26
Koda Energy, LLC CHP Biomass to Energy
Transcript
Page 1: CHP Biomass to Energy - Clean Energy Resource Teams...CHP Biomass Challenges • Annual Economics: – Biomass costs -$3.5 Million more than expected – Thermal revenues -$4 Million

Koda Energy, LLCCHP Biomass to Energy

Page 2: CHP Biomass to Energy - Clean Energy Resource Teams...CHP Biomass Challenges • Annual Economics: – Biomass costs -$3.5 Million more than expected – Thermal revenues -$4 Million

What is Koda Energy, LLC.?

• Koda is a partnership between Rahr and SMSC that

creates “green energy” from burning dry biomass fuels

• Koda’s combined heat and power plant (“CHP”) is located on Rahr property in Shakopee, MN

• Designed to service Rahr’s thermal load

Page 3: CHP Biomass to Energy - Clean Energy Resource Teams...CHP Biomass Challenges • Annual Economics: – Biomass costs -$3.5 Million more than expected – Thermal revenues -$4 Million

Rahr Malting Company

• The Rahr family has made malt for 165 years

• Operational in Shakopee since 1936

• Shakopee plant is the 2nd largest malting facility in the world

• Shakopee plant employs over 100 highly skilled workers

Page 4: CHP Biomass to Energy - Clean Energy Resource Teams...CHP Biomass Challenges • Annual Economics: – Biomass costs -$3.5 Million more than expected – Thermal revenues -$4 Million

Shakopee Mdewakanton Sioux Community

(SMSC)

• A federally • A federally

recognized Indian

Tribe

• The largest employer

in Scott County

Page 5: CHP Biomass to Energy - Clean Energy Resource Teams...CHP Biomass Challenges • Annual Economics: – Biomass costs -$3.5 Million more than expected – Thermal revenues -$4 Million

So why build Koda?

Page 6: CHP Biomass to Energy - Clean Energy Resource Teams...CHP Biomass Challenges • Annual Economics: – Biomass costs -$3.5 Million more than expected – Thermal revenues -$4 Million

2007 View“Environmental Stewardship and Favorable Economics”

• Renewable base-load energy production had value

• Expensive natural gas market

• Highly efficient combined heat and power (“CHP”)• Highly efficient combined heat and power (“CHP”)

– Rahr purchases all of the heat generated from Koda to replace

its natural gas usage

• ~1.1 million mmbtus of natural gas/year

– The electricity generated from Koda is:

• Purchased by the partners at avoided energy costs

• Sold to Xcel Energy as “Green Power”

• Favorable Carbon Market Development

Page 7: CHP Biomass to Energy - Clean Energy Resource Teams...CHP Biomass Challenges • Annual Economics: – Biomass costs -$3.5 Million more than expected – Thermal revenues -$4 Million

Koda Design

Page 8: CHP Biomass to Energy - Clean Energy Resource Teams...CHP Biomass Challenges • Annual Economics: – Biomass costs -$3.5 Million more than expected – Thermal revenues -$4 Million

Koda Energy LLC

22 PSI Steam to HX

250f Glycol to Rahr Malting

SNCR

Page 9: CHP Biomass to Energy - Clean Energy Resource Teams...CHP Biomass Challenges • Annual Economics: – Biomass costs -$3.5 Million more than expected – Thermal revenues -$4 Million

Biomass Fuels (100% Agricultural Material)

• First multi-fuel suspension boiler – flexibility & efficiency

• Biomass fuels supplied by Rahr, local food & agri-

businesses and farmers in a 75 mile radius

• Annual fuel requirement - 175,000 tons

– Rahr – 35,000 tons/year from by-products

– Dry Wood

– Oat Hulls – Long-term contracts and spot purchases

Page 10: CHP Biomass to Energy - Clean Energy Resource Teams...CHP Biomass Challenges • Annual Economics: – Biomass costs -$3.5 Million more than expected – Thermal revenues -$4 Million
Page 11: CHP Biomass to Energy - Clean Energy Resource Teams...CHP Biomass Challenges • Annual Economics: – Biomass costs -$3.5 Million more than expected – Thermal revenues -$4 Million

Has Koda been successful?

Page 12: CHP Biomass to Energy - Clean Energy Resource Teams...CHP Biomass Challenges • Annual Economics: – Biomass costs -$3.5 Million more than expected – Thermal revenues -$4 Million

Koda has been an engineering success!

• Plant Uptime:

–2010-2011 = 90%–2010-2011 = 90%

–2011-2012 = 93%

• Boiler Efficiency ~80%

• Plant Efficiency = > 55%

Page 13: CHP Biomass to Energy - Clean Energy Resource Teams...CHP Biomass Challenges • Annual Economics: – Biomass costs -$3.5 Million more than expected – Thermal revenues -$4 Million
Page 14: CHP Biomass to Energy - Clean Energy Resource Teams...CHP Biomass Challenges • Annual Economics: – Biomass costs -$3.5 Million more than expected – Thermal revenues -$4 Million

Average Capacity Factors by

Energy Source in 2009

• Combined Cycle Natural Gas Plant 10.1%

• Oil 7.8%• Oil 7.8%

• Hydroelectric 39.8%

• Renewables (Wind/Solar/Biomass) 33.9%

• Coal 63.8%

• Nuclear 90.3%

• Koda Energy (2010) 73.4%

Data provided by the US Energy Information Administration (EIA)

Page 15: CHP Biomass to Energy - Clean Energy Resource Teams...CHP Biomass Challenges • Annual Economics: – Biomass costs -$3.5 Million more than expected – Thermal revenues -$4 Million

Economic Success To MN?

Yes

$12.5 million into Minnesota Economy• Direct employment

– $1.7 million/yr

– Skilled workers– Skilled workers

• Indirect support of local employment through operating expenditures

– $1.4 million/yr

– Services, engineering, construction

• Biomass purchases in State of Minnesota

– $9.4 million/yr

– Not supporting gas, oil, coal from other states

Page 16: CHP Biomass to Energy - Clean Energy Resource Teams...CHP Biomass Challenges • Annual Economics: – Biomass costs -$3.5 Million more than expected – Thermal revenues -$4 Million

Economic Challenges

CHP Biomass Challenges• Annual Economics:

– Biomass costs - $3.5 Million more than

expectedexpected

Page 17: CHP Biomass to Energy - Clean Energy Resource Teams...CHP Biomass Challenges • Annual Economics: – Biomass costs -$3.5 Million more than expected – Thermal revenues -$4 Million

Significant Biomass Price Changes

Biomass 2007 2011Malt sprouts $44/ton $109/ton

Wheat midds $92/ton $220/ton

Wood by-products $38/ton $75/tonWood by-products $38/ton $75/ton

Economics affected by

• downturn in economy which reduced supply of dried wood byproducts

• increased competition from ethanol, and other biomass facilities

Page 18: CHP Biomass to Energy - Clean Energy Resource Teams...CHP Biomass Challenges • Annual Economics: – Biomass costs -$3.5 Million more than expected – Thermal revenues -$4 Million

Economic Challenges

CHP Biomass Challenges

• Annual Economics:– Biomass costs - $3.5 Million more than expected

– Thermal revenues - $4 Million less than – Thermal revenues - $4 Million less than

expected due to lower natural gas pricing

Page 19: CHP Biomass to Energy - Clean Energy Resource Teams...CHP Biomass Challenges • Annual Economics: – Biomass costs -$3.5 Million more than expected – Thermal revenues -$4 Million

2012 Natural Gas Strip

December 2006 to Present

Decision tobuild Koda

Koda constructionperiod

CommercialOperation

Today

Page 20: CHP Biomass to Energy - Clean Energy Resource Teams...CHP Biomass Challenges • Annual Economics: – Biomass costs -$3.5 Million more than expected – Thermal revenues -$4 Million

Economic Challenges

CHP Biomass Challenges

• Annual Economics:

– Biomass costs - $3.5 Million more than expected

– Thermal revenues - $4 Million less than expected– Thermal revenues - $4 Million less than expected

– Disappearance of carbon credit and REC markets

– PPA for renewable energy IPP’s NOT favorable

Page 21: CHP Biomass to Energy - Clean Energy Resource Teams...CHP Biomass Challenges • Annual Economics: – Biomass costs -$3.5 Million more than expected – Thermal revenues -$4 Million

Carbon Credits

2,500,000

3,000,000

3,500,000

4,000,000

4,500,000

$4.00

$5.00

$6.00

$7.00

$8.00

CCX Daily Average Settlement Price and Volume (metric ton)

Volume (MT)

Average Settlement Price ($/MT)

Data provided by Intercontinental Exchange (ICE)

-

500,000

1,000,000

1,500,000

2,000,000

$-

$1.00

$2.00

$3.00

$4.00

Page 22: CHP Biomass to Energy - Clean Energy Resource Teams...CHP Biomass Challenges • Annual Economics: – Biomass costs -$3.5 Million more than expected – Thermal revenues -$4 Million

Power Purchase Agreements

• PPA for Renewable IPP (non mandated projects)

– Minimal bargaining power for IPP biomass plants

– No “real value” included for base load capabilities

– Lack of built in contract protections – Lack of built in contract protections

• Pass thru fuel & transportation cost provisions not as favorable as public utility owned assets

• Coal and natural gas pass-thru pricing provisions are common

Page 23: CHP Biomass to Energy - Clean Energy Resource Teams...CHP Biomass Challenges • Annual Economics: – Biomass costs -$3.5 Million more than expected – Thermal revenues -$4 Million

Economic Challenges

CHP Biomass Challenges

• Annual Economics:

– Biomass costs - $3.5 Million more than expected

– Thermal revenues - $4 Million less than expected

– Depressed carbon credit and REC markets

– PPA for renewable energy IPP’s NOT favorable

• Insufficient Biomass Infrastructure Development

Page 24: CHP Biomass to Energy - Clean Energy Resource Teams...CHP Biomass Challenges • Annual Economics: – Biomass costs -$3.5 Million more than expected – Thermal revenues -$4 Million

Wood and Wood By-Products

for Fuel

• Municipal tree harvest (wet wood)

• Private tree harvest

• Sawmill capacity, cabinetry and construction wood sources dramatically declined with wood sources dramatically declined with economy

• No current storage depot infrastructure

Page 25: CHP Biomass to Energy - Clean Energy Resource Teams...CHP Biomass Challenges • Annual Economics: – Biomass costs -$3.5 Million more than expected – Thermal revenues -$4 Million

Grasses/Corn Stover for

Fuel???

• 7000-8000 btu/lb (10%mst)

• Annual Harvest

• Bail Storage

• Current price = ???

• 3-4 ton/acre = ~64 mmbtu• 3-4 ton/acre = ~64 mmbtu

• 5000-7000 acres for 15% of our fuel needs

Additional Costs to Factor

• Storage • Transportation• Grinding

Page 26: CHP Biomass to Energy - Clean Energy Resource Teams...CHP Biomass Challenges • Annual Economics: – Biomass costs -$3.5 Million more than expected – Thermal revenues -$4 Million

Does the State of Minnesota want

Bio-Energy CHP to Succeed?

• If Yes:

– Develop a biomass collection infrastructure

• Create biomass fuel storage and distribution depots

• Create assistance on transportation• Create assistance on transportation

– Create meaningful PPA incentives that encourage CHP capabilities and fuel price pass-thru options

– Utilize State resources & programs to assist existing bio-energy operations

– Leverage federal programs for renewable energy development


Recommended