+ All Categories
Home > Documents > CLIC Stabilisation meeting 8

CLIC Stabilisation meeting 8

Date post: 06-Feb-2016
Category:
Upload: tassos
View: 18 times
Download: 0 times
Share this document with a friend
Description:
Welcome. Newcomers. CLIC Stabilisation meeting 8. paper “Active control of quadrupole motion for future linear particle colliders” C.Collette et al. , IASTED Intelligent systems and control, November 2009, Cambridge, USA. Info:. - PowerPoint PPT Presentation
Popular Tags:
6
CLIC Stabilisation meeting 8 8/12/2009 Welcome Newcomers Some news from the CDR and Module WG paper “Active control of quadrupole motion for future linear particle colliders” C.Collette et al. , IASTED Intelligent systems and control, November 2009, Cambridge, USA Vibration Measurements at CESR (USA-Ithaca) in 2009 , M. Sylte EDMS 1004462 Ground vibration measurements and Experiment parts motion measurement at CMS, A.KUZMIN, EDMS 1027459 Info:
Transcript
Page 1: CLIC Stabilisation meeting 8

CLIC Stabilisation meeting 88/12/2009

Welcome

Newcomers

Some news from the CDR and Module WG

paper “Active control of quadrupole motion for future linear particle colliders” C.Collette et al. , IASTED Intelligent systems and control, November 2009, Cambridge, USA

Vibration Measurements at CESR (USA-Ithaca) in 2009 , M. SylteEDMS 1004462

Ground vibration measurements and Experiment parts motion measurement at CMS, A.KUZMIN, EDMS 1027459

Info:

Page 2: CLIC Stabilisation meeting 8

CLIC Stabilisation meeting 88/12/2009

Special session: Vibration isolation and nano-positioning

Call for papers

Contact: Christophe Collette

Page 3: CLIC Stabilisation meeting 8

CLIC Stabilisation meeting 88/12/2009

• CDR draft writing March-June 2010

• Means providing technical documentation “state of the art” on :• Sensors: performance and measurement techniques• Actuators and precision guiding• Controller• Characterisation Ground motion and vibrations + Characterisation of support and

floor

• Demonstration of technical feasibility

Main goal: Demonstrate technical feasibility of stabilisation

of the CLIC Main beam quadrupoles to 1 nm R.M.S. Integrated displacement at 1 Hz and 5 nm Lateral

Page 4: CLIC Stabilisation meeting 8

CLIC Stabilisation meeting 88/12/2009

CDR 2010 >>>> TDR 2015 TEST MODULE CLEXAccelerator environment

Integration stabilisation in

module

Page 5: CLIC Stabilisation meeting 8

5

Test program

IN LAB(mock-ups with real interface)

IN CLEX(real components)

2010

2011

2012

IN CLEX

IN LAB

3 TEST MODULES

4

1

0

Installation of Three Test Modules requires space of 6030 mm (3x2010)

 alignment test

Total – 4 modules Total – 3 modules

B252

B162

Anastasiya Solodko

Page 6: CLIC Stabilisation meeting 8

CLIC Stabilisation meeting 88/12/2009

• Some parts will be dummy parts in the test module and CLEX but the active parts for the stabilisation are considered independent (double)


Recommended