+ All Categories
Home > Documents > C&M Workforce Modernisation and Planning Network 6 th June 2013.

C&M Workforce Modernisation and Planning Network 6 th June 2013.

Date post: 01-Apr-2015
Category:
Upload: addison-strode
View: 215 times
Download: 2 times
Share this document with a friend
Popular Tags:
25
C&M Workforce Modernisation and Planning Network 6 th June 2013
Transcript
Page 1: C&M Workforce Modernisation and Planning Network 6 th June 2013.

C&M Workforce Modernisation and Planning Network

6th June 2013

Page 2: C&M Workforce Modernisation and Planning Network 6 th June 2013.

www.nw.hee.nhs.uktwitter.com/HENorthWest

Workforce Planning: 2013-14 to 2017-18• There are three templates to be completed:

• Narrative • Demand • Risks and Issues

• The deadline for return to Health Education North West is Friday 28th June 2013

• All queries, issues and submissions are to go to [email protected]

Page 3: C&M Workforce Modernisation and Planning Network 6 th June 2013.

www.nw.hee.nhs.uktwitter.com/HENorthWest

Workforce Planning: 2013-14 to 2017-18 Narrative• The Narrative Template is intended to

• Link with the Trust workforce strategy and business vision• Make a bottom-up assessment of future qualified and non-qualified workforce

trajectories• Understand any additional changes to demand for education commissioning plans

for pre-registration (degree and diploma) and specialist practitioner programmes (post-graduate and masters)

• Identify critical issues and pinch points in order to inform the development of new roles and targeted workforce initiatives

• Comprehend the demand for new roles, skills, competencies and pathways that may be required in new build, service re-design and hospital re-development

• There is now reference to Francis, Values and Culture, Education and Learning, Supporting bands1-4 and nurse to bed ratios and some changes to the Modernisation Section

Page 4: C&M Workforce Modernisation and Planning Network 6 th June 2013.

www.nw.hee.nhs.uktwitter.com/HENorthWest

Workforce Planning: 2013-14 to 2017-18 Demand• The demand template it is similar to last year and calculates percentage changes in the

workforce• The template has been developed by Health Education England and influenced by local

priorities for the North West• The baseline is the actual Staff in Post FTE as at 31st March 2013• The demand is recorded in establishment FTE i.e. the number that would actually be

employed in substantive posts were there are no barriers to that employment (either on the 'supply side' or to address other practical concerns such as holding posts vacant to deliver cost savings)

• It is acknowledged that different organisations and different areas do things differently• Aim to capture a forecast of true underlying staffing requirement• Factors which in practice mean fewer staff are actually employed can then be factored in

to subsequent discussions and modelling• For non-medical we need demand and supply information• For Medical & Dental, Healthcare Scientists and Modernisation we need demand

Page 5: C&M Workforce Modernisation and Planning Network 6 th June 2013.

www.nw.hee.nhs.uktwitter.com/HENorthWest

Workforce Planning: 2013-14 to 2017-18 Risks and IssuesWhat are the main risks and issues?E.g. • Medical and Dental staff• Non-Medical staff• Gaps in service and rotas• Care Pathways• Barriers to Service Delivery• Primary Care• QIPP• Skills shortages• Competency shortages• Overseas recruitment• Recruitment Issues

What are the solutions and actions? E.g.

• Recruitment and retention• New and expanded roles• Demand for newly qualified staff• Demand for skilled staff• Continuing Professional

Development• Education and learning

management• Service reconfigurations

Page 6: C&M Workforce Modernisation and Planning Network 6 th June 2013.

www.nw.hee.nhs.uktwitter.com/HENorthWest

Workforce Assurance Tool

• NHS Trust Development Agency use Workforce Assurance Tool as part of Foundation Trust pipeline

• Provide training, primarily for Non Foundation Trusts but also accessible to Foundation Trusts

• https://wfa.westmidlands.nhs.uk

Page 7: C&M Workforce Modernisation and Planning Network 6 th June 2013.

www.nw.hee.nhs.uktwitter.com/HENorthWest

Health Visitors

End of 2012/13 Position

• The North West was successful in achieving the target of 1489.0 FTE for March-13.• The Mar-13 target is 1656.90

Totals by Area Team Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Gap(ESR) (ESR) (ESR) (ESR) (ESR) (ESR) (ESR) (ESR) (ESR) (ESR) (ESR) (ESR) (ESR) to Mar-13

at Mar-13Lancashire 318.61 315.59 314.89 311.73 312.92 311.89 326.40 334.29 324.77 326.41 328.47 331.08 327.59 -10.37Greater Manchester 533.79 538.49 541.70 516.30 529.39 528.35 550.49 577.98 582.22 581.73 579.48 574.08 571.80 -5.10Cheshire, Warrington & Wirral 214.10 214.92 216.07 216.84 215.72 217.73 219.15 235.57 239.10 240.38 241.20 240.47 241.37 10.32Cumbria 74.73 76.91 78.43 76.21 76.74 76.07 78.25 81.59 84.61 85.68 85.08 84.41 81.29 2.65Merseyside 255.79 256.74 249.63 244.79 244.98 243.08 251.14 253.09 263.08 264.35 258.87 256.96 257.22 -7.55TOTAL 1397.02 1402.64 1400.72 1365.87 1379.76 1377.12 1425.44 1482.52 1493.77 1498.55 1493.10 1487.01 1479.27 -2.31TOTAL (inc Other Providers) 1410.63 1419.06 1415.53 1380.68 1395.07 1390.94 1439.83 1497.13 1507.39 1510.16 1504.72 1498.62 1491.95 9.30

NOTE: ESR cluster figures for Feb ESR have been calculated using proxy figures for the four divisions in Bridgewater, based on the Feb manual returns.

Page 8: C&M Workforce Modernisation and Planning Network 6 th June 2013.

www.nw.hee.nhs.uktwitter.com/HENorthWest

Health Visitors

• North West modelling for 2013/14 takes into account natural turnover, attrition and the outturn of newly qualified students into the Health Visiting workforce.

Page 9: C&M Workforce Modernisation and Planning Network 6 th June 2013.

www.nw.hee.nhs.uktwitter.com/HENorthWest

Health Visitors

• Table below shows the pre modelled trajectories for each of Area Teams as at 2013/14.• Area Team directors have been asked to consult with the LETBs and submit their local

plans to NHS England by the 31st May 2013.

Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 Jan-14 Feb-14 Mar-141483.49 1477.68 1471.89 1466.12 1460.38 1454.66 1448.96 1598.90 1664.46 1657.94 1663.41 1656.90

TARGETS BY AREA TEAMApr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 Jan-14 Feb-14 Mar-14

LANCASHIRE 336.64 335.32 334.01 332.70 331.40 330.10 328.80 362.83 377.70 376.23 377.47 375.99CUMBRIA 78.33 78.03 77.72 77.42 77.11 76.81 76.51 84.43 87.89 87.54 87.83 87.49MERSEYSIDE 263.74 262.70 261.67 260.65 259.63 258.61 257.60 284.25 295.91 294.75 295.72 294.57

230.14 229.24 228.34 227.45 226.56 225.67 224.79 248.05 258.22 257.21 258.06 257.05574.64 572.39 570.15 567.91 565.69 563.47 561.27 619.35 644.74 642.21 644.34 641.81

TOTAL 1483.49 1477.68 1471.89 1466.13 1460.38 1454.66 1448.97 1598.90 1664.46 1657.94 1663.42 1656.901648.00

CHESHIRE, WARRINGTON & WIRRAL

NORTH WEST TARGET

2013/14

GREATER MANCHESTER

OPERATING PLAN MINIMUM

Q1 Q2 Q3 Q4

Page 10: C&M Workforce Modernisation and Planning Network 6 th June 2013.

Data Quality Update: May-13

Page 11: C&M Workforce Modernisation and Planning Network 6 th June 2013.

www.nw.hee.nhs.uktwitter.com/HENorthWest

Data Quality Information

o Acute and mental health trust in England data quality results published in Health and Social Care Information Centre report:

o Available on HSCIC here or eWIN

o Woven report ex-employees validation limited to leavers since 1st July 2012

o Woven report GMC/GDC registration validation been corrected. Scores might have changed but are now correct

o Emphasis on putting in place strong data collection & validation processes remains

Page 12: C&M Workforce Modernisation and Planning Network 6 th June 2013.

www.nw.hee.nhs.uktwitter.com/HENorthWest

Data Quality: North West Score

• NW retained first place May-12 to May-13

• Error count increased by 4409 (28.7%) errors Apr-13 to May-13

• Error count increased by 756 (4.9%) errors May-12 to May-13

Page 13: C&M Workforce Modernisation and Planning Network 6 th June 2013.

www.nw.hee.nhs.uktwitter.com/HENorthWest

Data Quality: Priority Areas

Page 14: C&M Workforce Modernisation and Planning Network 6 th June 2013.

www.nw.hee.nhs.uktwitter.com/HENorthWest

Data Quality: CHESHIRE & MERSEYSIDE ORGANISATIONS FINAL SCORES

NORTH WEST TRUST RANKING BY FINAL SCORE

Sub-Region

Org Code

Trust Apr-13 May-13Score Change from Previous

MonthApr-13 May-13

Rank Change from Previous

MonthC&M RTV 5 Boroughs Partnership NHS Foundation Trust 9985 9975 ↓ 4 6 ↓C&M RXA Cheshire And Wirral Partnership NHS Foundation Trust 9985 9975 ↓ 4 6 ↓C&M RBL Wirral University Teaching Hospital NHS Foundation Trust 9925 9910 ↓ 10 12 ↓C&M REP Liverpool Women's NHS Foundation Trust 9895 9905 ↑ 13 14 ↓C&M RQ6 Royal Liverpool And Broadgreen University Hospitals NHS Trust 9635 9855 ↑ 29 17 ↑C&M RVY Southport And Ormskirk Hospital NHS Trust 9880 9850 ↓ 15 18 ↓C&M RY7 Wirral Community NHS Trust 9660 9740 ↑ 28 21 ↑C&M RBT Mid Cheshire Hospitals NHS Foundation Trust 9755 9720 ↓ 23 22 ↑C&M RJN East Cheshire NHS Trust 9770 9710 ↓ 22 23 ↓C&M RY1 Liverpool Community Health NHS Trust 9695 9710 ↑ 24 23 ↑C&M RJR Countess Of Chester Hospital NHS Foundation Trust 9805 9700 ↓ 20 25 ↓C&M RBN St Helens And Knowsley Hospitals NHS Trust 9585 9540 ↓ 30 28 ↑C&M REN Clatterbridge Cancer Centre NHS Foundation Trust 9385 9450 ↑ 34 32 ↑C&M RBQ Liverpool Heart And Chest NHS Foundation Trust 8495 9330 ↑ 39 33 ↑C&M RWW Warrington And Halton Hospitals NHS Foundation Trust 9290 9285 ↓ 35 34 ↑C&M RBS Alder Hey Children's NHS Foundation Trust 9005 9035 ↑ 36 36 →C&M RET Walton Centre NHS Foundation Trust 8540 8930 ↑ 38 37 ↑C&M REM Aintree University Hospital NHS Foundation Trust 7820 8520 ↑ 42 39 ↑C&M RW4 Mersey Care NHS Trust 7815 8220 ↑ 43 42 ↑

Final Score Regional Rank

Rank improved: hRank worsened: hRank remained same: h

Page 15: C&M Workforce Modernisation and Planning Network 6 th June 2013.

www.nw.hee.nhs.uktwitter.com/HENorthWest

Data Quality: CUMBRIA & LANCASHIRE ORGANISATIONS FINAL SCORES

• Each organisation starts with a perfect score (10,000) and loses a proportional amount of that score for each problem detected by the validation process

• Each validation is scored individually and is equally weighted

• The overall score is derived from the sum of the scores for the individual validations and is scaled out of 10,000

NORTH WEST TRUST RANKING BY FINAL SCORE

Sub-Region

Org Code

Trust Apr-13 May-13Score Change from Previous

MonthApr-13 May-13

Rank Change from Previous

MonthC&L RTX University Hospitals Of Morecambe Bay NHS Foundation Trust 9995 9995 → 1 1 →C&L RJX Calderstones Partnership NHS Foundation Trust 9960 9960 → 8 8 →C&L RX7 North West Ambulance Service NHS Trust 9985 9955 ↓ 4 10 ↓C&L RXN Lancashire Teaching Hospitals NHS Foundation Trust 9800 9810 ↑ 21 20 ↑C&L RXR East Lancashire Hospitals NHS Trust 9430 9475 ↑ 31 30 ↑C&L RXL Blackpool Teaching Hospitals NHS Foundation Trust 9400 9455 ↑ 33 31 ↑C&L RW5 Lancashire Care NHS Foundation Trust 8920 8925 ↑ 37 38 ↓C&L RNN Cumbria Partnership NHS Foundation Trust 8265 8300 ↑ 40 40 →C&L RNL North Cumbria University Hospitals NHS Trust 8180 8055 ↓ 41 43 ↓

Final Score Regional Rank

Rank improved: hRank worsened: hRank remained same: h

Page 16: C&M Workforce Modernisation and Planning Network 6 th June 2013.

www.nw.hee.nhs.uktwitter.com/HENorthWest

Data Quality: GREATER MANCHESTER ORGANISATIONS FINAL SCORES

NORTH WEST TRUST RANKING BY FINAL SCORE

Sub-Region

Org Code

Trust Apr-13 May-13Score Change from Previous

MonthApr-13 May-13

Rank Change from Previous

MonthGM RMC Bolton NHS Foundation Trust 9970 9995 ↑ 7 1 ↑GM TAE Manchester Mental Health And Social Care Trust 9990 9995 ↑ 3 1 ↑GM RM3 Salford Royal NHS Foundation Trust 9995 9990 ↓ 1 4 ↓GM RWJ Stockport NHS Foundation Trust 9820 9980 ↑ 18 5 ↑GM RRF Wrightington, Wigan And Leigh NHS Foundation Trust 9855 9960 ↑ 16 8 ↑GM RMP Tameside Hospital NHS Foundation Trust 9910 9945 ↑ 11 11 →GM RXV Greater Manchester West Mental Health NHS Foundation Trust 9910 9910 → 11 12 ↓GM RW6 Pennine Acute Hospitals NHS Trust 9820 9885 ↑ 18 15 ↑GM RBV Christie NHS Foundation Trust 9935 9875 ↓ 9 16 ↓GM RY2 Bridgewater Community Healthcare NHS Trust 9680 9655 ↓ 25 26 ↓GM RW3 Central Manchester University Hospitals NHS Foundation Trust 9680 9600 ↓ 25 27 ↓GM NQK Spiral Health CIC 9675 9485 ↓ 27 29 ↓GM RM2 University Hospital Of South Manchester NHS Foundation Trust 9410 9270 ↓ 32 35 ↓GM RT2 Pennine Care NHS Foundation Trust 9890 8230 ↓ 14 41 ↓GM NRT Bolton Community Practice 2995 3190 ↑ 44 44 →

Final Score Regional Rank

Rank improved: hRank worsened: hRank remained same: h

Page 17: C&M Workforce Modernisation and Planning Network 6 th June 2013.

www.nw.hee.nhs.uktwitter.com/HENorthWest

Data Quality: Maximum Scoring Organisations

0 organisations in the North West in May 2013 achieved a maximum score of 10,000

3 organisations achieved a score of 9995:

Bolton NHS Foundation TrustManchester Mental Health and Social Care TrustUniversity Hospitals of Morecambe Bay NHS Foundation Trust

For full ranking please access eWIN’s data quality reports here:

https://www.ewin.nhs.uk/qipp/data_quality_reporting/ranking_table

Page 18: C&M Workforce Modernisation and Planning Network 6 th June 2013.

www.nw.hee.nhs.uktwitter.com/HENorthWest

Data Quality

Full reports on eWIN: direct link https://www.ewin.nhs.uk/qipp/data_quality_reporting/ranking_table To navigate:1. Select Data Quality in Benchmarking Service

2. Four reports are currently available and a guidance page

3. Demos can be set up on request

Page 19: C&M Workforce Modernisation and Planning Network 6 th June 2013.

eWIN Resources. Intelligence. Innovation.

o Available in the Local Education and Training Board areas East of England, North West, Thames Valley, Wessex and Yorkshire and the Humber

o NHS workforce focused portal designed to support delivery of QIPP, transition and productivity challenges

o Aligning to Education Outcomes Framework and HEE and LETB priorities

o New eWIN live May 2013 at ewin.nhs.uk

www.ewin.nhs.uk @ewin_portalResources. Intelligence. Innovation.

Page 20: C&M Workforce Modernisation and Planning Network 6 th June 2013.

www.ewin.nhs.uk @ewin_portalResources. Intelligence. Innovation.

eWIN is

o A communication platform to drive a culture of sharing knowledge and generating innovation

o A repository of good practice case studies, hot topics, bulletins, news and events

o A benchmarking service providing valuable workforce indicators and modelling tools

Page 21: C&M Workforce Modernisation and Planning Network 6 th June 2013.

www.ewin.nhs.uk @ewin_portalResources. Intelligence. Innovation.

Current Work Programme

o Soft launch of eWIN version 2 (May – July 2013)o Champion Network Pilot (May – December 2013)o Testing of new dashboards (May – July 2013)o Pilot of GP Practice Data Collection (June – August 2013)o Implementation of Communities development (June 2013)

Page 22: C&M Workforce Modernisation and Planning Network 6 th June 2013.

www.ewin.nhs.uk @ewin_portalResources. Intelligence. Innovation.

New Dashboards

o Staff Health Indicators Dashboard o Staff sickness absence reasons – ESR & Staff Survey

o Equality and Diversity Dashboardo Profile of workforce by protected characteristics – ESR

o Workforce Modernisation Dashboardo Assistant and Advanced Practitioner commissions and

workforce

o Organisation Profile Toolo Determine who to benchmark against

Page 23: C&M Workforce Modernisation and Planning Network 6 th June 2013.

www.ewin.nhs.uk @ewin_portalResources. Intelligence. Innovation.

Membership

o Mainly public site, benchmarking and member forum closed to public

o As organisations sign up, their employees are able to register as members

o Organisations regulate own membership through “Super User”o Simple registration process, training and support available

Page 24: C&M Workforce Modernisation and Planning Network 6 th June 2013.

www.ewin.nhs.uk @ewin_portalResources. Intelligence. Innovation.

Value of Membership

o Access to closed benchmarking and member forumso Access to closed knowledge documentso Access to closed dedicated workforce planning resourceso Influence direction and development of eWINo Part of eWIN communityo All North West trustsare signed up

Page 25: C&M Workforce Modernisation and Planning Network 6 th June 2013.

www.ewin.nhs.uk @ewin_portalResources. Intelligence. Innovation.

Contact

Liz ThomasSenior Programme Manager Workforce Strategy, Health Education North West

[email protected] 625 7793


Recommended