Date post: 03-Jun-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
26
Transcript
Page 1: Changed - Tillamook County, Oregon · ond and the Trans epartment by 68% his means that we e have increased he first year of the ocused our resourc ... unty partnership w ck quarries.
Page 2: Changed - Tillamook County, Oregon · ond and the Trans epartment by 68% his means that we e have increased he first year of the ocused our resourc ... unty partnership w ck quarries.

  

 

Version  Change  Changed by 

Reviewed by  Approved by and date 

V.1  Initial Draft Report through Structures, p. 13  PBS  LW  November 24, 2015 

V.2 Draft Report – edit text, graphics, accomplishments and project detail; incorporate report changes from initial review  

PBS  LW/JS  December 18, 2015 

FINAL  Change Director’s Message and Drainage section to reflect December 2015 storm event; correct footers and spelling 

PBS  LW  December 31, 2015 

 

   

Page 3: Changed - Tillamook County, Oregon · ond and the Trans epartment by 68% his means that we e have increased he first year of the ocused our resourc ... unty partnership w ck quarries.

1   

TBdTw Tfa Wtib WmcpegLr W

1 | P a g e    T i

The Tillamook CouBond and the Transdepartment by 68%This means that wewe have increased

The first year of thefocused our resourcaddition to many sm

We’re implementinthe Federal Highwaincluded the Lommbridges with local f

We are still lackingmode. Culverts anculverts on projectspartners (watershedexample is the fish gaining momentumLoop realignment aresponse to the Cas

We appreciate that

l l a m o o k   C o

unty Road Departmsient Lodging Tax,

%. Local revenues me look at the risks toour expenditures o

e General Obligatioces on high speed, maller paving proje

ng the 10-year bridgay Bridge Program

men Bridge (Nehalefunds.

g staff to have an acd drainage continus where we paved. d councils and resopassage culvert on

m to replace fish bararound a large comscadia Earthquake;

we are a part of th

o u n t y   A s s e

ment appreciates the which dedicates 3

make up 53% of roao the travelling pubn road maintenanc

on Bond was used high volume roadsects across the Cou

ge management strm (HBP), which is fuem River) and the W

ctive ditch cleaninge to be a large risk December 2015 st

ource agencies) to rn Brickyard Road thrriers in the Nestuc

mplex active landslidthe storm damage

is community and

t   M a n a g e m

e community’s sup0% to the Road Dead revenues in 201blic and assign resoe to 49% of our bu

to “hold the systems that serve as emerunty.

rategy developed infunded about 90% fWyss Bridge (Trask

g program and guaras many of our kn

torm events wreakereplace culverts withat replaced a failincca and Tillamook de; the secondary erepairs on Resort D

commit to providin

m e n t   P l a n   2

pport of the passageepartment. Since 205. We continue to

ources to manage thudget.

m together” with smrgency routes and e

n 2014. We have befrom Federal Highwk Slough). In addit

rdrail replacement nown 3,300+ culvered havoc on this alth fish passage strung culvert. We actiBay Watersheds. Wegress out of NeskoDrive; and develop

ng the best service

2 0 1 5  

e of two local fundi009, we have seen make risk-based dehese risks. With the

mall paving patcheseconomic developm

een successful in gways with a 10% lotion, we implemen

program. We contirts are in poor condready fragile drain

uctures on County rively participate in We continue to woowin; the Sister Copment of our two ro

with County resou

  D e

ing measures in 20a reduction of fedeecisions in managine passage of the loc

s all over the Counment routes (Broote

getting projects appocal cash match. B

nted small repairs a

inue to repair ditchdition and need to bnage system. We coroads as opportunitthe Salmon Super

ork on special projeounty partnership wock quarries.

urces.

c e m b e r   2 0

 ReportD

013: the General Oberal forest funds to ng our transportatical funding measur

nty. The second yeaen and Latimer Roa

roved for replacemridges under design

and major rehabilita

hes and guardrails ibe replaced. We repontinue to work witties present themseHighway Project t

ects such as the Capwith Umatilla Coun

0 1 5  

t of the irector

bligation the road on system. res in 2013,

ar (2015) we ads) in

ment under n in FY 2015 ation to 6

in a reactive placed all the th our lves. An that is pe Meares nty for

Page 4: Changed - Tillamook County, Oregon · ond and the Trans epartment by 68% his means that we e have increased he first year of the ocused our resourc ... unty partnership w ck quarries.

2   

Trtsmtmmdrt

TwaTs

2 | P a g e    T i

AssetManag

The Tillamook Coroad system. We transportation nesystem is now vamanages an old rtransportation asmanagement strameans that somedisrepair which rereplacement, eveterm goal.  

The cashflow fromwill impact the avand Transient LodThe Road Departstakeholders and

l l a m o o k   C o

gementStra

ounty Road Deparbecome more knetwork each yearlued at $845 millroad system. Appssets are in poor /ategy is used we e roads and bridgequire major rehen while preventi

m the 10‐year Gevailability of funddging Tax) make ment will continu apply for grants 

o u n t y   A s s e

tegy

rtment managesnowledgeable abr. The overall tranion. Tillamook Coroximately one‐t/ very poor condicall “a mix of fixees have fallen intabilitation or comve maintenance 

eneral Obligation ds over the next 1up 53% of 2015 rue to use risk‐basthat augment re

t   M a n a g e m

the County out our nsportation ounty third of County ition. A risk es.” This to a state of mplete is our long 

bond passed in 210 years for road,road revenues. Fused decision maksources.  

m e n t   P l a n   2

Risk Man*Do preve*Increase*Increase*Increasemaintena*Continue*Slow sys* Identify *Continuecommunit

2013 varies widel, culvert and bridunding remains ining to set prioriti

2 0 1 5  

agement Strateentive pavemen bridge mainten drainage main culvert inventoance programse to do reactive tem deterioratiadditional funde to communicatyly year to year in ge maintenance nsufficient to mees and will seek o

  D e

egy – Mix of Fixnt maintenancenance tenance  ory, levee assess

maintenance wion; stabilize theding through paate critical failur

Asse

compliance withand improvemen

eet road service nopportunities to 

c e m b e r   2 0

xes                       

sment and build

with focus on safe rate of failure artnership & grares with the Boa

et ManagSt

& FinSum

h federal regulationts. Local revenueneeds over the nepartner with key

0 1 5  

                   

ding 

fety                                

ants              ard and 

gement trategy  nancial     mmary 

ons. This es (bond ext 10 years. y 

        

Page 5: Changed - Tillamook County, Oregon · ond and the Trans epartment by 68% his means that we e have increased he first year of the ocused our resourc ... unty partnership w ck quarries.

3   

WTaSrf 

S

3 | P a g e    T i

WhatdidweThe Road Departannual Asset PlanStructures, Drainreplacement valufunding and com

Specific 2015 imp

The Counmiles pavculverts) County rowere pav

The 2014Plan nowbridge mrehabilitareplacem

The Roadreceived Asphalt   Oregon PAward foBrooten RMarch 20

Partnershpartnershgaining m

l l a m o o k   C o

eaccomplishment is committen communicates age, and supportue of the system. munity priorities

provements inclu

nty doubled the ved (while replacon high volume oads. Over 12 mived in 2015.   4 Strategic Bridgew guides County aintenance, ation and ment projects.  d Department the 2015 PavemeAssociation of Pavement Excelleor the Latimer andRoad projects in 015. hips with federal,hip with Umatillamomentum to rep

o u n t y   A s s e

hthisyear?ed to continuousRoad Department (Equipment andVisual inspection.  

ude: 

ing 

les 

ent 

nce d 

, state and region County for respoplace culvert fish 

t   M a n a g e m

sly improve the snt asset managemd Buildings) servicns verify asset pe

nal agencies to leonse to the Cascabarriers in the N

m e n t   P l a n   2

kills, tools and bument strategy andces. Unit costs arerformance. Reso

verage County pradia Earthquake; estucca and Tilla

2 0 1 5  

usiness processesd performance ine updated each yurces are allocate

rojects. This incluand the Salmonmook Bay. 

  D e

s that support Coformation for Royear to determineed to manage hig

udes participatingn Super Highway C

c e m b e r   2 0

ounty road serviceoadway and Traffe the cost of servgh risks given ava

g in the Sister CoCommunity Proje

0 1 5  

es. This ic, vice, and ailable 

unty ect that is 

Page 6: Changed - Tillamook County, Oregon · ond and the Trans epartment by 68% his means that we e have increased he first year of the ocused our resourc ... unty partnership w ck quarries.

4   

4 | P a g e    T i

Specific achie

Focused oRoad and

Three briSalmonbe

Replacedo P

Lo Do O

ro O

Worked wCreek, M

Provide glandslideprovide s

Grading,  Managed Emergen

o So Ro E

“o N

Responde Engineer

o Ro R

Purchase

l l a m o o k   C o

evements include

on paving 12.68 md Brooten Road, Idge replacementerry Bridge. d culverts Provided local revLake Road and BeDesigned and parOn Brooten, and Lehabilitation proOn Kilchis River Rowith partners to dyrtle Creek, Bowgeotechnical analareas (Cape Mea

slope failure desigshoulder work, ad vegetation on 5cy Management Storm response Response to landsEmergency prepa“Filling the Void oNeskowin emergeed to service reqing Department pReviewed and appReviewed Departmed a used paveme

o u n t y   A s s e

e: 

miles on high spedaville, Necarneyts were in design 

venues to match ear Creek culvert tnered on Bear CLatimer Roads in jects oad design culverts foer Creek, and Geysis and alternatares Loop Road cgns (Resort Driveand cattle crossin73 miles of Coun

slides and 911 caredness for manaof Leadership”  ency egress desiguests permit support proved road apprment of Communent roller & two u

t   M a n a g e m

eed, high volume y City Road, Vaugphase: Lommen,

Federal and Statereplacement  Creek culvert replpreparation for r

or fish passage onorge Creek. ives for large actlosed January 20 MP 1.3 and MP g maintenance nty roads 

llouts  aging Cascadia Ea

gn 

roach and utility nity Developmenused  tilt trailers

m e n t   P l a n   2

roads in 2015; thghn, and Magnoli, Wyss and Whale

e Grants for Sand

acements road 

n Mapes 

ive 13), and 2.1)  

arthquake 

permits t permits 

2 0 1 5  

 

his is double the a. en Island bridges

La

  D e

miles paved in 20

s. Guardrail repai

atimer Road Pavi

c e m b e r   2 0

014. This included

rs were made on

ing ‐ Full Depth R

0 1 5  

d Latimer 

n the 

eclamation 

Page 7: Changed - Tillamook County, Oregon · ond and the Trans epartment by 68% his means that we e have increased he first year of the ocused our resourc ... unty partnership w ck quarries.

5   

CLEDE2WSW

 

B

M

G

*W

ThprPr

5 | P a g e    T i

State and Cape Meares LooLommen Bridge Emergency ReliefDrive MP 1.3 (FHWEmergency Relief2.1 (FHWA) Wyss Bridge Sand Lake Road 1Whalen Island Br

OtherBear Creek  

Mapes & Myrtle C

George Creek 

Salmon River Hig

**OWEB, Trout UWatershed Counc

he County continroject funds was arojects in FY 2015

l l a m o o k   C o

Federal Funded op  G

Bf ‐ Resort WA) 

S

f ‐ Resort MP  S

B10.5  Cidge  B

r partners' funds Cw

Creek  CfiCb

hway  R 

Total   Unlimited, Tillamocil, Nestucca/Nes

ues to apply for fadministered by 5. 

o u n t y   A s s e

Projects on CounGeotechnical StudBridge Design lope failure desig

lope failure desig

Bridge design Culvert replacemeBridge replacemeesign 

for County ProjeCulvert replacemewith fish passageCulvert design witish passage Culvert replaced wbridge fish passagReplace culverts f

ook Estuaries Parskowin  Watershe

federal and state ODOT and partne

t   M a n a g e m

nty Roads in 2015dy 

$gn  $

gn  $

$ent nt 

 ects in FY 15* ent  $

th 

with ge 

$

or fish passage 

$1.4rtnership, Tillamoed Council, and U

grants. $1.4 M iners for County 

m e n t   P l a n   2

   

 

  

 

  

5 $56,000495,000116,000

125,000

117,000$35,900$13,000

112,000

$68,000

234,728

4 Millionook Bay USFWS 

2 0 1 5     D e

George Creek Br

George Cre

c e m b e r   2 0

 

ridge Replacemen

eek Culvert ‐ Befo

0 1 5  

nt ‐ After

ore

Page 8: Changed - Tillamook County, Oregon · ond and the Trans epartment by 68% his means that we e have increased he first year of the ocused our resourc ... unty partnership w ck quarries.

6   

 

 

 

 

 

 

 

 

$1,000,0

$2,000,0

$3,000,0

$4,000,0

$5,000,0

$6,000,0

$7,000,0

$8,000,0

6 | P a g e    T i

$0

000

000

000

000

000

000

000

000

2009 201

Local re

Financial

l l a m o o k   C o

TraLod

10 2011 2012

evenues are now

lSummary

o u n t y   A s s e

Surface Transportatio

Program Exchange

5%

Permit Fees1%

ansient ging Tax9%

2013 2014

w 53% of Road 

t   M a n a g e m

on 

Road Depar

*Without Beginnin

2015

Revenues 

Reimb

Feder

State

Local

m e n t   P l a n   2

State Motor Vehicle Fees

27%

G.O. Bond41%

rtment Revenue$7 Million

ng Fund Balance of

VoLofed

ThanFethethePa

bursed work

ral

2 0 1 5  

F

InteW

es FY 2015

f $5.9 Million

oters approved a cal revenues nowderal funding dec

he Road Departmnd partnership wideral Highway Ade U.S. Fish and We Tillamook Bay Wrtnership. 

  D e

Federal Forest Receipts

7%

Refunds & Reimbursement

2%

Grants3%

Miscellaneous3%

er County Work 2%

local bond measw make up over clined 50% in 201

ent also funded $th the Oregon Dedministration, Or

Wildlife Service, WWatershed Coun

c e m b e r   2 0

ts

s

ure and Transien50% of County ro15.  

$1.4 million in prepartment of Traregon WatershedWhole Watershedcil, and the Tillam

0 1 5  

nt Lodging Tax in oad funding whil

ojects through gransportation, andd Enhancement Bd Restoration Initimook Estuaries 

2013. e 

rants d Board, iative, 

Page 9: Changed - Tillamook County, Oregon · ond and the Trans epartment by 68% his means that we e have increased he first year of the ocused our resourc ... unty partnership w ck quarries.

7   

W

7 | P a g e    T i

Whatdoest

Tillam

41

0

10

20

30

40

50

1998

l l a m o o k   C o

theCountyR

R

Structures31%

mook County R$8

1

1999

2000

2001

2002

2003

Employee

o u n t y   A s s e

RoadDepart

oadways & Traffic35%

sDraina33%

Road Networ845 Million

2004

2005

2006

2007

2008

es have declin

t   M a n a g e m

tmentmanag

age%

Building& 

Vehicles &Equipmen

1%

rk Value in 20

2009

2010

2011

2012

2013

2014

ned to 22 

m e n t   P l a n   2

ge? 

 

& nt

015 

22

2014

2015

2 0 1 5  

 

60

773

0

200

400

600

201

Roadw

  D e

CountAssets263 paved miles

65 miles gravel ro101 bridges3,300 culverts

7 levees5,169 signs

392 miles pavememarkings10 miles guardrai

04470

76

375

10 2011

Serv

way & Traffic Subto

c e m b e r   2 0

ty Road ServicServicesVegetatioManagem

oads Traffic SaMaterialsService RmanagemEmergenEngineer(permits projects)

ent  Fleet Ma

ls 15 buildi

321 3664 446 59

2012 2013

vice Requests2010‐2015

otal (incl. Eng.) St

0 1 5  

ces

on ment afetys/Stock PilesRequest ment ncy Responsering Services & capital 

nagement

ngs

21934108

7359

2014 201

s

tructures Draina

48

89

15

age

Page 10: Changed - Tillamook County, Oregon · ond and the Trans epartment by 68% his means that we e have increased he first year of the ocused our resourc ... unty partnership w ck quarries.

8   

GR

P

PG

S

PF

NC

8 | P a g e    T i

Goal/Key PerfoMeasure (K

Goal: Maintain andRoadway and Traf

Pavement condition

Percent of paved roGood or Fair condit

Structures

Percent of bridges Fair Condition (>80

Number of bridges Critical Condition

l l a m o o k   C o

ormance KPI)

repc

d preserve a safe affic

n index 5(

oad miles in tion

in Good or 0 SR) 84%

in Poor or 16

o u n t y   A s s e

Last porting cycle

Currepo

cycnd efficient county

50 PCI 2012)

54 (20

50% 57

% (2014) 84% (

(2014) 16 (2

t   M a n a g e m

rent rting cle

DrafTarge

road network.

PCI 014) TBD

7% 78% (OD

(2015) 78%(ODOT

2015) TBD

m e n t   P l a n   2

ft et Trend

D

P20tope

DOT)

Aim

% T)

Agobre

D

Sa&Gad

2 0 1 5  

Pavement condition 013. However, oveo decline; funds areerformance target.

A majority of Countymprovement since 2

A 2014 Bridge Manaood condition throuridge rehabilitation eplacement occurre

Six bridges are schellows. In Fiscal Yea

& Whalen Island), orGeorge Creek Bridgdequate fish passa

  D e

RoFY 20

Commen

improved with useer the next 5 years, e insufficient to mee

y roads are in Good2012.

agement Program augh cyclic maintena projects and varioed in Fiscal Year 20eduled for replacemar 2015, design for r complete bridge r

ge replaced a culveage.

c e m b e r   2 0

oad Depar15 Perfor

nts

e of local revenues pavement conditioet need or achieve

d or Fair condition (

aims to maintain brance and preservatus designs for bridg015.

ment from 2015-201 bridge replacemenreplacement (Wyss

ert with a design tha

0 1 5  

rtment  mance  

approved in on is expected the

(PCI >50), an

ridges in tion. Six ge

19 as funding nts (Lommen s) occurred. at provided

Page 11: Changed - Tillamook County, Oregon · ond and the Trans epartment by 68% his means that we e have increased he first year of the ocused our resourc ... unty partnership w ck quarries.

9 | P a g e    T i l l a m o o k   C o u n t y   A s s e t   M a n a g e m e n t   P l a n   2 0 1 5     D e c e m b e r   2 0 1 5     

 

Goal/Key Performance Measure (KPI)

Last reporting

cycle

Current reporting

cycle Draft

Target Trend Comments Drainage Percent of Culverts in Poor Condition (est. based on 2012 visual condition assessment of 20% of the inventory)

32% (2012) 32%(2012) 0%

(Drainage Asset Plan,

2012)

Culvert inventory information has not been maintained, however a partial (20%) inventory and condition assessment in 2011-12 indicates that there are more culverts, the replacement cost is significantly greater, and culvert condition is worse than earlier estimates. There is a Low confidence in culvert information.

Number of Culverts Replaced

836 lineal feet (<1%) 595 lineal

feet (<1%)

1,056 culverts, as funding is

found

Drainage on county roads was rated an Extreme risk in 2010 given the wet environment and increasing frequency and severity of weather events. Culverts are replaced as paving projects occur (Kilchis River Road), or funding partnerships allow. Completed culvert replacements with fish passage significance (Bear Creek Culvert on Brickyard Road and George Creek Bridge on Evergreen Road).

Emergency Response 

Service Request Response Staffing Levels

65%

22

66%

22

100%

N/A

All service requests related to emergency, health and safety received a response; Participating in Sister County emergency response partnership for managing Cascadia Earthquake (“Filling the Void of Leadership”).

Vehicles & Equipment

Useful life of vehicles 75% exceed their useful

life

75% exceed their useful

life

50% remaining useful life

The County purchased a used roller and 2 tilt trailers in Fiscal 2015. Thirteen pieces of underutilized equipment will be sold.

Buildings

Buildings in Poor Condition 2 (2012) 2 (2012) 0

The County needs to invest in its buildings. Health and safety code inspections occur quarterly; only critical building maintenance is performed. The Sign Shop was improved and portions of the Central Yard fence were replaced.

Page 12: Changed - Tillamook County, Oregon · ond and the Trans epartment by 68% his means that we e have increased he first year of the ocused our resourc ... unty partnership w ck quarries.

1   

PEcr Orrim SWOCAtr 

10 | P a g e    T i

PavementMEnsure roads are continue to improroads so that we 

Over the next 10 roads and those tresponse (2016). nventory througmarking services 

ServiceLeveWorking with theOnce targets are 

CurrentServAlmost half of ththe road miles proads and those 

l l a m o o k   C o

Managementsafe to travel onove the County rocan do more pre

years, provide smthat provide econInspect all roadsh jurisdictional trand share equipm

elTargete Board of Countyset, reevaluate h

viceLevel   he County’s 201paved in 2015 toe that provide e

 

o u n t y   A s s e

 

 

tStrategy   throughout the oad system’s aveventive maintena

mall patches Counomic value to th every other yearransfer. Improvement when pract

y Commissioners how our pavemen

15 transportatioo over 12 miles.conomic value t

t   M a n a g e m

County. Reduce eerage Pavement Cance. This extend

ntywide to hold the community (20r and respond to pavement workmticable.  

and the Road Adnt management s

on system budge. In 2015, the Roto the commun

m e n t   P l a n   2

Roadwa

expenses by mainCondition Index (ds the road life an

the system toget015), and move inservice requests,manship and pave

dvisory Committestrategy matches

et ($3.3 million)oad Departmenity.  

2 0 1 5  

ys & Traff

Perce

ntaining roads in PCI). This slows dnd reduces the lif

her (2014), focusnto the neighbor, as resources alloement equipmen

ee, set service levup with our serv

) was used to mt focused expen

  D e

fic – Pave

Perent of pavement

Good and Fair codeterioration longfecycle cost of pa

s expenditures onrhoods Countywidow. Where it mant. Partner with o

vel that are approvice level targets.

manage County pnditures on high

c e m b e r   2 0

ement Con

rformanceMt in Fair & Goo

ondition. Long teg term. Rehabilitaaved roads.  

n high speed, highde for safety andkes sense, reducother Counties fo

opriate for our co 

paved roads. Thh speed, high vo

0 1 5  

ndition 

Measure: d condition

rm, ate the 

h volume  emergency e the road r traffic 

ommunity. 

his doubled olume 

Page 13: Changed - Tillamook County, Oregon · ond and the Trans epartment by 68% his means that we e have increased he first year of the ocused our resourc ... unty partnership w ck quarries.

11 | P a g e    T i l l a m o o k   C o u n t y   A s s e t   M a n a g e m e n t   P l a n   2 0 1 5     D e c e m b e r   2 0 1 5     

In 2015 the Road Department focused on high speed, high volume roads and those that provide economic value to the community. The road miles paved in 2015 doubled to over 12 miles, including rebuilding 3.9 miles on Latimer and Brooten roads, and paving over 2 miles on Idaville, Necarney City Road, Vaughn and Magnolia. 

CurrentState  

LocalRevenuesImprovePavementServices

 

 

 

 

 

   

Road miles paved doubled in 2015 Latimer Road (contract) Brooten Road (contract)Miami River Road North Fork Road

Moss Creek Tohl RoadFront Street Sollie SmithFairview VaughnIdaville HobsonvilleBay Ocean Wilson River Loop E‐W & N‐S Kilchis River Road BrickyardHughey Lane MagnoliaElderberry PC Heights BoquistHodgdon Parkway DriveSavage Slab Creek SNecarney City Road

RisksforRoadways&Traffic1 Insufficient funding for resurfacing will allow 

water to enter the pavement resulting in pavement failures and avoidable and expensive reconstruction. 

2 Poor construction standards for many pavements mean that when they fail, reconstruction becomes very expensive.  This problem is compounded by increasing heavy vehicle loads. 

3 A substantial proportion of roads have poor design.  This can have safety impacts  

4 Lack of timely maintenance 5 Wet climate/storm damage reduces asset life, 

increases life cycle costs and diverts planned maintenance and renewal funds to reactive storm damage repairs. 

6 Poor drainage 7 Insufficient construction inspection 8 Increased traffic loads 9 Vegetation impact  RiskResponse1 Rehabilitate roads so that preventive 

maintenance can be performed on roads in Good and Fair condition  

2 Focus on high volume roads  3 Rate condition every other year and respond 

to service requests 4 Reduce the road inventory through 

jurisdictional transfer where possible 5 Improve road drainage 6 Improve workmanship and equipment 7 Partner with other Counties for traffic 

marking services and share equipment if possible. 

0%15%30%45%60%75%90%

2001 2004 2007 2008 2010 2012 2014

Since 2008, pavement  condition has improved

Good/Fair (PCI>50) Poor/Very Poor (PCI<50)

The majority of the 263 miles of County roads are in Good or Fair condition. The average road condition in 2014 improved to 54 or Fair, up from 50 in 2012. Road condition is rated every other year; the next update is in 2016.   Roadways are the County’s most valuable asset with a replacement value of $291M.  

Page 14: Changed - Tillamook County, Oregon · ond and the Trans epartment by 68% his means that we e have increased he first year of the ocused our resourc ... unty partnership w ck quarries.

1   

SAwg

SRriCr

CCtgi

  

1

12 | P a g e    T i

StructuresMA Mix of Fixes. Mwith Sufficiency Rguardrails as a pa

ServiceLeveReplace 20 bridgerehabilitation pronitial investmentConduct annual brepair damage or

CurrentServContinue to meetthe process of repgood condition thdentified and loc

                              

1 Tillamook Countyl l a m o o k   C o

Managementaintain bridges inRating less than 5art of ongoing roa

elTarget (to bes by 2029 (two poject every year (t of $35,000 to adbridge maintenanr missing hardwa

viceLevelt the target of 20placement. Implehrough cyclic maical funding allows

                             

y Strategic Bridge Po u n t y   A s s e

tStrategyn good condition 50%, inspect bridgad projects. 

be reviewed and

per year for 15 ye$250,000). Perfoddress backlog; ance ($25,000) follre on railings.1 

0 bridge replacemement the Bridgeintenance and prs.  

Program Plan, OBECt   M a n a g e m

 

by performing pges every other y

adopted by the C

ears or $610,000 rm cyclic bridge mnd resurface 4 browing initial inve

ments by 2029 by e Maintenance anreservation. Repla

C, May 2014. m e n t   P l a n   2

reservation and cyear, develop an a

County Road Adv

annually), then rmaintenance (joiridges/$48,000 aestment ($49,000

completing six bnd Preservation Pace bridges with 

2 0 1 5  

 Stru

Per

cyclic maintenancannual levee insp

visory Committee

replace 4 bridges nt replacement) nnually following0) to address sign

ridge replacemenProgram developea sufficiency ratin

  D e

ctures ‐ B

Perrcent of bridges

ce; seek funding pection program,

e in FY 2016) 

every 3 years. Peon five bridges/$g initial backlog cnage, clean debris

nts, which are eited in 2014 so thang below 50 perc

c e m b e r   2 0

Bridge Con

rformanceMs in Fair & Goo

partners to repla, and repair and r

erform one majo$25,000 annually catch up of $300,0s, remove drift & 

ther in the designat bridges are macent as funding p

0 1 5  

ndition 

Measure: d condition

ace bridges replace 

r bridge  following 000 . vegetation, 

n phase or in intained in artners are 

Page 15: Changed - Tillamook County, Oregon · ond and the Trans epartment by 68% his means that we e have increased he first year of the ocused our resourc ... unty partnership w ck quarries.

1   

Lomm2015. An intrecon13). WCreek removadded

The Corepair

*BridgCountyand sa

 

 

 

 

 

 

 

B

13 | P a g e    T i

0%20%40%60%80%100%

G

men bridge constrWyss Bridge reptergovernmental struction of Sout

Whalen Island Bridis on hold, the Cve East Beaver Crd to replace a culv

ounty contractedrs on six bridges i

ge currently closed y plans to remove tlvage the material

CurrentStat

BridgesRep

Bridges have a rin Good or Fair c

l l a m o o k   C o

The majorityin Good or 

ood (>80) Fair (

ruction began in Nlacement is almoagreement is nowh Fork Trask Rivedge is in design. Wounty is seeking reek. George Creevert. 

d bridge rehabilitan 2015. 

due to road washothe bridge from th. 

te

pairedandR

eplacement valucondition.  Howev

o u n t y   A s s e

 of County brFair conditio

51‐79) Poor (30

November ost complete.  w in place for er Bridge (MP While Cedar revenues to ek Bridge was 

ation and 

out; the e inventory 

Replaced

e of $261M. The ver, 16% are in P

t   M a n a g e m

ridges were n in 2015

0‐50) Critical (<3

Six Bridge SchLoW

CedS. Fork Tras

HWhaEast

Six BridgJim

BeavTillamook 

RicM

Lom

majority of the 1oor or Very Poor

x  m e n t   P l a n   2

0)

heduled for Replaommen Bridge Wyss Bridge ar Creek Bridgesk River Bridge (Molgate Bridge len Island Bridget Beaver Creek*ges Repaired in 20m Creek Bridge ver Creek BridgeRiver (Burton) Bre Creek Bridge 

Munich Bridge mmen Overpass 

101 County bridge condition. 

2 0 1 5  

 

 

 

acement 

MP 13) 

015 

ridge 

es are 

R1

2

3

4

5

R1

2

34

5

6

78

  D e

Risks1 Four fract

railroad caand Dougbridge (Sovolume roSlough). 

2 Three brid/settleme

3 27% of brmaterials environmand have 

4 Guardrail crash impflooding a

5 Funding ato addres 

RiskResponse1 Implemen

available f2 Replace tw

and Cedar3 Inspect al4 Monitor s

flood even5 Contract r

Creek, TillMinich Cr

6 Seek fundbridges.  

7 Develop a8 Repair gu

insurance

c e m b e r   2 0

ture critical bridgar bridges (Cedarherty Slough) andouth Fork of the Toads (Three River

dges are susceptient following flooidges are timber wear more quickent. These bridgethe lowest Sufficand levee failure

pacts, weather evand embankmentand the number os maintenance an

 

nt Strategic Bridgfunds. wo critical bridger Creek). l bridges every otsusceptible bridgent.  repair of 6 bridgelamook River (Bueek Bridges, and ding partners to r

an annual levee inardrails after crase reimbursement.

0 1 5  

es including threr Creek, Three Rivd one twin‐girdeTrask). Two are ors and Dougherty

ble to scour d events.   and 8% steel. Bokly in maritime es tend to be oldciency Rating. e due to poor desvents leading to t failure. of staff are insuffind repair needs. 

e Program based

es (South Fork Tra

ther year  es & levees follow

es (Jim Creek, Bearton), Rice CreekLommen Overpaeplace high prior

nspection prograshes and try to co. 

e vers, r n low  

oth 

er 

sign, 

icient 

d on 

ask 

wing 

aver k, ass).  rity 

m. ollect 

Page 16: Changed - Tillamook County, Oregon · ond and the Trans epartment by 68% his means that we e have increased he first year of the ocused our resourc ... unty partnership w ck quarries.

1   

    DAp

SD

Mn

 

14 | P a g e    T i

DrainageMaAs paving lists arepassage facilities 

ServiceLeveDrainage manage provide and  protect the r provide fish 

Manage surface snecessary to hand

culvert and c culvert replac ditching  erosion contr

CurrentServ

l l a m o o k   C o

anagementSe developed, inspin all watersheds

elTarget (to bement strategic omaintain adequarights of adjoiningpassage where m

storm water and dle their design c

atch basin cleanicement as fundin

rol using best ma

viceLevel:  O 

o u n t y   A s s e

Strategypect and replace s of the County. R

be reviewed andobjectives are to:ate road drainageg property, and mandated and as 

flooding by maincapacity, and whe

ng ng partners are id

nagement practi

One‐third of the e

t   M a n a g e m

culverts prior to Replace culverts t

adopted by the C

e in order to prev

funding partners

ntaining vegetateere culverts carry

dentified 

ces with regards 

estimated 3,300 c

m e n t   P l a n   2

paving. Continuethat are a high ris

County Road Adv

ent water damag

s are identified. 

d ditches that sey streams, mainta

to steep slopes, 

culverts are in Po

2 0 1 5  

Percen

e to seek funding sk to the safety o

visory Committee

ge to the roadway

rve as drainage faain them in a con

drainage ways an

oor condition and

  D e

Dra

Pernt of culverts in

partners to replaof the community

e in FY 2016) 

y structure, 

facilities, maintaindition to provide

nd permitted act

d 30% of ditches a

c e m b e r   2 0

ainage ‐ C

rformanceMPoor or Critica

ace culverts with y.  

n culverts in the ce fish passage by 

ivities.

are in Poor condi

0 1 5  

ulverts 

Measure: al condition

fish 

condition performing 

tion. 

Page 17: Changed - Tillamook County, Oregon · ond and the Trans epartment by 68% his means that we e have increased he first year of the ocused our resourc ... unty partnership w ck quarries.

1   

CTfcfPbcsdiPco 

 15 | P a g e    T i

CurrentStatThe December 20funding the needcounty roads wasfrequency and sePoor condition. Tbeen maintained condition assessmsignificantly greatditching was perfnventory and conPoor or Very Poocomprehensive donly. 

Confidence in Data

High

Moderate

Low

l l a m o o k   C o

te015 storms wreaked lifecycle costss rated an Extremeverity of weatheThis represents leand culvert condment in 2011‐12 iter, and culvert cformed in FY 2015ndition assessmer condition. The dditching program 

32%

28%

40%

2012 

Good 

o u n t y   A s s e

ked havoc on an s of the 3,300 culvme risk in 2010 givr events. In 2015ss than 1% of thedition is not knowindicates that thecondition is worse5, this does not ment identified thatdecline of TCPW for county roads

Culvert C

t   M a n a g e m

already fragile drverts and 198 miven the wet envir, the County reple inventory. Culvewn. However, a paere are more culve than earlier estmeet the needs ot 93% require somemployees has re. Currently, ditch

26%

16%

Condition

Poo

m e n t   P l a n   2

rainage system. Wles of ditches. Drronment and incrlaced 595 lineal fert inventory infoartial (20%) culveverts, the replaceimates. While 1,2of Tillamook Counme maintenance,esulted in the eliing occurs on a r

58%%

%

2020

r

2 0 1 5  

We are not rainage on reasing eet of culverts inormation has not ert inventory andement cost is 222 hours of nty. A 2008 ditch , and 30% are in mination of a eactive basis 

  D e

n  d 

Risks1 Ou

ass2 Lac3 Ro

de4 Ina

besto

5 Inaveg

6 Chreg

7 Eco8 Fai9 Po10 He11 Ina

crit12 No

RiskRe1 Re2 See

pahigrep

3 Inscu

4 Depro

5 Re& n

6 Pebru

c e m b e r   2 0

utdated inventorysessment ck of mapped culoads inundated byteriorated culverappropriately sizeavers, undersizedormwater and saladequate staffinggetation anging environmgulations ological impactsilure due to ageor construction teavy vehicle loadsadequate fundingtical culvert replao active ditching p

esponseplace culverts prek additional funrtner with other gh priority fish paplacements spect additional plvert inventory inevelop inventory &ogram port to Board onneeds rform vegetationush cutting as fun

0 1 5  

y & condition 

lverts y plugged or rts ed outfalls, d culverts, lt water g to manage 

mental 

techniques s  g to address acement program 

ior to paving ding and agencies on assage culvert 

portion of n FY 2016 & and cleaning 

 program costs 

n mowing and nding allows 

Page 18: Changed - Tillamook County, Oregon · ond and the Trans epartment by 68% his means that we e have increased he first year of the ocused our resourc ... unty partnership w ck quarries.

1   

EPc SI

CII 

16 | P a g e    T i

EmergencyRPrepare for and rcounty emergenc

ServiceLevenvestigate and q

CurrentServnvestigate 100%nspect critical br 

l l a m o o k   C o

ResponseMrespond to weathcy responders.  

elTarget (to buickly respond to

viceLevel   of emergency seridges, culverts an

o u n t y   A s s e

Managementher events and ha

be reviewed ando weather events

ervice requests. Rnd levees before 

t   M a n a g e m

Strategyazards to ensure a

adopted by the Cs and hazards. Eli

Reduce hazards aand after weathe

m e n t   P l a n   2

E

a safe county roa

County Road Advminate critical br

s a high priority.er events.  

2 0 1 5  

EmergencyR

ad network. Work

visory Committeeridges, culverts an

Tilla

  D e

Emerg

ResponsePeS

k in partnership w

e in FY 2016) nd levees before 

Alderbrook amook Headlight

c e m b e r   2 0

gency Res

erformanceMService Request

with federal, stat

and after weath

Road Flooding Herald, Novembe

0 1 5  

sponse 

Measure: ts response.

e and 

er events. 

er 2015

Page 19: Changed - Tillamook County, Oregon · ond and the Trans epartment by 68% his means that we e have increased he first year of the ocused our resourc ... unty partnership w ck quarries.

17 | P a g e    T i l l a m o o k   C o u n t y   A s s e t   M a n a g e m e n t   P l a n   2 0 1 5     D e c e m b e r   2 0 1 5     

CurrentStateThere were fewer weather related emergencies in 2015 however storm response is hard to predict and impacts the budget. Emergency Response expenditures were down significantly in FY 2015.  

$ 0

$ 100,000

$ 200,000

$ 300,000

$ 400,000

$ 500,000

$ 600,000

$ 700,000

$ 800,000

$ 900,000

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2015 Emergency Response costs was signficantly down in 2015

1202 ‐ Debris Removal

1161 ‐ Flood/Wind/Slide

1160 ‐ SnowPlow/Sanding

Risks1 Wet climate/storm damage reduces 

asset life, increases life cycle costs and diverts planned maintenance and renewal funds to reactive storm damage repairs 

2 Insufficient funding for road resurfacing will allow water to enter the pavement resulting in pavement failures and avoidable and expensive reconstruction. 

3 Roads inundated by plugged or deteriorated culverts 

RiskResponse1 Develop and regularly review 

appropriate emergency response capability.  

2 Target key emergency response vehicle (e.g., snow plows) for safety, maintenance and repair. 

3 Respond to storms 4 Respond to landslides and 911 

callouts 5 Participate in statewide emergency 

preparedness initiative for the Cascadia earthquake  “Filling the Void of Leadership”  

6 Design Neskowin emergency egress route 

Page 20: Changed - Tillamook County, Oregon · ond and the Trans epartment by 68% his means that we e have increased he first year of the ocused our resourc ... unty partnership w ck quarries.

1   

BAa

TT

CTO

  

18 | P a g e    T i

BuildingMaAddress the numand equipment) u

TargetServiTo be developed 

CurrentServThere are 15 builOnly critical build

l l a m o o k   C o

anagementSber, quality and lused to deliver co

iceLevelwith the County 

viceLeveldings with 2 (13%ding repairs are p

 

o u n t y   A s s e

Strategylocation of TCPWounty road servic

Road Advisory Co

%) in Poor conditierformed. 

t   M a n a g e m

W buildings that inces. 

ommittee in FY 2

ion based on a 20

m e n t   P l a n   2

nfluence the effic

2016. 

012 inspection. B

2 0 1 5  

BPercent

ient and effective

Buildings are inspe

  D e

BuildingPert of buildings in

e management o

ected quarterly f

c e m b e r   2 0

BuildrformanceMPoor or Critica

of resources (labo

for safety code vi

0 1 5  

ings Measure: al condition

or, materials 

olations. 

Page 21: Changed - Tillamook County, Oregon · ond and the Trans epartment by 68% his means that we e have increased he first year of the ocused our resourc ... unty partnership w ck quarries.

1   

 

CIHi

 

 

 

 

 

 19 | P a g e    T i

CurrentStatmprovements toHowever, a 2012 n Poor condition

l l a m o o k   C o

te o the Sign Shop westimate states t. 

o u n t y   A s s e

were made in 201that by 2022 a m

t   M a n a g e m

5 and a fence repajority of Road D

m e n t   P l a n   2

paired in the CentDepartment build

2 0 1 5  

tral Yard. ings will be 

  D e

Risks1 There is

an invenassessmelemenand bui

2 Building3 Building4 Many b

RiskRespo

1 Improve2 Inspect 

code vio3 Address

identifieespecia

4 Implemexisting

5 Conducfor OSHcomplia

6 Commuadditionoverall needs

c e m b e r   2 0

s no building assentory and conditment of major buits that assure wolding code compgs not to code gs functionally is buildings are in po

onse

e Sign Shop interbuildings quarteolations s critical repair need in the 2012 inlly on Main Offic

ment improvemeng office space in Cct annual buildingHA health and safance unicate the need nal resources to aRoad Departmen

0 1 5  

et plan with ion ilding orker safety liance 

inadequate oor condition 

ior  rly for safety 

eeds spection, e and fence nts to use of Central Office g inspection ety code 

for address nt facility 

Page 22: Changed - Tillamook County, Oregon · ond and the Trans epartment by 68% his means that we e have increased he first year of the ocused our resourc ... unty partnership w ck quarries.

2   

VEe

TV

CNAf

 

20 | P a g e    T i

VehiclesandEnsure availabilitequipment and v

TargetServiVehicles have 50%

CurrentServNearly 75% exceeA preventive maifield work. 

l l a m o o k   C o

dEquipmeny and reliability oehicles to manag

iceLevel(Tar% or greater rem

viceLeveled the County’s antenance. The Pu

 

o u n t y   A s s e

tManagemeof vehicles and eqge fleet at lowest 

rget to be review

aining useful life

adopted useful lifublic Works Depa

t   M a n a g e m

entStrategyquipment for roalifecycle cost as f

ed and adopted b

. Perform preven

fe for vehicles. In artment staffing l

m e n t   P l a n   2

Pe

yd crews by providfunds are availab

by the County Ro

ntive maintenance

Fiscal 2015, onlyevels are inadequ

2 0 1 5  

ercent of vehicle

ding timely maintble.  

oad Advisory Com

e (Level A & B) on

y twenty‐four peruate; the Shop Fo

  D e

 Vehicle

Peres with less than

tenance and repa

mmittee in FY 201

n 100% of the fle

rcent (24%) of theoreman and crew

c e m b e r   2 0

es & Equi

rformanceMn 50% useful life

airs. Replace criti

16) 

eet.  

e County fleet recw are primarily as

0 1 5  

pment 

Measure: e remaining

ical 

ceived Level ssigned to 

Page 23: Changed - Tillamook County, Oregon · ond and the Trans epartment by 68% his means that we e have increased he first year of the ocused our resourc ... unty partnership w ck quarries.

2   

Upw

 

21 | P a g e    T i

Used vehicles andpurchase.  The Coworn out equipm

l l a m o o k   C o

d equipment thatounty purchased ment that requires

Worn o

o u n t y   A s s e

t increase work ea used roller ands high maintenan

out equipment to

t   M a n a g e m

efficiency and effed 2 tilt trailers in Fnce will be sold. 

 be sold 

m e n t   P l a n   2

ectiveness are taFiscal 2015. Thirt

2 0 1 5  

rgeted for een pieces of 

 

  D e

Risks1 24%

LevThetheprisum

2 Neado

3 57%veh

4 Somand

5 Eqinc

6 Eqfor

 

RiskRe1 Co

peveh

2 Re3 Au

hig4 Pro

thaeff

c e m b e r   2 0

% of the County fvel A preventive mere is an inadeque Shop Foreman amarily assigned tmmer. early 75% exceed opted useful life % of all Shop exphicle repair. me vehicle parts d must be made uipment reliabilitcreasing concern.uipment may notr all job requirem

sponsentinue tracking trformance & maihicle. port on need. ction vehicles nogh maintenance cocure used vehiclat increase work fectiveness.   

0 1 5  

fleet received maintenance. uate staffing leveand crew are to field work in th

the County’s for vehicles.  penses are for 

are not availablein house. ty and safety is a. t be appropriate 

ments. 

ime and hours ofintenance cost pe

ot in use or with costs. les and equipmenefficiency and 

l; 

he 

f er 

nt 

Page 24: Changed - Tillamook County, Oregon · ond and the Trans epartment by 68% his means that we e have increased he first year of the ocused our resourc ... unty partnership w ck quarries.

22 | P a g e    T i l l a m o o k   C o u n t y   A s s e t   M a n a g e m e n t   P l a n   2 0 1 5     D e c e m b e r   2 0 1 5     

AppendixA‐ListofFY2015ProjectsonCountyRoads 

List of 2015 Projects on County RoadsProject   Purpose  Performed by Paving (10.639 miles)     

Latimer Road  Full Depth Reclamation‐1.69 miles           Contract Brooten Road  Full Depth Reclamation‐2.21 miles  Contract 

Miami River Road    TCPW Moss Creek    TCPW 

Necarney City Road   One lift  TCPW North Fork Road    TCPW 

Tohl Road    TCPW Front Street    TCPW Sollie Smith     TCPW 

Vaughn    TCPW Idaville    TCPW 

Hobsonville    TCPW BayOcean    TCPW 

Wilson River Loop E‐W & N‐S    TCPW Kilchis River Road    TCPW 

Brickyard    TCPW Hughey Lane    TCPW 

Magnolia    TCPW Elderberry PC Heights    Partnership/LAR 

Boquist  Spring Paving 2.040 miles  TCPW Hodgdon  Spring Paving 2.040 miles  TCPW 

Parkway Drive  Spring Paving 2.040 miles  TCPW Savage  Spring Paving 2.040 miles  TCPW 

 

 

Page 25: Changed - Tillamook County, Oregon · ond and the Trans epartment by 68% his means that we e have increased he first year of the ocused our resourc ... unty partnership w ck quarries.

23 | P a g e    T i l l a m o o k   C o u n t y   A s s e t   M a n a g e m e n t   P l a n   2 0 1 5     D e c e m b e r   2 0 1 5     

List of 2015 Projects on County RoadsProject   Purpose  Performed by 

Slab Creek S  Spring Paving 2.040 miles  TCPW Bridges     

Salmonberry Bridge  Guard rail repair  TCPW Lommen Bridge  Bridge design   ODOT 

Cape Meares Loop Road  Geotechnical evaluation and alternative analysis around large active landslide 

ODOT 

Wyss Bridge  Bridge design   ODOT Whalen Island Park Bridge   Reduce to one lane as a result of foundation issues, initiated 

procurement for consultant to design new bridge ODOT 

Neskowin Alternate Access Project    Grant, Citizens, TCPW Lommen Bridge Overpass  Bridge repair and rehabilitation  Contract 

Salmon River Highway Project  Replace culverts to reduce fish barriers   Partnership Jim Creek  Bridge repair and rehabilitation  Contract 

Beaver Creek Bridge  Bridge repair and rehabilitation  Contract Tillamook River (Burton Bridge)  Bridge repair and rehabilitation  Contract 

Rice Creek Bridge  Bridge repair and rehabilitation  Contract Minich Creek Bridge  Bridge repair and rehabilitation  Contract 

Culverts     Kilchis River Road  Replaced culverts  TCPW All paving projects  Replaced culverts  TCPW 

Bear Creek Culvert (Brickyard Road)   Culvert replacement with fish passage  TCPW with funding partnership George Creek Bridge (Evergreen Road)  Bridge replacement with fish passage  TCPW with funding partnership Vegetation Management  Reduce vegetation on County ROW  TCPW in partnership with Soil & 

Water District Signs    Replaced signs indicated in the night Inventory.  Night Inventory 

scheduled late 2015. TCPW 

Page 26: Changed - Tillamook County, Oregon · ond and the Trans epartment by 68% his means that we e have increased he first year of the ocused our resourc ... unty partnership w ck quarries.

24 | P a g e    T i l l a m o o k   C o u n t y   A s s e t   M a n a g e m e n t   P l a n   2 0 1 5     D e c e m b e r   2 0 1 5     

List of 2015 Projects on County RoadsProject   Purpose  Performed by Buildings – Central Yard  Repair buildings – improve sign shop, repair fence in Central 

Yard TCPW 

Equipment  Purchased used roller and 2 tilt trailers  TCPW    


Recommended