+ All Categories
Home > Documents > COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation...

COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation...

Date post: 23-Sep-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
58
COMPANY PROFILE EM-TEK M&E CONSTRUCTION (HEAD OFFICE) EM-TEK AUTOMATION EM-TEK CAMBODIA EM-TEK MYANMAR Address 153/18 Nguyen Van Huong, Thao Dien Ward, DistrIct 2, HCMC, Vietnam Address Lot B9, B11 Dinh Tram Industrial Zone, Viet Yen District, Bac Giang Province, Vietnam Address Kamco City, R1 Condominium A103- 702, Sangkat Toul Sangke, Khan Russey Keo, Phnom Penh, Cambodia Address Shwe Ohn Pin Housing, Room No.03, Building – 12, 5- Quarter, Yankin Township, Yangon, Myanmar Phone (+84 028) 3636 4651-4 Phone (+84 020) 4386 6568 Phone (+855 023) 900 413
Transcript
Page 1: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

COMPANY PROFILE

EM-TEK M&E CONSTRUCTION (HEAD OFFICE)

EM-TEK AUTOMATION EM-TEK CAMBODIA EM-TEK MYANMAR

Address153/18 Nguyen Van Huong, Thao Dien Ward,DistrIct 2, HCMC, Vietnam

AddressLot B9, B11 Dinh Tram Industrial Zone, Viet Yen District, Bac Giang Province, Vietnam

AddressKamco City, R1 Condominium A103-702, Sangkat Toul Sangke, Khan Russey Keo, Phnom Penh, Cambodia

Address

Shwe Ohn Pin Housing, Room No.03, Building – 12, 5-Quarter, Yankin Township, Yangon, Myanmar

Phone (+84 028) 3636 4651-4 Phone (+84 020) 4386 6568 Phone (+855 023) 900 413

Page 2: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

CONTENTSElectrical & Instrument

Mechanical

Fire Fighting

Solar

Robotics & Automation

Page 3: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

Asia Networks Group

Chairman : Lee Kyu Sang

“ Composed of 1 holdings company & 4 subsidiaries ”

Trading,

Vietnam Biz Consulting

Electrical & Instrument,

Mechanical, Fire Fighting, Solar,

Robotics & Automation

1

2 3

4

Solar ESCO / EPC /

Development / DistributionPower, Oil & Gas plant equipment

Supply / Services / Maintenance

Page 4: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

1. Company History

2009 05. Establish EM-TEK / Start M&E Construction Biz

2013 03. Establish Myanmar Branch (Yangon) / Advance to oversea market

2016 08. Establish Cambodia Branch (Phnom Penh)

09. Establish Automation Division (Bac Giang) / Start Robotics & Automation Biz

Page 5: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

EM - TEK

Automation(Bac Giang Province)

Electrical & Instrument, Mechanical, Fire

Fighting, Solar Construction(Head : HCMC / Branch : Cambodia; Myanmar)

Company Name Mechanical Electrical Technology Corp. C E O Park Seung Hwa

Establishment 2009.05. Capital 30,000,000,000 VND

Business Filed- Electrical & Instrument Work / Mechanical / Fire protection / Solar

- Robotics & Automation equipment Design, Manufacture and Set up

Main Performance- Nghi Son Refinery & Petrochemical Complex - Taiwan Formosa Steel Mill

- Samsung Electric Vietnam W.W.T - HCMC MRT Line #1

Human Resource 250 employees(Construction)

Main ClientELETRICITY OF

VIETNAM

2. Company Brief

Page 6: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

3. Organization Chart

GENERAL DIRECTOR

Cambodia Branch(Phnom Penh)

PROJECT DEPT

• Electrical & Instrument

• Mechanical

• Fire Fighting

• Solar

• Robotics & Automation

MANAGEMENT DEPT ASSISTANT DEPTPLANNING DEPT

Fire Fighting

Team.

Electrical &

Instrument

Team.

Bidding Team.

Operation

Team.

Sales Team.

Market Team.

DEVELOPMENT DEPT

H / R Team.

Procurement

Team.

Contract Team.

Finance Team.

Account Team.

Legal Team.QA / QC Team.

CMD DEPT

Myanmar Branch(Yangon)

Electric Team

Mechanical

TeamMechanical

Team.

Solar Team.

Page 7: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

3. Manpower list

0

20

40

60

80

100

120

140

160

Total Electric & Instrument Mechanical Fire Fighting Solar Robotic & Automation

14

4 3 2 2 3

37

10 9 8 5 5

153

65

3325

10

20

46

2115

5 3 2

Project Manager Site Manager Engineer Officer

Works Field Project Managers Site Managers Engineers Officers

Electrical & Instrument 4 10 65 21

Mechanical 3 9 33 15

Fire Fighting 2 8 25 5

Solar 2 5 10 3

Robotic & Automation 3 5 20 2

Total 14 37 153 46

Page 8: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

4. Works Field

FIRE FIGHTINGELECTRICAL & INSTRUMENT

MECHANICAL

SOLARROBOTICS & AUTOMATION

Page 9: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

ELECTRICAL & INSTRUMENT

Page 10: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

5-1. Typical Implementation Project

No. Project name Type Work Scope Owner Working Period

1 HAGL Myanmar Centre – Phase 2 Apartment Electrical Coteccons Going

2 Vin City Grand Park APT Apartment Electrical Hoa Binh Corpotation 2019. 07 – Going

3 Human City Apartment Apartment Electrical Human City 2017.02 – 2019. 12

4 Song Ngoc Apartment Electrical Hoa Binh Corporation 2017. 10 – 2019. 12

5 CAMKO CITY R1 (Phnom Penh) Apartment Electrical World City 2017.06 – 2018.06

6 Booyoung Apartment CT-7 B/L Apartment Electrical Booyoung VINA 2016.08 – 2018. 04

7 Vinh Long Mall Commercial Electrical Hoa Binh Corpotation 2019. 07 - Going

8 Lotte Mall Hanoi Commercial Electrical Lotte E&C 2018.11 – Going

9Lotte Shopping Plaza Re-modeling

(Lotte Center Hanoi)Commercial Electrical Lotte Shopping Plaza 2018.07 – 2019. 05

10 AEON MALL Phnom Penh PPC Commercial ElectricalFuji Furukawa E&C

World Space2017. 01 – 2018.06

11 AEON MALL Phnom Penh PPC Commercial Electrical HyunDai Engineering 2016. 09 – 2018. 06

12 Lotte Mart Go Vap Commercial Electrical Lotte Viet Nam Co., Ltd. 2015. 11 – 2016. 09

Page 11: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

5-1. Typical Implementation Project

No. Project name Type Work Scope Owner Working Period

13 Lotte Mart Vung Tau Commercial Electrical Lotte Viet Nam Co., Ltd 2014. 06 - 2014.12

14 Lotte Mart Ba Dinh (Lotte Center) Commercial Electrical Lotte Viet Nam Co., Ltd 2014. 06 - 2014. 09

15 Lotte Mart Dong Da Commercial Electrical Lotte Viet Nam Co., Ltd 2013. 10 - 2013. 12

16 Lotte Mart Binh Duong Commercial Electrical Lotte Viet Nam Co., Ltd 2013. 06 - 2013.12

17 POSCO Splendora City Complex building Electrical POSCO E&C 2010. 12 - 2012. 08

18 Serenity SKY VILLA Electric Hoa Binh Corporation 2017. 10 – 2019. 12

19 Prime Resort and Hotel VILLA Electrical Hoa Binh Corporation 2018.03 – 2019. 12

20 Korea Military Base Camp Philippine Housing ElectricalMinistry National Defence Korea

2013. 10 - 2014. 02

21 Lotus Mui Ne resort 4-star Hotel Hotel Electrical Bich Khue Co., Ltd 2009. 08 - 2010. 02

22 Yen Bai General Hospital Hospital Electrical Hyundai Engineering 2013. 10 – 2016. 06

23 NS2 BOT THERMAL Power Plant Power PlantElectrical

InstrumentDoosan Heavy Industries VN

& Lilama2018. 08 - Going

24 HCMC MRT Line 1 CP2 Project Metro Train Electrical GS Engineering & Construction 2015.11 - Going

Page 12: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

5-1. Typical Implementation Project

No. Project name Type Work Scope Owner Working Period

25 KN Cam Lam Solar Power Plant Solar Plant Electrical Hanwha E&C 2018.10 – 2019. 08

26 Formosa Steel Plant Steel PlantElectrical

InstrumentPosco E&C Vietnam 2013. 08 – 2016.12

27Nghi Son Refinery andPetrochemical Complex

Oil PlantElectrical

InstrumentGS Engineering &

Construction2014. 11 – 2016.12

28 500kv Duc Hoa Substation Substation Electrical EVNSPMB-EVNNPT 2017.10 – 2019. 10

29 500kv Cau Bong Substation Substation Electrical EVNSPMB-EVNNPT 2017.10 - 2019. 08

30Tham Lương 110kv

Power Substation ProjectUnderground

CableElectrical EVN-PCHCM 2015.07 - 2015.10

31 Kefico 2nd Plant Factory Electrical Hyundai Engineering 2018.06 - 2020. 01

32 DSR VINA Factory Factory Electrical DSR VINA 2017.02 - 2017.09

33 SOLU M VINA Factory Electrical SOLU M VINA 2016.07 - 2017.02

34 Global Dyeing Factory Factory Electrical Global Dyeing Co.,Ltd. 2016.08 - 2017.02

35 Global Hantex Factory Factory Electrical Global Hantex Co.,Ltd. 2016.08 - 2017.01

Page 13: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

5-1. Typical Implementation Project

No. Project name Type Work Scope Owner Working Period

36 CJ-SC Global Mill Vung Tau FactoryElectrical

InstrumentCJ-SC Global

Milling LLC Co., Ltd.2014.09 - 2015.05

37 HyunDai Aluminum – Hung Yen Factory Electrical SW Construction Co., Ltd. 2014.08 - 2015.05

38 LLG Vina Cookware FactoryGlass

FactoryElectrical LLG Vina Limited Liability 2012.03 - 2013.08

39 C Y VINA Factory Factory Electrical C Y VINA 2011.07 - 2012.07

40 On Acessories Factory Electrical On Accessories Co., Ltd. 2012.01 - 2012.06

41 DongHwa Factory Factory Electrical G-TECH Co., Ltd. 2011.03 - 2012.02

42 Kum Ho Factory Factory Electrical Kum Ho Electric VINA 2012.04 - 2012.11

43 Simone Factory Factory Electrical Simone Co., Ltd. 2011.03 - 2011.11

44 Factory Nike Shoes Factory Electrical Teakwang Vina Co., Ltd. 2009.11 - 2011.03

45DK UIL Vietnam FactorySAMSUNG ELECRONICS

Factory Electrical DK VN Co., Ltd. 2010.04 - 2010.08

46 Vinagio Vietnam Factory Factory Electrical VinaGio Co., Ltd 2009.09 - 2010.01

47Hyundai Vinashin ShipyardFactory– Extension Phase II

FactoryElectrical Hyundai VinaShin

Shipyard2008.11 - 2009.10

Page 14: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

5-1. Typical Implementation Project

Name : Lotte Mart Vietnam

Location : Bien Hoa, Go Vap, Nha Trang, Dong Da, Binh Duong, Vung Tau, Hanoi

Page 15: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

5-1. Typical Implementation Project

Name : HAGL Myanmar Centre

Location : Yangon, Myanmar

Name : Camko City R1

Location : Phnom Penh, Cambodia

Page 16: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

5-1. Typical Implementation Project

Name : AEON MALL Phnom Penh

Location : Phnom Penh , Cambodia

Name : Booyoung Apartment CT-7 B/L

Location : Ha Noi , Viet Nam

Page 17: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

5-1. Typical Implementation Project

Name : Serenity SKY Villas

Location : Ho Chi Minh, Viet Nam

Page 18: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

Name : Vin City Grand Park APT

Location : Ho Chi Minh City, Vietnam

Name : Vinh Long Mall

Location : Vinh Long, Vietnam

5-1. Typical Implementation Project

Page 19: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

5-1. Typical Implementation Project

Name : Prime Resort & Hotels

Location : Cam Ranh, Vietnam

Name : Song Ngoc Apartment

Location : HCMC, Vietnam

Page 20: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

5-1. Typical Implementation Project

Name : Yen Bai Hospital

Location : Yen Bai, Vietnam

Name : The Eastern Residence Complex

Location : HCMC, Vietnam

Page 21: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

Name : Nghi Son Refinery and Petrochemicals

Location : Thanh Hoa, Vietnam

Name : NS2 BOT THERMAL Power Plant

Location : Thanh Hoa, Vietnam

5-1. Typical Implementation Project

Page 22: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

Name : KN Cam Lam Solar Power Plant

Location : Khanh Hoa, Vietnam

Name : Formosa Steel Plant

Location : Ha Tinh, Vietnam

5-1. Typical Implementation Project

Page 23: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

Name : HCMC MRT Line 1 CP2 Project

Location : Ho Chi Minh City, Vietnam

Name : 500kv Duc Hoa Substation

Location : Long An, Vietnam

5-1. Typical Implementation Project

Page 24: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

MECHANICAL

Page 25: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

5-2. Typical Implementation Project

No. Project name Type Work Scope Owner Working Period

1 SEMV-W.W.T Environment Waste Water TreatmentSamsung Electro-

Mechanics VietNam2014. 07 – 2016.06

2 SEVT Metal/3D Glass ProjectEnvironment

PlantWaste Water Treatment

Samsung Engineering Vietnam Co., Ltd.

2015. 06 – 2015. 11

3 HAGL Myanmar Centre – Phase 2 Apartment Mechanical Coteccons Going

4 Vin City Grand Park APT Apartment Mechanical Hoa Binh Corpotation 2019. 07 – Going

5 Human City Apartment Apartment Mechanical Human City 2017.02 – 2019. 12

6 City Land (CH2) Apartment Mechanical Hoa Binh Corpotation 2018.10 – 2019. 12

7 CAMKO CITY R1 (Phnom Penh) Apartment Mechanical World City 2017.06 – 2018.06

8The Eastern Residence

Complex ProjectApartment Mechanical Posco E&C VietNam 2012. 02 - 2013. 10

9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going

10Lotte Shopping Plaza Re-modeling

(Lotte Center Hanoi)Commercial Mechanical Lotte Shopping Plaza 2018.07 – 2019. 05

11 AEON MALL Phnom Penh PPC Commercial ElectricalFuji Furukawa E&C

World Space2017. 01 – 2018.06

12 AEON MALL Phnom Penh PPC Commercial Mechanical HyunDai Engineering 2016. 09 – 2018. 06

13 SVH Shopping Mall Commercial Mechanical Bac Binh Investment 2017.04 – 2017.11

14 Lotte Mart Nha Trang Commercial Mechanical Lotte Viet Nam Co., Ltd. 2015. 11 – 2016. 09

Page 26: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

5-2. Typical Implementation Project

No. Project name Type Work Scope Owner Working Period

15 Lotte Mart Ba Dinh (Lotte Center) Commercial Mechanical Lotte Viet Nam Co., Ltd 2014. 06 - 2014. 09

16 Lotte Mart Bien Hoa Commercial Mechanical Lotte Viet Nam Co., Ltd 2012. 06 - 2012. 10

17 Korea Military Base Camp Philippine Housing MechanicalMinistry National Defence Korea

2013. 10 - 2014. 02

18 Formosa Domitory Housing MechanicalFomosa Taffeta VietNam

Co., Ltd.2012. 06 - 2013. 06

19 Posco Vietnam Residence Housing Mechanical Posco Vietnam 2010. 06 - 2010. 12

20 JeongSan VINA Golf Club House Housing Mechanical JeongSan VINA 2010. 06 - 2010. 12

21 HCMC MRT Line 1 CP2 Project Metro Train Mechanical GS Engineering & Construction 2015.11 - Going

22Nghi Son Refinery andPetrochemical Complex

Oil Plant Mechanical GS Engineering & Construction 2014. 11 – 2016.12

23 CJ-SC Global Mill Vung Tau B Factory MechanicalCJ-SC Global

Milling LLC Co., Ltd.2018. 05 - 2019. 05

24 KOLON KVT-1 BINH DUONG Factory Mechanical KOLON GLOBAL 2017.05 - 2018.08

25 Kyung Bang – Binh Duong Factory Mechanical G-TECH Co., Ltd. 2014.06 - 2015.05

26 CY VINA Factory Factory Mechanical CY VINA 2011.07 - 2012.07

27 Factory Nike Shoes Factory Mechanical Teakwang Vina Co., Ltd. 2009.11 - 2011.03

28DK UIL Vietnam FactorySAMSUNG ELECRONICS

Factory Mechanical DK VN Co., Ltd. 2010.04 - 2010.08

Page 27: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

Name : SEVT Metal/3D Glass Project

Location : Thai Nguyen, Vietnam

5-2. Typical Implementation Project

Name : SEMV-W.W.T

Location : Thai Nguyen, Vietnam

Page 28: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

5-1. Typical Implementation Project

Name : Lotte Mart Vietnam

Location : Bien Hoa, Nha Trang, Hanoi

Page 29: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

5-1. Typical Implementation Project

Name : HAGL Myanmar Centre

Location : Yangon, Myanmar

Name : Vin City Grand Park APT

Location : Ho Chi Minh City, Vietnam

Page 30: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

5-1. Typical Implementation Project

Name : AEON MALL Phnom Penh

Location : Phnom Penh , Cambodia

Name : CJ-SC Global Mill Vung

TauLocation : Vung Tau, Vietnam

Page 31: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

Name : Camko city R1

Location : Phnom Penh, Cambodia

5-2. Typical Implementation Project

Name : HCMC MRT Line 1 CP2 Project

Location : Ho Chi Minh City, Vietnam

Page 32: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

Name : KOLON KVT-1 Factory

Location : Binh Duong, Vietnam

Name : CH2 – CityLand

Location : Go Vap, Vietnam

5-2. Typical Implementation Project

Page 33: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

5-2. Photos of implementation works

LOTTE PROJECT

Page 34: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

5-2. Photos of implementation works

METRO PROJECT

VINH LONG PROJECT

Page 35: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

FIRE FIGHTING

Page 36: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

5-3. Typical Implementation Project

No. Project name Type Work Scope Owner Working Period

1 Human City Apartment Apartment Fire Fighting Human City 2017.02 – 2019. 12

2 CAMKO CITY R1 (Phnom Penh) Apartment Fire Fighting World City 2017.06 – 2018.06

3 Booyoung Apartment CT-7 B/L Apartment Fire Alarm Booyoung VINA 2016.08 – 2018. 04

2The Eastern Residence

Complex ProjectApartment Fire Fighting Posco E&C VietNam 2012. 02 - 2013. 10

4Lotte Shopping Plaza Re-modeling

(Lotte Center Hanoi)Commercial Fire Fighting Lotte Shopping Plaza 2018.07 – 2019. 05

5 Lotte Mart Go Vap Commercial Fire Alarm Lotte Viet Nam Co., Ltd. 2015. 11 – 2016. 09

6 Lotte Mart Nha Trang Commercial Fire Fighting Lotte Viet Nam Co., Ltd. 2015. 11 – 2016. 09

7 Lotte Mart Ba Dinh (Lotte Center) Commercial Fire Fighting Lotte Viet Nam Co., Ltd 2014. 06 - 2014. 09

8 Lotte Mart Dong Da Commercial Fire Alarm Lotte Viet Nam Co., Ltd 2013. 10 - 2013. 12

9 Lotte Mart Binh Duong Commercial Fire Alarm Lotte Viet Nam Co., Ltd 2013. 06 - 2013.12

10 Lotte Mart Bien Hoa Commercial Fire Fighting Lotte Viet Nam Co., Ltd 2012. 06 - 2012. 10

Page 37: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

5-3. Typical Implementation Project

No. Project name Type Working Scope Owner Working Period

11 Serenity SKY VILLA Fire alarm Hoa Binh Corporation 2017. 10 – 2019. 12

12 Yen Bai General Hospital Hospital Fire Alarm Hyundai Engineering 2013. 10 – 2016. 06

13 Formosa Domitory Housing Fire FightingFomosa Taffeta VietNam

Co., Ltd.2012. 06 - 2013. 06

14 Formosa Steel Plant Steel Plant Fire Fighting Posco E&C Vietnam 2013. 08 – 2016.12

15Nghi Son Refinery andPetrochemical Complex

Oil Plant Fire FightingGS Engineering &

Construction2014. 11 – 2016.12

16 CJ-SC Global Mill Vung Tau B Factory Fire FightingCJ-SC Global

Milling LLC Co., Ltd.2018. 05 - 2019. 05

17 KOLON KVT-1 BINH DUONG Factory Fire Fighting KOLON GLOBAL 2017.05 - 2018.08

18 DSR VINA Factory Factory Fire Fighting DSR VINA 2017.02 - 2017.09

19 SOLU M VINA Factory Fire Fighting SOLU M VINA 2016.07 - 2017.02

20 Factory Nike Shoes Factory Fire Fighting Teakwang Vina Co., Ltd. 2009.11 - 2011.03

21POSCO Cold Mill factory

Warehouse Factory Fire Fighting POSCO VIETNAM 2010.05 - 2010.09

22DK UIL Vietnam FactorySAMSUNG ELECRONICS

Factory Fire Fighting DK VN Co., Ltd. 2010.04 - 2010.08

23Hyundai Vinashin ShipyardFactory– Extension Phase II

Factory Fire FightingHyundai VinaShin

Shipyard2008.11 - 2009.10

Page 38: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

5-3. Typical Implementation Project

Name : Formosa Steel Plant

Location : Ha Tinh, Vietnam

Name : Nghi Son Refinery and Petrochemicals LLC

Location : Thanh Hoa, Vietnam

Page 39: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

5-3. Typical Implementation Project

Name : KOLON KVT-1 Factory

Location : Binh Duong, Vietnam

Name : DSR VINA Factory

Location : Binh Duong, Vietnam

Page 40: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

5-3. Typical Implementation Project

Name : CJ-SC Global Mill Vung

TauLocation : Vung Tau, Vietnam

Name : Factory Nike Shoes

Location : Binh Duong, Vietnam

Page 41: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

5-3. Photos of implementation works

KOLON PROJECT

LOTTE D0NG NAI

Page 42: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

5-3. Photos of implementation works

Booyoung Apartment CT-7 DSR VINA Factory

Page 43: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

5-3. Photos of implementation works.

FIRE FIGHTING SYSTEM - INSPECTION WITH GOVERMENT

Page 44: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

SOLAR

Page 45: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

5-4. Typical Implementation Project

No. Project name Type Work Scope Owner Working Period

1 Anpha-AG Solar Plant Electrical Anpha-AG Konoike 2019.12 – 2020.01

2 KN Cam Lam Solar Power Plant Solar Plant Electrical Hanwha E&C 2018.10 – 2019. 08

3 Windcube system for UPC Solar Plant ElectricalWindcube UPC Company

05/2019

4 Windcube system for UPC Solar Plant ElectricalWindcube UPC Company

05/2019

5 Windcube system for UPC Solar Plant ElectricalWindcube UPC Company

05/2019

6 Windcube system for UPC Solar Plant ElectricalWindcube UPC Company

05/2019

7 Rooftop Mini Farm Solar Plant Electrical Rooftop Mini Farm 04/2019

8 Asia Office Solar Plant Electrical Asia Networks Holdings 12/2018

Page 46: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

5-4. Typical Implementation Project

Name : Anpha-AG

Location : Long An, Vietnam

Name : Asia Office

Location : Ho Chi Minh City, Vietnam

Page 47: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

5-4. Typical Implementation Project

Name : Windcube system for UPC

Location : Bac Lieu, Vietnam

Name : KN Cam Lam Solar Power Plant

Location : Cam Ranh, Vietnam

Page 48: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

5-4. Typical Implementation Project

Name : Leyna Place

Location : Binh Thuan, Vietnam

Name : Phien Market

Location : Dak Lak, Vietnam

Page 49: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

5-4. Typical Implementation Project

Name : Rubber Factory

Location : Binh Thuan, Vietnam Name : Rooftop Mini Farm

Location : Dak Lak, Vietnam

Page 50: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

ROBOTICS & AUTOMATION

Page 51: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

Division Name EM-TEK Automation Representative An Chang Min

Establishment 2016.09. Location Bac Giang Province

Business FiledRobotics & Automation equipment Design, Manufacture and Set up

* Registered as the 1st vendor of Samsung Display Vietnam

Main Product

Main Performance

- TV & Watch Line Set up (Samsung Display Vietnam)

- MI facility Set up (Samsung Display Vietnam)

- Polishing / IR Film attach machine Development & Supply (Samsung Display Vietnam)

Bending Unloader IR Film attach Machine Silicon Dispense Machine Logistics system Automation

5-5. Robotics & Automation

Page 52: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

5-5. Robotics & Automation(Ha Noi)

Page 53: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

6. Equipment list

No Equipment Q’ty No Equipment Q’ty

1 Excavator Lease 12 Insulation Tester(600V/1000Ω ) 10

2 Fork lift Lease 13 Digital Insulation & Continuity Tester 10

3 Cargo crane (5t, 10t, 15t) Lease 14 Laser Level machine 20

4 Boom Lift Lease 15 Digital, Analog Multi meter 20

5 Air Compressor 5 16 Bender (1/2~1.1/2, 2~2.1/2, Tubing) 15

6 Truck(Pick up, 1t, 2t) 4 17 Bender (Hydraulics) 2

7 Generator (5~50kV) 20 18 Various Drill 50

8 Engine Driven Welder(200A) 10 19 Various Grinder 50

9 Megger Tester (5kV) 10 20 Terminal lug presser machine (Oil) 10

10 Speed Cutter 20 21 Core machine (Sleeve) 5

11 Oil Punch 5 22 Scaffolding 150

Page 54: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

7. Certificates

Construction LicenseFire Fighting License

Page 55: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

7. Certificates

ISO CERTIFICATE 9001:2008 (EN / VN) ISO CERTIFICATE 14001:2004 (EN / VN)

Page 56: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

OHSAS CERTIFICATE 18001:2007 (EN / VN) TAX DEPARTMENT AWARD

7. Certificates

Page 57: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

CERTIFICATE OF CREDIT

7. Certificates

Page 58: COMPANY PROFILE · 2020. 7. 27. · 9 Vinh Long Mall Commercial Mechanical Hoa Binh Corpotation 2019. 07 - Going 10 Lotte Shopping Plaza Re-modeling (Lotte Center Hanoi) Commercial

THANK YOUEM-TEK CORPORATION

Address : 153/18 Nguyen Van Huong, Thao Dien Ward, District 2, HCMC, Viet Nam

Tel : +84 (0)28 3636 4651~4


Recommended