Chetek Lakes Diagnostic and Feasibility Study Barr Engineering Company August 2, 2009 Annual Meeting
Transcript
Page 1: Chetek Lakes Diagnostic and Feasibility Study Barr Engineering Company August 2, 2009 Annual Meeting.

Chetek Lakes Diagnostic and

Feasibility StudyBarr Engineering Company

August 2, 2009 Annual Meeting

Page 2: Chetek Lakes Diagnostic and Feasibility Study Barr Engineering Company August 2, 2009 Annual Meeting.

Overview

• Lake Water Quality Basics

•Why Study?

• Study Details

•CLPA Volunteers Needed

Page 3: Chetek Lakes Diagnostic and Feasibility Study Barr Engineering Company August 2, 2009 Annual Meeting.

How Does Phosphorus Affect

WQ?Increase in Phosphorus

Increase in Algae

Lake gets Greener

Secchi Disc readingDecreases

Page 4: Chetek Lakes Diagnostic and Feasibility Study Barr Engineering Company August 2, 2009 Annual Meeting.

Phosphorus Sources

•Watershed

•Sediment

•Rainfall

•Groundwater

Page 5: Chetek Lakes Diagnostic and Feasibility Study Barr Engineering Company August 2, 2009 Annual Meeting.

How Do Sediments Add Phosphorus to

Lakes?Really low oxygen at bottom

Phosphorus released from sediments

Phosphorus mixed throughout lakefrom

Boats Wind

Fall Temperature Change

Page 6: Chetek Lakes Diagnostic and Feasibility Study Barr Engineering Company August 2, 2009 Annual Meeting.

Watershed Phosphorus Loading

Rain

Runoff

Phosphorus to Lake

Page 7: Chetek Lakes Diagnostic and Feasibility Study Barr Engineering Company August 2, 2009 Annual Meeting.

Why Study?

•Secchi Disc readings Decreased Since 1996 – Why?

•Lake Sediment Study Needed

•Lake on 303d list of impaired waters

Page 8: Chetek Lakes Diagnostic and Feasibility Study Barr Engineering Company August 2, 2009 Annual Meeting.

Study Details•Phase 1

•Habitat Study

•Monitoring

•Phase 2

•Internal Load Study

•Modeling

•Management Plan

Page 9: Chetek Lakes Diagnostic and Feasibility Study Barr Engineering Company August 2, 2009 Annual Meeting.

Phase 1

Page 10: Chetek Lakes Diagnostic and Feasibility Study Barr Engineering Company August 2, 2009 Annual Meeting.

DNR Habitat Maps•Aquatic Plant

Sensitive Areas

•Coarse Rock Rubble Habitat Areas for Walleyes

•Coarse woody debris habitat

•Shoreline buffers/restoration areas

Page 11: Chetek Lakes Diagnostic and Feasibility Study Barr Engineering Company August 2, 2009 Annual Meeting.

Sediment Monitoring - Barr

•Mud - 7 cores

•Prairie – 18 cores

•Pokegama – 7 cores

•Chetek – 8 cores

•Ten Mile – 6 cores

•Total of 46 cores

Page 12: Chetek Lakes Diagnostic and Feasibility Study Barr Engineering Company August 2, 2009 Annual Meeting.

Sediment Monitoring - Barr

•Discover exactly how much phosphorus is in the lake sediments by measuring it

Page 13: Chetek Lakes Diagnostic and Feasibility Study Barr Engineering Company August 2, 2009 Annual Meeting.

Tributary Monitoring - USGS

•Flow – 2 years

•Phosphorus – 1 year

Page 14: Chetek Lakes Diagnostic and Feasibility Study Barr Engineering Company August 2, 2009 Annual Meeting.

Lake Monitoring

•7 Times Per Year – USGS

•Volunteers – Weekly – June-Sept.

•Chetek – 2 years

•Other Lakes – 1 year

Page 15: Chetek Lakes Diagnostic and Feasibility Study Barr Engineering Company August 2, 2009 Annual Meeting.

Other Monitoring - USGS

•Recording Stage Gage

•Recording Precipitation Gages

•10 Groundwater Piezometers

Page 16: Chetek Lakes Diagnostic and Feasibility Study Barr Engineering Company August 2, 2009 Annual Meeting.

Phase 2

Page 17: Chetek Lakes Diagnostic and Feasibility Study Barr Engineering Company August 2, 2009 Annual Meeting.

Phase 2 – Internal Phosphorus Load

Study

•Phosphorus release rates – low oxygen or high pH

•Boat propellor resuspension

Page 18: Chetek Lakes Diagnostic and Feasibility Study Barr Engineering Company August 2, 2009 Annual Meeting.

Modeling Components

•How much Water enters the lake?

•How much Phosphorus enters the lake?

•Where does the Phosphorus come from?

•How much can Water Quality improve?

Page 19: Chetek Lakes Diagnostic and Feasibility Study Barr Engineering Company August 2, 2009 Annual Meeting.

Management Plan

•Set Goals

•Watershed Management

•Internal Load Management

•Habitat Management

•Committee & Public Meetings

•CLPA Approval, WDNR Approval

Page 20: Chetek Lakes Diagnostic and Feasibility Study Barr Engineering Company August 2, 2009 Annual Meeting.

What comes next?

•Projects from the management plan

•Projects that improve water quality

Page 21: Chetek Lakes Diagnostic and Feasibility Study Barr Engineering Company August 2, 2009 Annual Meeting.

Schedule

•Phase 1 - 2010 to 2013

•Phase 2 - 2011 to 2013

Page 22: Chetek Lakes Diagnostic and Feasibility Study Barr Engineering Company August 2, 2009 Annual Meeting.

Study Cost

•About $290,000 for Phase 1

•Estimate Similar Cost for Phase 2

•About $580,000 for Study

•About $116,000 per lake

Page 23: Chetek Lakes Diagnostic and Feasibility Study Barr Engineering Company August 2, 2009 Annual Meeting.

Funding Sources

•Two DNR Lake Protection Grants of $200,000 Each

•USGS Funds 35% of USGS Project

•CLPA $10,000 for Each Phase

Page 24: Chetek Lakes Diagnostic and Feasibility Study Barr Engineering Company August 2, 2009 Annual Meeting.

CLPA Cost

•About $10,000 for Phase 1

•About $10,000 for Phase 2

Page 25: Chetek Lakes Diagnostic and Feasibility Study Barr Engineering Company August 2, 2009 Annual Meeting.

Volunteers Needed

•Lake Sampling

•Stream Sampling

•Sediment Sampling

Page 26: Chetek Lakes Diagnostic and Feasibility Study Barr Engineering Company August 2, 2009 Annual Meeting.

Support

•Contact CLPA President John Plaza

•Support?

•Feedback?

Page 27: Chetek Lakes Diagnostic and Feasibility Study Barr Engineering Company August 2, 2009 Annual Meeting.

Next Steps•Meet With

DNR

•Apply for Lake Protection Grant Funds

•Find Volunteers

Page 28: Chetek Lakes Diagnostic and Feasibility Study Barr Engineering Company August 2, 2009 Annual Meeting.

Recommended