EMMA LAYOUT 4.9.07
Transcript
Page 1: EMMA LAYOUT 4.9.07. Neil Bliss, Bruno Muratori EMMA LAYOUT - EC Meeting 4.9.07 ERLP EMMA RING EMMA layout is required to fit within equipment and emergency.

EMMA LAYOUT4.9.07

Page 2: EMMA LAYOUT 4.9.07. Neil Bliss, Bruno Muratori EMMA LAYOUT - EC Meeting 4.9.07 ERLP EMMA RING EMMA layout is required to fit within equipment and emergency.

Neil Bliss, Bruno Muratori EMMA LAYOUT - EC Meeting 4.9.07

ERLP

EMMARING

EMMA layout is required to fit withinequipment and emergency access routesfrom ERLP represented by green pathways

INJECTIONLINEDIAGNOSTICS

BEAMLINE

EMMA LAYOUT

Page 3: EMMA LAYOUT 4.9.07. Neil Bliss, Bruno Muratori EMMA LAYOUT - EC Meeting 4.9.07 ERLP EMMA RING EMMA layout is required to fit within equipment and emergency.

Neil Bliss, Bruno Muratori EMMA LAYOUT - EC Meeting 4.9.07

Quadrupole x 4Available from SRS

Septum 72°

New Dipole 60°& BPMs

Quadrupole x 9Available from SRS

OTR Screen in ERLP

Screen or WS

Kicker

Kicker

INJECTION LINE

Quadrupoles x 2in ERLP

New Dipole 30°

Screen

New Dipole 30°

Window ?

Wall Current Monitor ? or

Faraday cup at spectrometer

2 New Quadrupoles

Screen or MWS

& BPM

Pumping

SpectrometerScreen & Faraday cup

Vacuum valveVacuum valve

Page 4: EMMA LAYOUT 4.9.07. Neil Bliss, Bruno Muratori EMMA LAYOUT - EC Meeting 4.9.07 ERLP EMMA RING EMMA layout is required to fit within equipment and emergency.

Neil Bliss, Bruno Muratori EMMA LAYOUT - EC Meeting 4.9.07

EMMARING

Septum 72°

Kicker

Kicker

Kicker power supplies

Cavity x 19

Septum 72°

Kicker

Kicker

Kicker power supplies

Screen

Wire Scanner

Resistive Wall Monitor

Wire Scanner

Screen

BPM x 84

D Quadrupole x 42F Quadrupole x 42

Vertical Corrector x 16

Girders x 7

Cavity locationor next cell ?

Cavity locationor cell before ?

Page 5: EMMA LAYOUT 4.9.07. Neil Bliss, Bruno Muratori EMMA LAYOUT - EC Meeting 4.9.07 ERLP EMMA RING EMMA layout is required to fit within equipment and emergency.

Neil Bliss, Bruno Muratori EMMA LAYOUT - EC Meeting 4.9.07

DIAGNOSTIC BEAMLINE PHASE 2

Quadrupole x 3available from SRS

New Dipole 21°& BPMs

Screen or WS

Screen x 4

New Quadrupole x 12

Vacuum valve

Transverse DeflectingCavity

Dipole 30°available from SRS

SpectrometerScreenF/Cup

Page 6: EMMA LAYOUT 4.9.07. Neil Bliss, Bruno Muratori EMMA LAYOUT - EC Meeting 4.9.07 ERLP EMMA RING EMMA layout is required to fit within equipment and emergency.

Neil Bliss, Bruno Muratori EMMA LAYOUT - EC Meeting 4.9.07

ScreenSpectrometerScreenF/Cup

Screen or WS

New Dipole 21°& BPMs

Quadrupole x 3available from SRS

New Quadrupole x 12

DIAGNOSTIC BEAMLINE PHASE 1

Page 7: EMMA LAYOUT 4.9.07. Neil Bliss, Bruno Muratori EMMA LAYOUT - EC Meeting 4.9.07 ERLP EMMA RING EMMA layout is required to fit within equipment and emergency.

Neil Bliss, Bruno Muratori EMMA LAYOUT - EC Meeting 4.9.07

ERLPEMMA

window location ?

INJECTION

Work inprogress

Page 8: EMMA LAYOUT 4.9.07. Neil Bliss, Bruno Muratori EMMA LAYOUT - EC Meeting 4.9.07 ERLP EMMA RING EMMA layout is required to fit within equipment and emergency.

Neil Bliss, Bruno Muratori EMMA LAYOUT - EC Meeting 4.9.07

INJECTION

Page 9: EMMA LAYOUT 4.9.07. Neil Bliss, Bruno Muratori EMMA LAYOUT - EC Meeting 4.9.07 ERLP EMMA RING EMMA layout is required to fit within equipment and emergency.

Neil Bliss, Bruno Muratori EMMA LAYOUT - EC Meeting 4.9.07

INJECTION

Page 10: EMMA LAYOUT 4.9.07. Neil Bliss, Bruno Muratori EMMA LAYOUT - EC Meeting 4.9.07 ERLP EMMA RING EMMA layout is required to fit within equipment and emergency.

Neil Bliss, Bruno Muratori EMMA LAYOUT - EC Meeting 4.9.07

INJECTION

Page 11: EMMA LAYOUT 4.9.07. Neil Bliss, Bruno Muratori EMMA LAYOUT - EC Meeting 4.9.07 ERLP EMMA RING EMMA layout is required to fit within equipment and emergency.

Neil Bliss, Bruno Muratori EMMA LAYOUT - EC Meeting 4.9.07

INJECTION

Page 12: EMMA LAYOUT 4.9.07. Neil Bliss, Bruno Muratori EMMA LAYOUT - EC Meeting 4.9.07 ERLP EMMA RING EMMA layout is required to fit within equipment and emergency.

Neil Bliss, Bruno Muratori EMMA LAYOUT - EC Meeting 4.9.07

EXTRACTION

To dipole & dump

Diagnostics line – Phase 2

To dipole & dump

• Phase 1:– No deflecting cavity– No Tomography– Quadrupole scan & dipole– → Emittance measurement & energy

spread• Phase 2:

– Deflecting cavity– Tomography– ~ 10 extra quadrupoles– → Emittance, slice emittance, energy

spread, slice energy spread, bunch length

Diagnostics linePhase 1:

Page 13: EMMA LAYOUT 4.9.07. Neil Bliss, Bruno Muratori EMMA LAYOUT - EC Meeting 4.9.07 ERLP EMMA RING EMMA layout is required to fit within equipment and emergency.

Neil Bliss, Bruno Muratori EMMA LAYOUT - EC Meeting 4.9.07

EXTRACTION

To dipole & dump

Diagnostics line – Phase 2

Page 14: EMMA LAYOUT 4.9.07. Neil Bliss, Bruno Muratori EMMA LAYOUT - EC Meeting 4.9.07 ERLP EMMA RING EMMA layout is required to fit within equipment and emergency.

Neil Bliss, Bruno Muratori EMMA LAYOUT - EC Meeting 4.9.07

EXTRACTION

Page 15: EMMA LAYOUT 4.9.07. Neil Bliss, Bruno Muratori EMMA LAYOUT - EC Meeting 4.9.07 ERLP EMMA RING EMMA layout is required to fit within equipment and emergency.

Neil Bliss, Bruno Muratori EMMA LAYOUT - EC Meeting 4.9.07

EXTRACTION


Recommended