+ All Categories
Home > Documents > Commissioning EMMA

Commissioning EMMA

Date post: 15-Jan-2016
Category:
Upload: zion
View: 33 times
Download: 0 times
Share this document with a friend
Description:
Bruno Muratori STFC, Daresbury Laboratory. Commissioning EMMA. 02/07/09. PRISM workshop – Imperial College. Motivation / Introduction. Give an overview of what has been thought about – given talks & previous attempts (Scott, Eberhard, Shane, Carol, Fran ç ois, Dejan and others) - PowerPoint PPT Presentation
Popular Tags:
26
Revisiting the Wheel of Retailing The Case of a Turkish Discount Retailer? Muge CEVIK, Neva YALMAN Yeditepe University, Istanbul, TURKEY
Transcript
Page 1: Commissioning EMMA

Bruno Muratori

STFC, Daresbury Laboratory

Commissioning EMMA

02/07/09PRISM workshop – Imperial College

Page 2: Commissioning EMMA

Motivation / Introduction

• Give an overview of what has been thought about – given talks & previous attempts (Scott, Eberhard, Shane, Carol, François, Dejan and others)

• Does not mean it is always correct or complete – this is part of our duty in the next months

• May be different & much better ways of implementing procedures – these are initial thoughts

• Requires several iterations & discussions• Process started & lots to think about• Aim to be ready by end of summer (~ October)• Need help – who is available & for what ?

Page 3: Commissioning EMMA

Overview

• Commissioning– Preparing machine for beam

• set-up DAQ & controls & hardware• set-up diagnostic devices required

– Getting beam into the machine & where you want it– Making sure all desired properties are achieved

• for the bunch (full characterisation etc.)• for the machine (e.g. dispersion-free sections)

– Making all the desired measurements– Set-up machine for particular experiments– Requires several fully consistent simulations of the

machine !

Page 4: Commissioning EMMA

ALICE schematic

LINAC

BOO

STER

GU

N

SOL-01

H&V-01

H&V-06BPM-01

BUNCHERYAG-01

SOL-02

H&V-02 BPM-02

Q-01

YAG-02 Q-02

BPM-03

H&V-03 Q-03

Q-04

YAG-03

DIP-01

Q-05

DIP-02

YAG-??

FCUP-01

BPM-04H&V-04

Q-06Q-07

Q-08Q-09

DIP-3

Q-10

YAG-04

Q-11 BPM-05H&V-05

Q-12

INJECTOR

OTR-01BPM-01H&V-01

ST1

OTR-02 DIP-01DIP-02

DIP-03Q-01

OTR-03

BPM-02H&V-02

Q-02 Q-03 Q-04

OTR-04

BPM-01DIP-01

BPM-02SEXT-01

OTR-01

ST1 ARC1

ARC1

Q-01

V-01

Q-02

BPM-03

DIP-02

BPM-04

Q-03

V-02

Q-04

OTR-02SEXT-02

BPM-05DIP-03

BPM-06

OTR-01

Q-01Q-02

BPM-01H&V-01

OTR-02

Q-03Q-04

BPM-02H&V-02DIP-01

DIP-02BPM-03V-03

OTR-03

DIP-03

DIP-04Q-05

ST 2ST 2

ARC 2 PLM-01TCM-01

BPM-04H&V-04

BPM-05H&V-05

BPM-01H&V-01

Q-06Q-07

WIGGLER

ST 3ST 3

Q-01Q-02

Q-03Q-04

OTR-01

BPM-02H&V-02

BPM-01DIP-01

BPM-02SEXT-01

OTR-01

Q-01

V-01

Q-02

BPM-03DIP-02

BPM-03Q-03

V-02

Q-04

OTR-02SEXT-02BPM-05

DIP-03BPM-06

ARC 2

ST4

OTR-01Q-01 Q-02

BPM-01H&V-01

Q-03

DUMP-01

Q-04 Q-05

BPM-02H&V-02

OTR-02DIP-01 DIP-02 DIP-03

BPM-01Q-01

Q-02Q-03

OTR-01

DMP

1 m

Note: scale is for guidance only

ERLP SCHEMATIC DIAGRAM

v.0.2 (15/06/2006)extracted from AO-180/10078/E

• Need similar schematic for EMMA injection line, ring and extraction line (shall be enormously more detailed … !)

Page 5: Commissioning EMMA

Injection Line (1)

ALICE

EMMA

ALICE quadrupoles

SRS quadrupoles

New quadrupoles

Faraday Cup

Screen

last dispersivesection

dogleg

tomography

Page 6: Commissioning EMMA

Injection line (2)

Page 7: Commissioning EMMA

Injection Line (3)

Page 8: Commissioning EMMA

Injection Line Commissioning (1)

• Prepare ALICE as Injector for EMMA– Bunch length: ~ 10 ps rms in order to decrease space

charge effects and for painting the longitudinal phase space

– Energy spread: < 100 keV in order to have a better defined beam for painting and avoid chromaticity

– Bunch charge: 15 – 30 pC in order to reduce collective effects (e.g space charge)

– Normalised transverse emittance: 5 - 10 µm in order to decrease space charge effects but still have a well defined beam for painting

Page 9: Commissioning EMMA

Injection Line Commissioning (2)

– Beam energy: 10 to 20 MeV with the ability to be changed several times a day.

– Beam characterisation (full 6D)• Bunch length / Charge / Emittance / Energy /

Energy spread– Hardware commissioning– Controls & online model commissioning

• Which is best suited ?– DAS commissioning

Page 10: Commissioning EMMA

Injection Line Commissioning (3)

• Probable sequence of ALICE set up to act as an injector for EMMA– Set the ALICE injector up for an appropriate booster

beam energy (6 – 8 MeV) at 1 – 2 bunch charges (15 – 30 pC) too low / too high ?

– Characterise the beam in the ALICE injector for energy spread, emittance and bunch length etc.

– Set 3-4 injection energies in the range 10 to 20 MeV and set the rest of ALICE for injection into the EMMA ring

– Measure the beam characteristics at each combination of energy and bunch charge

Page 11: Commissioning EMMA

Detailed Procedures (1)

• Dogleg & dispersion– Iterative procedure setting two external quads – then

central – then repeat• Matching to tomography

– Not trivial & very sensitive even in initial tracking models• Last dispersive section and setting Dx & D’

x

– Tomography helps keep the beam small– Dedicated model with some quads off– Measure dispersion in two places → derivative known– Turn quads to nominal model value → Dx & D’

x should be close to desired value ... is this a valid procedure ?

Page 12: Commissioning EMMA

Measurements in Injection Line (1)

• Emittance– Tomography section– Quadrupole scan

• Bunch length– Zero cross method with 2nd linac cavity used as a

buncher and YAG screen in dogleg• Charge

– Faraday cup after dipole or tomography• Energy & Energy spread

– Slit & YAG in last dispersive section

Page 13: Commissioning EMMA

Commissioning the EMMA ring (1)

Injection Septum 65°Kicker

Kicker

Cavities x 19

Extraction Septum 70°

Kicker

KickerScreen

Wire Scanner

Wall Current Monitor

Wire Scanner

Screen

BPM x 82

D Quadrupole x 42F Quadrupole x 42

16 Vertical Correctors

IOT Racks (3)

Waveguide distribution

KickerPowerSupplies

SeptumPowerSupply

SeptumPowerSupply

KickerPowerSupplies

Page 14: Commissioning EMMA

Commissioning the EMMA ring (2)

Injection

Page 15: Commissioning EMMA

Commissioning the EMMA ring (3)

Extraction

Page 16: Commissioning EMMA

Commissioning the EMMA ring (4)

Extraction

Page 17: Commissioning EMMA

• Before Injection into EMMA– Start with easier energy (probably 17-18 MeV)– Start with a low charge ? (e.g. 1 pC)– Measure injection energy to within 100 keV– Set nominal septum & kicker values

• Inject beam & look at first few BPMs – no acceleration– Calibrate this w.r.t. chosen model (ZGOUBI)– Make half a turn & extract & diagnose beam (may be

better to circulate first & measure tunes & TOF ?)– Measure bunch properties in extraction line

Commissioning the EMMA ring (5)

Page 18: Commissioning EMMA

Establishing the orbit (1)• Look at Beam Position Monitor (BPM) one by one from the

injection point (not symmetric → not straightforward)• Adjust initial beam position (x,x’,y,y’) as well as Quad

current and position

BPM

Page 19: Commissioning EMMA

Establishing the orbit (2)

• Double focusing lattice (QF and QD)• Bend fields are created by shifting quadrupoles

QFQD

Linear slide

• 4 knobs– QF and QD strength– QF and QD position

(horizontally)

• 4 parameters to fit

– Qx and Qy

– TOF shape and offset• Should have model to

predict 4 parameters according to desired lattice which model is best ?

Page 20: Commissioning EMMA

Measurements in EMMA ring

• Measurement of time of flight– Change frequency until no synchrotron oscillations– Frequency then translates into TOF– Hence find minimum of TOF

• Relationship of TOF to lattice parameters / tune– Tune vs. energy

• Study variation of all parameters to lattice properties• Interpretation of BPM readings

– Not all identical & only symmetry every other cell– Important to model all BPM readings → GPT / other

• Best code to do this – ZGOUBI (more this p.m.)

Page 21: Commissioning EMMA

ALICE

EMMA

SRS quadrupoles

New quadrupoles

TD Cavity

spectrometer dipole

tomography, EOand spectrometer matching section and TDC

first dispersive section

Diagnostic line (1)

Page 22: Commissioning EMMA

Diagnostic line (2)

Page 23: Commissioning EMMA

Diagnostic line (3)deflecting cavity tomography EO

spectrometer

Page 24: Commissioning EMMA

Extraction Line Commissioning (1)

• Much harder than injection as no precise knowledge of energy

• Set kickers & septum at ‘best guess’• Extract ideal – pencil-like beam• Measure energy with screen & dipole• Iterate• Zero the dispersion on exit of 1st straight (not obvious)• ‘Match’ to tomography – not trivial & again possibility for

collaboration (already two students & me but ...)• Make bunch measurements

Page 25: Commissioning EMMA

• How to achieve zero dispersion at the exit of straight ?– Usually done by centering the beam and then slightly

changing the energy & ensuring spot is motionless– Where do we introduce this change ?

• main linac → changes dynamics of EMMA & spot could appear still with dispersion non-zero

• switch off one of the EMMA cavities ? → also changes the dynamics

• slightly reduce all of them ?• look at centroid trajectories ?

Detailed Procedures (2)

Page 26: Commissioning EMMA

Measurements in Extraction Line (1)

• Emittance– Tomography section

• Slice emittance– TDC & screen in tomography section

• Bunch length– EO monitor and / or TDC

• Charge– Faraday cup after spectrometer dipole

• Energy spread– Slit & YAG in first dispersive section / spec. dipole

• Slice energy spread– TDC & spectrometer dipole

Page 27: Commissioning EMMA

Modelling (1)

• Model ALICE injector to deliver EMMA beam (10 ps etc.)• Create model of ALICE to EMMA injector line in GPT

– Run this model both on & off line for comparisons / predictions

• Create S2E model for all of EMMA in GPT– Run with field maps & misalignments for comparisons

/ predictions– Run all the way to spectrometer & dump in the EMMA

extraction line• Compare this with ZGOUBI models & FFEMMAG / other

models wherever possible

Page 28: Commissioning EMMA

Aperture survey

• Phase space at injection• Scan aperture in phase space with a pencil beam• Use steerers vertically & kickers horizontally

• When is normalized acceptance is 3 mm rad ?• Explore acceptance at all energies• Should also be modelled with FFEMMAG, GPT & others• To be done at all energies from 10 to 20 MeV

x’

/

x

/

pencil beam

Page 29: Commissioning EMMA

Online Modelling (1)• Ring optics – what things may look like

courtesy S. Machida

Page 30: Commissioning EMMA

Online Modelling (2)• Injection orbit and optics - what things may look like

Set septum and kicker strength

See orbit and optics of incoming beam

courtesy S. Machida

Page 31: Commissioning EMMA

We Need Your Help

• Identify all tasks required to operate EMMA successfully - started

• Identify & describe procedures – started– TOF / Tunes / Orbit correction / Experiments / other ?

• Help prepare programme of work - started• Help develop online models where required - started• Help interpret data & measurements correctly – what

does everything mean ?• Begin to lay out a commissioning plan - started• Estimate resources available to the project and in

particular commissioning – started• I will send list of tasks & initial commissioning thoughts

Page 32: Commissioning EMMA

• Update commissioning document to have– Project plan for EMMA commissioning preparation

• Deliverables / Milestones• Who can look into it, STFC, collaborators etc.• Simulations to be carried out (Richard D’Arcy &

others)• Procedure writing

• Give this plan to collaborators for feedback & help• Full Commissioning Plan by end of October• Major tasks e.g. - Build online model with interface

(ZGOUBI / PI-ZGOUBI)– Already under way thanks to Yoel Giboudot, David

Kelliher, Shinji, Machida, Kiril Marinov, Ben Shepher

We Need Your Help

Page 33: Commissioning EMMA

Thanks you for your attention

Still lots of work to be done !

Expect requests for help soon ...

Pre-Commissioning Workshop ~mid November

Everyone invited


Recommended