+ All Categories
Home > Documents > Co Existence vs Replacement H Kolbe Collaborate 2014

Co Existence vs Replacement H Kolbe Collaborate 2014

Date post: 23-Nov-2015
Category:
Upload: hans-kolbe
View: 10 times
Download: 1 times
Share this document with a friend
Description:
Upgrade and Co-existence strategies with Oracle EBS - Presentation at Collaborate 2014
17
#C14LV REMINDER Check in on the COLLABORATE mobile app #C14LV Co-Existence versus Replacement, the Future of Global Implementations Prepared by: Hans Kolbe Principal Celantra Systems Session ID#: XXXX a Multi-National User Panel
Transcript

COLLABORATE 14 Presentation Template

Co-Existence versus Replacement, the Future of Global ImplementationsPrepared by:Hans KolbePrincipalCelantra SystemsSession ID#: XXXXa Multi-National User PanelREMINDER

Check in on the COLLABORATE mobile app#C14LV#C14LV1 Slide 2Hans KolbeHans Kolbe has managed and advised global software implementation projects for over 15 years. His extensive knowledge on Oracle applications is combined with a formal background as a German attorney, trained in international and comparative law. Chair of Multi-National SIG GroupSpecialist in Intercompany and multi-org configurations, international compliance and transaction taxhanskolbe@celantrasystems.comwww.celantrasystems.com415-730-1131

Visit the Celantra Booth 1055 at Collaborate 2014#C14LV23AgendaAbout the PresenterCompany InformationMulti-National SIGThe Fundamental Challenges of Multi-National ERP ImplementationsImplementation Results and Models Panel#C14LV3

San Francisco, CA 94114 +1 415 824 8344, e-mail: [email protected] http://www.celantrasystems.comGlobal Implementations and Process Alignment: Plan, Design, and ExecuteCelantra Systems provides innovative solutions to todays most vexing issues in multi-national ERP configurations. Celantra specializes in helping large organizations tackle the challenges of operational efficiency and process synchronization while improving and automating financial, legal, and trade compliance. Celantra has a proven track record of success in simplifying multi-national implementations, reducing implementation timeframes, and satisfying challenging local in-country requirements.We address and specialize in- Legal and Operational Structure design to support operational efficiency and reporting compliance - Languages and International Document Formats- Global Chart of Accounts and Financial Reporting- Tax, Statutory, Trade and Customs compliance - Intercompany automation and reconciliation- Transfer price elimination (Profit in Inventory)- Integration with Boundary Systems - Instance Strategy and Design- IFRS and Multi-GAAP Accounting We offer project planning, system design, program management, and supplementary staffing assistance.

Celantra Systems Customers

#C14LVSquare = No customizations fit into Circle = It must fit like a gloveSquare = Single Global Template fit into Circle = comply with all country regulationsSquare = Quick to implement fit into Circle = Consider all requirementsSquare = Nimble and adaptable to change fit into Circle = Well tested, documented, trained.

Key Challenge for Multi-National ImplementationsSquaring not just one, but many circles resolving many contradictory demands Should we rethink? Maybe co-existence and collaboration of multiple systems is the answer#C14LV5Global FootprintMultiple Language and Character Sets Time ZonesCompliance Footprint EBS-Tax configuration Secondary / MRC LedgersLocalizations Technical Footprint Global Instance capabilitiesPatching without interrupting operations (12.2)ERP Functionality has greatly improved We can technically run a multi-national system across the globe ..#C14LV6A global organization has multiple operational models to combine them into a single configuration is complex. This has to square with operational efficiency. Efficiency demands simplicityBut .. The critical square / circle challenge remains So what are the results of global implementations at the moment ? -Time to implement - Replacing custom systems whats the impact - Global data management how well are you doing? - Management reporting do you use a data warehouse? Does it reconcile to your ERP system? - Local compliance / Are you outsourcing? #C14LV7- Complex (segments, values)Capture all required dimensions and data elementsAllow sufficient detail for local statutory reportingNeeds segment for each reporting dimensionAllow sufficient length for details and roll-up structureSimple (few segments, few values)Simple, short, easy to understand & train, truly global Quick Operational processing Easier interfaces legacy system connectionsLess Maintenance/setups / configurationsSimpler Cross-Validation Rules Fewer Screen and Report Display challenges (max ~28 chars)There is no Right Answer! It is a balancing act!Key Challenge for Multi-National Implementations#C14LV8Legal Entity, Operating Unit, Multi-Org Access (Shared Services, Compliance, Localizations) Inter-Company (multi-tier, trading, accounting, pricing, )Global Project Management and Support Global Chart of Accounts Secondary LedgersMulti-language, multi-byte (MLS & NLS), Time ZonesTax and Legal Compliance Challenges (coordinate solutions in different regions)Global Single InstanceApplication Upgrade Strategy - R12, Fusion Apps, Co-Existence Options for multi-nationals Key Challenges for Multi-National Implementations

#C14LV9Application Upgrade Strategy - R12, Fusion Apps, Co-Existence Options for multi-nationals Legal Entity, Operating Unit, Multi-Org Access (Shared Services, Compliance, Localizations) Inter-Company (multi-tier, trading, accounting, pricing, )Global Project Management and Support Global Chart of Accounts Secondary LedgersMulti-language, multi-byte (MLS & NLS), Time ZonesTax and Legal Compliance Challenges (coordinate solutions in different regions)Global Single InstanceKey Issues for the Multi-National SIG

#C14LV10New Implementation Model AspirationReduce the time (from months to days) that it takes to add a new legal entity (LE) into Oracle This could be for either an acquisition or an existing LE that is not yet on OracleEnsure that any changes to business operations resulting from this new approach do not negatively impact:Qualcomm accounting operationsERP support by FSG & ITMonth-end close processes are not negatively impactedDesign this new solution around a typical international implementation scope GL, FA, PO, AP and ProjectsAssumption is that orgs requiring either manufacturing, component inventory or order management must have separate LE

#C14LV11Panelists - 1- Introduction Kevin Elshaw State Street

Maryanne, Jeff Terex

Geir - Christine Accenture / DNV-GL

Adina / Boeing

12#C14LV12Panelists - 2- Questions & AnswersQuestion 1: What is your products specialty? Please describe the gap that your product fills? Which source Oracle modules do you address or work with?

Question 2: How does your product integrate? Across ledgers, currencies, and extensions & customizations, or applications. Also geographically across countries, languages.

Optional Question 3: Are there other ways to fulfill this need? Alternatives?

13#C14LV13Audience

Questions & Answers 14#C14LV14Collaborative SIG - 2014Session IDSession Date and TimeRoom13890CS-Part I The Reporting Conundrum? How to Solve the Reporting Needs of a Multinational14071CS-Part II ADI and Report Manager how they help in providing a solution to a reporting need14118CS-Part III BI Publisher and APEX reporting capabilities14406CS-Part IV Business Intelligence to the fore for Dashboards and Management reporting14925CS-Part V Hyperion the financial planning and budgeting tool with reporting capabilities14431CS-Part VI The External Reporting Eco-System which Completes the E-Business Suite IntegrationApril 10th 11:00-12:00Marco Polo Room 805#C14LV15Invitation Oracle Open World

MUSICIANS AT THE BOOTH- A call to anybody attending the Oracle Open World to play or to listen to chamber music at our booth. Please join us at the Celantra Systems booth 3413, Moscone West. We will provide the instruments! What better way to strike a work/life balance? If you are interested in playing, please contact Christina Schnemann at [email protected] and she will work out the details of what, when, where and how.

CELANTRA RECEPTION Sep 24th -We would also like to cordially invite you to join us for a reception and short concert on Tuesday, September 24th from 6:30 - 8:30 at the Steinway Piano Gallery, located at 647 Mission Street, just 4 blocks away from the convention center! This is our way of saying thank you for your business and your friendship, in the way that we know best. If you plan to attend, please email [email protected]. We hope to see you there#C14LV16Please complete the session evaluationWe appreciate your feedback and insightYou may complete the session evaluation either on paper or online via the mobile app#C14LV#C14LV17


Recommended