRAME

FOUNDATION

FOOT BRIDGE

FLOW LINE

FIRE HYDRANT

FIELD ENTRANCE

FENCE POST

FEDERAL AID URBAN SECONDARY

FEDERAL AID SECONDARY

FEDERAL AID PRIMARY

FEDERAL AID INTERSTATE

FEDERAL AID

FACE TO FACE

OFFSET DISTANCE TO VERTICAL CURVE

EXTERNAL DISTANCE OF HORIZONTAL CURVE

EXPRESSWAY

EXISTING

EXCAVATION

ENTRANCE

ELEVATION

EDGE TO EDGE

EDGE TO CENTERLINE

EDGE OF PAVEMENT

EASTBOUND

EACH

DUCT

DRIVEWAY

DRAINAGE INLET OR DROP INLET

DRAINAGE OR DRIVE

DOWNSTREAM FLOWLINE

DOWNSTREAM ELEVATION

DOUBLE

DOMESTIC

DISTRICT

DIAMETER

DETECTOR

DEPRESSED CURVE

DEGREE OF CURVE

CURB & GUTTER

CULVERT

CUBIC YARD

WO

W

WILDFL

WB

WMAIN

WV

WM

VPT

VPI

VPC

VC

VERT

VP

VEH

VLT

VV

VBOX

UTIL

USFL

USEL

USGS

UNDGND

TYP

T-A

TY

TRN

TRVL

TRVS

TSC

TSCB

TS

TR

TWP

TBS

TBR

TBE

TD

TBM

TEMP

TP

TB

TEL

T.R.

T

SMK

SURF

S.E. RUN.

e

STR

ST

STY

SS

SPBGR

STA

SR

SBI

STD

WITHOUT

WITH

WILDFLOWERS

WESTBOUND

WATER MAIN

WATER VALVE

WATER METER

VERTICAL POINT OF TANGENCY

VERTICAL POINT OF INTERSECTION

VERTICAL POINT OF CURVATURE

VERTICAL CURVE

VERTICAL

VENT PIPE

VEHICLE

VAULT

VALVE VAULT

VALVE BOX

UTILITY

UPSTREAM FLOWLINE

UPSTREAM ELEVATION

U.S. GEOLOGICAL SURVEY

UNDERGROUND

TYPICAL

TYPE A

TYPE

TURN

TRAVEL

TRANSVERSE

TRAFFIC SYSTEMS CENTER

TRAFFIC SIGNAL CONTROL BOX

TRAFFIC SIGNAL

TOWNSHIP ROAD

TOWNSHIP

TO BE SAVED

TO BE REMOVED

TO BE EXTENDED

TILE DRAIN

TEMPORARY BENCH MARK

TEMPORARY

TELEPHONE POLE

TELEPHONE BOX

TELEPHONE

TANGENT RUNOUT DISTANCE

TANGENT DISTANCE

SURVEY MARKER

SURFACE

SUPERELEVATION RUNOFF LENGTH

SUPERELEVATION RATE

STRUCTURE

STREET

STORY

STORM SEWER

STEEL PLATE BEAM GUARDRAIL

STATION

STATE ROUTE

STATE BOND ISSUE

STANDARD

PM

PVMT

PVD

PAT

OLID

NW

NE

NB

NC

NOAA

N & W

N & C

N & BC

MFT

MOD

MBH

MIX

mm DIA

mm

M

METH

m

MED

MATL

MH

MB

MACH

L SUM

LNG

LC

L

LF

LGT

LP

LT

LN

LS

km

kg

JT

IR

IP

INV

IDS

INST

INL

IN DIA

IMP

IL

HSE

HORIZ

HWY

HMA

ha

HDUTY

HDW

HD

PAVEMENT MARKING

PAVEMENT

PAVED

PATTERN

OPEN LID

NORTHWEST

NORTHEAST

NORTHBOUND

NORMAL CROWN

ADMINISTRATION

NATIONAL OCEANIC ATMOSPHERIC

NAIL & WASHER

NAIL & CAP

NAIL & BOTTLE CAP

MOTOR FUEL TAX

MODIFIED

MOBILE HOME

MIXTURE

MILLIMETER DIAMETER

MILLIMETER

MID-ORDINATE

METHOD

METER

MEDIAN

MATERIAL

MANHOLE

MAIL BOX

MACHINE

LUMP SUM

LONGITUDINAL

LONG CHORD

LITER OR CURVE LENGTH

LINEAL FEET OR LINEAR FEET

LIGHTING

LIGHT POLE

LEFT

LANE

LANDSCAPING

KILOMETER

KILOGRAM

JOINT

IRON ROD

IRON PIPE

INVERT

INTERSECTION DESIGN STUDY

INSTALLATION

INLET

INCH DIAMETER

IMPROVEMENT

ILLINOIS

HOUSE

HORIZONTAL

HIGHWAY

HOT MIX ASPHALT

HECTARE

HEAVY DUTY

HEADWALL

HEAD

STABILIZED

SQUARE YARD

SQUARE MILLIMETER

SQUARE METER

SQUARE FEET

SPECIAL DITCH

SPECIAL

SOUTHEAST

SOUTHBOUND

SOLID MEDIAN

SODDING

SIGNAL

SIDEWALK OR SOUTHWEST

SHOULDER

SHEET

SHED

SHAPING

SEEDING

SECTION

SANITARY SEWER

SANITARY

ROUTE

ROADWAY

ROAD

RIGHT-OF-WAY

RIGHT

RETAINING

RESURFACING

RESTAURANT

REPLACEMENT

REMOVE CROWN

REMOVAL

REINFORCEMENT

REINFORCED CONCRETE CULVERT PIPE

REFLECTIVE

REFERENCE POINT STAKE

RAILROAD SPIKE

RAILROAD

RADIUS

PROPOSED

PROPERTY LINE

PROPERTY CORNER

PROJECT

PROFILE GRADELINE

PROFILE

PRIVATE ENTRANCE

PRIME

POWER POLE OR PRINCIPAL POINT

PORTLAND CEMENT CONCRETE

POLYETHYLENE

POINT ON TANGENT

POINT OF TANGENCY

POINT OF REVERSE CURVE

CURVE

POINT OF INTERSECTION OF HORIZONTAL

POINT OF CURVATURE

POINT

PEDESTAL

STB

SQ YD

mm

m

SQ FT

SD

SPL

SE

SB

SM

SOD

SIG

SW

SHLD

SH

S

SHAP

SEED

SEC

SANS

SAN

RTE

RDWY

RD

ROW

RT

RET

RESURF

REST

REP

RC

REM

REINF

RCCP

REF

RPS

RRS

RR

R

PR

PL

P.C.

PROJ

PGL

PROF

PE

PRM

PP

PCC

POLYETH

POT

PT

PRC

PI

PC

PNT

PED

STANDARD 000001-07

Illinois Department of Transportation

DATE REVISIONS

January 1,

ENGINEER OF POLICY AND PROCEDURES

APPROVED January 1,

ENGINEER OF DESIGN AND ENVIRONMENT

ISS

UE

D1-1-9

7

PASSED

AND PATTERNS

ABBREVIATIONS

STANDARD SYMBOLS,

1-1-11

and symbols.

Updated abbreviations

Added new symbols.

2019

2019

Page 44: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

ADJ

C

F

R

REC

A

A

A

A

SP

AB

M

REL

PL

T

N

R

E

T N

E

R

N

T

R

E

FL FL

FM

FSP

RSP

D=

CURVE

P.I. STA=

!=

T=

R=

L=

E=

S.E. RUN=

e=

P.T. STA=

P.C. STA=

T.R.=

D=

CURVE

P.I. STA=

!=

T=

R=

L=

E=

S.E. RUN=

e=

P.T. STA=

P.C. STA=

T.R.=

(Sheet 2 of 9)

Structure To Be Adjusted

Structure To Be Cleaned

Structure To Be Filled

Structure To Be Removed

Reconstructed

Structure To Be

To Be Adjusted

Frame and Grate

To Be Adjusted

Frame and Lid

To Be Adjusted

Domestic Service Box

Valve Vault To Be Adjusted

Special Adjustment

Item To Be Abandoned

Item To Be Moved

Item To Be Relocated

and Replacement

Pavement Removal

Baseline

Centerline

Centerline Break Circle

Baseline Symbol

Centerline Symbol

PI Indicator

Point Indicator

Dashed Property Line

Solid Property/Lot Line

Section/Grant Line

County/Township Line

State Line

Iron Pipe Found

Iron Pipe Set

Survey Marker

Property Line Symbol

Riprap

Water Surface Indicator

Culvert End Section

Catch Basin

Swale

Roadway Ditch Flow

Summit

Manhole

Inlet

Headwall

Ditch Check

Flowline

Aggregate Ditch

Paved Ditch

Drainage Boundary Line

Grading & Shaping Ditches

Culvert Line

\\

¡¡

Main Structure To Be Filled

Structure To Be Filled Special

Structure To Be Reconstructed Special

Storm Sewer

Pipe Underdrain

(Half Size)

Same Ownership Symbol

(Half Size)

Northwest Quarter Corner

(Half Size)

Section Corner

(Half Size)

Southeast Quarter Corner

(Half Size)

Horizontal Curve Data

Quarter Section Line

Quarter/Quarter Section Line

Channel or Stream Line

STANDARD 000001-07

ADJUSTMENT ITEMS EX PR ALIGNMENT ITEMS EX PR

BOUNDARIES ITEMS EX PR

DRAINAGE ITEMS EX PR

Illinois Department of Transportation

January 1,

ENGINEER OF POLICY AND PROCEDURES

APPROVED January 1,

ENGINEER OF DESIGN AND ENVIRONMENT

ISS

UE

D1-1-9

7

PASSED

AND PATTERNS

ABBREVIATIONS

STANDARD SYMBOLS,

Overflow

Sheet Flow

Hydrant Outlet

EXHYDRAULICS ITEMS PR

2019

2019

Page 45: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

Intermediate Contour

Index Contour

Approx. Intermediate Line

Approx. Index Line

CONTOUR ITEMS EX PR

T

E

E

FL

(Sheet 3 of 9)

Cleaning & Grading Limits

Dike

Erosion Control Fence

Perimeter Erosion Barrier

Temporary Fence

Ditch Check Temporary

Ditch Check Permanent

Inlet & Pipe Protection

Sediment Basin

Erosion Control Blanket

Revetment Mat

Fabric Formed Concrete

Turf Reinforcement Mat

Mulch Temporary

Mulch Method 1

Mulch Method 2 Stabilized

Mulch Method 3 Hydraulic

Noise Attn./Levee

Fence

Base of Levee

Mailbox

Pay Telephone

Advertising Sign

Contour Mounding Line

Fence

Perennial Plants

Seeding Class 2

Seeding Class 2A

Seeding Class 4

Seeding Class 4 & 5 Combined

Seeding Class 5

Seeding Class 7

Seedlings Type 1

Seedlings Type 2

Sodding

Mowstake w/Sign

Tree Trunk Protection

Evergreen Tree

Shade Tree

Duct

Conduit

Electrical Aerial Cable

Electrical Buried Cable

Controller

Underpass Luminaire

Power Pole

Shrubs

Mowline

Fence Post

Field Line

Multiple Mailboxes

STANDARD 000001-07

CONTROL ITEMS

EROSION & SEDIMENTEX PR

IMPROVEMENT ITEMS

NON-HIGHWAYEX PR

(contd.)

LANDSCAPING ITEMS

EXISTING

EX PR

LANDSCAPING ITEMS EX PRLIGHTING EX PR

Illinois Department of Transportation

January 1,

ENGINEER OF POLICY AND PROCEDURES

APPROVED January 1,

ENGINEER OF DESIGN AND ENVIRONMENT

ISS

UE

D1-1-9

7

PASSED

AND PATTERNS

ABBREVIATIONS

STANDARD SYMBOLS,

*

*

ITS Camera

Wind Turbine

Cellular Tower

Intelligent Transportation Systems

2019

2019

Page 46: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

P P

H

J

H

J

RR

(Sheet 4 of 9)

Pull Point

Handhole

Heavy Duty Handhole

Junction Box

Light Unit Comb.

Electrical Ground

Traffic Flow Arrow

Light Unit-1

Keyed Long. Joint

Keyed Long. Joint w/Tie Bars

Sawed Long. Joint w/Tie Bars

Bituminous Shoulder

Bituminous Taper

Stabilized Driveway

Widening

RR Crossing

Raised Marker Amber 1 Way

Raised Marker Amber 2 Way

Raised Marker Crystal 1 Way

Two Way Turn Left

Shoulder Diag. Pattern

Skip-Dash White

Skip-Dash Yellow

Stop Line

Solid Line

Double Centerline

Dotted Lines

(Half Size)

High Mast Pole

Handicap Symbol

STANDARD 000001-07

(contd.)

LIGHTINGEX PR

PAVEMENT (MISC.) EX PR

PAVEMENT MARKINGS EX PR

Illinois Department of Transportation

January 1,

ENGINEER OF POLICY AND PROCEDURES

APPROVED January 1,

ENGINEER OF DESIGN AND ENVIRONMENT

ISS

UE

D1-1-9

7

PASSED

AND PATTERNS

ABBREVIATIONS

STANDARD SYMBOLS,

2019

2019

Page 47: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

ONLYONLY

ONLY

(Sheet 5 of 9)

Urban Left Turn Arrow

Urban Right Turn Arrow

Urban Left Turn Only

Urban Right Turn Only

Urban Thru Only

Abandoned Railroad

Railroad

Railroad Point

Control Box

Crossing Gate

Flashing Signal

Railroad Cant. Mast Arm

Crossbuck

Removal Tic

Bituminous Removal

Hatch Pattern

Future ROW Corner Monument

ROW Marker

ROW Line

Easement

Temporary Easement

Urban Combination Left

Urban Combination RightTree Removal Single

STANDARD 000001-07

(contd.)

PAVEMENT MARKINGSEX PR

RAILROAD ITEMS EX PR

EX PR

EX PR

Illinois Department of Transportation

January 1,

ENGINEER OF POLICY AND PROCEDURES

APPROVED January 1,

ENGINEER OF DESIGN AND ENVIRONMENT

ISS

UE

D1-1-9

7

PASSED

AND PATTERNS

ABBREVIATIONS

STANDARD SYMBOLS,

2019

2019

REMOVAL ITEMS

RIGHT OF WAY ITEMS

RRPM 40' (12.2 m) o.c.

CL Multilane Div.

RRPM 80' (24.4 m) o.c.

CL Multilane Div.

RRPM 80' (24.4 m) o.c.

CL Multilane Div. Dbl.

CL Multilane Undiv.

Two Way Turn Left Line

RRPM 12.2 m (40') o.c.

CL 2Ln 2Way

RRPM 80' (24.4 m) o.c.

CL 2Ln 2Way

Page 48: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

ONLYONLY

ONLY

Rural Left Turn Arrow

Rural Right Turn Arrow

Rural Left Turn Only

Rural Right Turn Only

Rural Thru Only

Urban U-Turn

Urban Combined U-Turn

Rural Combination Left

Rural Combination Right

Bike Lane Symbol

Bike Lane Text

AND PATTERNS

ABBREVIATIONS

STANDARD SYMBOLS,

STANDARD 000001-07

Illinois Department of Transportation

January 1,

ENGINEER OF POLICY AND PROCEDURES

APPROVED January 1,

ENGINEER OF DESIGN AND ENVIRONMENT

ISS

UE

D1-1-9

7

PASSED

(contd.)

PAVEMENT MARKINGSEX PR

Bike Path Shared

Bike Shared Roadway

2019

2019

(Sheet 6 of 9)

Page 49: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

I

VPIELEVLE

= = = =

VPIELEVLE

= = = =

SINGLE

LANE

AHEAD

ROAD

CONSTRUCTION

AHEAD

ROAD

CLOSED

AHEAD

RIGHT LANE

CLOSED

AHEAD

LEFT LANE

CLOSED

AHEAD

DETOUR

AHEAD

STA. 45+00

9

(Sheet 7 of 9)

Edge of Pavement

and C&G Line

Bit Shoulders, Medians

Aggregate Shoulder

Sidewalks, Driveways

Guardrail

Guardrail Post

Traffic Sign

Corrugated Median

P.I. Indicator

Point Indicator

Earthworks Balance Point

Begin Point

Vert. Curve Data

Cone, Drum or Barricade

Barricade Type II

Barricade Type III

Barricade With Edge Line

Flashing Light Sign

Panels I

Panels II

Direction of Traffic

Ditch Profile Left Side

Ditch Profile Right Side

Roadway Profile Line

Storm Sewer Profile Left Side

Storm Sewer Profile Right Side

(Half Size)

Sign Flag

(Half Size)

Detour Ahead W20-2(O)

(Half Size)

Road Closed Ahead W20-3(O)

(Half Size)

Reverse Left W1-4L

(Half Size)

Reverse Right W1-4R

(Half Size)

Two Way Traffic Sign W6-3

(Half Size)

Transition Right W4-2R

(Half Size)

Transition Left W4-2L

(Half Size)

Road Construction Ahead W20-1-(O)

(Half Size)

Right Lane Closed Ahead W20-5R(O)

(Half Size)

Single Lane Ahead

(Half Size)

Left Lane Closed Ahead W20-5L(O)

Slope Limit Line

Match Line

Typical Cross-Section Line

Access Control Line

Access Control Line & ROW

ROW with Fence

Access Control Line &

Excess ROW Line

(Half Size)

North Arrow with District Office

Cable Barrier

Concrete Barrier

Impact Attenuator

STANDARD 000001-07

(contd.)

RIGHT OF WAY ITEMSEX PR

ITEMS

ROADWAY PLANEX PR

ROADWAY PROFILES EX PR

SIGNING ITEMS EX PR

(contd.)

SIGNING ITEMSEX PR

Illinois Department of Transportation

January 1,

APPROVED January 1,

ENGINEER OF DESIGN AND ENVIRONMENT

ISS

UE

D1-1-9

7

PASSED

AND PATTERNS

ABBREVIATIONS

STANDARD SYMBOLS,

ENGINEER OF POLICY AND PROCEDURES

2019

2019

Page 50: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

G

Y

DW

W

G

Y

DW

W

ROAD CLOSED

TO

THRU TRAFFIC

ROAD

CLOSED

STOPHERE

ONRED

STOPHERE

ONRED

KEEP

RIGHT

KEEP

RIGHT

KEEP

LEFT

KEEP

LEFT

LEFT

TURN

LANE

DETOUR

DETOUR

ONE WAY

ONE WAY

(Sheet 8 of 9)

Cable Number

Left Turn Green

Left Turn Yellow

Signal Backplate

Walk/Don't Walk Letters

Walk/Don't Walk Symbols

Galv. Steel Conduit

Underground Cable

Detector Loop Line

Detector Loop Large

Detector Loop Small

Detector Loop Quadrapole

Bridge Pier

Box Culvert Barrel

Box Culvert Headwall

Bridge

Retaining Wall

Temporary Sheet Piling

(Half Size)

Left Turn Lane R3-I100L

(Half Size)

Keep Left R4-7AL

(Half Size)

Keep Left R4-7BL

(Half Size)

Keep Right R4-7AR

(Half Size)

Keep Right R4-7BR

(Half Size)

Stop Here On Red R10-6-AL

(Half Size)

Stop Here On Red R10-6-AR

(Half Size)

No Left Turn R3-2

(Half Size)

No Right Turn R3-1

(Half Size)

Road Closed R11-2

(Half Size)

Road Closed Thru Traffic R11-2

(Half Size)

Detour M4-10L-(O)

(Half Size)

Detour M4-10R-(O)

(Half Size)

One Way Left R6-1L

(Half Size)

One Way Right R6-1R

(Half Size)

One Way Arrow Lrg. W1-6-(O)

(Half Size)

Two Way Arrow Large W1-7-(O)

Signal Section 8'' (200 mm)

Signal Section 12'' (300 mm)

STANDARD 000001-07

(contd.)

SIGNING ITEMSEX PR STRUCTURES ITEMS EX PR

ITEMS

TRAFFIC SHEETEX PR

ITEMS

TRAFFIC SIGNALEX PR

Illinois Department of Transportation

January 1,

ENGINEER OF POLICY AND PROCEDURES

APPROVED January 1,

ENGINEER OF DESIGN AND ENVIRONMENT

ISS

UE

D1-1-9

7

PASSED

AND PATTERNS

ABBREVIATIONS

STANDARD SYMBOLS,

2019

2019

Page 51: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

"E"

H

J J

H

H

J

H

J

V

C C

V

TS

(Sheet 9 of 9)

Detector Raceway

Aluminum Mast Arm

Steel Mast Arm

Veh. Detector Magnetic

Conduit Splice

Controller

Gulfbox Junction

Wood Pole

Temp. Signal Head

Handhole

Heavy Duty Handhole

Junction Box

Ped. Pushbutton Detector

Ped. Signal Head

Power Pole Service

Priority Veh. Detector

Signal Head

Signal Head w/Backplate

Signal Post

Controller

Double Handhole

Fire Hydrant

Handhole

Heavy Duty Handhole

Junction Box

Light Pole

Manhole

Power Pole

Splice Box Above Ground

Telephone Pole

Traffic Signal

Water Meter Valve Box

Above Ground

Telephone Splice Box

Deciduous Tree

Evergreen Tree

Stump

Stream or Drainage Ditch

Waters Edge

Water Surface Indicator

Water Point

Disappearing Ditch

Marsh

Marsh/Swamp Boundary

Bush or Shrub

Woods & Bush Line

Vegetation Line

Orchard/Nursery Line

GuyWire or Deadman Anchor

Profile Line

Aerial Power Line

Cable TV

Electric Cable

Fiber Optic

Gas Pipe

Oil Pipe

Sanitary Sewer

Telephone Cable

Water Pipe

Double Handhole

Closed Circuit TV

Video Detector System

Pipeline Warning Sign

Power Pole with Light

Sanitary Sewer Cleanout

Traffic Signal Control Box

Water Meter

STANDARD 000001-07

ITEMS (contd.)

TRAFFIC SIGNAL

UTILITY ITEMS

UNDERGROUNDEX PR EX PR ABANDONED

(contd.)

UTILITY ITEMSEX PR

VEGETATION ITEMS EX PR

UTILITIES ITEMS EX PR

ITEMS

WATER FEATUREEX PR

Illinois Department of Transportation

January 1,

ENGINEER OF POLICY AND PROCEDURES

APPROVED January 1,

ENGINEER OF DESIGN AND ENVIRONMENT

ISS

UE

D1-1-9

7

PASSED

AND PATTERNS

ABBREVIATIONS

STANDARD SYMBOLS,

2019

2019

Monitoring Well (Gasoline) MW

Page 52: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

fabric.

Silt fence

metal stake.

Wood post or

metal stake.

Wood post orfabric.

Silt fence

fence with fabric positioned as swown.

adjacent to end-post (stake) of second silt

Place end-post (stake) of first silt fence

and drive both posts (stakes) 18 (450) into ground.

Rotate posts (stakes) together 180° clockwise

(Not applicable for J-hooks)

J-hook

Sheet flow

J-hook

Sheet flow

(60 m)

200'

(typical).

metal stake

Wood post or

fabric.

Continuous fence

top with wire.

adjacently and bind at

Place posts (stakes)

bank.

Top of

pin.

Securing

fabric.

Filter

pin.

Securing

(150)

6 min.

12 (300)

max.

36 (9

14)

of the aggregate shall be 1:4 (V:H).

traffic, the traffic approach slope

clear zone and the road is open to

When the ditch check is within the*

aggregate.

Coarse

ditch.

Bottom of

pin.

Securing

Flow

fabric.

Filter

2*

1 1

1

Riprap

2*

1

fabric.

Filter

pin.

Securing

(300)

12

(300)

12

(300)

12

(300)

12

(300)

12

(150)

6

(1.5 m)

5'

Wood or metal stake

Fence fabric

Sheet flow

(150)

6

(450)

18

(1.2

m)

4'

unless otherwise shown.

All dimensions are in inches (millimeters)

protection.

shall also apply for inlet and pipe

shown for perimeter erosion barriers

The installation details and dimensions

1-1-13

(Sheet 1 of 2)

Wood or metal stake

Fence fabric

Sheet flow

(450)

18

(1.2

m)

4'

(150)

6

(250)

10

trench to secure fabric.

Excavate, backfill and compact

1-1-12

to SECTION A-A.

barrier. Added SLICE METHOD

Omitted hay/straw perimeter

STANDARD 280001-07

STEP 1

STEP 2

ATTACHING TWO SILT FILTER FENCES

SILT FILTER J-HOOK PLACEMENT

J-HOOK

ELEVATION

SECTION B-B

AGGREGATE DITCH CHECK

ELEVATION

SECTION A-A

GENERAL NOTES

PERIMETER EROSION BARRIER

SILT FILTER FENCE AS A

TRENCH METHOD

SLICE METHOD

CONTROL SYSTEMS

TEMPORARY EROSION

B

B

A

A

BASIN ELEVATION.

flowline (¥) on SEDIMENT

Corrected notation for Illinois Department of Transportation

January 1, 2013

ENGINEER OF POLICY AND PROCEDURES

APPROVED January 1, 2013

ENGINEER OF DESIGN AND ENVIRONMENT

ISS

UE

D1-1-9

7

PASSED

DATE REVISIONS

Page 53: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

Flow

or rolled excelsior

Straw or hay bales

Flow

Flow

Spacers

fence

Silt filter

30' (9.0 m)

20' (6.0 m) to

6' (1.8 m)

24 (600) to

min.

12 (3

00)

will improve if put into a series.

The performance of the basin

directed by Engineer.

Outlet type as

Flow

removed anytime the basins become 75% filled.

direction of the flow. Accumulated silt shall be

The long dimension should be parallel with the

(2.4

m)

8'

Flow

Tie down stakes

Flow

Bale ties

hay bales

Straw or

Flow

Flow

fence

Silt filter

open grate

Manhole with

Flow

Spacers

Flow

to excavation

Ground line prior

ditch

Downside

limits

Final excav.

Upside ditch

slope

or finished

Temporary

Final embankment limits

toe ditch

Temporary

toe ditch

Temporary

ditch

Final

(Sheet 2 of 2)

F Ditch

STANDARD 280001-07

INLET AND PIPE PROTECTION

ELEVATION

SEDIMENT BASIN

PLAN

TYPICAL CUT CROSS-SECTION TYPICAL FILL CROSS-SECTION

CUT & FILL SECTIONS

TEMPORARY DITCHES FOR

CONTROL SYSTEMS

TEMPORARY EROSIONIllinois Department of Transportation

January 1, 2013

ENGINEER OF POLICY AND PROCEDURES

APPROVED January 1, 2013

ENGINEER OF DESIGN AND ENVIRONMENT

ISS

UE

D1-1-9

7

PASSED

Page 54: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

13

16

B

A W A

L

length

Pip

e pay

edge

Reinforced

dia.

Pipe

centers, max.

Holes on 12 (300)

H

(50)

2

(150)

6

L

V

Slope H

(V:H).

displacement to units of horizontal displacement

All slope ratios are expressed as units of vertical

(M10) rivets or bolts.83

diameter. The angles shall be attached by

(64x64x6.4) for 78 (1950) thru 84 (2250)41x2

1x2212

for 60 (1500) thru 72 (1800) diameter and

(51x51x6.4)41angles. The angles shall be 2x2x

edges shall be supplemented with stiffener

For 60 (1500) thru 84 (2250) sizes, reinforced

rod

Threaded

lug

Connector

(See Note 1)

24 (600) only

For 12 (300) thru

length

Pip

e pay

rod

Threaded

holder

Rod

(See Note 1)

36 (900) only

For 30 (750) and

length

Pip

e pay

and nut.

x6 (M12x150) band bolt21

strap with standard

1 (25) wide, 0.109 (2.77) thick

(For Type 1 only)

(See note 2)

Connector section

(M10) bolts.83with

to end section

Band shop bolted

(See Note 2) (See Note 3)

1.

2.

3.

DIA.

PIPE

NESS

THICK-

DIMENSIONS

A B H L W

(25)(max.)

(25)

±211

(38)

(50)

(V:H)

(Approx.)

SLOPE

BODY

12

(300)

15

(375)

18

(450)

21

(525)

24

(600)

30

(750)

36

(900)

42

(1050)

48

(1200)

54

(1350)

60

(1500)

66

(1650)

72

(1800)

78

(1950)

84

(2250)

0.064

(1.63)

0.064

(1.63)

0.079

(2.01)

0.079

(2.01)

0.079

(2.01)

0.109

(2.77)

0.109

(2.77)

0.079

(2.01)

0.109

(2.77)

0.109

(2.77)

0.109

(2.77)

0.109

(2.77)

0.138

(3.51)

0.168

(4.27)

0.168

(4.27)

6

(150)

7

(180)

8

(205)

9

(230)

10

(255)

12

(305)

14

(355)

16

(405)

18

(455)

18

(455)

18

(455)

18

(455)

18

(455)

18

(455)

18

(455)

6

(150)

8

(205)

10

(255)

12

(305)

13

(330)

16

(405)

19

(480)

22

(560)

27

(685)

30

(760)

33

(840)

36

(915)

39

(990)

42

(1.065 m)

45

(1.145 m)

6

(150)

6

(150)

6

(150)

6

(150)

6

(150)

8

(205)

9

(230)

11

(280)

12

(305)

12

(305)

12

(305)

12

(305)

12

(305)

12

(305)

12

(305)

21

(535)

26

(660)

31

(785)

36

(915)

41

(1.040 m)

51

(1.295 m)

60

(1.525 m)

69

(1.750 m)

78

(1.980 m)

84

(2.135 m)

87

(2.210 m)

87

(2.210 m)

87

(2.210 m)

87

(2.210 m)

87

(2.210 m)

24

(610)

30

(760)

36

(915)

42

(1.065 m)

48

(1.220 m)

60

(1.525 m)

72

(1.830 m)

84

(2.135 m)

90

(2.285 m)

102

(2.590 m)

114

(2.895 m)

120

(3.050 m)

126

(3.200 m)

132

(3.355 m)

138

(3.505 m)

211:2

211:2

211:2

211:2

211:2

211:2

211:2

211:2

411:2

1:2

431:1

211:1

1:1

1:1

411:1

1 Pc.

1 Pc.

1 Pc.

1 Pc.

1 Pc.

1 Pc.

2 Pc.

2 Pc.

2 Pc.

2 Pc.

3 Pc.

3 Pc.

3 Pc.

3 Pc.

3 Pc.

PLAN

END VIEW

SIDE VIEW

END SECTION

NOTES

TYPE 1 TYPE 2 TYPE 3 TYPE 4

ALTERNATE STRAP CONNECTOR

CONNECTIONS OF END SECTIONS

NOTES

STANDARD 542401-03

unless otherwise shown.

All dimensions are in inches (millimeters)

band will be allowed.

metal pipes having helical ends, only the dimple

metal pipes having annular ends. For corrugated

or annular band may be used with corrugated

or annular band of 3x1 (75x25). The dimple, hugger,

(68x13) dimple, hugger,21 x 3

2Coupler shall be 2

Type 4 connection can be used for all pipe sizes.

x 1 (25) depth annular corrugated pipe.

(13) depth or 3 (75) pitch21 (68) pitch x 3

2either 2

metal thickness as the end section. Stub shall be

section by rivets or bolts and shall be the same

connector section shall be attached to the end

and includes 12 (300) of the pipe length. The

Type 3 connection may be used for all pipe sizes

Types 1 and 2 for pipes with annular ends only.

Illinois Department of Transportation

2018

ENGINEER OF POLICY AND PROCEDURES

APPROVED 2018

ENGINEER OF DESIGN AND ENVIRONMENT

ISS

UE

D1-1-9

7

PASSED

DATE REVISIONS

January 1,

January 1,

PIPE CULVERTS

SECTION FOR

METAL FLARED END

4-1-16

in table.

Revised THICKNESS values

1-1-18 Renamed standard.

Page 55: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

11

1

2

1 1 2

Saw at 4 to 24 hours, and seal.

2 (50) deep, and seal.

(3) thick steel template81Form with

construction option:

(Placed in prolongation with pavement joints)

Doweled contraction joint

1.

2.

ramp returns).

side streets and

(Such as entrances,

Short radius curve

joint

Contraction

(when space permits)

placed at mid-depth

2-No. 4 (No. 13) bars

dowel bars

18 (450) long

joint

Construction

box

Curb

with curb box

Drainage casting

Back of curb

pavement

joint on the adjacent

adjusted to align with

This dimension shall be*(typ.)

12 (300

min.

(1.0 m)

* 3'-0''

min.

(1.0 m)

* 3'-0''

(4.5 m)

15'-0"

(4.5 m)

15'-0"

(4.5 m)

15'-0"

(300)

12

(75)

3

pavement

Edge of

with (or without) dowels

Pavement expansion joint

min.

(300)

* 12

A A A

A A

with 2 (50) min. cl.

2-No. 4 (No. 13) bars

(when space permits)

placed at mid-depth

2-No. 4 (No. 13) barswithout curb box

Drainage casting

Back of curb

(typ.)

12 (300)

min.

(1.0 m)

*3'-0''

min.

(1.0 m)

*3'-0''

mid-depth).

bar (placed at

18 (450) long dowel

cap

Expansion

joint filler.

preformed expansion

1 (25) - thick (min.)

Full depth & width

min.

1 (25)

curb type.

as required for

Gutter flag width

(175)

7

Slope 6%

Pavement

t

(40)

21

1

Tie bar

Pavement

CB

A

Tie bar

RSlope 6%

t

Dcurb type.

as required for

Gutter flag width

Slope 5% max.

Pavement

Tie bar

t

(13)

21

(175)

7

Pavement

A

B C

R

Tie bar

Slope 6% D

t

HMA surfacing

course

PCC base Tie bar

(other types permitted)

Mountable curb shown

course 8 (200)

10 (250) when PCC base

course 8 (200)

9 (225) when PCC base

min.

3 (7

5)

(6)

41

Slope 6%

A

Pavement

BC

R

Tie bar

R D

t

Slope 2%

BARRIER CURB

TABLE OF DIMENSIONS

TYPE

(B-15.3)

B-6.12

(B-15.45)

B-6.18

(B-15.60)

B-6.24

(B-22.30)

B-9.12

(B-22.45)

B-9.18

(B-22.60)

B-9.24

A

(300)

12

(450)

18

(600)

24

(300)

12

(450)

18

(600)

24

B

(25)

1

(25)

1

(25)

1

(50)

2

(50)

2

(50)

2

C

(150)

6

(150)

6

(150)

6

(125)

5

(125)

5

(125)

5

D

(150)

6

(150)

6

(150)

6

(225)

9

(225)

9

(225)

9

R

(25)

1

(25)

1

(25)

1

(25)

1

(25)

1

(25)

1

MOUNTABLE CURB

TABLE OF DIMENSIONS

TYPE

(M-5.15)

M-2.06

(M-5.30)

M-2.12

(M-10.15)

M-4.06

(M-10.30)

M-4.12

(M-10.45)

M-4.18

(M-10.60)

M-4.24

(M-15.15)

M-6.06

(M-15.30)

M-6.12

(M-15.45)

M-6.18

(M-15.60)

M-6.24

A

(150)

6

(300)

12

(150)

6

(300)

12

(450)

18

(600)

24

(150)

6

(300)

12

(450)

18

(600)

24

B

(50)

2

(50)

2

(100)

4

(100)

4

(100)

4

(100)

4

(150)

6

(150)

6

(150)

6

(150)

6

C

(100)

4

(100)

4

(75)

3

(75)

3

(75)

3

(75)

3

(50)

2

(50)

2

(50)

2

(50)

2

D

(50)

2

(50)

2

(100)

4

(100)

4

(100)

4

(100)

4

(150)

6

(150)

6

(150)

6

(150)

6

R R

(75)

3

(75)

3

(75)

3

(75)

3

(75)

3

(75)

3

(50)

2

(50)

2

(50)

2

(50)

2

(50)

2

(50)

2

NA

NA

NA

NA

NA

NA

NA

NA

(Sheet 1 of 2)

(150)

6

(25)

1

(150)

6

(150)

6

(25)

1

(B-15.15)

B-6.06

For corner islands only.

STANDARD 606001-07

A

*

*

CONCRETE CURB AND GUTTER

AND COMBINATION

CONCRETE CURB TYPE B

¡

¡

¡

¡

¡

GENERAL NOTES

TO THE DISABLED

TO CURB RAMP ACCESSIBLE

DEPRESSED CURB ADJACENT

DEPRESSED CURB (TYPICAL)

WITH HMA SURFACING

ADJACENT TO PCC BASE COURSE

M-2.06 (M-5.15) and M-2.12 (M-5.30)

EXPANSION JOINT

DETAIL

MOUNTABLE CURBBARRIER CURB

ADJACENT TO PCC PAVEMENT OR PCC BASE COURSE

PLAN

Illinois Department of Transportation

January 1, 2018

ENGINEER OF POLICY AND PROCEDURES

APPROVED January 1, 2018

ENGINEER OF DESIGN AND ENVIRONMENT

ISS

UE

D1-1-9

7

PASSED

DATE REVISIONS

1-1-15

(corner islands only).

curb and gutter to table

Added B-6.06 (B-15.15) barrier

1-1-18

bar spacing to 36 (900) cts.

Revised General Note for tie

unless otherwise shown.

All dimensions are in inches (millimeters)

islands.

See Standard 606301 for details of corner

only be required for monolithic construction.

The dowel bars shown in contraction joints will

maintained.

the tie bar and the back of the curb shall be

A minimum clearance of 2 (50) between the end of

Standard 420001.

longitudinal construction joint shown on

36 (900) centers in accordance with details for

Longitudinal joint tie bars shall be No. 6 (No. 19) at

t = Thickness of pavement.

is omitted.

the same slope as the subbase or 6% when subbase

constructed adjacent to pcc pavement shall be

The bottom slope of combination curb and gutter

Page 56: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

1

1

(Sheet 2 of 2)

Short radius curve

A

A A A

(when space permits)

placed at mid-depth

2-No. 4 (No. 13) bars

Back of curb

with curb box

Drainage casting

pavement

Edge of

(typ.)

12 (300)

Construction joint

full depth and width.

(20) thick preformed joint filler43Insert

Saw 2 (50) deep at 4 to 24 hours, and seal.

2 (50) deep, and seal.

(3) thick steel template81Form with

construction options:

Undoweled contraction joint (typ.)

1.

2.

3.

PT

PC

max. cts. (typ.)

at 25'-0'' (7.6 m)

Contraction joints

with 2 (50) min. cl.

2-No. 4 (No. 13) bars

(when space permits)

placed at mid-depth

2-No. 4 (No. 13) bars

(1.5 m)

5'-0"

(1.5 m)

5'-0"

without curb box

Drainage casting

Back of curb

(typ.)

12 (300)

pavement

Edge of

A A

(1.5 m)

5'-0"

(1.5 m)

5'-0"

(other types permitted)

Mountable curb shown

HMA surfacing

Base course

(6)

41

t

min.

9 (2

25)

min.

9 (2

25)

(6)

41

t

Base course

HMA surfacing

Pavement (40)

21

1(175)

7

(340)

21

13

Pavement

B C

R

D

(450)

18

Pavement

Tie bar

(40)

21

1

t

(175)

7

Pavement

R

Tie bar

BC

D

t

A

STANDARD 606001-07

CONCRETE CURB AND GUTTER

AND COMBINATION

CONCRETE CURB TYPE B

¡¡

DEPRESSED CURB BARRIER CURB

ADJACENT TO FLEXIBLE PAVEMENT

DEPRESSED CURB BARRIER CURB

ADJACENT TO PCC PAVEMENT OR PCC BASE COURSE

CONCRETE CURB TYPE B

ADJACENT TO FLEXIBLE PAVEMENT

ON UNDISTURBED SUBGRADEON DISTURBED SUBGRADE

PLAN

Illinois Department of Transportation

January 1, 2018

ENGINEER OF POLICY AND PROCEDURES

APPROVED January 1, 2018

ENGINEER OF DESIGN AND ENVIRONMENT

ISS

UE

D1-1-9

7

PASSED

Page 57: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

ROAD

AHEAD

CONSTRUCTION

ROAD

AHEAD

WORK

ROAD

AHEAD

CONSTRUCTION

ROAD

AHEAD

WORK

SIDEWALK

CLOSED

USE OTHER

SIDE

SIDEWALK

CLOSEDSIDEWALK

CLOSED

USE OTHER

SIDE

projects

construction

contract

W20-I103(0)-48 for

projects

and utility

maintenance

W20-1(0)-48 for

Or

Or

projects

construction

contract

W20-I103(0)-48 for

projects

and utility

maintenance

W20-1(0)-48 for

R11-I101-2418

road work traffic control.

Omit whenever duplicated by

4-1-16

10' (3 m) Spacing

25' (8 m) Spacing

Work area

permanent support

Sign on portable or

Barricade or drum

barricade

Cone, drum or

Type lll barricade

(Sheet 1 of 2)

1

1

1

1

R11-I102-2430 R11-I102-2430

1

unless otherwise shown.

All dimensions are in inches (millimeters)

detail on Standard 701901.

positioned as shown in "ROAD CLOSED TO ALL TRAFFIC"

Type lll barricades and R11-2-4830 signs shall be

ends of the actual closures.

The SIDEWALK CLOSED signs shall be used at the

the corners across the street from the closure.

occurs at a corner, the signs shall be erected on

to each end of the closure. Where the closure

placed at the nearest crosswalk or intersection

The SIDEWALK CLOSED / USE OTHER SIDE sign shall be

whenever possible.

provided on the same side of the closed facilities

The temporary pedestrian facilities shall be

accessible.

Temporary facilities shall be detectable and

roadway traffic is affected.

other Traffic Control & Protection Standards when

This Standard must be used in conjunction with

performed.

traffic must be rerouted due to work being

This Standard is used where, at any time, pedestrian

(1.2

m)

4'

min.

typical

Parking space,

channelizing barricade

Detectable pedestrian

1-1-12

plan views. Renamed Std.

Modified appearance of

Added SIDEWALK DIVERSION.

covered in the std. spec.

from standard as this is

Omitted orange safety fence

STANDARD 701801-06

CROSSWALK CLOSURE

SIDEWALK, CORNER OR

SIDEWALK DIVERSION

SIDEWALK CLOSURE

GENERAL NOTES

SYMBOLS

Illinois Department of Transportation

2016

APPROVED 2016

ENGINEER OF DESIGN AND ENVIRONMENT

ISS

UE

D1-1-9

7

PASSED

ENGINEER OF SAFETY ENGINEERING

April 1,

April 1,

DATE REVISIONS

Page 58: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

ROAD

AHEAD

CONSTRUCTION

ROAD

AHEAD

WORK

SIDEWALK

CLOSED

USE OTHER

SIDE

SIDEWALK

CLOSED

SIDEWALK

CLOSED

SIDEWALK

CLOSED

USE OTHER

SIDE

SIDEWALK

CLOSED

USE OTHER

SIDE

ROAD

AHEAD

CONSTRUCTION

ROAD

AHEAD

WORK

SIDEWALK

CLOSED

USE OTHER

SIDE

SIDEWALK

CLOSED

USE OTHER

SIDE

ROAD

CLOSED

AHEAD

Or

projects

construction

contract

W20-I103(0)-48 for

projects

and utility

maintenance

W20-1(0)-48 for

Or

projects

construction

contract

W20-I103(0)-48 for

projects

and utility

maintenance

W20-1(0)-48 for

R11-I101-2418

R11-I101-2418

Spacing

10' (3 m)

R3-1-2424

(Sheet 2 of 2)

1

1

R11-I102-2430

R11-I102-2430

R11-I102-2430

1

1

1

R3-2-2424

R20-3(O)-48

1

1

R11-I102-2430

R11-I102-2430

STANDARD 701801-06

CROSSWALK CLOSURE

SIDEWALK, CORNER ORIllinois Department of Transportation

2016

APPROVED 2016

ENGINEER OF DESIGN AND ENVIRONMENT

ISS

UE

D1-1-9

7

PASSED

ENGINEER OF SAFETY ENGINEERING

April 1,

April 1,

CORNER CLOSURE

CROSSWALK CLOSURE

Page 59: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

*

*

* *

*

*

** *

(450-9

00)

18-3

6

(700)

28

min.

4' (1.2

m)

min.

24 (6

00)

(900)

36

min.

18 (450)

min.

5' (1.5

m)

min.

4' (1.2 m)

(600)

24

(900)

36

(300)

12

(200)

8 (900)

36

(Sheet 1 of 3)

min.

4' (1.2 m)min.

36 (9

00)

(100)

4

min.

36 (9

00)

min.

24 (600)

min.

36 (9

00)

min.

24 (600)

(100)

4

Orange

(100)

4

(700 -

900)

28 -

36

Posted speed < 45 mph

STANDARD 701901-08

TUBULAR MARKER VERTICAL PANEL

TYPE I BARRICADE TYPE II BARRICADE TYPE III BARRICADE

BARRICADE

DIRECTION INDICATOR

DRUM

VERTICAL BARRICADE

CHANNELIZING BARRICADE

DETECTABLE PEDESTRIAN

GENERAL NOTES

DATE REVISIONS

orange to white background.

SPEED LIMIT sign from

Revised END WORK ZONE1-1-18

1-1-19

(700 -

900)

28 -

36

CONES

Any posted speed

DAYTIME USE

Any posted speed Any posted speed

>36 (9

00)

DAY OR NIGHTTIME USE

(100-150)

4-6

(100-150)

4-6

added cones >36" (900 m) height.

Revised cone usage and

DEVICES

TRAFFIC CONTROL

(200-3

00)

8-1

2m

ax.

2 (5

0)

(150)

6 (150)

6

Warning lights (if required)

unless otherwise shown.

All dimensions are in inches (millimeters)

pavement surface.

All heights shown shall be measured above the

(200-3

00)

8-1

2

(100)

4(1

00)

4(1

00)

4 (100)

4

(200-3

00)

8-1

2 (200-3

00)

8-1

2

(150)

6(150)

6

(300)

12

(150)

6

(150)

6

(100)

4 (100)

4

(50)

2

(150)

6

(75 -

100)

3 -

4

min.

3 (75)

(100)

4

(100)

4

(200-300)

8-12

4-6 (100-150)

4-6 (100-150)

POST MOUNTED

Orange Orange Orange

Illinois Department of Transportation

January 1, 2019

APPROVED January 1, 2019

ENGINEER OF DESIGN AND ENVIRONMENT

ISS

UE

D1-1-1

3

ENGINEER OF SAFETY PROG. AND ENGINEERING

APPROVED

Page 60: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

"'-

MAX WIDTH

XX XXX MILES

AHEAD

NEXT X MILES

CONSTRUCTION

ROAD

CONSTRUCTION

END

(IF SPECIFIED)

SIGN

STOP SLOWEND

WORK ZONE

SPEED LIMIT

MINIMUM

$XXX FINE

LIMIT

SPEED

XX

ZONE

WORK

ENFORCED

PHOTO

(1.8 m - 3.6 m)

6' - 12'

FRONT SIDE REVERSE SIDE

(100)

4

(125)

5

(600)

24

(125)

5

(175)

7

(400)

16

(175)

7

(125)

5

(600)

24

(600 - 3 m)

24 - 10'

min.

8' (2.4

m)

(Sheet 2 of 3)

(1.8

m -

2.1

m)

6' -

7'

R2-1-3648

R2-I106p-3618

G20-I104(0)-6036 G20-I105(0)-6024

W12-I103-4848

XX'-XX" width and X miles are variable.

G20-I103-6036

STANDARD 701901-08

POST MOUNTED SIGNS

SIGNS ON TEMPORARY SUPPORTS

HIGH LEVEL WARNING DEVICE

WIDTH RESTRICTION SIGN

FLAGGER TRAFFIC CONTROL SIGN

SPEED ZONE SIGNSHIGHWAY CONSTRUCTION

WORK LIMIT SIGNING

DEVICES

TRAFFIC CONTROL

Edge of

pave

ment

**

(if required)

Warning light

wood post

Metal or

6' (1.8 m) urban

4' (1.2 m) rural

embedment

5' (1.5 m) min.

of pavement

Elevation of edge

7' (2.1 m) min. urban

5' (1.5 m) min. rural

edge of the paved shoulder.

face of curb or 6' (1.8 m) to the outside

this dimension shall be 24 (600) to the

When curb or paved shoulder are present**

of curb

or face

pavement

Edge of

of pavement

Elevation of edge

completely above the devices.

shall be sufficient to be seen

behind other devices, the height

be 5' (1.5 m) min. If located

four days, this dimension shall

When work operations exceed***

min.

***

12 (3

00)

Orange flags

18x18 (450x450)

lane highways.

Dual sign displays shall be utilized on multi-

within 2 miles (3200 m).

the end of the job unless another job is

END CONSTRUCTION sign shall be erected at

ject limits.

be placed 500' (150 m) in advance of pro-

ROAD CONSTRUCTION NEXT X MILES sign shall

2 miles (3200 m) or more in length.

This signing is required for all projects

W21-Ill5(0)-3618

R10-I108p-3618 ****

or as allowed by District Operations.

Sign assembly as shown on Standards

above sign assembly is used.

This sign shall be used when the

under the juristiction of the State.

R10-I108p shall only be used along roadways****

8 (200) Federal series C

(15)32

19

(513)

20 21

7 (180) Federal series B

R.

1 (4

0)

21

(9

0)

32

1

Illinois Department of Transportation

January 1, 2019

APPROVED January 1, 2019

ENGINEER OF DESIGN AND ENVIRONMENT

ISS

UE

D1-1-1

3

ENGINEER OF SAFETY PROG. AND ENGINEERING

APPROVED

Page 61: Champaign, IL 61821...CHAMPAIGN PARK DISTRICT . 706 Kenwood Road . Champaign, IL 61821 . INVITATION TO BID: Sealed bids for the Zahnd Park ADA/Mobility Enhancements project will be

ROAD

CLOSED

ROAD CLOSED

TO

THRU TRAFFIC

ROAD CLOSED

TO

THRU TRAFFIC

min.

4' (1.2 m)min.

5' (1.5 m)

min.

(600)

24

min.

6' (1.8

m)

min.

7' (2.1

m)

min.

30 (7

50)

min.

4' (1.2

m)

min.

7' (2.1

m)

min.

8' (2.4 m)

(8 m)

25'

100' (3

0

m)

max.

30' (9.1

m)

min.

(Sheet 3 of 3)

A

A

STANDARD 701901-08

ARROW BOARDS

SECTION A-A

TEMPORARY RUMBLE STRIPS

PLAN

TYPICAL INSTALLATION

TYPE III BARRICADES CLOSING A ROAD

TYPICAL APPLICATIONS OF

24 (600) ±

MOUNTED

TRAILER

TYPE C

MOUNTED

ROOF OR TRAILER

TYPE B

MOUNTED

ROOF

TYPE A

DEVICES

TRAFFIC CONTROL

21

3 (9

0)

±

Weep holes

Traffic

1 (45) ±43

Epoxy channels

stepped or smooth

Face may be

(13)

±

21

21

3 (90) ±

Traffic

(8 m)

25'

(60 m) ±

200

(60 m) ±

200

(8 m)

25'

(8 m)

25'

(60 m) ±

200 warning signs

advance

Construction

(1.5 m)

5'

min.

12 (300)

min.

12 (300)

R11-4

Pavement

flasher

Type A

ROAD CLOSED TO THRU TRAFFIC

directly in front of the barricade.

on NCHRP 350 temporary sign supports

not available, the signs may be mounted

sign panel which meets NCHRP 350 is

Type III barricade with an attached

both sides of the barricades. If a

Reflectorized striping shall appear on

ROAD CLOSED TO ALL TRAFFIC

in front of the barricade.

NCHRP 350 temporary sign support directly

available, the sign may be mounted on an

sign panel which meets NCHRP 350 is not

If a Type III barricade with an attached

on the back side of the barricades.

Reflectorized striping may be omitted

Pavement

shoulder

Edge of

R11-2flasher

Type Amax.

6 (150)max.

6 (150)

max.

6 (150)

Illinois Department of Transportation

January 1, 2019

APPROVED January 1, 2019

ENGINEER OF DESIGN AND ENVIRONMENT

ISS

UE

D1-1-1

3

ENGINEER OF SAFETY PROG. AND ENGINEERING

APPROVED


Recommended