CM20 Meeting April 9, 2013 D.R. Dietderich, LBNL1
Insulation Status for QXF Cables
D.R. Dietderich, LBNLLARP-CERN Collaboration meeting
April 9, 2013
bnl – fnal – lbnl – slacUS LHC Accelerator Research Program
CM20 Meeting April 9, 2013 D.R. Dietderich, LBNL2
Outline
• Status of QXF R&D– Target Thicknesses
• 0.125 mm or 0.150 mm per side
• HQ/LHQ insulation R&D experience– HQ/LHQ Target thickness
• 0.100 mm per side
CM20 Meeting April 9, 2013 D.R. Dietderich, LBNL3
NEW QXF Insulation R&D
• New England Wire (NEW)• Target thickness 0.150 mm
per side• AGY S2-glass fibers (66
tex) with 933 silane sizing• 2 ply fibers twisted with a
pitch length of 3”. • 48 carriers• Braided has 15.4 P/I
CM20 Meeting April 9, 2013 D.R. Dietderich, LBNL4
Braid Thickness
• Reference pressure is 1,000 ksi
• ~18.2 P/I to obtain 0.150 mm
• ~12.4 P/I to obtain 0.125 mm
y = 0.0044x + 0.0694
0.125
0.13
0.135
0.14
0.145
0.15
12 14 16 18 20Picks per inch
Th
ickn
ess
per
sid
e (m
m)
R&D results
Extrapolated
Linear (R&D results)
R&D Results
CM20 Meeting April 9, 2013 D.R. Dietderich, LBNL5
New England Wire Braid on QXF Cable
Flat-bed scanner image of three cables
CM20 Meeting April 9, 2013 D.R. Dietderich, LBNL6
Insulation 14.1 P/I
Grey-scale image of the selected area
CM20 Meeting April 9, 2013 D.R. Dietderich, LBNL7
Number of pixel: 1028176 Number of white pixel (threshold 170): 973336 (94.67%)
Number of black pixel: 54840 (5.33%)
CM20 Meeting April 9, 2013 D.R. Dietderich, LBNL8
CM20 Meeting April 9, 2013 D.R. Dietderich, LBNL9
Summary and Plans
• Have 0.130 mm thickness • 2 ply braid may produce insulation with target
thickness of 0. 125 mm and 0.150 mm with either 12.4 P/I (picks per inch) or 18.3 P/I, respectively
• Do not plan to make any new R&D runs for 2 to 3 months
• Going to focus on QXF cable R&D