City of Austin Upcoming Projects FY 2017
Special Edition April 2017
City Departments
Austin Energy:
Amelie Gonzalez)
Austin Water Utility:
Martin Tower
Aviation: Lyn Estbrook
& Janice White
Capital Contracting
Office: Garrett Cox
Economic Development:
Sylnovia Holt-Rabb
Parks and Recreation:
Tony Arnold
Public Works:
Roxanne Cook
Purchasing:
Shawn Willett
Austin Energy
City of Austin Upcoming Projects FY 2017
Facilities
Decker Power Plant Entry Rock Structural Repair
Procurement Strategy: Construction Cost Estimate: Under $60,000
Potential Scopes of Work: Rockwall Repair and Painting Services
Anticipated Advertisement Date: July 2017
Floor Concrete Cutout for Electrical & Network Areas in Conference Rooms 107 & 151 at Kramer and
Sandhill Conference Rooms
Procurement Strategy: Construction Cost Estimate: Under $70,000
Potential Scopes of Work: Concrete Cutting, Electrical Work, Conduit Installation, Painting
and Carpet Repairs
Anticipated Advertisement Date: August 2017
Town Lake Center CMU Storage Area Level 1A
Procurement Strategy: Construction Cost Estimate: Under $60,000
Potential Scopes of Work: Masonry and Painting Services
Anticipated Advertisement Date: July 2017
On-Site Energy Resources (OSER)
Domain District Cooling Plant Chiller #11 Replacement
Removal & Replacement of existing Chiller #11 with new 2500 ton Chiller
Procurement Strategy: Construction
Cost Estimate: $3,300,000
Potential Scopes of Work: HVAC, Electrical (Industrial), Concrete Pads, Site Clean-up, Pipe
Insulation (Service), Chiller & Control System
Anticipated Advertisement Date: May 2017
Austin Energy
City of Austin Upcoming Projects FY 2017
Electric Service Delivery
Gilleland Substation Control House
Procurement Strategy: Construction
Cost Estimate: $150,000
Potential Scopes of Work:
Structural Steel, Portable Toilet, Metal Siding (PBR Panels), Gutter System, Vents, Flashing, Doors, Door
Jambs & Hardware, AC Equipment (120/240VAC Panels, Transfer Switch, Conduit, Outlets, Lighting),
DC Equipment (250VDC Panel), Insulation, HVAC, Cable Tray, Safety Equipment (Fire Extg., Eye
Wash Station, Emergency Lighting, etc.)
Anticipated Advertisement Date: May 2017
Austin Energy
City of Austin Upcoming Projects FY 2017
Electric Service Delivery
Gilleland to Techridge Circuit 1030 Transmission Line Foundation Installation
Procurement Strategy: Construction
Cost Estimate: $1.2-1.6M
Potential Scopes of Work:
Photography, Temporary Fencing/Barricades,
Erosion/Sedimentation Controls, Caisson Shafts,
Concrete Pilings, Concrete Forms, Concrete Curing
Mixtures, Concrete Services, Corrugated Galv.
Metal Pipe, Structural Steel, Protecting Coats
(Concrete), Portable Toilet, Base Course Aggregate
Anticipated Advertisement Date: May 2017
Austin Energy
City of Austin Upcoming Projects FY 2017
Upcoming Opportunities Non-Professional Services
Tentative Date
Project Name
Cost Estimate
Project Description
Customer Energy Solutions (CES)/Energy Efficiency Services (EES)
April 2017 Thermostat & Water Heater Con-troller Reconditioning
$50,000/5 Year Agree-
ment
Equipment Maintenance
April 2017
Austin Energy Home Energy Service
$348,825/Year
Energy Efficiency Assess-ment/Audits
Energy Services Delivery (ESD)
April/May 2017
Ground Maintenance Services for Substations
$125,000/Year
Mowing, ground mainte-nance, and irrigation sys-tem services at AE substa-tions
City of Austin Upcoming Projects FY 2017
Austin Water Utility
City of Austin Upcoming Projects FY 2017
Aviation
Aviation – Upcoming Procurement/Contracting opportunities Apron and Terminal Expansion and Improvements procurement schedule Project is CMAR Project Delivery-Hensel Phelps is the Contractor
GMP 4 - Apron are 4 and remote pond – Fall 2017 -$50M
Parking Garage & Administration Building Project is CMAR Project Delivery - Austin Commercial is the Contractor
GMP 1 – Concrete and sub-surface work - Bids returned March/April - $104M
GMP 2 –Site work and Exit Toll Plaza’s - May/June 2017 - $40M
GMP 3 – Admin Building - June/July 2017 - $40M Stormwater Drainage Improvements
Council Approved Contractor Award March 2017 - $2.6M
Upper Level Embankment Inspections and Repairs Project to be CSP
Council Approved Contractor Award March 2017 – $3.6M
Campus Signage Improvements
Construction Bid - Out for bid - $250,000
Landside Roadway and Pedestrian Improvements – Phase 2
Construction Bid, Summer 2017 - $600,000
Terminal Restroom Renovations Project to be CSP
Construction Bid, Summer 2017 – $2.5M
Spirit of Texas Drive Rehabilitation and Connectivity Path Phase 3
Construction Bid, late Fall 2017 - $750,000
ABIA Campus HVAC Project to be JOC or CSP
Construction Bid, late Fall 2017 – $5M
Consolidated Maintenance Facility Project to be CSP
Construction Bid, late Fall 2018 – $35M
City of Austin Upcoming Projects FY 2017
Aviation
Garage and Admin Building – View from Presidential Bvld.
Garage and Admin Building – Sky view from the Terminal
Consolidated Maintenance Facility – Site Plan
City of Austin Upcoming Projects FY 2017
Bid/Procurement Opportunities
Construction (IFBs) Spring/Summer 2017
Tanglebriar System Improvements Project Circle C Ranch Metro Park
Veloway Trail Improvements
Citywide Stormwater Infrastructure Maintenance Projects IDIQ
Miscellaneous Street Overlay IDIQ Project
Waller Creek District - Sabine St. Promenade
Burleson Road Reclaim Water Pressure Conversion Project
Rutherford Ranch Road Renewal
GL-TR Circuit 1030 Transmission Line - Foundation Installation
Bull Creek Tract 24-Inch Offsite Water Line (CRC)
Landside Roadway & Pedestrian Improvements - Phase 2
Dove Springs Recreation Center Expansion
Yarborough Branch Library Renovation 2017
Walnut Creek WWTP Secondary Process Improvements
Walnut Creek WWTP Stormwater
Pleasant Hill Branch Library Roof Replacement & HVA/C Upgrade
FM 812 Landfill Letdown Repair
Rosewood - Zaragosa Neighborhood Center
New Field Ops Facility
East Austin Wastewater Line Improvements
Pedestrian Safety Improv-Hybrid Beacon Installations-TAP Grant
Pedestrian Safety Improvements - Accessible Pedestrian Signals-TAP Grant
Ullrich WTP Administration & Centrifuge SCADA Asset Replacement
Safe Routes to School /North Lamar Safety IDIQ Driveway Replacements Traffic Signal Installation – Spring 2017
Transportation Bolt-Down Device – Summer 2017
Pavement Markings and Removal – Summer 2017
Capital Contracting Office
City of Austin Upcoming Projects FY 2017
Bid/Procurement Opportunities
Alternative Delivery—Spring/Summer 2017
ABIA Centralized Baggage Handling System DB
ABIA Restroom Renovation - CSP
Montopolis Recreation Center – CSP
Professional Services (RFQs) Spring/Summer 2017
ABIA Baggage Handling System Design Criteria Manual
Zilker Metro Park - Preliminary Design
Future Downtown Substation Design
ABIA Information Systems Building
Street Design Staff Augmentation (Sit-in Consultant) – Spring 2017
William Cannon Railroad Overpass– Spring 2017
CCO - Initiatives
Vendor Connection Solicitation Access
All CCO complete solicitation packages are now available electronically in Vendor Connection, this includes construction drawings which were only available on disc in the past
Meeting held with Consultants on March 27th to obtain feedback on consultant hourly rate review process
Pre-Proposal meeting for Job Order Contract April 10th, subcontractors are encour-aged to attend to learn about this opportunity and network with prime contractors
Enhancements
Contractor/Consultant Evaluation Annual Review
Simplifying process
Capital Contracting & Public Works joint initiative
Best practice research being conducted to evaluate improvement recom-mendations
Proposed changes to be presented to Construction Advisory Committee (CAC), MWBE Advisory Committee , Public Works, and Contracting/Consulting community prior to implementation.
Capital Contracting Office
City of Austin Upcoming Projects FY 2017
Austin Economic Development
Chapter 380 Performance-Based Contracts ACTIVE AGREEMENTS
Company
Jobs
Required
Investment
Required
Estimated City’s
Net Benefit
Council
Approved
Athenahealth 607 $7,750,500 $1,665,899 1/30/2014
Visa 794 $27,312,918 $6,860,665 12/6/2012
HID Global 276 $36,000,000 $2,257,170 9/27/2012
Apple 3,635 $282,500,000 $14,573,704 3/22/2012
Advisory
Board Com-
pany
239 $8,100,000 $1,406,971 6/23/2011
Hanger 250 $6,744,335 $924,778 1/28/2010
Samsung 500 $4,000,000,000 $8,000,0001 8/18/2005
Totals 6,301 $4,368,407,753 $35,689,187
City of Austin Upcoming Projects FY 2017
Austin Economic Development
Project is an Opportunity Austin 3.0 and COA Target Market (bio/life-sciences/tech)
The project anticipates creating a total of 600 jobs
The project creates significant contracting opportunities for local firms as it proposes to invest $20,532,000 million in construction, as well as an estimated $2 million in annual expenditures for local services and an estimated $500,000 in annual local purchases.
The development of the Company’s fourth IT Hub is focused on metadata collection and designing solution-based platforms for personalized, proactive and preventative healthcare that will ultimately revolutionize the delivery of healthcare in a timely and affordable manner.
Looking at Austin as a potential location for the fourth IT Hub, the Company has a strong interest in the development of the Innovation Zone as its mission aligns with the university, Central Health, People’s Community Clinic and many other groups that could support the transformation of healthcare deliv-ery and affordability.
If Austin is chosen, the Company will locate a short-term, lease space, while the future long-term space is constructed within the Innovation Zone.
Chapter 380 Performance-Based Contracts
City of Austin Upcoming Projects FY 2017
Austin Parks and Recreation
PARD Capital Improvement Program
Upcoming Projects
Design
Emma Long Metro Park Improvements RFQ Fall 2017
Construction
Govalle Pool Renovation (IFB) Summer 2017
Colony District Park Phase 1 Park Imp. (IFB) Summer 2017
Alliance Children’s Garden (CM@R) Fall 2017
Little Stacy Neighborhood Park (IFB) Fall 2017
Ricky Guerrero Pocket Park (IFB) Fall 2017
Veloway Trailhead (IFB) Fall 2017
Eilers Neighborhood Park Renovation (IFB) Fall 2017
Barton Creek Trailhead Restroom (IFB) Winter 2017
Onion Creek Metro Park Development (IFB) Winter 2017
Walsh Boat Landing (IFB) Winter 2017
Shipe Pool Renovation (IFB) Winter 2017
Montopolis Community and Rec Center (IFB) Winter 2017
Dove Springs Rec Center Expansion (IFB) Winter 2017
Elizabet Ney Museum Renovations (IFB) Summer 2018
Emma Long Metro Park Redevelopment (IFB) Fall 2018
City of Austin Upcoming Projects FY 2017
Public Works
First Adver-tisement
Date
Subproject Name
Construction Cost Esti-
mate
May-17 Exposition Blvd (W. 35th to Enfield) Water & Wastewater Pipeline Renewal
2,500,691
May-17 APD Mounted Patrol Facilities 5,843,778
May-17 Public Safety Training Academy - Tenant Finish Out Building I 785,728
May-17 Mary Street Storm Drain 1,000,000
May-17 Citywide - Stormwater Infrastructure Maintenance Projects 13,450,000
May-17 ABIA Campus HVAC Improvements 4,880,700
May-17 East Austin Wastewater Line Improvements 2,310,000
May-17 Barton Creek Watershed - Pond Retrofits 806,000
Jun-17 Country Club Creek Trail Phase 1 475,000
Jun-17 Onion Creek Metro Park - Development 3,187,079
Jun-17 William Cannon Railroad Overpass (west end) 6,662,000
Jun-17 Violet Crown Trail - North 1,130,000
Jun-17 Bowie Underpass Bicycle and Pedestrian Facility 6,681,301
Jun-17 Upper Boggy Creek Trail Phase 1 1,065,000
Jun-17 In Situ Wastewater Pipeline Renewal Group B 1,400,000
Jun-17 East Bouldin Creek - One Texas Center (OTC) Water Quality Retro-fits
403,000
Jul-17 West Allandale and Trailridge Drive Line Renewal 2,200,000
Jul-17 Shipe Neighborhood Park - Pool Renovation 3,010,000
Jul-17 Hornsby Bend Thickener Complex Rehab 7,550,000
Jul-17 Pedestrian Bridge McNeil Dr and Jekel Circle - 1/4¢ Fund 301,000
Jul-17 Montopolis Recreation and Community Center 11,554,780
Jul-17 Boggy Creek - MLK-TOD Stormdrain Improvements Phase 1 8,500,000
Jul-17 Northwest A & B Zone Boundary Projects 1,050,000
Jul-17 Burleson Road Reclaimed Water Pressure Conversion Phase 1 4,700,000
Aug-17 FM 812 Additional Closure Work and Letdown Repair 1,050,000
Aug-17 Rosewood Neighborhood Park - Pool Bathhouse 523,000
Aug-17 Waller Creek - Reznicek Field Water Quality Retrofit 626,000
Aug-17 Williamson Creek - Bitter Creek Tributary Channel Rehabilitation 2,534,884
Aug-17 Carson Creek Basin Wastewater Line Improvements 2,100,000
Aug-17 Northern Walnut Creek Hike and Bike Trail Phase 1-A 756,439
Aug-17 Bus Stop Landing Pad Improvements 280,000
Sep-17 Walnut Creek Wastewater Treatment Plant Pumping System Im-provements
7,151,134
Sep-17 Nueces Wastewater Rehabilitation from W 8th to MLK 2,640,000
Sep-17 Slaughter - Old San Antonio Rd Low Water Crossing Upgrade 4,891,000
Sep-17 Hornsby Bend Side Stream Treatment Plant (SSTP) Relief 9,070,000
Sep-17 Morrow and Gault Water & Wastewater Pipeline Renewal 4,725,000
Sep-17 Burrell Drive Wastewater Improvements 1,100,000
City of Austin Upcoming Projects FY 2017
Public Works
First Adver-tisement
Date
Subproject Name
Construction Cost Esti-
mate
Oct-17 Walnut Creek Wastewater Treatment Plant Sludge Thickener Rehab 9,603,300
Oct-17 Bull Creek - Old Lampasas #3 Dam Modernization (R01475) 2,725,000
Oct-17 E. 51st Street Improvements 2,330,000
Oct-17 Elisabet Ney Museum - Building Restoration and Site Improvements 558,942
Nov-17 Plaza Saltillo Water Rehabilitation Phase 2 2,246,000
Nov-17
East Allandale White Rock Neighborhood Water & Wastewater Sys-tem Renewal 3,150,000
Nov-17 Wastewater Collection System Replacement Lines Group A 960,500
Nov-17
South Austin Regional WWTP Sludge Transfer Line and Reclaimed Line 4,580,000
Jan-18 Little Walnut Creek - Creek Flood Hazard Reduction 12,100,000
Jan-18 Williamson Creek - Battle Bend Water Quality Retrofit 837,363
Jan-18 Crosstown Tunnel Centralized Odor Control Facility 5,598,470
Jan-18 Spirit of Texas Drive Rehabilitation 1,100,000
Jan-18 Roy G. Guerrero Colorado River Park - Channel Repair 6,000,000
Jan-18 Govalle Wastewater Flow Diversion 2,192,000
Five-year CIP Plan Online
City of Austin Upcoming Projects FY 2017
Purchasing
City of Austin Upcoming Projects FY 2017
Purchasing