CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016
"R.R. Seismundo Construction & Supply" 10961Const./Widening/Upgrading/Rehab. of Del Pilar (San Juan)-
New Cortez-San Jose Carcor Panas Rd.08/12/13 XI 45.784 205 O 0.245 0.300 0.150 0.030 0.050 0.033 80.80 -
"R.R. Seismundo Construction & Supply" 10961Const./Widening/Upgrading/Rehab. of Del Pilar (San Juan)-
New Cortez-San Jose Carcor Panas Rd.03/18/13 XI 45.784 179 O 0.338 0.231 0.150 0.030 0.045 0.050 84.40 -
"R.R. Seismundo Construction & Supply" 10961Widening of Surigao-Davao Coastal Rd., Km.1822+(-423)-
Km.1822+821, Apokon Sect.03/18/13 XI 17.793 125 O 0.355 0.240 0.150 0.030 0.045 0.050 87.00 -
"R.R. Seismundo Construction & Supply" /
Davao Concrete Products Joint VentureJV-12-116
Const. of Flood Control Structure (Sheet Piles & Grouted
Riprap) Agusan River, Brgy. Inambatan11/27/12 XI 27.838 240 O 0.333 0.240 0.150 0.030 0.040 0.050 84.30 -
121 Construction Corporation (Formerly: 121
Construction)21686
Improvement/Concreting with Drainage System along
Ballesteros Street29/11/2014 NCR 6.684 120 O 0.355 0.240 0.150 0.030 0.035 0.033 84.30%
84.30%
Satisfactory
12-30 CONSTRUCTION & SUPPLY 37025Construction of 1-CL Trinidad Cario PS
11/13/15Palawan 1st
DEO1.070 90 C 0.444 0.133 0.3 - - - 87.70%
87.7%
Satisfactory
2M Construction & Enterprises 33331Slope Protection (Grouted Riprap) along Isabela-Maluso Rd.,
Matarling Sect. at K15+190-K15+24903/13/13 IX 4.842 75 O 0.328 0.240 0.150 0.030 0.040 0.050 83.80 -
2-R CONSTRUCTION & SUPPLY 15304 Off Carriage Improvement at Lingayen, Captiol Loop 11/06/2015Pangasinan 2nd
DEO9.34 105 C 0.28 0.3 0.15 0.03 0.06 0.03 85.20% -
2-R CONSTRUCTION & SUPPLY 15304
Raising of Grade of Dike Agno River Basin Flood Control
Project (Phase III), Brgy. Cabalitian, Asingan, Pangasinan 11/16/15PANGASINAN
3RD DEO9.167 120 OG 0.391 0.24 0.15 0.03 0.05 0.05 91.10%
91.1%
Very Satisfactory
2-RCONSTRUCTION & SUPPLY 15304Off Carriageway Improvement at Lingayen Capitol Loop,
K0364+(-219) to K0364+836, Lingayen, Pangasinan02/09/2016
Pangasinan 2nd
DEO9.34 105 C 0.473 0.133 0.3 - - - 90.60%
*87.36%
Satisfactory
3A'S BUILDERS 33251
Rehabilitation/Major Repair of Permanent Bridges
Tagbinunga Bridge (B00549LT) along Daang Maharlika (LT),
Mahaplag, Leyte
11/15/15 Leyte Fifth DEO 5.403 150 C 0.484 0.133 0.3 - - - 91.70%91.7%
Very Satisfactory
3C'SL CONSTRUCTION AND SUPPLY 36393 Construction/ Upgrading of Local Road 02/06/2015AGUSAN DEL
NORTE DEO3.763 48 C 0.461 0.133 0.3 - - - 89.40%
*89.4% Very
Satisfactory
3K ROCK ENGINEERING 27908
Rehabilitation/Reconstruction/Upgrading of Damaged Paved
National Road including Drainage based on Pavement
Management System/Highway Development & Management-
4 (HDM-4) (Intermittent Section), Asin Road, K0305+(-291) -
K0305+958
12/06/2015Baguio City
DEO22.149 170 C 0.414 0.196 0.3 - - - 90.97%
*90.97% Very
Satisfactory
3K ROCK ENGINEERING 27908
Road Upgrading (Unpaved to Paved) Based on Gravel Road
Strategies, Traffic Benchmark for Upgrading to Paved Road
Standards (HDM-4 Project Analysis) (Intermittent Sections)
of Kabugao - Pudtol - Luna - Cagayan Bdry. Road,
K0611+917 to K0612+961, K0612+973 to K0613+699,
K0613+723 to K0614+500, Apayao
27/08/2015 CAR 75.709 221 O 0.363 0.241 0 0.03 0.061 0.033 72.80% -
3K Rock Engineering/RVC Construction (J.V.) 27908
Road Upgrading (Gravel to Concrete) of Asin -Nanganban -
San Pascual Road K0270+594 - K0272+220 ; K0275+5311 -
K0275+7178
16/08/2014 CAR 91.358 237 O 0.379 0.240 0.150 0.024 0.060 0.050 90.30 -
3RB Construction & Supply 19541 Prieto Diaz Port Development Project 08/19/15 DOTC 8.512 124 O 0.367 0.300 0.150 0.030 0.054 0.050 95.10 -
4B Construction Corporation2014 heavy maintenance works along SCTEX lot 2 - Bridge
revetment, slope and drainage repair works10/31/14 BCDA 12.430 90 O 0.298 0.288 0.135 0.000 0.035 0.050 80.53 -
4B Construction Corporation Gumain Bridges Pier 5 & 6 Protection Works 02/05/15 BCDA 18.951 120 O 0.377 0.293 0.000 0.030 0.041 0.033 77.44 -
4B Construction Corporation Gumain Bridges Pier 5 & 6 Protection Works 11/20/14 BCDA 18.951 120 O 0.400 0.271 0.105 0.000 0.032 0.033 84.10 -
4B CONSTRUCTION CORPORATION 23445Widening along Roman Expressway, K153+263 to K153+938,
K153+938 to K154+780, Mariveles, Bataan04/06/2015
Bataan 2nd
DEO22.523 99 C 0.4 0.2 0.3 - - - 90.00%
*90% Very
Satisfactory
5'S CONSTRUCTION & SUPPLY 32404Construction of One (1) Storey, Two (2) Classroom School
Building at Dumangas National High School10/06/2015
Iloilo Second
DEO1.479 60 C 0.478 0.172 0.3 - - - 95.00%
*95% Very
Satisfactory
626 Construction and Trading 34990 Improvement of Balungao Hot and Cold Spring Resort 5/27/15 TIEZA 11.800 180 O 0.397 0.299 0 0.030 0.045 0.017 78.74
ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/
QUALITATIVE
DESCRIPTION
AMOUNT
(Php, M)
DUR
(C.D.)
CONTRACT*IMPL.
AGENCYNAME OF CONSTRUCTOR
LICENSE
NO.PROJECT
DATE OF
EVALUATION
*1st/Final
* For DPWH, only the region and PMO office are listed
24th CPES Release Page1
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016
ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/
QUALITATIVE
DESCRIPTION
AMOUNT
(Php, M)
DUR
(C.D.)
CONTRACT*IMPL.
AGENCYNAME OF CONSTRUCTOR
LICENSE
NO.PROJECT
DATE OF
EVALUATION
626 CONSTRUCTION AND TRADING 34990 Improvement of Hot and Cold Spring Resort 10/9/15 TIEZA 12.000 240 O 0.395 0.300 0.103 0.030 0.047 0.050 92.49 -
626 CONSTRUCTION AND TRADING 34990 Improvement of Hot and Cold Spring Resort 11/25/15 TIEZA 12.000 240 C 0.473 0.200 0.300 97.3089.1%
Very Satisfactory
722 CONSTRUCTION INC (Formerly 722
Construction)21923
Repair/Rehabilitation/Improvement along Baliuag-Candaba
Road, K0054+000 to K0057+000, Baliuag-Candaba Road,
Baliuag, Bulacan
26/08/2015Bulacan First
DEO12.104 72 C 0.394 0.2 0.3 - - - 89.40%
*82.86%
Satisfactory
722 CONSTRUCTION, INC. (Formerly: 722
Construction)21923
Construction/Rehabilitation of Road with Drainage,
Barangay Poblacion II, Phase III Constantino, Municipality of
Marilao, Bulacan 4th LD
11/19/15Bulacan
Second DEO6.509 90 C 0.493 0.133 0.3 - - - 92.60%
92.6%
Very Satisfactory
722 Construction, Inc.(Formerly: 722
Construction)21923
Repair/Rehabilitation/Improvement along Baliuag-Candaba
Road K0054+000 to K0057+00024/11/2014 III 12.104 72 O 0.295 0.240 0.150 0.030 0.037 0.033 78.50%
78.50%
Unsatisfactory
739 BUILDERS 31174 Widening of Vigan - Sta. Catalina Road 05/06/2015Ilocos Sur 1st
DEO15.404 96 C 0.22 0.2 0.3 - - - 72.00% *72% Poor
808 CONSTRUCTION AND SUPPLY 18711 Construction of Local Roads, Ortiz-Baraoas-Roas 07/06/2015La Union 2nd
DEO1.887 37 C 0.396 0.133 0.3 - - - 82.90% *82.9% Satisfactory
888 ACY ENTERPRISES 32898
Rehab/Major Repair of Permanent Bridges, Pandan Bridge,
Along Brdy, S. leyte-Maasin-Macrohon-Sogod-Daang
Maharlika
03/06/2015Southern Leyte
DEO8.812 150 O 0.4 0.24 0.15 0.03 0.052 0.033 90.50% -
888 ACY ENTERPRISES 32898
Rehabilitation/Major Repair of Permanent Bridge, Pandan
Bridge along Bdry. Southern Leyte-Macrohon-Sogod-Daang
Maharlika (BOO344LT), Sogod, Southern Leyte
30/08/2015Southern Leyte
DEO8.812 150 C 0.411 0.2 0.3 - - - 91.10%
*90.74% Very
Satisfactory
888 ACY ENTERPRISES 32898
Rehabilitation/Major Repair of Permanent Bridges, Pangi
Bridge Along Daang Maharlika (B00597LT), Libagon,
Southern Leyte
11/16/15Southern Leyte
DEO14.826 180 C 0.442 0.2 0.18 - - - 82.20%
82.2%
Satisfactory
8R'S CONSTRUCTION 22997Concreting of Daig - Tumapon - Maybo Farm to Market Road,
Boac, Marinduque01/09/2015
Marinduque
DEO23.211 195 C 0.442 0.137 0.3 - - - 87.90%
*87.9%
Satisfactory
8R'S CONSTRUCTION 22997Concreting of Farm to Market Road, Brgy. Maligaya and
Brgy. Buliasnin (Brgy. Buliasnin-Maligaya)11/16/15
Marinduque
DEO1.947 41 C 0.405 0.147 0.3 - - - 85.20%
85.2%
Satisfactory
A B Aponesto Construction, Parts & Supply 22998
Repair/Rehab of Agusan River Flood Control, Osmena
Section, Compostela along Montevista Compostela New
Bataan Maragusan Mati Bdry. Road.
09/08/2014 XI 30.533 183 O 0.384 0.219 0.123 0.030 0.042 0.033 83.10 -
A DE GUIA CONSTRUCTION 18228Construction of River Bank Protection, Siffu Flood Control
Project, Sittio Gabit Section, Roxas, Isabela28/08/2015
Isabela 2nd
DEO18.346 215 O 0.354 0.3 0.15 0.03 0.04 0.05 92.40% -
A DE GUIA CONSTRUCTION 18228Construction of River Bank Protection, Stiffu River Flood
Control Project, Sitio Gabit Section, Roxas, Isabela11/14/15
ISABELA 2ND
DEO18.347 219 C 0.3 0.133 0.3 - - - 73.30%
73.3%
Poor
A J TAYLAN CONSTRUCTION &
DEVELOPMENT/JLP CONSTRUCTION &
SUPPLY JOINT VENTURE
JV-14-518
Rehabilitation/Reconstruction/Upgrading of Damaged Paved
National Roads including Drainage Based on Pavement
Management System/Highway Development and
Management- 4(HDM-4), Pinili-Nueva Era Road, K0453+(-224)-
K0454+1013, K0455+884-K0456+433, Pinili Road, Ilocos
Norte
26/08/2015Ilocos Sur 2nd
DEO37.519 219 O 0.355 0.209 0.15 0.03 0.051 0.05 84.50% -
*1st/Final
* For DPWH, only the region and PMO office are listed
24th CPES Release Page2
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016
ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/
QUALITATIVE
DESCRIPTION
AMOUNT
(Php, M)
DUR
(C.D.)
CONTRACT*IMPL.
AGENCYNAME OF CONSTRUCTOR
LICENSE
NO.PROJECT
DATE OF
EVALUATION
A. C. RIVERO DEVELOPMENT CORPORATION
(Formerly: A.C. Rivero Construction)5122
Construction of Bridge at Dodiongan Box Culvert along Sta.
Felomina-Bonbonon-Digkilaan-Rogongon Road, Barangay
Bonbonon, Iligan City, K01526+078.00 to K01526+108.00, K0
0+000.00 to K0 0+000.00
08/06/2015Lanao del Norte
Second DEO24.567 295 C 0.433 0.2 0.3 - - - 93.30%
*90% Very
Satisfactory
A. De Guia Construction 18228
Construction of Drainage System / Protection Works along
Daang Maharlika, Isabela 4th LD K0311+590 - K0314+350,
San Luis - Caquilingan
27/10/2014 II 19.403 231 O 0.347 0.300 0.150 0.030 0.029 0.033 88.90%88.90%
Satisfactory
A. De Guia Construction 18228Construction/ Rehabilitation of Flood Control Projects,
Nagassican Flood Control Projects, Sta. 0+000 to Sta. 0+22412/08/2014 II 19.500 184 O 0.288 0.248 0.150 0.030 0.055 0.050 82.10 -
A. DE GUIA CONSTRUCTION 18228Construction of Drainage System/Protection Works along
Daang Maharlika07/06/2015
Isabela 4th
DEO19.403 261 C 0.422 0.133 0.3 - - - 85.50%
*87.54%
Satisfactory
A. DE GUIA CONSTRUCTION 18228
Construction/Rehabilitation of Flood Control Projects in
Isabela 4th DEO/4th LD-Nagassican Flood Control Project,
Sta. 0+000 - Sta. 0+224
07/06/2015Isabela 4th
DEO19.5 214 C 0.365 0.2 0.3 - - - 86.50%
*83.86%
Satisfactory
A. I. P. CONSTRUCTION 32458
Rehabilitation/ Reconstruction/ Upgrading of Damaged
Paved National Roads Including Drainage Based on
Pavement Management System/ Highway Development and
Management-4 (HDM-4) (Intermittent Sections), Lt. Tacay
Road, K0308+(-599)-K0308+000 & K0308+616-K0308+754,
11/9/15 Baguio City 13.442 104 C 0.415 0.195 0.300 - - - 91.00%87.82%
Satisfactory
A. J. LAVA BUILDERS CORP. (Formerly: A. J.
Lava Builders)22265
Flood Management Services Construction/Maintenance of
Flood Mitigation Structures and Drainage System
Improvement/Riprapping of Sitio Kapatagan River
(Downstream), Brgy. San Jose, Antipolo City, 2nd LD
11/11/15RIZAL 1ST
DEO27.612 180 OG 0.39 0.24 0.15 0.03 0.06 0.05 92.00%
92%
Very Satisfactory
A. M. Oreta and Co., Incorporated 108 Region 2-PIDP-CBIMO 09/19/15 NIA 80.788 690 O 0.370 0.300 0.130 0.030 0.060 0.050 94.00 -
A. P. B. CONSTRUCTION 17055
Network Development/ Widening of National Roads-
Secondary Road-Abra-Ilocos Norte Road K0409+000-
K0409+100, K0409+115-K409+178, K0409+307-K0409+404,
K0409+531-K0409+648, K0409+748-K0410+139, K0410+159-
K0410+360, K0410+369-K0410+777, K0411+050-K0411+220,
K0412+122-K0412+499, K0413+000-K0414+354, K0414+764-
K0415+747, K0416+175-K0416+445, K041
11/20/15 Regional Office 81.971 286 OG 0.318 0.29 0.15 0.022 0.045 0.033 85.80%85.8%
Satisfactory
A. SANDOVAL CONSTRUCTION & SUPPLY 35991
Construction and Maintenance of Bridges along National
Roads - Retrofitting/Strengthening of Permanent Bridges
Leviste Bridge 1 (B03170LZ) along Talisay - Laurel -
Agoncillo Road, Laurel, Batangas
11/13/15BATANGAS
3RD DEO4.557 150 C 0.372 0.2 0.3 - - - 87.20%
87.2%
Satisfactory
A.A. DE VERA CONSTRUCTION 6191
Concreting /Road Upgrading (Unpaved to Paved) Jct. (TNR)
Cortes-Balilihan-Catigbian-Macaas Road, K0046+592.75 -
K0046+858.9, Tubigon, Bohol
11/16/15 Bohol 1st 8.485 155 C 0.344 0.2 0.3 - - - 84.40%84.4%
Satisfactory
A.B. OPEA BUILDERS 33996
Concreting of Barangay Roads, Brgy. Sooc-Haluban, Lupi,
Camarines Sur 11/12/15Camarines Sur
Fifth DEO1.881 60 C 0.359 0.172 0.3 - - - 83.10%
83.1%
Satisfactory
A.C. MOJARES CONSTRUCTION, INC. 1771Concreting and Sidewalk Improvement of Phase 2, Scout
Tobias St., Brgy. Laging Handa, Quezon City03/06/2014
Quezon City
2nd DEO10.018 207 O 0.394 0.24 0.15 0.015 0.028 0.05 87.70% -
A.C. MOJARES CONSTRUCTION, INC. (DOING
BUSINESS UNDER THE NAME AND STYLE OF
A.C. MOJARES CONSTRUCTION)
1771
Construction/Improvement of Road and Bridge, Brgy.
Obrero and Kristong Hari, Quezon City12/4/15 QC 2nd DEO 9.105 102 C 0.481 0.133 0.3 - - - 91.40%
91.4%
Very Satisfactory
A.C. Rivero Development Corporation
(Formerly: A.C. Rivero Construction)5122
Const./Completion of Subang Daku Bridge, Subang Daku
River, San Miguel08/17/12 VIII 42.820 220 O 0.383 0.300 0.150 0.030 0.040 0.033 93.60 -
A.C. Rivero Development Corporation
(Formerly: A.C. Rivero Construction)5122
Const./Impv't. of San Miguel-Jct. Buac Rd., Daang Maharlika
Rd (Km1207+000 - Km1209+454.40)08/19/12 VIII 35.731 220 O 0.349 0.289 0.150 0.030 0.045 0.033 89.60 -
*1st/Final
* For DPWH, only the region and PMO office are listed
24th CPES Release Page3
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016
ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/
QUALITATIVE
DESCRIPTION
AMOUNT
(Php, M)
DUR
(C.D.)
CONTRACT*IMPL.
AGENCYNAME OF CONSTRUCTOR
LICENSE
NO.PROJECT
DATE OF
EVALUATION
A.C. Rivero Development Corporation
(Formerly: A.C. Rivero Construction)5122
Upgrading/Conc. of San Juanico-Basey-Sohoton Rd.,
K0913+721.75-K0917+915.72, w/ exceptions08/07/12 VIII 47.065 200 O 0.357 0.240 0.150 0.030 0.040 0.033 85.00 -
A.C. RIVERO DEVELOPMENT CORPORATION
(Formerly: A.C. Rivero Construction)5122
Rehab/Major Repair of Permanent Bridges, Amparo Bridge,
Along Bdry, S. Leyte- Maasin-Macrohon-Sogod-Daang
Maharlika
03/06/2015Southern Leyte
DEO8.928 150 C 0.426 0.133 0.3 - - - 85.90% *85.9% Satisfactory
A.C. RIVERO DEVELOPMENT CORPORATION
(Formerly: A.C. Rivero Construction)5122
Off-Carriageway Improvement along Jct. Taft - Oras - San
Policarpio-Arteche Road, K0950+000 - K0955+00029/06/2015
Eastern Samar
DEO33.355 150 O 0.297 0.3 0.15 0.03 0.04 0.033 85.00% -
A.C. RIVERO DEVELOPMENT CORPORATION
(Formerly: A.C. Rivero Construction)5122
Completion of Dodiongan Bridge along Sta. Felomina-
Bonbonon-Digkilaan-Rogongon Road, Brgy. Bonbonon,
Iligan City K01526+058-K01526+118, K01526+910-
K01526+297
03/09/2015Lanao del Norte
2nd DEO37.105 236 O 0.384 0.285 0.15 0.02 0.045 0.05 93.40% -
A.C. RIVERO DEVELOPMENT CORPORATION
(Formerly: A.C. Rivero Construction)5122
Replacement of Permanent Weak Bridge, Ramon Magsaysay
Bridge (B0469MN) along Jct. Switch-Jct.Monte Alegre Road29/08/2015
Zamboanga del
Sur 1st29.101 230 O 0.288 0.299 0.15 0.03 0.051 0.05 86.79% -
A.C. RIVERO DEVELOPMENT CORPORATION
(Formerly: A.C. Rivero Construction)5122
Construction and Maintenance of Bridges along National
Rd. (Replacement of Permanent Weak Bridge) at Olingan
Bridge along Dipolog-Oroquieta National Road, Olingan,
Dipolog City, Zamboanga del Norte
11/16/15Zamboanga Del
Norte 1st DEO21.218 220 OG 0.371 0.22 0.15 0.022 0.042 0.05 85.50%
85.5%
Satisfactory
A.C. RIVERO DEVELOPMENT
CORPORATION/JQD CONSTRUCTION AND
GENERAL SERVICES JOINT VENTURE
JV-14-1038
Rehabilitation/Major Repair of Permanent Weak Bridges,
Otikon Bridge Along Daang Maharlika (B00598LT), Libagon,
Southern Leyte11/16/15
Southern Leyte
DEO31.056 195 OG 0.249 0.3 0.15 0.03 0.06 0.05 83.90%
83.9%
Satisfactory
A.C. SOLIVEN CONSTRUCTION & GENERAL
MERCHANDISE19278
Construction of River Bank Protection along Marusay River,
San Vicente Section10/06/2015
Pangasinan 4th
DEO18.228 116 C 0.35 0.2 0.3 - - - 85.00% *85% Satisfactory
A.C. SOLIVEN CONSTRUCTION & GENERAL
MERCHANDISE19278
Construction of Bank Protection Works, Agnooo River Basin
Flood Control Project (Phase III) Brgy. Bantog, Asingan,
Pangasinan
11/16/15PANGASINAN
3RD DEO18.336 180 OG 0.389 0.24 0.15 0.03 0.055 0.05 91.40%
91.4%
Very Satisfactory
A.D.P CONST. & SUPPLY 3466
Network Development, Widening of National Road,
Secondary Road along Roxas City-Cagay-Sibaguan
Balijuagan-Cudian-Ivisan Road Chainage 0-200, Chainage
942-1182 (0-200(0+304.50) (K0104+122.50) 942-1182
(K0104+760-K0105+000)
02/09/2015 Capiz 1st 10.341 121 C 0.418 0.133 0.3 - - - 85.10%*85.1%
Satisfactory
A.D.P Construction & Supply 3466 Impvt./Conc. of Access Road, Tubalan Port, Tubalan 06/14/10 XI 58.261 320 O 0.338 0.300 0.000 0.030 0.040 0.033 74.10 -
A.D.P Construction & Supply 3466
Rehab./Reconst./Upgrading of Damaged Paved National
Road, Roxas City Boundary-Panitan Road-Jct. Bailan Road,
Capiz (KM.112+750-Km.122+705) with exception
08/31/10 VI 53.673 225 O 0.364 0.240 0.150 0.030 0.051 0.050 88.50 -
A.D.P Construction & Supply 3466
Malag-it Box Culvert along Iloilo East Coast-Capiz Road
(Construction of Malag-it Bridge along Iloilo East Coast-
Capiz Road)
29/10/2014 VI 35.132 240 O 0.388 0.249 0.000 0.030 0.054 0.033 75.40%75.40%
Unsatisfactory
A.D.P Construction & Supply 3466Widening of Caradio-an Bridge alog Bacolod South Road,
Barangay Caradio-an23/10/2014 VI 24.804 273 O 0.378 0.221 0.034 0.030 0.045 0.033 74.10%
74.10%
Poor
A.D.P Construction & Supply 3466Construction/Rehab. Of Drainage System along Balasan-
Carles Road, Brgy. Barosbos29/10/2014 VI 43.954 274 O 0.373 0.218 0.150 0.030 0.054 0.050 87.50%
87.50%
Satisfactory
A.D.P Construction & Supply 3466 Construction of Multi-Purpose Building 28/10/2014 VI 4.227 120 O 0.362 0.214 0.121 0.030 0.049 0.050 82.60%82.60%
Satisfactory
A.D.P Construction & Supply 3466
Road Upgrading (Gravel to Paved) along Davao-Sarangani
Coastal Road km. 1671+600 to km. 1673+060, Biton-Lanao
Section
07/08/2014 XI 40.082 208 O 0.014 0.300 0.000 0.030 0.014 0.000 35.80 -
A.D.P Construction & Supply 3466Rd. Upgrading (Gravel to Paved) along Davao-Sarangani
Coastal Rd., Km.1671+600-Km.1673+060, Biton-Lanao Sect.08/06/13 XI 40.082 179 O 0.322 0.248 0.000 0.030 0.033 0.033 66.60 -
A.D.P Construction & Supply 3466Const. of Slope Protection along Jct. Bancal-Leon-Antique
Boundary Rd., K0031+722-K0031+89103/22/13 VI 13.802 188 O 0.388 0.241 0.150 0.030 0.055 0.050 91.40 -
*1st/Final
* For DPWH, only the region and PMO office are listed
24th CPES Release Page4
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016
ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/
QUALITATIVE
DESCRIPTION
AMOUNT
(Php, M)
DUR
(C.D.)
CONTRACT*IMPL.
AGENCYNAME OF CONSTRUCTOR
LICENSE
NO.PROJECT
DATE OF
EVALUATION
A.D.P. CONST. & SUPPLY 3466
Network Development, Widening of National Road,
Secondary Road along Roxas City, Cagay-Sibaguan
Balijuangan-Cudian-Ijisan Road
06/06/2015 Capiz First DEO 10.341 121 O 0.368 0.251 0.105 0.03 0.035 0.033 82.20% -
A.D.P. CONST. & SUPPLY 3466 Widening of Sara-San Dionisio Road 09/06/2015 Iloilo Third DEO 26.054 175 O 0.344 0.252 0.15 0.022 0.035 0.05 85.30% -
A.D.P. CONST. & SUPPLY 3466Construction of Drainage System along Iloilo East Coast
Capiz Road09/06/2015 Iloilo Third DEO 44.467 252 O 0.37 0.247 0.15 0.022 0.035 0.05 87.40% -
A.D.P. CONST. & SUPPLY 3466Retrofitting/Strengthening of Cabiri-an Bridge (B00165PN)
along Guimbal-Tubungan Road03/06/2015 Iloilo First DEO 9.3 90 C 0.5 0.133 0.3 - - - 93.30%
*93.3% Very
Satisfactory
A.D.P. CONST. & SUPPLY 3466Widening of Sara - San Dionisio Road, K0203+ (-882) -
K0203+24329/08/2015 Iloilo 3rd 26.054 175 C 0.449 0.133 0.3 - - - 88.20%
*87.3%
Satisfactory
A.D.P. CONST. & SUPPLY 3466
Construction/Improvement of Access Road Leading to
Declared Tourism Destination, Hanay-Hanay Road leading to
Twin Lake, San Jose, 2nd District, Negros Oriental11/11/15
Negros Oriental
2nd DEO9.310 131 C 0.457 0.133 0.3 - - - 89.00%
89%
Satisfactory
A.F.G. CONSTRUCTION AND
CONSTRUCTION SUPPLY17161
Rehabilitation/Reconstruction/Upgrading of Damaged Paved
National Road including Drainage Based on Pavement
Management System / Highway Development and
Management - 4 (HDM-4) (Intermittent Section) along
Hinigaran - Isabela Road, K0058+263 - K0059+000
27/08/2015Negros
Occidental 2nd12.674 127 O 0.358 0.239 0.15 0.03 0.05 0.033 86.00% -
A.F.G. Construction and Construction Supply 17161Odiong-Sibalom-San Remegio-Leon Rd. Upgrading (Gravel
to Paved), Km. 129+328-Km. 131+27508/15/13 VI 40.453 179 O 0.336 0.240 0.150 0.030 0.037 0.033 82.60 -
A.F.G. Construction and Construction Supply 17161Const. of Two (2) Storey, Eight (8) Cl Sch. Bldg., Leonora
Salapantan NHS08/22/13 VI 8.949 150 O 0.347 0.200 0.108 0.030 0.032 0.033 75.00 -
A.F.G. Construction and Construction Supply 17161 Const. of Tangalan-Ibajay Rd. 03/19/13 VI 45.834 179 O 0.387 0.259 0.150 0.024 0.030 0.033 88.30 -
A.F.G. Construction and Construction Supply 17161 Replacement/Const. of Tubog Bridge, Brgy. Tubog 08/15/12 VI 7.587 180 O 0.372 0.230 0.150 0.010 0.035 0.033 83.00 -
A.F.G. CONSTRUCTION AND CONSTRUCTION
SUPPLY17161
Construction of 2-CL Alimanguan National High School
Brgy. Alimanguan05/06/2015
Palawan 1st
DEO1.721 120 O 0.36 0.24 0.15 0.03 0.047 0.033 86.00% -
A.F.G. CONSTRUCTION AND CONSTRUCTION
SUPPLY17161
Construction/Improvement of J.M. Basa-Gen. Hughes-Fort
San Pedro Road02/06/2015 Iloilo City DEO 23.375 155 C 0.386 0.2 0.3 - - - 88.60% *88.6% Satisfactory
A.F.G. CONSTRUCTION AND CONSTRUCTION
SUPPLY17161
Widening of Jct. New Sagay - Old Sagay Rd with drainage,
K0084 + (-828) - K0085+337, Sagay City, Negros Occidental 11/19/15Regional Office,
NIR49.212 245 C 0.44 0.135 0.3 - - - 87.50%
87.5%
Satisfactory
A.F.G. CONSTRUCTION AND CONSTRUCTION
SUPPLY17161
Construction/Upgrading/Rehabilitation of Drainage along
Bacolod North Road, K0005+(-135) - K0006+622, Talisay City,
Negros Occidental
11/18/15
Negros
Occidental 1st
DEO
9.297 252 C 0.454 0.133 0.3 - - - 88.70%88.7%
Satisfactory
A.F.G. CONSTRUCTION AND CONSTRUCTION
SUPPLY17161
Rehabilitation /Reconstruction/ Upgrading of Damaged
Paved National Road including Drainage Based on
Pavement Management System / Highway Development and
Management - 4 (HDM-4) (Intermittent Section), along
Hinigaran-Isabela Road, K0058+263 - K0059+000, Barangay
Paticui, Hinigaran, Negros Occidental
11/16/15
Negros
Occidental 2nd
DEO
12.674 157 C 0.427 0.134 0.3 - - - 86.10%86.04%
Satisfactory
A.F.G. CONSTRUCTION AND CONSTRUCTION
SUPPLY/REDSON CONSTRUCTION AND
SUPPLIES (JOINT VENTURE)
JV-13-257Rehab./Reconstruction/Upgrading/Concreting of Access
Road Leading to Gawahon Resort, with exceptions12/06/2015
Negros First
DEO36.23 280 C 0.356 0.2 0.3 - - - 85.60% *85.6% Satisfactory
A.F.G. CONSTRUCTION AND SUPPLY 27999
Construction of Farm to Market Road, Barangay
Laguinbanwa West, Numancia, Aklan11/16/15 Aklan 4.652 80 C 0.421 0.2 0.3 - - - 92.10%
92.1%
Very Satisfactory
*1st/Final
* For DPWH, only the region and PMO office are listed
24th CPES Release Page5
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016
ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/
QUALITATIVE
DESCRIPTION
AMOUNT
(Php, M)
DUR
(C.D.)
CONTRACT*IMPL.
AGENCYNAME OF CONSTRUCTOR
LICENSE
NO.PROJECT
DATE OF
EVALUATION
A.I.P. CONSTRUCTION 32458
Rehabilitation/Reconstruction/Upgrading of Damaged Paved
National Roads including Drainage Based on Pavement
Management System/Highway Development and
Management-4 (HDM-4) (Intermittent Section), Lt. Takay
Road, K0308+(-599) to K0308+000 & K0308+616 to
K0308+754, Baguio City
04/09/2015Baguio City
DEO13.442 104 O 0.36 0.228 0.15 0.03 0.056 0.05 87.40% -
A.J Taylan Construction Corporation 2336Road Opening/Const. of Missing Links of National Road,
Solsona-Kabugao Road, Ilocos Norte Side09/09/09 I 48.199 300 O 0.379 0.250 0.150 0.030 0.050 0.033 89.20 -
A.J. Lava Builders 22265Repair & Maint. of Flood Control & Drainage Structures
along Rofriguez-San Jose-Quezon City Rd.11/19/12 IVA 2.449 90 O 0.337 0.300 0.150 0.030 0.025 0.033 87.50 -
A.J. LAVA BUILDERS CORP. (Formerly: A.J.
Lava Builders)22265
National Road Services - Network Development - Widening
of National Road - Arterial Roads, Marikina-Infanta Roads,
K0 035+540 - K0 036+440, K0 037+290 - K0 037+484
26/08/2015 Rizal 1st 19.6 180 C 0.454 0.133 0.3 - - - 88.70%*88.7%
Satisfactory
A.J. Taylan Construction Corp/FR Espiritu Jr.
Builders (JV)JV-14-074 Additional Priority Flood Control Project 21/10/2014 I 41.179 163 O 0.299 0.276 0.150 0.030 0.056 0.050 86.10%
86.10%
Satisfactory
A.J. TAYLAN CONSTRUCTION CORPORATION 2336
Laoag River Basin Flood and Sabo Project, Concrete
Revetment along Bongo River Brgy. Sta. Monica, Sitio 2,
San Nicolas, Ilocos Norte
11/13/15
ILOCOS
NORTE 2ND
DEO
9.650 194 OG 0.38 0.24 0.15 0.03 0.055 0.05 90.50%90.5%
Very Satisfactory
A.J. Taylan Construction Corporation/Zedik
Builders (JV)JV-13-345
Road Upgrading (Gravel to Paved) Based on Gravel Road
Strategies, Traffic Benchmark for Upgrading to Paved
Standard (HDM-4 Project Analysis) of Piniti-Banna (Espiritu)
Road
08/08/2014 I 28.942 236 O 0.380 0.240 0.150 0.030 0.055 0.033 88.80 -
A.L Gantuangco Construction 30872Construction of the Diversion Works and Canal System of
Libertad CIP - Phase 211/15-20/2010 NIA 16.060 202 O 0.373 0.264 0.150 0.023 0.038 0.050 89.69 -
A.L Gantuangco Construction 30872 Benolho CIS 10/6-10/08 NIA 3.720 90 O 0.277 0.180 0.050 0.020 0.038 0.100 66.50 -
A.L. Dare Construction 11932Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rd. (Int.
Sect.) at Candaba-San Miguel Rd., K0070+290-K0071+18407/29/13 III 11.909 139 O 0.319 0.240 0.136 0.030 0.055 0.033 81.30
A.L. DARE CONSTRUCTION -Rehabilitation/Construction of Slope Protection along
Cabetican, Bacolor, Pampanga01/06/2015
Pampanga 1st
DEO6.32 118 C 0.333 0.2 0.3 - - - 83.30% *83.3% Satisfactory
A.L. SALAZAR CONSTRUCTION INC. 3899Drainage Improvement of Commonwealth Avenue Drive to
Zuzuaregui, Brgy. Batasan Hills, Quezon City25/08/2015 QC 1st DEO 17.562 270 O 0.38 0.24 0.15 0.023 0.045 0.05 88.80% -
A.L. Salazar Construction, Inc. 3899Rehabiliation/Improvement of drainage System along C-3
Road22/11/2014 NCR 17.425 209 O 0.380 0.240 0.150 0.030 0.045 0.033 87.80%
87.80%
Satisfactory
A.L. Salazar Construction, Inc. 3899Const./Widening/Upgrading/Rehab. of Access Rd. to Taytay-
Bantulan Port (Km.210+000-Km.214+211)03/12/13 IVB 89.312 450 O 0.364 0.300 0.030 0.030 0.055 0.033 81.20 -
A.L. Salazar Construction, Inc. 3899Const./Widening/Upgrading/Rehab. of Access Road
(Km.210+000-Km.214+211)08/03/12 IVB 81.362 349 O 0.332 0.240 0.150 0.030 0.045 0.050 84.70 -
A.L.R. Construction Corporation 24110 Completion of 2-Storey 4-CL @ Landayan E/S 02/24/10 IVA 5.030 225 O 0.354 0.300 0.150 0.015 0.018 0.033 87.00 -
A.M. AYUNAN CONSTRUCTION 13983Construction/Rehabilitation of Brgy Hall
11/11/15Cotabato First
DEO0.924 75 OG 0.363 0.16 0.052 0.03 0 0.016 62.10%
62.1%
Poor
A.M. Oreta & Co., Inc./IBC Int'l Builders Corp.
(JV)JV-07096 Kalibo Airport Development Project 06/17/15 DOTC 287.056 360 O 0.381 0.300 0.150 0.020 0.044 0.033 92.80 -
A.M. Oreta / IBC (Joint Venture) JV-11-210Const. of Drainage System along Iloilo-Capiz Rd. (Old
Route) Nat'l Rd. CPU Sect., Iloilo City08/06/12 VI 42.875 240 O 0.321 0.239 0.150 0.030 0.055 0.050 84.50 -
A.M. TABAYAG BUILDERS 15008
Construction/Concreting of Local Road, Lower Bayao,
Tukuran, Zamboanga del Sur 11/13/15Zamboanga Del
Sur 1st DEO2.938 45 C 0.422 0.133 0.3 - - - 85.50%
85.5%
Satisfactory
A.P Palacios Construction 29021 Rehab./Impvt. of Dikidit-Suguit FTMR 09/08/09 III 4.723 150 O 0.300 0.300 0.150 0.030 0.050 0.033 86.30 -
A.P. CONSEBIDO CONSTRUCTION AND
TRADING33616
Cnstruction of Barangay Road (New Road with PCCP
Surfacing), Brgy. Tagumpay Sta. 000+008.10- Sta. 000+22504/06/2015
Palawan 1st
DEO1.866 40 C 0.456 0.133 0.3 - - - 88.90% *88.9% Satisfactory
A.P. CONSEBIDO CONSTRUCTION AND
TRADING33616
Construction of Barangay Road (New Road with PCCP
Surfacing) Brgy, Tagumpay Sta. 000+0008.10-Sta.
000+225.00, Roxas, Palawan
26/08/2015 Palawan I DEO 1.866 40 C 0.425 0.136 0.3 - - - 86.10%*86.1%
Satisfactory
A.P. CONSEBIDO CONSTRUCTION AND
TRADING33616
Repair/Maintenance of Tagbulan River Revetment,
K0143+955, Roxas-Taytay Road, Brgy. Minara11/13/15
Palawan 1st
DEO2.415 45 C 0.428 0.133 0.3 - - - 86.10%
86.1%
Satisfactory
A.P.B. Construction 17055Rehab./Reconst./Upgrading of Damaged Paved National
Road, PMA cut-off Road 2 K0+000-K0+36008/18/11 CAR 5.610 102 O 0.370 0.240 0.000 0.030 0.042 0.033 71.50 -
*1st/Final
* For DPWH, only the region and PMO office are listed
24th CPES Release Page6
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016
ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/
QUALITATIVE
DESCRIPTION
AMOUNT
(Php, M)
DUR
(C.D.)
CONTRACT*IMPL.
AGENCYNAME OF CONSTRUCTOR
LICENSE
NO.PROJECT
DATE OF
EVALUATION
A.P.B. CONSTRUCTION 17055
Off-Carriageway Improvement along Baguio-Bontoc Road,
K0253+(-586) to K0253+000, K0259+450 to K0259+600,
K0260+500 to K0262+000
02/06/2015Benguet 1st
DEO18.999 150 O 0.333 0.274 0.149 0.03 0.05 0.035 87.10% -
A.P.B. CONSTRUCTION 17055
Improvement/Upgrading of Naguilian-Bagulin Road Leading
to Tudingan Falls and Kedlap Burial Cave Sta. 266+980 to
Sta. 271+279, Naguilian, La Union
30/08/2015La Union 2nd
DEO41.295 179 O 0.335 0.287 0.15 0.023 0.037 0.05 88.20% -
A.P.O. General Construction 7010
Road Upgrading (Gravel to Paved) along Acop-Kapangan-
Kibungan-Bakun Road, K0283+636 - K0283+796, K0287+621 -
K0287+685, K0289+214 - K0289+473, K0289+549 -
K0289+709, K0290+901 - K0291+000, K0292+016 -
K0292+114, K0298+781 - K0299+514, K0299+531 - K0299+816
20/11/2014 CAR 72.026 267 O 0.362 0.240 0.150 0.030 0.061 0.050 89.30%89.30%
Very Satisfactory
A.P.O. General Construction 7010Rd. Upgrading (Gravel to Paved) Int. Sect., Acop-Kapangan-
Kibungan-Bakun Rd., K0348+000-K0349+00008/01/13 CAR 23.654 207 O 0.356 0.239 0.150 0.023 0.048 0.050 86.60 -
A.P.O. General Construction 7010
Rd. Upgrading (gravel to concrete) along Acop-Kapangan-
Kibungan-Bakun Rd., K0285+444-K0286+840 V.S.
(K0285+423-K0286+836 as per RBIA) & K0345+470-
K0348+000 V.S. (K0345+500-K0348+000 as per RBIA)
11/21/12 CAR 59.896 237 O 0.333 0.240 0.150 0.015 0.047 0.050 83.50 -
A.P.O. GENERAL CONSTRUCTION 7010
Road Upgrading (Gravel to Paved) along Acop-Kapangan-
Kibungan-Bakun Road, K0283+636 - K0283+796, K0287+621 -
K0287+685, K0289+214 - K0289+473, K0289+549 -
K0289+709, K0290+901 - K0291+000, K0292+016 -
K0929+114, K0296+781 - K0299+514, K0299+531 - k0299+816
03/06/2015 CAR 72.026 267 C 0.398 0.175 0.3 - - - 87.30% *88.5% Satisfactory
A.P.O. GENERAL CONSTRUCTION 7010
Road Upgrading (Unpaved to Paved) Based on Gravel Road
Strategies, Traffic Benchmark for Upgrading to Paved Road
Standards (HDM-4 Project Analysis) (Intermittent Sections)
along Mt. Province - Ifugao Road (Kiling - Paracelis Section),
K0460+508 to K0460+868, K0467+904 to K0469+000,
K0471+451 to K0472+061, K0473+155 to K0473+582,
K0474+350 to K0474+368, K0477+312 to K0477+341,
Paracelis, Mt. Province
29/08/2015 CAR 54.883 237 O 0.367 0.246 0.15 0.03 0.051 0.05 89.40% -
A.R. & Mark Builders 31673 Const. of Multi-Purpose Building, BUSECO Compound 21/10/2014 X 7.920 124 O 0.304 0.240 0.017 0.010 0.022 0.033 62.60%62.60%
Poor
A.R. & Mark Builders 31673Const. of 1-Storey, 1-CL & 1-Storey, 1-CL Kinder at Maramag
South PS, Pob.08/08/13 X 1.448 187 O 0.393 0.235 0.120 0.030 0.023 0.033 83.40 -
A.R. & MARK BUILDERS 31673
Cluster 2014-28, Construction of Roads; Municipalities of El
Salvador (Brgy. Sinaloc, Bolisong, Himaya, Sambulawan);
Jasaan (Brgy. Kimaya, Luz Banson), Misamis Oriental11/16/15
Misamis
Oriental 2nd8.348 105 C 0.207 0.2 0.3 - - - 70.70%
70.7%
Poor
A.R. Lustre Jr. Construction 7680Conc. of Puerto Princesa South Rd. (Aborlan Sect.
Km.60+024.80-Km.64+000 w/ exceptions)03/15/13 IVB 62.614 240 O 0.362 0.240 0.150 0.030 0.055 0.033 87.00 -
A.R. Lustre, Jr. Construction 7680Const. of Taguliat Bridge along PPSR-JCT-Napsan-
Apurawan Rd., K0037+67508/15/13 IVB 18.839 515 O 0.373 0.300 0.047 0.030 0.042 0.033 82.50 -
A.R.T. DWELL LIFESTYLE STORE and ECO
BUILDERS38284
Rehab./Reconst./Upgrading of Damaged Paved National
Road Including Drainage Based on Pavement Management
System Highway Development & Management-4 (Intermittent
Section), Angeles-Porac-Floridablanca-Dinalupihan Road at
K0084+(-305) - K0084+122
11/13/15Pampanga
Third DEO5.855 75 C 0.458 0.133 0.3 - - - 89.10%
89.1%
Very Satisfactory
A.S.S. Construction 31509 Completion of ACA Building II 05/14-15/09 DOST 9.631 210 O 0.380 0.296 0.150 0.030 0.062 0.050 96.80 -
A.S.T. BUILDERS 34104Widening of National Roads, Secondary Roads, R. Palma
Street, Chainage 0 - Chainage 38, Chainage 0 - Chainage 37903/09/2015 Cebu City 7.71 150 C 0.432 0.178 0.3 - - - 91.00%
*91% Very
Satisfactory
A.T. DUMLAO CONSTRUCTION INC. 34028
Rehabilitation/Reconstruction of National Roads with Slips,
Slope Collapse and Landslide along NRJ Cuevas-Bislig
Road, K1378+327 - K1378+443 (RBIA Chainage), K1378+320 -
K1378+450 (Survey), (S00464MN), Trento, Agusan del Sur)
11/11/15Agusan del Sur
2nd DEO25.215 208 OG 0.383 0.252 0.15 0.03 0.045 0.05 91.00%
91%
Very Satisfactory
*1st/Final
* For DPWH, only the region and PMO office are listed
24th CPES Release Page7
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016
ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/
QUALITATIVE
DESCRIPTION
AMOUNT
(Php, M)
DUR
(C.D.)
CONTRACT*IMPL.
AGENCYNAME OF CONSTRUCTOR
LICENSE
NO.PROJECT
DATE OF
EVALUATION
A.T. DUMLAO CONSTRUCTION, INC. 34028
Construction/Widening of Adlayan Bridge Along Daang
Maharlika (Agusan-Davao Section) (B00914MN) K1307+585-
K1307+614.80
25/08/2015Agusan del Sur
2nd36.641 377 C 0.463 0.133 0.3 - - - 89.60%
*85.52%
Satisfactory
A.T. Dumlao Construction, Inc. (Formerly:
Andoni T. Dumalao Civil Engineer -
Contractor)
34028
Construction/Widening of Adlayan Bridge along Daang
Maharlika (Agusan - Davao Section) K1307+585 -
K1307+614.8
08/08/2014 XIII 36.650 196 O 0.400 0.240 0.060 0.030 0.065 0.033 82.80 -
A.T. Dumlao Construction, Inc. (Formerly:
Andoni T. Dumlao Civil Engineer-Contractor)34028
Replacement of San Pedro Bridge along Daang Maharlika
(Surigao-Agusan Rd.) Brgy. San Pedro11/21/12 XIII 14.945 390 O 0.360 0.231 0.127 0.030 0.055 0.033 83.60 -
A.T. Dumlao Construction, Inc. (Formerly:
Andoni T. Dumlao Civil Engineer-Contractor)34028
Replacement of Lengigon Bridge (Temporary to Permanent)
along Argao - Moalboal Road, Municipality of Argao24/10/2014 VII 12.230 270 O 0.400 0.300 0.000 0.030 0.055 0.000 78.50%
78.50%
Unsatisfactory
A.T. Dumlao Construction, Inc. (Formerly:
Andoni T. Dumlao, Civil Engineer - Contractor)34028
Reconst. of Timamana Bridge along Daang Maharlika
Highway (Surigao-Agusan Rd.), Brgy. Timamana03/14/13 XIII 24.213 496 O 0.305 0.252 0.150 0.030 0.056 0.050 84.30 -
A.T. DUMLAO CONSTRUCTION, INC.
(Formerly: Andoni T. Dumlao, Civil Engineer -
Contractor)
34028Widening of Permanent Bridge (from 1 lane to 2 lane) at
Sumaguan Bridge along Argao - Moalboal Road29/08/2015 Cebu 4th 24.872 191 C 0.355 0.2 0.3 - - - 85.50%
*85.5%
Satisfactory
A.T. Dumlao Construction, Inc. (Formerly:
Andoni T. Dumlao, Civil Engineer-Contractor)34028
Replacement of San Pedro Bridge along Daang Maharlika
(Surigao-Agusan Rd.), Brgy. San Pedro03/14/13 XIII 15.781 435 O 0.355 0.223 0.150 0.030 0.035 0.033 82.60 -
A.T. Dumlao Construction, Inc. (Formerly:
Andoni T. Dumlao, Civil Engineer-Contractor)34028
Rehab./Reconst. of Hubang Bridge along Daang Maharlika
(Agusan-Davao Rd.) Km.1307+369-Km.1307+53603/09/13 XIII 19.141 380 O 0.338 0.300 0.000 0.030 0.058 0.033 75.90 -
A.T. DUMLAO CONSTRUCTION, INC.
(Formerly: Andoni T. Dumlao, Civil Engineer-
Contractor)
34028Replacement of Lengigon Bridge( Temporary to Permanent)
along Argao-Boalboal Road11/06/2015
Cebu Fourth
DEO13.23 300 C 0.477 0.16 0.3 - - - 93.70%
*84.58%
Satisfactory
A.V. CONSTRUCTION & SUPPLY (Formerly:
A.V. Construction)13202
Construction of Two (2) Storey, Two (2) Classroom School
Building at Marcos E/S12/06/2015
Laguna 3rd
DEO4.196 90 C 0.365 0.161 0.3 - - - 82.60% *82.6% Satisfactory
A.V. CONSTRUCTION AND SUPPLY
(Formerly: A.V. Construction)13202
Concreting of Tiguion-Canaon-Talao Farm to Market Road11/16/15
Marinduque
DEO5.698 85 C 0.449 0.133 0.3 - - - 88.20%
88.2%
Satisfactory
A.V.M. Construction and Supplies 114114 NHA Bayside Subdivision Housing Project 10/24/14 NHA 19.225 330 O 0.376 0.300 0.095 0.030 0.023 0.033 85.74 -
A.Y.U. ENGINEERING AND CONSTRUCTION 25632
Improvement/Rehabilitation @ Quimpo Boulevard Ecowest
Drive, Ecoland, Barangay Bucana, Brgy. 76-A, Davao City 11/19/15Davao City 1st
DEO0.000 149 C 0.479 0.133 0.3 - - - 91.20%
91.2%
Very Satisfactory
AB Aponesto Construction, Parts & Supply 22998Conc. of Lublub-Bolilac-Salad Road, Km.277+707.50-
Km.278+71109/05/10 VI 14.425 192 O 0.356 0.240 0.150 0.030 0.042 0.033 85.10 -
ABJ CONTRACTOR SERVICES 35865Construction of Farm-to-Market Road, Guiwan, Zamboanga
City11/18/15
Zamboanga
City DEO2.819 68 C 0.402 0.133 0.3 - - - 83.50%
83.5%
Satisfactory
Abulug Construction Company, Inc. 5593 Const. of Colony Road 11/13/08 II 2.894 120 O 0.329 0.240 0.100 0.030 0.033 0.100 83.20 -
Abulug Developers & Builders Co., Inc. 2366Reblocking along Manila North Road (Fugu Bdry.-Bangag
Section)05/21/09 II 19.299 210 O 0.368 0.240 0.150 0.030 0.051 0.033 87.20 -
AC RIVERO DEVELOPMENT CORPORATION 5122
Const./Imprv't of Access Road to Sabsaban Falls & Eco Park
11/10/15Palawan 2nd
Deo31.345 172 OG 0.308 0.3 0.15 0.006 0.035 0.033 83.20%
83.2%
Satisfactory
AC Rivero Development Corporation
(Formerly: AC Rivero Construction)5122
Const. of Bridge at Dodiongan Box Culvert along Sta.
Felomina-Bonbon-Digkilaan-Rogongon Road29/10/2014 X 24.567 295 O 0.339 0.278 0.150 0.010 0.051 0.050 87.80%
87.80%
Satisfactory
ACCELERATED METAL TECHNOLOGY &
CONSTRUCTION, INC. (Formerly: A.M.
Tumolva Construction and Development
Corp.)
32073Construction of Multi-Purpose Building at Delnacia Subd.,
Brgy. Talipapa, Quezon City25/08/2015 QC 1st DEO 4.749 120 C 0.487 0.2 0.3 - - - 98.70%
*98.7%
Outstanding
Accuracy Builders Enterprise 27507 Rehabilitation of Banaue Hotel Roofing 01/13/14 TIEZA 19.880 180 S 0.304 0.300 0.052 0.150 0.008 0.033 71.14 -
ACJ Construction Resources 10635
Road Upgrading of Nat'l Rd. (Gravel to Concrete) Nat'l
Secondary Rd., Km.1628+584-Km.1630+803 along
Kidapawan-Magpet-Pangao-an Rd.
08/17/11 XII 24.178 180 O 0.342 0.300 0.000 0.030 0.045 0.033 75.00 -
ACJ Construction Resources 10635Conc. of Paco-Roxas-Arakan Road Kiyaab-Antipas Section
(Km. 1648+300-Km.1649+385.63)09/05/09 XII 16.826 150 O 0.324 0.300 0.150 0.015 0.042 0.050 88.10 -
ACJ Construction Resources 10635Concreting of Poblacion Magpet-Nowa Road (Nowa Basak
Sect.) 03/10/09 XII 18.798 180 O 0.356 0.284 0.150 0.030 0.035 0.050 90.50 -
*1st/Final
* For DPWH, only the region and PMO office are listed
24th CPES Release Page8
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016
ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/
QUALITATIVE
DESCRIPTION
AMOUNT
(Php, M)
DUR
(C.D.)
CONTRACT*IMPL.
AGENCYNAME OF CONSTRUCTOR
LICENSE
NO.PROJECT
DATE OF
EVALUATION
ACJ Construction Resources 10635
Rd. Upgrading (Gravel to Conc.) Nat'l Secondary Rd.,
K1657+(-247)-K1659+824 along Paco-Roxas-Arakan Valley
Rd.
08/10/12 XII 46.844 384 O 0.354 0.244 0.150 0.030 0.051 0.050 87.90 -
Acme Builders Corporation 6442Rd. Upgrading of Tigbao-Sta. Fe-San Miguel Rd., K0910+000-
K0911+500 & K0913+000-K0913+90008/22/13 VIII 55.416 270 O 0.383 0.240 0.150 0.012 0.042 0.050 87.70 -
Acme Builders Corporation 6442Rehab./Strengthening of Rosales Bridge along Daang
Maharlika (SM) (San Isidro-San Juanico Bridge)08/14/13 VIII 25.251 165 O 0.393 0.242 0.150 0.030 0.060 0.033 90.80 -
Acme Builders Corporation 6442Rehab./Reconst./Impvt./Upgrading of Damaged Pavement,
Tacloban Baybay South Rd.06/17/10 VIII 34.600 150 O 0.366 0.300 0.150 0.030 0.032 0.033 91.10 -
Acme Builders Corporation 6442 Construction of Bagacay Bridge 03/02/09 VIII 39.122 332 O 0.319 0.288 0.000 0.030 0.023 0.050 71.00 -
Acme Builders Corporation / B. Vicencio
ConstructionJV-07-066
Const. of Palo East By Pass Road (Const. of Bernard Reed II
Bridge)08/31/09 VIII 57.823 616 O 0.384 0.240 0.150 0.030 0.047 0.033 88.40 -
Acme Builders Corporation / MWJ
Construction (JV)JV-08-243
Const. of Albuera-Burauen Road including Bridges, Burauen
Sect.09/02/09 VIII 47.235 240 O 0.352 0.245 0.150 0.030 0.045 0.050 87.20 -
Adfil Corporation 14437Rehab./Reconst. of Damaged Paved National Roads
Gingoog-Calveria-Villanueva Road09/10/09 X 96.400 405 O 0.259 0.300 0.150 0.030 0.061 0.050 85.00 -
Adfil Corporation 14437Const./Improvement of Road to Support River Rhine Cruise
leading to Banza Ruins, Barangay Banza14/08/2014 XIII 26.706 148 O 0.332 0.254 0.150 0.030 0.070 0.050 88.60 -
Adfil Corporation 14437
Rehab./Reconstruction/Replacement/Retrofitting of
Magsaysay Bridge along Butuan - Cagayan de Oro - Iligan
(Agusan - Misamis Oriental)
15/08/2014 XIII 36.843 234 O 0.384 0.234 0.150 0.030 0.047 0.050 89.50 -
Adfil Corporation 14437Construction of Agusan - Bukidnon Road, Sta. 1262+260 -
Sta. 1265+12005/08/2014 XIII 40.140 209 O 0.360 0.264 0.150 0.030 0.037 0.050 89.10 -
Adfil Corporation 14437Repair/Maintenance with Asphalt Overlay of Tabon-Tabon
Slip along Agusan- Davao Road06/17/10 XIII 32.364 225 O 0.371 0.240 0.150 0.030 0.055 0.033 87.90 -
Adfil Corporation 14437 Rehab. of Magsaysay Bridge along Iligan City 09/09/10 XIII 48.161 300 O 0.352 0.300 0.150 0.030 0.055 0.050 93.70 -
Adfil Corporation 14437
Rehab./Reconst. of Damaged Paved National Rd. along
Butuan City-CDO-Iligan Rd.,(Agusan-Misamis Oriental
Sect.)Libertad-Bancasi Sect.
09/16/09 XIII 54.954 285 O 0.371 0.300 0.150 0.030 0.055 0.050 95.60 -
Adfil Corporation 14437Const./Completion/Continuation of Unfinished Bridge and
Approaches, Brgy. Libertad09/16/09 XIII 23.830 195 O 0.364 0.300 0.150 0.030 0.055 0.050 94.90 -
Adfil Corporation 14437 Concreting of NRJ-Bahbah-Talacogon Rd. 09/13/09 XIII 15.872 225 O 0.371 0.244 0.150 0.030 0.065 0.050 91.00 -
Adfil Corporation (Formerly: Adfil
Construction)14437
Construction of Agusan-Bukidnon Road, Sta. 1262+260 -
Sta. 1265+12021/10/2014 XIII 40.140 271 O 0.387 0.182 0.150 0.024 0.065 0.050 85.80%
85.80%
Satisfactory
Adfil Corporation (Formerly: Adfil
Construction)14437 Rehab./Reconst. of Ampayon Bridge along Daang Maharlika 08/23/13 XIII 19.207 219 O 0.397 0.240 0.150 0.018 0.040 0.050 89.50 -
Adfil Corporation (Formerly: Adfil
Construction)14437
Widening/Conc. of Add'l. Lane Both Directions along Butuan
City-Cagayan de Oro-Iligan Rd., K1249+461-K1253+310.5008/06/13 XIII 86.661 240 O 0.390 0.238 0.150 0.030 0.035 0.050 89.30 -
Adfil Corporation (Formerly: Adfil
Construction)14437
Road Upgrading (Gravel to Paved) of Butuan City-Pianing-
Tandag Road, K1237+055 - K1240+040, with exceptions30/10/2014 XIII 127.287 270 O 0.346 0.240 0.150 0.024 0.056 0.050 86.60%
86.60%
Satisfactory
Adfil Corporation (Formerly: Adfil
Construction)14437
Reconstruction/Replacement/Completion of Minusong
Bridge along Butuan-Cagayan de Oro-Iligan Road (Agusan--
Misamis Oriental), Km1269+217
21/10/2014 XIII 34.627 270 O 0.343 0.286 0.150 0.030 0.065 0.050 92.40%92.40%
Very Satisfactory
Adfil Corporation (Formerly: Adfil
Construction)14437
Rehab./Reconst./Replacement/Retrofitting of Salvacion
Bridge along NRJ Cuevas - Bislig Road, K1374+670 -
K1374+731
08/08/2014 XIII 36.656 196 O 0.400 0.200 0.150 0.030 0.042 0.050 87.20 -
Adfil Corporation (Formerly: Adfil
Construction)14437
Rehab./Reconst./Upgrading of Butuan City-Cagayan de Oro-
Iligan City Rd. a)K1494+049-K1495+240; b)K1499+692-
K1499+712; c)K1500+678-K1500+902; d)K1501+905-
K1507+000; e)K1508+000-K1508+919
03/12/13 X 48.167 285 O 0.293 0.271 0.150 0.010 0.050 0.050 82.40 -
Adfil Corporation (Formerly: Adfil
Construction)14437
Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rds.,
Butuan City-Cagayan de Oro City-Iligan City Rd.:
a.)K1494+049-K1495+240; b.)K1499+692-K1499+712;
c.)k1500+678-K1500+902; d.)K1501+905-K1507+000;
e.)K1508+000-K1508+919
11/23/12 X 44.537 255 O 0.332 0.300 0.150 0.030 0.040 0.050 90.20 -
Adfil Corporation (Formerly: Adfil
Construction)14437 Rehab./Reconst. of Ampayon Bridge along Daang Maharlika 03/21/13 XIII 18.426 171 O 0.390 0.300 0.150 0.030 0.054 0.033 95.70 -
Adfil Corporation (Formerly: Adfil
Construction)14437
Widening/Conc. of Add'l Lane along Daang Maharlika
(Agusan-Surigao Rd.) Cabadbaran City Sect., Sta.1213+540-
Sta.1215+520
03/11/13 XIII 29.059 142 O 0.365 0.300 0.150 0.030 0.050 0.033 92.80 -
*1st/Final
* For DPWH, only the region and PMO office are listed
24th CPES Release Page9
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016
ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/
QUALITATIVE
DESCRIPTION
AMOUNT
(Php, M)
DUR
(C.D.)
CONTRACT*IMPL.
AGENCYNAME OF CONSTRUCTOR
LICENSE
NO.PROJECT
DATE OF
EVALUATION
Adfil Corporation (Formerly: Adfil
Construction)14437
Completion of Maraput Bridge along Daang Maharlika
(Surigao-Agusan Rd.), Sta.1207+19203/11/13 XIII 9.115 120 O 0.348 0.300 0.150 0.030 0.037 0.033 89.80 -
Adfil Corporation (Formerly: Adfil
Construction)14437
Const./Impv't of Rd. to Support River Rhine Cruise, Banza
Ruins03/21/13 XIII 29.509 155 O 0.313 0.300 0.150 0.024 0.060 0.033 88.00 -
Adfil Corporation (Formerly: Adfil
Construction)14437
Completion of La Union Bridge along Pandanon-Magallanes
Rd.03/11/13 XIII 15.889 150 O 0.312 0.300 0.150 0.020 0.047 0.033 86.20 -
Adfil Corporation (Formerly: Adfil
Construction)14437
Conc. of Agusan-Malaybalay Road, Km. 1283+183.50-
Km.1284+78003/31/12 XIII 39.495 300 O 0.351 0.300 0.150 0.030 0.040 0.050 92.10 -
Adfil Corporation (Formerly: Adfil
Construction)14437
Widening of Butuan-Cagayan de Oro-Iligan Rd. (Agusan-
Misamis Oriental Sect.) Pob., Buenavista Sect.08/06/12 XIII 24.129 255 O 0.336 0.296 0.150 0.030 0.055 0.033 90.00 -
Adfil Corporation (Formerly: Adfil
Construction)14437 Rehab. of Salvacion (Crossing Luna Flood Control) 08/20/12 XIII 16.733 285 O 0.375 0.240 0.150 0.030 0.050 0.050 89.50 -
Adfil Corporation (Formerly: Adfil
Construction)14437
Widening of Daang Maharlika (Agusan-Usrigao Rd.) Pob.,
Cabadbaran Sect.08/06/12 XIII 27.390 255 O 0.370 0.240 0.150 0.030 0.050 0.050 89.00 -
Adfil Corporation (Formerly: Adfil
Construction)14437
Rehab./Reconst./Strengthening of Minusong Bridge along
Butuan-Cagayan de Oro-Iligan (Agusan Misamis Oriental)
Km.1269+217, Aclan, Nasipit
08/06/12 XIII 28.848 270 O 0.383 0.246 0.150 0.030 0.045 0.033 88.70 -
Adfil Corporation (Formerly: Adfil
Construction)14437
Rehab./Reconst./Strengthening of Minusuang Bridge along
Daang Maharlika (Surigao-Agusan Rd.) Km.1206+56108/07/12 XIII 23.512 270 O 0.326 0.240 0.150 0.030 0.055 0.050 85.10 -
Adfil Corporation (Formerly: Adfil
Construction)14437
Rehab./Reconst./Strengthening of Maraput Bridge along
Daang Maharlika (Surigao-Agusan Rd.) Km.1207+192, Brgy.
Victory
08/07/12 XIII 23.512 285 O 0.325 0.240 0.150 0.030 0.055 0.050 85.00 -
ADFIL CORPORATION (Formerly: Adfil
Construction)14437
Construction/Upgrading of Banza to Magallanes Road
leading to Centennial Tree and Beaches, Magallanes,
Agusan del Norte
11/19/15Agusan del
Norte DEO37.219 185 C 0.403 0.2 0.3 - - - 90.30%
90.3%
Very Satisfactory
ADFIL CORPORATION (Formerly: Adfil
Construction)14437
Widening of Daang Maharlika (Agusan-Davao Section),
K1304+(-404) - K1307-471, K1309+138.1 - K1312+810, San
Francisco, Agusan del Sur
11/11/15 Regional Office 169.799 300 OG 0.257 0.3 0.15 0.03 0.065 0.033 83.50%83.5%
Satisfactory
ADFIL CORPORATION (Formerly: Adfil
Construction)14437
Widening of Permanent Bridges to more than 2 lanes, Wawa
Bridge (B00896MN) along Daang Maharlika (Agusan-Davao
Road Section), Brgy. Wawa, Sibagat, Agusan del Sur11/9/15 Regional Office 207.695 340 OG 0.317 0.24 0.15 0.03 0.055 0.033 82.50%
82.5%
Satisfactory
Adige Sta. Clara (JV) JV-06-032DPWH Component Project under the Help for Catubig
Agricultural Advancement Proj.05/30/09 VIII 519.663 1,073 O 0.378 0.300 0.150 0.030 0.050 0.050 95.80 -
Adige Sta. Clara (JV) JV-06-032DPWH Component Project under the HELP for Catubig
Agricultural Project (HCAAP)08/25/08 VIII 448.581 734 O 0.377 0.300 0.070 0.030 0.050 0.067 89.40 -
Adimre Construction 25534 Taytay Airport Development Project 07/22/15 DOTC 10.794 154 O 0.390 0.300 0.033 0.030 0.044 0.050 84.70 -
Adimre Construction 25534 Marinduque Airport Development Project 08/07/15 DOTC 6.293 120 O 0.384 0.300 0.150 0.015 0.035 0.050 93.40 -
Adimre Construction 25534 Balagtas Port Development Project 07/10/14 DOTC 7.802 180 O 0.385 0.300 0.150 0.020 0.040 0.033 92.80 -
Adimre Construction 25534 Obando Port Development Project 08/18/14 DOTC 8.109 194 O 0.378 0.300 0.150 0.010 0.016 0.033 88.65 -
Adimre Construction 25534 Malolos Port Development Project 08/19/14 DOTC 9.625 254 O 0.397 0.300 0.150 0.010 0.009 0.050 91.56 -
Adimre Construction 25534 Const. of Three Storey Six CL Sch. Bldg. Tibagan NHS 08/14/13 III 7.027 180 O 0.326 0.240 0.150 0.030 0.047 0.033 82.60 -
Adimre Construction 25534Const. of Drainage Canal along Pulilan-Calumpit Rd., Pulilan
Section Km. 46+000-Km. 47+20008/02/12 III 11.886 170 O 0.376 0.283 0.150 0.022 0.060 0.050 94.10 -
Adimre Construction 25534 Meycauayan Port Development Project 07/09/14 DOTC 8.300 150 O 0.385 0.300 0.150 0.020 0.035 0.033 92.30 -
ADIMRE CONSTRUCTION 25534 Marinduque Airport Development Project 11/12/15 DOTC 6.293 120 C 0.498 0.200 0.300 - - - 99.7595.31% V.
Satisfactory
ADIMRE CONSTRUCTION 25534 Taytay Airport Development Project 12/17/15 DOTC 10.794 105 C 0.440 0.200 0.300 - - - 94.0488.43%
Satisfactory
ADIMRE CONSTRUCTION 25534 Puerto Princesa Airport Development Project 03/29/16 DOTC 64.553 420 O 0.353 0.300 0.150 0.020 0.039 0.050 91.23 -
*1st/Final
* For DPWH, only the region and PMO office are listed
24th CPES Release Page10
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016
ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/
QUALITATIVE
DESCRIPTION
AMOUNT
(Php, M)
DUR
(C.D.)
CONTRACT*IMPL.
AGENCYNAME OF CONSTRUCTOR
LICENSE
NO.PROJECT
DATE OF
EVALUATION
Adimre Construction 25534 Puerto Princesa Airport Development Project 9/20/16 DOTC 64.553 420 O 0.396 0.300 0.062 0.020 0.039 0.033 85.05 -
ADP Construction & Supply 3466 Const. of Sta. Barbara Catching DAM and Canal Struc. 04/05/14 NIA 16.962 150 O 0.327 0.245 0.150 0.018 0.032 0.050 82.20 -
ADP Construction & Supply 3466 Const. of Various CIP's Package 1 - Badbaran CIP 04/13/13 NIA 24.770 210 O 0.348 0.249 0.150 0.000 0.027 0.050 82.40 -
ADP CONSTRUCTION AND SUPPLY 3466
Construction of Juaneza-Aguirre-Malapaya Farm-to-Market
Road (Sta. 0+000-Sta.4+000 with exceptions), Sara, Iloilo 11/14/15 Iloilo 3rd 47.767 190 C 0.365 0.2 0.3 - - - 86.50%86.5%
Satisfactory
ADP CONSTRUCTION AND SUPPLY 3466
Reconstruction/Improvement of Dumalag Municipal Road,
Brgy. Poblacion, Dumalag, Capiz (Section I) 11/13/15 Capiz 2nd 35.960 224 OG 0.366 0.232 0.15 0.03 0.07 0.05 89.80%89.8%
Very Satisfactory
Advance Foundation Const. System Corp. /
Abulug Developer Builders Const. Inc. (JV)JV-09-289
Const. of Gov. Edgar R. Lara Bridge along Cagayan-Apayao
Road03/30/11 II 112.029 240 O 0.360 0.300 0.000 0.023 0.051 0.017 75.10 -
Advance Tech Construction & Trading Corp. 35288 Cabucgayan Seaport Construction 08/11/15 DOTC 8.606 240 O 0.400 0.300 0.150 0.015 0.029 0.050 94.42 -
Advance Tech Construction & Trading Corp/ 35288 Miag-ao Feeder Port Development 11/16/16 DOTC 7.161 120 O 0.400 0.300 0.150 0.020 0.041 0.050 96.08 -
Advance Tech Construction & Trading
Corporation35288 Construction of Brgy. Iquiran Wharf 10/14/15 DOTC 9.438 180 O 0.400 0.300 0.150 0.020 0.018 0.050 93.75 -
Advance Tech Construction & Trading
Corporation35288 Construction of Iquiran Wharf 01/21/16 DOTC 9.438 180 C 0.492 0.200 0.300 - - - 99.15
95.91%
V. Satisfactory
Advance Tech Construction & Trading
Corporation35288 Cabucgayan Port Development Project 02/16/16 DOTC 8.602 240 C 0.467 0.200 0.300 - - - 96.70
95.30%
V. Satisfactory
ADVANCED FOUNDATION CONSTRUCTION
SYSTEM CORP./PULSAR CONSTRUCTION
(JV)
JV-13-601
Construction and Maintenance of Bridges along National
Roads-Construction of Bridges-On-going, Lucban Bridge
along Manila North Road
01/06/2015Regional Office
No. I278.183 674 O 0.398 0.3 0.15 0.024 0.05 0.033 95.50% -
Advanced Foundation Construction System,
Corp.15449
Lucban Bridge & Approaches Phase I along Manila North
Rd.08/01/13 II 153.067 450 O 0.328 0.300 0.150 0.030 0.056 0.033 89.70 -
Advanced Foundtaion Construction System
Corp./Pulsar Construction(JV)JV-13-601
Construction and Maintenance of Bridges along National
Roads - Construction of Bridges - On going; Lucban Bridge
along Manila North Road
22/10/2014 II 253.267 650 O 0.456 0.225 0.150 0.030 0.033 0.033 92.70%92.70%
Very Satisfactory
Advanced Matrix Construction Inc. 32873 Structural Retrofitting of Buildings at PICC Phase 1 1/27/16 BSP 36.535 240 C 0.481 0.200 0.300 - - - 98.1092.50%
Very Satisfactory
Advanced Matrix Construction Inc. 32873Rehabilitation of Common Maintenance Shop (CMS) at BSP,
SPC1/27/16 BSP 19.053 188 C 0.466 0.200 0.119 - - - 78.50
86.90%
Satisfactory
Advanced Matrix Construction Inc. 32873 Full Upgrading of Toilets at PICC 1/26/16 BSP 29.298 210 C 0.481 0.200 0.300 - - - 98.1093.50%
Very Satisfactory
Advanced Matrix Construction Inc. 32873 New Roofing System for Building E Roofdeck 3/2/16 BSP 23.296 321 C 0.469 0.200 0.194 - - - 86.3084.30%
Satisfactory
Advanced Matrix Construction Incorporated 32873 Rehabilitation of Building B Lighting System 10/08/13 BPS 2.000 60 O 0.346 0.279 0.150 0.030 0.035 0.050 89.00 -
Advanced Matrix Construction Incorporated 32873Proposed Renovation of Executive Offices Located at 5th
Floor, 5-Storey Building-Phase IV03/06/14 BSP 14.500 146 C 0.431 0.200 0.300 - - - 93.10
*93.10%
V. Satisfactory
Advanced Matrix Construction, Inc. 32873 New Roofing System for Building E Roofdeck 11/19/14 BSP 22.300 120 O 0.389 0.300 0.071 0.020 0.030 0.025 83.50 -
*1st/Final
* For DPWH, only the region and PMO office are listed
24th CPES Release Page11
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016
ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/
QUALITATIVE
DESCRIPTION
AMOUNT
(Php, M)
DUR
(C.D.)
CONTRACT*IMPL.
AGENCYNAME OF CONSTRUCTOR
LICENSE
NO.PROJECT
DATE OF
EVALUATION
Advanced Matrix Construction, IncorporatedImprovement of BSP-SPC Parking Lot at BSP Security Plant
Complex03/31/13 BSP 13.800 180 O 0.399 0.190 0.150 0.030 0.051 0.050 87.00 -
AEJ Hardware Construction & Enterprises 34740
Repair/Rehab. of Licomo Failed Rd. Shoulder along Maria
Clara Lobregat Highway (Pagadian-ZC Rd.), K1851+500-
K1851+600
03/11/13 IX 1.880 64 O 0.363 0.240 0.124 0.030 0.035 0.033 82.50 -
AFG CONSTRUCTION AND SUPPLY 17161
Construction of Academic Building at: 6. Construction of 2-
CL Alimanguan National High School, Brgy. Alimanguan,
San Vicente, Palawan
26/08/2015 Palawan I DEO 1.712 120 C 0.485 0.167 0.3 - - - 95.20%*95.2% Very
Satisfactory
Agafer Construction 7912 Const. of Cagayan River Control 11/11/08 II 14.241 240 O 0.318 0.160 0.030 0.030 0.033 0.133 70.40 -
AGUERO CONSTRUCTION 23338
Cluster XII- Construction of Classrooms in Areas
Experiencing Acute classroom Shortage in Lake Sebu,
South Cotabato (1 Unit-2CL/1 Unit-3CL & 1 Unit-1CL)
02/06/2015South Cotabato
DEO4.808 210 C 0.45 0.133 0.3 - - - 88.30% *88.3% Satisfactory
AGUINSOD GENERAL CONSTRUCTION 34741
Construction of Slope Protection/Retaining Wall along Pico-
Lamtang Road, K0256+300 - K0256+420, K0258+163 -
K0258+235, K0259+670 - K0259+700, K0260+665 -
K0260+725, K0262+500 - K0262+585
02/06/2015Benguet 1st
DEO8.292 120 O 0.237 0.3 0.15 0.02 0.045 0.05 80.20% -
AHMADI BUILDERS 31752
Construction of roads at Iligan City a) Purok 8, Upper
Tominobo, Iligan City, b) Purok Mauswagon to Purok Pag-
asa, Barangay Ditucalan, Iligan City, c) Purok 5, Barangay
Sta. Elena, Iligan City
08/06/2015Lanao del Norte
Second DEO1.927 45 C 0.424 0.2 0.3 - - - 92.40%
*92.4% Very
Satisfactory
Ahnex Builders & Ready Mix Corporation 32296 Widening of Cavite-Batangas Rd., Km.22+000-Km.23+653 11/23/12 IVA 30.797 369 O 0.352 0.300 0.106 0.022 0.050 0.033 86.30 -
Ahnex Builders & Ready Mix Corporation 32296Widening of Governors Drive (Carmona-Dasmarias-Trece
Martires City Rd.) inc. Drainage System08/15/12 IVA 38.813 190 O 0.366 0.300 0.081 0.030 0.055 0.033 86.50 -
AJ TAYLAN CONSTRUCTION
CORPORATION/DJCM
CNSTRUCTION/ALTHEA CONSTRUCTION (JV)
JV-14-867
Rehabilitation/Reconstruction of National Roads with Slips,
Slope Collapse and Landslide, Batac-Pinili via Maipag Road,
K0472+520, K0479+192, K0479+735, Batac, Ilocos Norte11/12/15
REGIONAL
OFFICE56.537 242 C 0.478 0.147 0.3 - - - 92.50%
92.5%
Very Satisfactory
AJ Tylan Const., Corp./DJCM Const/VVH
Const., Corp./ZEDIK Builders (DAVZ JV)JV-13-702
Construction and Maintenance of Bridges along National
Roads-Widening of Permanent Bridges, Subec Bridge along
MNR
21/10/2014 I 36.706 304 O 0.330 0.249 0.150 0.030 0.056 0.050 86.50%86.50%
Satisfactory
Ajan Jaeda, inc. 17869Corollary Works for Banquerohan Resettlement Project, Ph.
29/14-18/09 NHA 30.991 150 O 0.398 0.245 0.015 0.024 0.070 0.050 80.15 -
Ajan Jeada, Inc. 17869 Impv't. of Bahi-Cagubulacao Rd. (Cagraray Eco Park) 08/03/11 V 18.989 221 O 0.317 0.300 0.150 0.030 0.045 0.033 87.50 -
AJYSC Marketing 26924Completion of Drainage Canal along Dulawan-Marbel Rd.
(New Carment Sect.)03/11/13 XII 17.419 214 O 0.364 0.300 0.000 0.030 0.050 0.033 77.70 -
AJYSC Marketing 26924Const./Replacement of Banga Bridge and Approaches
Phase II03/08/10 XII 24.657 240 O 0.350 0.240 0.150 0.030 0.040 0.033 84.30 -
AJYSC Marketing 26924Rehab./Improvement of Bulok Bridge along Marbel-Makar
Road06/05/09 R-XII 4.764 90 O 0.271 0.300 0.150 0.030 0.059 0.050 86.00 -
AJYSC Marketing 26924Completion of Drainage Canal along Dulawan-Marbel Rd.,
New Carmen Sect.11/24/12 XII 17.419 214 O 0.359 0.300 0.102 0.030 0.055 0.000 84.60 -
AJYSC Marketing 26924Completion of Drainage Canal along Dulawqan-Marbel Rd.
(New Carment Sect.)08/08/12 XII 17.419 196 O 0.386 0.300 0.085 0.030 0.045 0.033 87.90 -
AJYSC MARKETING 26924Repair/Rehab./Improvement along Dulawan-Marbel Road
(Grio- Tacurong Section) 03/06/2015
Sultan Kudarat
1st DEO10.349 143 C 0.441 0.133 0.3 - - - 87.40% *87.4% Satisfactory
AJYSC MARKETING 26924Construction of Revetment at the Side of Damaged River
Bank of Banga Bridge along Cotabato-Marbel Road02/06/2015
South Cotabato
DEO5.798 150 C 0.398 0.133 0.3 - - - 83.10% *83.1% Satisfactory
AJYSC MARKETING 26924
Midsayap-Marbel Road, K1777+409-K1780+1020 ( with
exceptions), Luayan-Dumadalig Section, Tantangan, South
Cotabato Modified to: MF01- Widening of Secondary Road-
Midsayap-Marbel Road, K1777+353-K1779+553.16 ( with
exceptions), Luayan-Dumadalig Section
02/06/2015South Cotabato
DEO43.944 174 O 0.358 0.24 0.15 0.03 0.02 0.033 83.10% -
*1st/Final
* For DPWH, only the region and PMO office are listed
24th CPES Release Page12
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016
ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/
QUALITATIVE
DESCRIPTION
AMOUNT
(Php, M)
DUR
(C.D.)
CONTRACT*IMPL.
AGENCYNAME OF CONSTRUCTOR
LICENSE
NO.PROJECT
DATE OF
EVALUATION
AJYSC MARKETING 26924
Midsayap-Marbel Road K1777+353 to K1779+553.16 with
exception Luayan-Dumadalig Section, Tantangan South
Cotabato, 2nd LD
11/9/15South Cotabato
First DEO47.958 234 OG 0.36 0.248 0.15 0.03 0.042 0.05 88.00%
88%
Satisfactory
AJYSC MARKETING 26924
Construction and Namleaning of Bridges along National
Roads- Widening of Permanent Bridges to more than 2
lanes, Bawing Bridge along Makar-Kiamba Road11/18/15
South Cotabato
Second DEO25.481 176 OG 0.346 0.3 0 0 0.023 0 66.90%
66.9%
Poor
AJYSC MARKETING 26924
Construction/Rehabilitation of Drainage Protection Works
along National Roads - Nationwide: Construction of the
Revetment along the Damaged Riverbank of Banga Bridge
along Cotabato-Marbel Road
02/09/2015 South Cotabato 5.24 98 C 0.411 0.147 0.3 - - - 85.80%*85.8%
Satisfactory
AKH Construction and Trading Corporation 20759
Preventive Maintenance Based on Pavement Management
System/Highway Development and Management-4 (HDM-4)
along V. Mapa Street
24/11/2014 NCR 22.598 206 O 0.381 0.240 0.150 0.030 0.045 0.033 87.90%87.90%
Satisfactory
AKH Construction and Trading Corporation 20759Proposed Repair/Rehab. Of Road along Jalandoni St., CCP
Complex17/08/2014 NCR 8.100 90 O 0.446 0.215 0.150 0.030 0.040 0.030 91.10 -
AKH Construction and Trading Corporation 20759
Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rd.
(Int. Sect.) of Mendiola Extension (Chainage 0000-Chainage
0119, A) Prev. Maint. (Int. Sect.) of Mendiola (Chainage 0119-
085)
03/13/13 NCR 2.678 69 O 0.366 0.200 0.150 0.030 0.048 0.033 82.70 -
AKH CONSTRUCTION AND TRADING
CORPORATION20759
Concrete Reblocking along commonwealth Ave., Quezon
City, K0017+061 - K0020+(-262), K0016+938 - K0019+731,
Quezon City
06/06/2015 NCR 17.988 273 O 0.387 0.24 0.15 0.024 0.056 0.05 90.70% -
AKH CONSTRUCTION AND TRADING
CORPORATION20759
Rehabilitation/Reconstruction/Upgrading of Damaged South
Super Highway East Service Road, K13+890 to K16+793,
Paraaque City
03/09/2015 NCR 27.364 165 O 0.376 0.24 0.15 0.03 0.053 0.05 89.90% -
AKN Construction Corporation (Formerly:
AKN Construction)11845
Slope Protection of Estero Tripa De Gallina, Barangay
Bangkal19/11/2014 NCR 17.321 150 O 0.357 0.300 0.059 0.030 0.049 0.050 84.50%
84.50%
Satisfactory
AKN Construction Corporation (Formerly:
AKN Construction)11845
Widening/Conc. of R-10 inc. ROW, (Const. of Footbridge at
corner Pacheco)04/15/11 NCR 17.977 248 O 0.371 0.296 0.150 0.030 0.035 0.050 93.20 -
AKN Construction Corporation (Formerly:
AKN Construction)11845
Rehab./Reconstruction of Muntinlupa Insular Prison Road
and its Vicinity, Brgy. Poblacion09/09/09 NCR 19.113 100 O 0.297 0.219 0.150 0.023 0.035 0.050 77.40 -
AKN CONSTRUCTION CORPORATION
(Formerly: AKN Construction)11845
Dredging of Marala River, (from C-3 to C-4), Sta. 1+400 to
Sta. 2+750, Navotas City06/06/2015 NCR 50.541 120 C 0.48 0.2 0.3 - - - 98.00% *98% Outstanding
AKN CONTRUCTION CORP. 11845Dredging of Paranaque River Mouth (Phase I), Paranaque
City, Metro Manila12/3/15
Metro Manila
2nd DEO86.133 240 OG 0.4 0.2 0.05 0.036 0.25 - 93.60%
93.6%
Very Satisfactory
AL CHRIS CONSTRUCTION 12406Health Facilities and Multi-Purpose Buildings (Cluster II) a)
Construction of Public Market27/08/2015 Bohol 2.877 140 C 0.473 0.078 0.3 - - - 85.10%
*85.1%
Satisfactory
AL Chris Construction 12406BERRRP-Candumayao (Catigbian) - Cabanugan (San Isidro)
rd.01/19/15 Bohol 8.874 209 O 0.338 0.300 0.066 0.030 0.051 0.050 83.50 -
AL HUSSEIN CONSTRUCTION 18438
Rehabilitation/Reconstruction of National Road with Slips,
Collapse and Landslides, Lanao del Norte Interior
Circumferential Road (LDN1CR), K1536+610-K1536+750;
K1544+120-K1544+725, Tagoloan, Lanao del Norte
03/09/2015Lanao del Norte
1st DEO44.744 205 O 0.384 0.24 0.15 0.03 0.06 0.05 91.40% -
Al-B Construction 11740Rehab./Reconst./Upgrading along Angeles-Porac-
Floridablanca-Dinalupihan Rd.06/01/10 III 18.839 90 O 0.389 0.240 0.150 0.030 0.047 0.033 88.90 -
AL-B DEVELOPMENT CORP./PING-ANN'S
CONSTRUCTION AND TRADING (JV)JV-14-075 Reconstruction of Loboc River Terminal 8/27/15 TIEZA 19.500 240 C 0.481 0.200 0.300 98.10
93.9%
Very Satisfactory
AL-B DEVELOPMENT CORPORATION
(Formerly ALB Construction)11740
Network Development, Widening of National Roads, (Arterial
Roads-Outside N1), Angeles-Porac-Floridablanca-
Dinalupihan Road at KO084+(-615) to KO085+(-024), Angeles
City, Pamapanga 1st LD
29/08/2015Pampanga
Third DEO34.069 210 O 0.379 0.24 0.15 0.03 0.07 0.05 91.90% -
AL-B Dev't Corp./ Ping-Ann's Construction
and Trading (JV)JV-14-075 Reconstruction of Loboc River Terminal 6/24/15 TIEZA 19.550 240 O 0.375 0.300 0.097 0.030 0.070 0.050 92.10 -
ALBERTO UY CONSTRUCTION &
DEVELOPMENT20924
Rehabilitation/Upgrading of Mapang (Taas) Formon Road,
Bongabong, Oriental Mindoro28/08/2015
Southern
Mindoro DEO14.477 149 O 0.368 0.24 0.15 0.03 0.057 0.05 89.50% -
ALBERTO UY CONSTRUCTION &
DEVELOPMENT20924
Rehab./Upgrading of Mapang Road (Taas) Formon Road11/19/15
Southern
Mindoro DEO14.477 149 C 0.471 0.133 0.3 - - - 90.40%
90.4%
Very Satisfactory
*1st/Final
* For DPWH, only the region and PMO office are listed
24th CPES Release Page13
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016
ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/
QUALITATIVE
DESCRIPTION
AMOUNT
(Php, M)
DUR
(C.D.)
CONTRACT*IMPL.
AGENCYNAME OF CONSTRUCTOR
LICENSE
NO.PROJECT
DATE OF
EVALUATION
Alcel Construction 15129
Road Upgrading (Gravel-Paved) Along Gurel-Bokod-
Kabayan-Buguias-Abatan Road, K0338+481-K0339+838,
Kabayan, Benguet
14/08/2014 CAR 46.461 240 O 0.361 0.240 0.150 0.023 0.050 0.050 87.40 -
Alcel Construction 15129 Const. of Access Rd. to Airport, Alaminos City Airport 03/15/13 I 1.821 45 O 0.390 0.300 0.150 0.010 0.023 0.033 90.60 -
Alcel Construction 15129 Const. of Access Rd. for Alaminos Airport (Phase I) 08/16/12 I 17.991 253 O 0.384 0.240 0.150 0.030 0.045 0.033 88.20 -
ALCEL CONSTRUCTION 15129
Rehabilitation/Improvement of Gurel - Bokod - Kabayan -
Buguias - Abatan Road Including ROW, Bokod and Kabayan
Section, K0301+(-797) - K0326+004 (I.S.)
26/02/2015 CAR 97 403 C 0.392 0.2 0.3 - - - 89.20%*89.2% Very
Satisfactory
ALCEL CONSTRUCTION 15129
Rehabilitation/Reconstruction/Upgrading of Alaminos-
Bolinao Road, K0325+000 to K0326+000, K0321+(-204) to
K0323+133, Alaminos City, Pangasinan
01/09/2015Pangasinan 1st
DEO43.823 240 O 0.331 0.3 0.15 0.023 0.042 0.05 89.60% -
ALCEL CONSTRUCTION 15129Construction of Road (Baywalk) Brgy. Libsong East,
Lingayen to Baybay Lopez, Binmaley, Pangasinan11/19/15
PANGASINAN
2ND DEO28.812 180 C 0.376 0.24 0.15 0.03 0.05 0.05 89.60%
89.6%
Very Satisfactory
Alcel Construction/Oriental Sales Center and
Contractor (J.V.)JV-12-432
Prev. Maint. of Manila North Rd. K0169+700-K0172+105 w/
exception w/n the District08/09/13 I 34.285 150 O 0.345 0.300 0.150 0.030 0.047 0.033 90.50 -
Alebon Genuine Merchandising 26300Widening of Butuan City - Cagayan de Oro City - Ilagan City
Road Km1425+500 - Km.1426+50004/08/2014 X 18.578 191 O 0.383 0.300 0.150 0.030 0.040 0.050 95.30 -
Alebon Genuine Merchandising 26300Construction of Concrete Revetment along Kinoguitan By-
Pass Road11/08/2014 X 13.482 210 O 0.383 0.300 0.150 0.030 0.047 0.033 94.30 -
Alebon Genuine Merchandising 26300 Widening of Carmen-Patag-Bulua Rd., Bulua-Patag Sect. 03/11/13 X 4.198 37 O 0.371 0.244 0.150 0.010 0.037 0.050 86.20 -
ALEBON GENUINE MERCHANDISING 26300
Rehab/Reconst/Upgrading of Damaged Paved National
Roads Including Drainage Based on Pavement Management
System/Highway Development and Management-4 (HDM-4)
(Intermittent Section) CDO-Cadre Circumferential Ext., Rd.,
Chainage 0-556.00, Cagayan de Oro City
11/06/2015
Cagayan de
Oro City First
DEO
8.865 170 O 0.353 0.3 0.15 0.02 0.025 0.05 89.80% -
Al-Fahdel Const. and Eng'g 17953Conc./Impvt. of Tubod-Ganassi Road (Caniogan Sect.) Sta.
1602+000-Sta. 1603+000 with exception06/05/09 X 18.126 150 O 0.344 0.265 0.150 0.015 0.043 0.050 86.70 -
Al-Fahdel Const. and Eng'g. 17953Repair/Rehab. of Rd. Slip (down) along Dobleston-Butadon
Nat'l Rd. (Secondary Rd.), K2007+860-K2007+90011/28/12 X 3.790 59 O 0.363 0.226 0.150 0.030 0.023 0.033 82.50 -
Alfalfa Construction 29712Road Upgrading of Banaue-Hungduan Benguet Bdry. Road
Hapao-Abatan Section04/08/11 CAR 16.560 177 O 0.385 0.300 0.090 0.010 0.054 0.017 85.60 -
Alfie's Const. & Const. Supply, Inc. (Formerly:
Alfie's Construction & Const. Supply)17162
Completion of Binalbagan Bridge 2 - Km. 66+910 along
Hinigaran-Isabela Road03/05/09 VI 45.049 809 O 0.316 0.300 0.150 0.030 0.040 0.033 86.90 -
Alfie's Const. & Const. Supply, Inc. (Formerly:
Alfie's Construction & Const. Supply)17162 Road Upgrading, Jct. Palencia-Boy Scout, Campsite Road 03/05/09 VI 66.624 553 O 0.263 0.296 0.150 0.030 0.050 0.033 82.20 -
Alfie's Construction & Const. Supply, Inc.
(Formerly: Alfie's Construction & Construction
Supply)
17162Const. of Access Rd. for Himoga-an Bridge, Bacolod North
Rd., Sta. 71+035.20-Sta. 74+557.2008/12/13 VI 109.290 310 O 0.342 0.240 0.150 0.030 0.042 0.050 85.40 -
Alfie's Construction & Const. Supply, Inc.
(Formerly: Alfie's Construction & Construction
Supply)
17162Road Upgrading of Villahermoso-Canla-on City-La
Castellana Road, K0074+205-K0074+99508/10/13 VI 23.131 182 O 0.356 0.206 0.047 0.030 0.035 0.033 70.70 -
Alfie's Construction & Construction Supply
Inc. (Formerly: Alfie's Construction and
Construction Supply)
17162Conc. of Nat'l Rd. along Bacolod South Rd., K0086+061-
K0088+00308/11/12 VI 32.631 222 O 0.242 0.300 0.150 0.030 0.050 0.050 82.20 -
Alfie's Construction & Construction Supply
Inc. (Formerly: Alfie's Construction and
Construction Supply)
17162
Road Upgrading (Gravel to Paved) Based on Gravel Road
Strategies, Traffic Benchmark for Upgrading to Paved Road
Standard (HDM-4 Project Analysis - Intermittent Sections)
National Secondary Road, Kabankalan Jct. Salong Tapi
Dacongcogon Bantayan Road - Package B
24/10/2014 VI 48.461 209 O 0.361 0.232 0.150 0.030 0.048 0.033 85.40%0%
Poor
*1st/Final
* For DPWH, only the region and PMO office are listed
24th CPES Release Page14
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016
ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/
QUALITATIVE
DESCRIPTION
AMOUNT
(Php, M)
DUR
(C.D.)
CONTRACT*IMPL.
AGENCYNAME OF CONSTRUCTOR
LICENSE
NO.PROJECT
DATE OF
EVALUATION
Alfies Construction & Construction Supply,
Inc.17162
Conc. of Junction Bearin-Salong-Tapi-Dacongcogon-
Bantayan Raod (Km. 99+675.50-Km.131+142.75 w/ exception,
Brgy. Salong & Batayan
09/17/09 VI 79.400 400 O 0.304 0.300 0.150 0.030 0.035 0.033 85.20 -
ALFIE'S CONSTRUCTION & CONSTRUCTION
SUPPLY, INC. (Formerly: Alfie's Construction
& Construction Supply)
17162Rehabilitation/Reconstruction/Upgrading of Bacolod North
Road, 25/08/2015
Regional Office
No.VI65.069 250 O 0.357 0.24 0.15 0.03 0.06 0.05 88.70% -
ALFIE'S CONSTRUCTION & CONSTRUCTION
SUPPLY, INC. (Formerly: Alfie's Construction
& Construction Supply)
17162
Construction/Replacement of Permanent Weak Bridges
along National Road, Tapi Bridge (B00211NR), along
Kabankalan Jct. Salong Tapi Dacongcogon Bantayan Road,
Brgy. Tapi, Kabankalan City, Negros Occidental
11/14/15
Negros
Occidental 3rd
DEO
10.094 286 OG 0.363 0.241 0.15 0.03 0.045 0.05 87.90%87.9%
Satisfactory
ALFIE'S CONSTRUCTION & CONSTRUCTION
SUPPLY, INC. (Formerly: Alfie's Construction
& Construction Supply)
17162
Widening of National Roads along Bacolod South Road,
K0048+542-K0051+468; K0052+444-K0053+600; K0064+250-
K0065+360, Hinigaran, Negros Occidental11/16/15
Regional Office,
NIR119.102 310 OG 0.373 0.238 0.15 0.03 0.055 0.05 89.60%
89.6%
Very Satisfactory
ALFIE'S CONSTRUCTION & CONSTRUCTION
SUPPLY, INC. (Formerly: Alfie's Construction
& Construction Supply)
17162
Widening of Bacolod Circumferential Road (South) with
Drainage (including RROW), K0006+451 - K0011+476,
Bacolod City, Negros Occidental11/9/15
Regional Office,
NIR81.443 255 OG 0.337 0.3 0.078 0.03 0.06 0.033 83.80%
83.8%
Satisfactory
ALFIE'S CONSTRUCTION & CONSTRUCTION
SUPPLY, INC. (Formerly: Alfie's Construction
& Construction Supply)
17162
Rehabilitation/Reconstruction/Upgrading of Damaged Paved
National Road along Bacolod North Road, K0039+771-
K0040+288; K0061+420-K0062+000; K0075+903-K0075+953;
K0076+620-K0077+000; K0080+060-K0081+000; K0081+558-
K0082+000; K0082+000-K0083+000; K0036+902-K0036+952;
K0038+200-K0038+406; K0041+843-K0042+300; K0042+500-
K0043+000, Manapla, Negros Occidental
11/19/15Regional Office,
NIR75.626 265 OG 0.34 0.214 0.15 0.03 0.055 0.05 83.90%
83.9%
Satisfactory
ALFIE'S CONSTRUCTION & CONSTRUCTION
SUPPLY, INC. (Formerly: Alfie's Construction
& Construction Supply)
17162
Rehabilitation/Reconstruction/Upgrading of Bacolod North
Road, K0086+000 - K0087+000, K0087+540 - K0088+327,
K0088+362 - K0090+933, Sagay City, Negros Occidental11/19/15
Regional Office,
NIR68.500 280 OG 0.371 0.237 0.15 0.03 0.055 0.05 89.30%
89.3%
Very Satisfactory
Alfie's Construction & Construction Supply,
Inc. (Formerly: Alfie's Construction &
Construction Supply)
17162Const. of the Remaining Structures: Himogaan Bridge, Sta.
71+035.20-Sta. 74+557.2008/12/13 VI 116.246 505 O 0.376 0.240 0.150 0.030 0.042 0.050 88.80 -
ALFREDO D. SANTOS