Asian Contractor Association 4201 Ed Bluestein Blvd., #2105 Austin, TX 78721 www.acta-austin.com 512-926-5400 City of Austin Upcoming Projects FY 2017 Special Edition April 2017 City Departments Austin Energy: Amelie Gonzalez) Austin Water Utility: Martin Tower Aviation: Lyn Estbrook & Janice White Capital Contracting Office: Garrett Cox Economic Development: Sylnovia Holt-Rabb Parks and Recreation: Tony Arnold Public Works: Roxanne Cook Purchasing: Shawn Willett
Transcript
Page 1: City of Austin Upcoming Projects 2017 FY 2017acta-austin.com/doc/special edition - upcoming projects COA 2017.pdf · Decker Power Plant Entry Rock Structural Repair Procurement Strategy:

Asian Contractor Association

4201 Ed Bluestein Blvd., #2105

Austin, TX 78721

www.acta-austin.com

512-926-5400

City of Austin Upcoming Projects FY 2017

Special Edition April 2017

City Departments

Austin Energy:

Amelie Gonzalez)

Austin Water Utility:

Martin Tower

Aviation: Lyn Estbrook

& Janice White

Capital Contracting

Office: Garrett Cox

Economic Development:

Sylnovia Holt-Rabb

Parks and Recreation:

Tony Arnold

Public Works:

Roxanne Cook

Purchasing:

Shawn Willett

Page 2: City of Austin Upcoming Projects 2017 FY 2017acta-austin.com/doc/special edition - upcoming projects COA 2017.pdf · Decker Power Plant Entry Rock Structural Repair Procurement Strategy:

Austin Energy

City of Austin Upcoming Projects FY 2017

Facilities

Decker Power Plant Entry Rock Structural Repair

Procurement Strategy: Construction Cost Estimate: Under $60,000

Potential Scopes of Work: Rockwall Repair and Painting Services

Anticipated Advertisement Date: July 2017

Floor Concrete Cutout for Electrical & Network Areas in Conference Rooms 107 & 151 at Kramer and

Sandhill Conference Rooms

Procurement Strategy: Construction Cost Estimate: Under $70,000

Potential Scopes of Work: Concrete Cutting, Electrical Work, Conduit Installation, Painting

and Carpet Repairs

Anticipated Advertisement Date: August 2017

Town Lake Center CMU Storage Area Level 1A

Procurement Strategy: Construction Cost Estimate: Under $60,000

Potential Scopes of Work: Masonry and Painting Services

Anticipated Advertisement Date: July 2017

On-Site Energy Resources (OSER)

Domain District Cooling Plant Chiller #11 Replacement

Removal & Replacement of existing Chiller #11 with new 2500 ton Chiller

Procurement Strategy: Construction

Cost Estimate: $3,300,000

Potential Scopes of Work: HVAC, Electrical (Industrial), Concrete Pads, Site Clean-up, Pipe

Insulation (Service), Chiller & Control System

Anticipated Advertisement Date: May 2017

Page 3: City of Austin Upcoming Projects 2017 FY 2017acta-austin.com/doc/special edition - upcoming projects COA 2017.pdf · Decker Power Plant Entry Rock Structural Repair Procurement Strategy:

Austin Energy

City of Austin Upcoming Projects FY 2017

Electric Service Delivery

Gilleland Substation Control House

Procurement Strategy: Construction

Cost Estimate: $150,000

Potential Scopes of Work:

Structural Steel, Portable Toilet, Metal Siding (PBR Panels), Gutter System, Vents, Flashing, Doors, Door

Jambs & Hardware, AC Equipment (120/240VAC Panels, Transfer Switch, Conduit, Outlets, Lighting),

DC Equipment (250VDC Panel), Insulation, HVAC, Cable Tray, Safety Equipment (Fire Extg., Eye

Wash Station, Emergency Lighting, etc.)

Anticipated Advertisement Date: May 2017

Page 4: City of Austin Upcoming Projects 2017 FY 2017acta-austin.com/doc/special edition - upcoming projects COA 2017.pdf · Decker Power Plant Entry Rock Structural Repair Procurement Strategy:

Austin Energy

City of Austin Upcoming Projects FY 2017

Electric Service Delivery

Gilleland to Techridge Circuit 1030 Transmission Line Foundation Installation

Procurement Strategy: Construction

Cost Estimate: $1.2-1.6M

Potential Scopes of Work:

Photography, Temporary Fencing/Barricades,

Erosion/Sedimentation Controls, Caisson Shafts,

Concrete Pilings, Concrete Forms, Concrete Curing

Mixtures, Concrete Services, Corrugated Galv.

Metal Pipe, Structural Steel, Protecting Coats

(Concrete), Portable Toilet, Base Course Aggregate

Anticipated Advertisement Date: May 2017

Page 5: City of Austin Upcoming Projects 2017 FY 2017acta-austin.com/doc/special edition - upcoming projects COA 2017.pdf · Decker Power Plant Entry Rock Structural Repair Procurement Strategy:

Austin Energy

City of Austin Upcoming Projects FY 2017

Upcoming Opportunities Non-Professional Services

Tentative Date

Project Name

Cost Estimate

Project Description

Customer Energy Solutions (CES)/Energy Efficiency Services (EES)

April 2017 Thermostat & Water Heater Con-troller Reconditioning

$50,000/5 Year Agree-

ment

Equipment Maintenance

April 2017

Austin Energy Home Energy Service

$348,825/Year

Energy Efficiency Assess-ment/Audits

Energy Services Delivery (ESD)

April/May 2017

Ground Maintenance Services for Substations

$125,000/Year

Mowing, ground mainte-nance, and irrigation sys-tem services at AE substa-tions

Page 6: City of Austin Upcoming Projects 2017 FY 2017acta-austin.com/doc/special edition - upcoming projects COA 2017.pdf · Decker Power Plant Entry Rock Structural Repair Procurement Strategy:

City of Austin Upcoming Projects FY 2017

Austin Water Utility

Page 7: City of Austin Upcoming Projects 2017 FY 2017acta-austin.com/doc/special edition - upcoming projects COA 2017.pdf · Decker Power Plant Entry Rock Structural Repair Procurement Strategy:

City of Austin Upcoming Projects FY 2017

Aviation

Aviation – Upcoming Procurement/Contracting opportunities Apron and Terminal Expansion and Improvements procurement schedule Project is CMAR Project Delivery-Hensel Phelps is the Contractor

GMP 4 - Apron are 4 and remote pond – Fall 2017 -$50M

Parking Garage & Administration Building Project is CMAR Project Delivery - Austin Commercial is the Contractor

GMP 1 – Concrete and sub-surface work - Bids returned March/April - $104M

GMP 2 –Site work and Exit Toll Plaza’s - May/June 2017 - $40M

GMP 3 – Admin Building - June/July 2017 - $40M Stormwater Drainage Improvements

Council Approved Contractor Award March 2017 - $2.6M

Upper Level Embankment Inspections and Repairs Project to be CSP

Council Approved Contractor Award March 2017 – $3.6M

Campus Signage Improvements

Construction Bid - Out for bid - $250,000

Landside Roadway and Pedestrian Improvements – Phase 2

Construction Bid, Summer 2017 - $600,000

Terminal Restroom Renovations Project to be CSP

Construction Bid, Summer 2017 – $2.5M

Spirit of Texas Drive Rehabilitation and Connectivity Path Phase 3

Construction Bid, late Fall 2017 - $750,000

ABIA Campus HVAC Project to be JOC or CSP

Construction Bid, late Fall 2017 – $5M

Consolidated Maintenance Facility Project to be CSP

Construction Bid, late Fall 2018 – $35M

Page 8: City of Austin Upcoming Projects 2017 FY 2017acta-austin.com/doc/special edition - upcoming projects COA 2017.pdf · Decker Power Plant Entry Rock Structural Repair Procurement Strategy:

City of Austin Upcoming Projects FY 2017

Aviation

Garage and Admin Building – View from Presidential Bvld.

Garage and Admin Building – Sky view from the Terminal

Consolidated Maintenance Facility – Site Plan

Page 9: City of Austin Upcoming Projects 2017 FY 2017acta-austin.com/doc/special edition - upcoming projects COA 2017.pdf · Decker Power Plant Entry Rock Structural Repair Procurement Strategy:

City of Austin Upcoming Projects FY 2017

Bid/Procurement Opportunities

Construction (IFBs) Spring/Summer 2017

Tanglebriar System Improvements Project Circle C Ranch Metro Park

Veloway Trail Improvements

Citywide Stormwater Infrastructure Maintenance Projects IDIQ

Miscellaneous Street Overlay IDIQ Project

Waller Creek District - Sabine St. Promenade

Burleson Road Reclaim Water Pressure Conversion Project

Rutherford Ranch Road Renewal

GL-TR Circuit 1030 Transmission Line - Foundation Installation

Bull Creek Tract 24-Inch Offsite Water Line (CRC)

Landside Roadway & Pedestrian Improvements - Phase 2

Dove Springs Recreation Center Expansion

Yarborough Branch Library Renovation 2017

Walnut Creek WWTP Secondary Process Improvements

Walnut Creek WWTP Stormwater

Pleasant Hill Branch Library Roof Replacement & HVA/C Upgrade

FM 812 Landfill Letdown Repair

Rosewood - Zaragosa Neighborhood Center

New Field Ops Facility

East Austin Wastewater Line Improvements

Pedestrian Safety Improv-Hybrid Beacon Installations-TAP Grant

Pedestrian Safety Improvements - Accessible Pedestrian Signals-TAP Grant

Ullrich WTP Administration & Centrifuge SCADA Asset Replacement

Safe Routes to School /North Lamar Safety IDIQ Driveway Replacements Traffic Signal Installation – Spring 2017

Transportation Bolt-Down Device – Summer 2017

Pavement Markings and Removal – Summer 2017

Capital Contracting Office

Page 10: City of Austin Upcoming Projects 2017 FY 2017acta-austin.com/doc/special edition - upcoming projects COA 2017.pdf · Decker Power Plant Entry Rock Structural Repair Procurement Strategy:

City of Austin Upcoming Projects FY 2017

Bid/Procurement Opportunities

Alternative Delivery—Spring/Summer 2017

ABIA Centralized Baggage Handling System DB

ABIA Restroom Renovation - CSP

Montopolis Recreation Center – CSP

Professional Services (RFQs) Spring/Summer 2017

ABIA Baggage Handling System Design Criteria Manual

Zilker Metro Park - Preliminary Design

Future Downtown Substation Design

ABIA Information Systems Building

Street Design Staff Augmentation (Sit-in Consultant) – Spring 2017

William Cannon Railroad Overpass– Spring 2017

CCO - Initiatives

Vendor Connection Solicitation Access

All CCO complete solicitation packages are now available electronically in Vendor Connection, this includes construction drawings which were only available on disc in the past

Meeting held with Consultants on March 27th to obtain feedback on consultant hourly rate review process

Pre-Proposal meeting for Job Order Contract April 10th, subcontractors are encour-aged to attend to learn about this opportunity and network with prime contractors

Enhancements

Contractor/Consultant Evaluation Annual Review

Simplifying process

Capital Contracting & Public Works joint initiative

Best practice research being conducted to evaluate improvement recom-mendations

Proposed changes to be presented to Construction Advisory Committee (CAC), MWBE Advisory Committee , Public Works, and Contracting/Consulting community prior to implementation.

Capital Contracting Office

Page 11: City of Austin Upcoming Projects 2017 FY 2017acta-austin.com/doc/special edition - upcoming projects COA 2017.pdf · Decker Power Plant Entry Rock Structural Repair Procurement Strategy:

City of Austin Upcoming Projects FY 2017

Austin Economic Development

Chapter 380 Performance-Based Contracts ACTIVE AGREEMENTS

Company

Jobs

Required

Investment

Required

Estimated City’s

Net Benefit

Council

Approved

Athenahealth 607 $7,750,500 $1,665,899 1/30/2014

Visa 794 $27,312,918 $6,860,665 12/6/2012

HID Global 276 $36,000,000 $2,257,170 9/27/2012

Apple 3,635 $282,500,000 $14,573,704 3/22/2012

Advisory

Board Com-

pany

239 $8,100,000 $1,406,971 6/23/2011

Hanger 250 $6,744,335 $924,778 1/28/2010

Samsung 500 $4,000,000,000 $8,000,0001 8/18/2005

Totals 6,301 $4,368,407,753 $35,689,187

Page 12: City of Austin Upcoming Projects 2017 FY 2017acta-austin.com/doc/special edition - upcoming projects COA 2017.pdf · Decker Power Plant Entry Rock Structural Repair Procurement Strategy:

City of Austin Upcoming Projects FY 2017

Austin Economic Development

Project is an Opportunity Austin 3.0 and COA Target Market (bio/life-sciences/tech)

The project anticipates creating a total of 600 jobs

The project creates significant contracting opportunities for local firms as it proposes to invest $20,532,000 million in construction, as well as an estimated $2 million in annual expenditures for local services and an estimated $500,000 in annual local purchases.

The development of the Company’s fourth IT Hub is focused on metadata collection and designing solution-based platforms for personalized, proactive and preventative healthcare that will ultimately revolutionize the delivery of healthcare in a timely and affordable manner.

Looking at Austin as a potential location for the fourth IT Hub, the Company has a strong interest in the development of the Innovation Zone as its mission aligns with the university, Central Health, People’s Community Clinic and many other groups that could support the transformation of healthcare deliv-ery and affordability.

If Austin is chosen, the Company will locate a short-term, lease space, while the future long-term space is constructed within the Innovation Zone.

Chapter 380 Performance-Based Contracts

Page 13: City of Austin Upcoming Projects 2017 FY 2017acta-austin.com/doc/special edition - upcoming projects COA 2017.pdf · Decker Power Plant Entry Rock Structural Repair Procurement Strategy:

City of Austin Upcoming Projects FY 2017

Austin Parks and Recreation

PARD Capital Improvement Program

Upcoming Projects

Design

Emma Long Metro Park Improvements RFQ Fall 2017

Construction

Govalle Pool Renovation (IFB) Summer 2017

Colony District Park Phase 1 Park Imp. (IFB) Summer 2017

Alliance Children’s Garden (CM@R) Fall 2017

Little Stacy Neighborhood Park (IFB) Fall 2017

Ricky Guerrero Pocket Park (IFB) Fall 2017

Veloway Trailhead (IFB) Fall 2017

Eilers Neighborhood Park Renovation (IFB) Fall 2017

Barton Creek Trailhead Restroom (IFB) Winter 2017

Onion Creek Metro Park Development (IFB) Winter 2017

Walsh Boat Landing (IFB) Winter 2017

Shipe Pool Renovation (IFB) Winter 2017

Montopolis Community and Rec Center (IFB) Winter 2017

Dove Springs Rec Center Expansion (IFB) Winter 2017

Elizabet Ney Museum Renovations (IFB) Summer 2018

Emma Long Metro Park Redevelopment (IFB) Fall 2018

Page 14: City of Austin Upcoming Projects 2017 FY 2017acta-austin.com/doc/special edition - upcoming projects COA 2017.pdf · Decker Power Plant Entry Rock Structural Repair Procurement Strategy:

City of Austin Upcoming Projects FY 2017

Public Works

First Adver-tisement

Date

Subproject Name

Construction Cost Esti-

mate

May-17 Exposition Blvd (W. 35th to Enfield) Water & Wastewater Pipeline Renewal

2,500,691

May-17 APD Mounted Patrol Facilities 5,843,778

May-17 Public Safety Training Academy - Tenant Finish Out Building I 785,728

May-17 Mary Street Storm Drain 1,000,000

May-17 Citywide - Stormwater Infrastructure Maintenance Projects 13,450,000

May-17 ABIA Campus HVAC Improvements 4,880,700

May-17 East Austin Wastewater Line Improvements 2,310,000

May-17 Barton Creek Watershed - Pond Retrofits 806,000

Jun-17 Country Club Creek Trail Phase 1 475,000

Jun-17 Onion Creek Metro Park - Development 3,187,079

Jun-17 William Cannon Railroad Overpass (west end) 6,662,000

Jun-17 Violet Crown Trail - North 1,130,000

Jun-17 Bowie Underpass Bicycle and Pedestrian Facility 6,681,301

Jun-17 Upper Boggy Creek Trail Phase 1 1,065,000

Jun-17 In Situ Wastewater Pipeline Renewal Group B 1,400,000

Jun-17 East Bouldin Creek - One Texas Center (OTC) Water Quality Retro-fits

403,000

Jul-17 West Allandale and Trailridge Drive Line Renewal 2,200,000

Jul-17 Shipe Neighborhood Park - Pool Renovation 3,010,000

Jul-17 Hornsby Bend Thickener Complex Rehab 7,550,000

Jul-17 Pedestrian Bridge McNeil Dr and Jekel Circle - 1/4¢ Fund 301,000

Jul-17 Montopolis Recreation and Community Center 11,554,780

Jul-17 Boggy Creek - MLK-TOD Stormdrain Improvements Phase 1 8,500,000

Jul-17 Northwest A & B Zone Boundary Projects 1,050,000

Jul-17 Burleson Road Reclaimed Water Pressure Conversion Phase 1 4,700,000

Aug-17 FM 812 Additional Closure Work and Letdown Repair 1,050,000

Aug-17 Rosewood Neighborhood Park - Pool Bathhouse 523,000

Aug-17 Waller Creek - Reznicek Field Water Quality Retrofit 626,000

Aug-17 Williamson Creek - Bitter Creek Tributary Channel Rehabilitation 2,534,884

Aug-17 Carson Creek Basin Wastewater Line Improvements 2,100,000

Aug-17 Northern Walnut Creek Hike and Bike Trail Phase 1-A 756,439

Aug-17 Bus Stop Landing Pad Improvements 280,000

Sep-17 Walnut Creek Wastewater Treatment Plant Pumping System Im-provements

7,151,134

Sep-17 Nueces Wastewater Rehabilitation from W 8th to MLK 2,640,000

Sep-17 Slaughter - Old San Antonio Rd Low Water Crossing Upgrade 4,891,000

Sep-17 Hornsby Bend Side Stream Treatment Plant (SSTP) Relief 9,070,000

Sep-17 Morrow and Gault Water & Wastewater Pipeline Renewal 4,725,000

Sep-17 Burrell Drive Wastewater Improvements 1,100,000

Page 15: City of Austin Upcoming Projects 2017 FY 2017acta-austin.com/doc/special edition - upcoming projects COA 2017.pdf · Decker Power Plant Entry Rock Structural Repair Procurement Strategy:

City of Austin Upcoming Projects FY 2017

Public Works

First Adver-tisement

Date

Subproject Name

Construction Cost Esti-

mate

Oct-17 Walnut Creek Wastewater Treatment Plant Sludge Thickener Rehab 9,603,300

Oct-17 Bull Creek - Old Lampasas #3 Dam Modernization (R01475) 2,725,000

Oct-17 E. 51st Street Improvements 2,330,000

Oct-17 Elisabet Ney Museum - Building Restoration and Site Improvements 558,942

Nov-17 Plaza Saltillo Water Rehabilitation Phase 2 2,246,000

Nov-17

East Allandale White Rock Neighborhood Water & Wastewater Sys-tem Renewal 3,150,000

Nov-17 Wastewater Collection System Replacement Lines Group A 960,500

Nov-17

South Austin Regional WWTP Sludge Transfer Line and Reclaimed Line 4,580,000

Jan-18 Little Walnut Creek - Creek Flood Hazard Reduction 12,100,000

Jan-18 Williamson Creek - Battle Bend Water Quality Retrofit 837,363

Jan-18 Crosstown Tunnel Centralized Odor Control Facility 5,598,470

Jan-18 Spirit of Texas Drive Rehabilitation 1,100,000

Jan-18 Roy G. Guerrero Colorado River Park - Channel Repair 6,000,000

Jan-18 Govalle Wastewater Flow Diversion 2,192,000

Five-year CIP Plan Online

Page 16: City of Austin Upcoming Projects 2017 FY 2017acta-austin.com/doc/special edition - upcoming projects COA 2017.pdf · Decker Power Plant Entry Rock Structural Repair Procurement Strategy:

City of Austin Upcoming Projects FY 2017

Purchasing

Page 17: City of Austin Upcoming Projects 2017 FY 2017acta-austin.com/doc/special edition - upcoming projects COA 2017.pdf · Decker Power Plant Entry Rock Structural Repair Procurement Strategy:

City of Austin Upcoming Projects FY 2017

Purchasing

COA IT Commodity Code List by Dollar Amount from April 16 to April 17

Page 18: City of Austin Upcoming Projects 2017 FY 2017acta-austin.com/doc/special edition - upcoming projects COA 2017.pdf · Decker Power Plant Entry Rock Structural Repair Procurement Strategy: