Page 1: Ck21 presentation team 4

46 Westgate Structural Design

Page 2: Ck21 presentation team 4

46 Westgate RoadProject Introduction

Brief:

To design a new building tailored to the Arts, both visual and auditory. An exploration of vertical space must be incorporated.

Shedule of accommodation:

• Performance Space• Exhibition Space• Dressing Rooms• Studios• Cafe and Bar

Page 3: Ck21 presentation team 4

46 Westgate RoadSite Location

The proposed site is located at 46 Westgate Rd Newcastle upon Tyne NE1 1TSIt is a brownfield site situated between two buildings on the north side of the road.The site is 36m x 18m in size (648m sq)

Page 4: Ck21 presentation team 4

46 Westgate RoadSite Constraints

• Fronts onto busy Westgate road (one way system)• Buildings on either side• Windows on office building• Overlooked by residential accommodation to the North• Listed buildings and office area• Access for construction traffic to north (rear) or site.

Page 5: Ck21 presentation team 4

46 Westgate RoadSite Constraints

Rail noise Road Noise

Page 6: Ck21 presentation team 4

46 Westgate RoadLaser Scanning

• Paul Burrows from Leica GeoSystems visited to give a tutorial on to use the Leica P20 Laser Scanner.• Scans were taken from three different locations• Scans were registered in the office using Leica Cyclone software

Page 7: Ck21 presentation team 4

46 Westgate RoadPoint Cloud Data

• Three separate sets of point cloud data were synced together to form one set for the site and surrounding context• This data was imported into Revit where the point cloud was aligned to the existing city model• Once aligned the data could be used to accurately model the adjacent buildings to the site

Page 8: Ck21 presentation team 4

46 Westgate RoadPrecedent

Page 9: Ck21 presentation team 4

46 Westgate RoadDesign Development

Main approach perspective Sectional Perspective Suspended Staircase

Page 10: Ck21 presentation team 4

46 Westgate RoadDesign Development

Ground Floor Axonometric First Floor Axonometric

Page 11: Ck21 presentation team 4

46 Westgate RoadDesign Development

Exhibition Space with pitched glazed roof and sunscreen Cafe/Bar with exposed steel frame

Page 12: Ck21 presentation team 4

46 Westgate RoadSouth Elevation

Page 13: Ck21 presentation team 4

46 Westgate RoadNorth Elevation

Page 14: Ck21 presentation team 4

46 Westgate RoadBasement Plan

Page 15: Ck21 presentation team 4

46 Westgate RoadGround Floor Plan

Page 16: Ck21 presentation team 4

46 Westgate RoadFirst Floor Plan

Page 17: Ck21 presentation team 4

46 Westgate RoadSecond Floor Plan

Page 18: Ck21 presentation team 4

46 Westgate RoadRoof Plan

Page 19: Ck21 presentation team 4

46 Westgate RoadStructural Foundations

Displacement piles are driven into the site

Page 20: Ck21 presentation team 4

46 Westgate RoadBasement Construction

In Situ Concrete is poured to form basement floor slab and retaining walls

Page 21: Ck21 presentation team 4

46 Westgate RoadStructural Columns

203x203x46 universal steel columns are erected on the pile caps

Page 22: Ck21 presentation team 4

46 Westgate RoadStructural Beams

Universal Beams 533x210x82 are added to the columns

Page 23: Ck21 presentation team 4

Universal Beams 356x171x51 are added to the columns

46 Westgate RoadStructural Beams

Page 24: Ck21 presentation team 4

Universal Beams 254x146x31 are added to the columns

46 Westgate RoadStructural Beams

Page 25: Ck21 presentation team 4

Universal Beams 178x102x19 are added to the columns

46 Westgate RoadStructural Beams

Page 26: Ck21 presentation team 4

C channels 152x89 are added to the columns for the lift shafts

46 Westgate RoadStructural Beams

Page 27: Ck21 presentation team 4

Bracing is added to the structure to provide additional rigidity

46 Westgate RoadStructural Bracing

Page 28: Ck21 presentation team 4

Insitu concrete is poured to form protected fire stair well

46 Westgate RoadFire Shaft

Page 29: Ck21 presentation team 4

In Situ Concrete Floors are poured to finish the primary structure

46 Westgate RoadConcrete Floors

Page 30: Ck21 presentation team 4

46 Westgate RoadConstruction Access

Page 31: Ck21 presentation team 4

46 Westgate RoadNavisworks - Clash Detection

We ran a clash detection on Navisworks between the structural columns and the walls, doors and curtain walling. Several clashes occurred where the columns and beams meet the internal walls and the openings have not been modelled.