+ All Categories
Home > Documents > CONNECTED GAS LOAD SCHEDULE GAS DIAGRAMpix.ghphipps.com/projects/2015/15.0770/ProjDocs/08 - ASIs,...

CONNECTED GAS LOAD SCHEDULE GAS DIAGRAMpix.ghphipps.com/projects/2015/15.0770/ProjDocs/08 - ASIs,...

Date post: 25-Mar-2018
Category:
Upload: nguyenduong
View: 221 times
Download: 4 times
Share this document with a friend
19
PLUMBING GENERAL NOTES 1. ALL INFORMATION SHOWN ON THESE DRAWINGS INCLUDING LOCATION AND SIZES ARE BASED ON THE BEST INFORMATION AVAILABLE. INFORMATION SHOWN IS TO INDICATE THE INTENT OF THE PLUMBING SYSTEM WORK BUT MAY NOT REFLECT THE EXACT ROUTING AND LOCATION. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY EXISTING EQUIPMENT, PIPING, CONNECTIONS, STRUCTURE, ELECTRICAL, LIGHTING AND ARCHITECTURAL INFLUENCES PRIOR TO INSTALLATION OF THE NEW WORK TO AVOID ANY CONFLICTS WITH SYSTEMS REQUIRING MODIFICATIONS. NOTIFY ENGINEER OF ANY CONFLICTS, PRIOR TO PERFORMING WORK. 2. OFFSET ALL PIPING AS REQUIRED TO AVOID STRUCTURAL MEMBERS, FLASHING, MECHANICAL AND ELECTRICAL EQUIPMENT. 3. DO NOT SCALE DRAWINGS, SEE ARCHITECTURAL DRAWINGS FOR FINAL LOCATIONS OF ALL PLUMBING FIXTURES, GENERAL PURPOSE FLOOR DRAINS, AND ADDITIONAL EQUIPMENT REQUIRING PLUMBING CONNECTIONS. 4. COORDINATE SANITARY DRAINAGE UTILITY LOCATIONS AND INVERT ELEVATIONS PRIOR TO COMMENCING WORK, NOTIFY ARCHITECT IMMEDIATELY IF CONDITIONS DISCOVERED WILL NOT ALLOW SYSTEM INSTALLATION AS DESIGNED. 5. SEE ISOMETRICS AND DIAGRAMS FOR BRANCH PIPE SIZES NOT INDICATED IN PLAN. 6. COORDINATE PLACEMENT OF SLEEVES THROUGH FLOORS, WALLS AND ROOF CONSTRUCTION PRIOR TO COMMENCING WORK. 7. SEE ARCHITECTURAL PLANS AND DETAILS FOR MOUNTING ELEVATIONS OF ALL PLUMBING FIXTURES. 8. MOUNT WALL HYDRANTS AND HOSE BIBBS AT 18" ABOVE SURROUNDING GRADE OR FINISHED FLOOR ELEVATIONS UNLESS SPECIFICALLY NOTED OTHERWISE. 9. FIELD VERIFY EXACT LOCATION OF ALL EXISTING UTILITIES AND EQUIPMENT PRIOR TO COMMENCING WORK. 10. PROTECT EXISTING UTILITIES AND EQUIPMENT TO REMAIN DURING ENTIRE CONSTRUCTION PERIOD; REPLACE DAMAGED MATERIALS IMMEDIATELY AT NO ADDITIONAL COST TO THE OWNER. 11. COORDINATE EXACT ROUGH-IN CONNECTION LOCATIONS AND SIZES WITH EQUIPMENT SUPPLIER PRIOR TO COMMENCING WORK ASSOCIATED WITH EQUIPMENT BEING FURNISHED BY OTHERS. 12. SEE HVAC PLANS FOR FINAL LOCATION OF ALL HVAC EQUIPMENT, COORDINATE PIPING SYSTEM CONNECTION PRIOR TO INSTALLATION. 13. ALL WORK SHALL COMPLY WITH IPC 2015 AND IFGC 2015. 14. ALL MATERIALS IN THE PLENUM SPACE SHALL MEET THE FLAME SPREAD AND SMOKE DEVELOPMENT INDEX PER IMC/2015-SECTION 602.2.1. AND SHALL BE LISTED AND LABELED FOR INSTALLATION WITHIN A PLENUM. 15. ALL EQUIPMENT AND MATERIALS USED IN THE DISTRIBUTION OF DOMESTIC POTABLE WATER SHALL BE APPROVED AND TESTED FOR SUCH APPLICATION WITH DOCUMENTED LISTINGS AND LABELING IN ACCORDANCE WITH THE LATEST EDITION OF THE INTERNATIONAL PLUMBING CODE, PUBLIC LAW 111-380 AND ANSI/NSF-61, ANNEX G. 16. EXTEND ALL VENT TERMINATIONS THROUGH THE ROOF A MINIMUM OF 20' FROM ALL OUTSIDE AIR INTAKES, AND OTHER BUILDING OPENINGS. DESCRIPTION SYMBOL PLUMBING ABBREVIATIONS ABOVE ABV AMERICANS WITH DISABILITIES ACT A.D.A. ABOVE FINISHED FLOOR AFF ABOVE FINISHED GRADE AFG ACID NEUTRALIZATION TANK ANT ACCESS PANEL AP ARCHITECT, ARCHITECTURAL ARCH ACID VENT THROUGH ROOF AVTR BACK FLOW PREVENTER BFP BELOW BLW BALL VALVE BV COMMON C CUBIC FEET PER HOUR CFH CAST IRON PIPING C.I. CEILING CLG COLUMN COL CONCRETE CONC CONNECT CONN CONTINUE CONT CONSTRUCT, CONSTRUCTION CONST COORDINATE COOR CRAWLSPACE CS CHECK VALVE CV DOWN DN DISHWASHER DW EXISTING (E) EACH EA ELECTRICAL CONTRACTOR EC ELECTRIC, ELECTRICAL ELEC ELEVATION ELEV ELECTRIC WATER COOLER EWC FAHRENHEIT F FLOOR FLR GENERAL CONTRACTOR GC GALLONS PER MINUTE GPM HEADER HDR HORIZONTAL HORIZ HORSEPOWER HP INVERT ELEVATION IE INDIRECT WASTE IW INTEGRAL INT JOIST(S) JST(S) KITCHEN EQUIPMENT CONTRACTOR KEC LOCATION LOC MANUFACTURE MANUF MAXIMUM MAX THOUSAND BRITISH THERMAL UNIT PER HOUR MBH MECHANICAL CONTRACTOR MC MEDIUM PRESSURE GAS MG MINIMUM MIN MEMORY STOP MS NEW (N) NORMALLY CLOSED NC NORMALLY OPEN / NUMBER NO NOT TO SCALE NTS OUTSIDE AIR OA PLUMBING CONTRACTOR PC PHASE PH POINT OF CONNECTION P.O.C. PROVIDE PROV PRESSURE REDUCING VALVE PRV PRESSURE PER SQUARE INCH GAUGE PSIG PRESSURE AND TEMPERATURE RELIEF PTR POLYVINYL CHLORIDE PIPING PVC RELOCATED (R) RETURN AIR RA REFERENCE RE REQUIRED REQD SUPPLY AIR SA SANITARY PIPING SAN SHEET SHT SQUARE SQ SIMILAR SIM SAFETY RELIEF VALVE SRV STAINLESS STEEL SS TEMPERATURE CONTROL TCC TYPICAL TYP VENT PIPING V VERTICAL VERT VACUUM BREAKER VB VENT THROUGH ROOF VTR WITH W DESCRIPTION SYMBOL PLUMBING ABBREVIATIONS ABOVE ABV ABOVE FINISHED FLOOR AFF ARCHITECT, ARCHITECTURAL ARCH BACK FLOW PREVENTER BFP BELOW BLW CAST IRON PIPING C.I. CEILING CLG COLUMN COL CONCRETE CONC CONSTRUCT, CONSTRUCTION CONST COORDINATE COOR DOWN DN DISHWASHER DW EXISTING (E) EACH EA ELECTRICAL CONTRACTOR EC ELECTRIC, ELECTRICAL ELEC ELEVATION ELEV FLOOR FLR GENERAL CONTRACTOR GC GALLONS PER MINUTE GPM INVERT ELEVATION IE INDIRECT WASTE IW MAXIMUM MAX MECHANICAL CONTRACTOR MC MINIMUM MIN NEW (N) NORMALLY CLOSED NC NORMALLY OPEN NO NOT TO SCALE NTS OUTSIDE AIR OA POINT OF CONNECTION P.O.C. PRESSURE REDUCING VALVE PRV POLYVINYL CHLORIDE PIPING PVC RETURN AIR RA SUPPLY AIR SA SIMILAR SIM STAINLESS STEEL SS TEMPERATURE CONTROL TCC TYPICAL TYP DESCRIPTION SYMBOL GENERAL CONNECT NEW TO EXISTING REFERENCE BUBBLE REVISION NUMBER SECTION OR ELEVATION BUBBLE DRAWING NOTE DEMOLITION NOTE * SECTION NUMBER # SHEET NUMBER # * # # * * SECTION OR ELEVATION LETTER * # ISOMETRIC OR ELEVATION BUBBLE # REFERENCE DRAWING NUMBER * ISOMETRIC OR ELEVATION LETTER # REFERENCE DRAWING NUMBER # # DEMOLITION NOTE, ALTERNATE X DRAWING NOTE, ALTERNATE # NOTES: 1. REFER TO PROJECT SPECIFICATIONS FOR ADDITIONAL INSULATION REQUIREMENTS. 2. (ASTM E84) ALL INSULATION MATERIALS INSTALLED WITHIN THE PLENUM SHALL MEET THE FLAME/SMOKE REQUIREMENTS OF 25/50. REMARKS: 1. FOR PIPING SMALLER THAT 1-1/2" INSTALLED WITHIN A BUILDING PARTITION WITHIN A CONDITIONED SPACE WITHIN A CONDITIONED SPACE. INSULATION REDUCTION OF UP TO 1" BUT NOT LESS THAN 1" PER IECC TABLE C403.2.1, NOTE A. DOMESTIC COLD WATER DOMESTIC COLD WATER DOMESTIC COLD WATER DOMESTIC HOT WATER & RECIRC. DOMESTIC HOT WATER & RECIRC. DOMESTIC HOT WATER & RECIRC. DOMESTIC HOT WATER & RECIRC. DOMESTIC HOT WATER & RECIRC. DOMESTIC HOT WATER & RECIRC. STORM & OVERFLOW DRAINAGE ROOF & OVERFLOW DRAIN BOWLS CONDENSATE DRAINAGE CONDENSATE DRAINAGE WITH HEAT TRACING INTERIOR INTERIOR (WITHIN PARTITION) EXTERIOR INTERIOR INTERIOR (WITHIN PARTITION) EXTERIOR INTERIOR INTERIOR (WITHIN PARTITION) EXTERIOR INTERIOR INTERIOR GLASS FIBER WITH ASJ-SSL GLASS FIBER WITH ASJ-SSL GLASS FIBER WITH ASJ-SSL GLASS FIBER WITH ASJ-SSL GLASS FIBER WITH ASJ-SSL GLASS FIBER WITH ASJ-SSL GLASS FIBER WITH ASJ-SSL GLASS FIBER WITH ASJ-SSL GLASS FIBER WITH ASJ-SSL GLASS FIBER GLASS FIBER FLEXIBLE ELASTOMERIC YES YES YES NONE NONE NONE NONE NONE NONE YES YES NONE NONE NONE NONE ALUMINUM NONE NONE ALUMINUM NONE NONE ALUMINUM PVC NONE ALUMINUM NONE 40 - 60 120 - 140 180 180 180 NA NA NA NA 0.21 - 0.27 75 0.21 - 0.27 75 0.21 - 0.27 75 0.21 - 0.28 100 0.21 - 0.28 100 0.21 - 0.28 100 0.25 - 0.29 125 0.25 - 0.29 125 0.25 - 0.29 125 0.21 - 0.27 75 0.21 - 0.27 75 0.21 - 0.27 75 0.21 - 0.27 75 0.5 1 1 1 - 0.5 1 1 1 1 0.5 1 1 1 - 1 1.5 1.5 1.5 - 1 1.5 1.5 1.5 1 1 1.5 1.5 1.5 - 1.5 2 2 2 - 1 2 2 2 1 1.5 2 2 2 - 1 1 1 1 - 1 1 1 1 - 0.5 0.5 0.5 0.5 - 0.5 0.5 0.5 0.5 - 0.5 0.5 0.5 1 1 1 1.5 1 1.5 1 1 0.5 0.5 INTERIOR INTERIOR FLEXIBLE ELASTOMERIC 40 - 60 40 - 60 120 - 140 120 - 140 SERVICE INSULATION CONDUCTIVITY CONDUCTIVITY BTU * IN / (H * FT * °F ) LOCATION INSULATION MATERIAL VAPOR BARRIER JACKET OPERATING TEMPERATURE ( ° F ) MEAN TEMP RATING ( ° F ) NOMINAL PIPE SIZE (IN) REMARKS < 1 1 TO < 1-1/2 1-1/2 TO < 4 4 TO < 8 ≤ 8 PIPE INSULATION SCHEDULE F P PLUMBING LEGEND ALL SYMBOLS MAY NOT BE USED DESCRIPTION SYMBOL NOTE: 1. COORDINATE AND SCHEDULE WITH GAS SERVICE AND METER PROVIDER PRIOR TO COMMENCING WORK. MEDIUM PRESSURE GAS (2PSI) REQUIRED FROM THE METER TO THE BUILDING. CONTACT XCEL BUILDERS CALL LINE @ 1.800.628.2121 PRIOR TO COMMENCING WORK. 2. GAS PIPE SIZING BASED UPON 70 LINEAR FEET OF GAS PIPING, LOW PRESSURE GAS (2PSI) AT 831 BTU/CF. CONNECTED GAS LOAD SCHEDULE 1 B-1 2,500,000 2,500,000 2PSI/7"W.C. MECHANICAL ROOM - 9,162,000 TOTAL CONNECTED LOAD NO OF UNITS EQUIPMENT LOAD EACH (BTU/H) TOTAL LOAD PRESSURE REQUIRED MIN. / MAX. LOCATION REMARKS 1 B-2 - 1 B-3 - 1 MAU-1 170,000 170,000 14"W.C./7"W.C. ROOF - 1 GWH-1 800,000 800,000 - 1 GWH-2 300,000 300,000 - 2 OVENS 160,000 320,000 10.5"W.C./7"W.C. KITCHEN - 12 TURRETS 6,000 72,000 7"W.C. SCIENCE ROOMS - 2,500,000 2,500,000 2,500,000 2,500,000 MECHANICAL ROOM MECHANICAL ROOM MECHANICAL ROOM MECHANICAL ROOM 2PSI/7"W.C. 2PSI/7"W.C. 14"W.C./7"W.C. 14"W.C./7"W.C. STORM DRAIN, RAINWATER DRAIN SD OVERFLOW STORM DRAIN OSD SUBSOIL DRAIN, FOOTING DRAIN SSD SOIL, WASTE, OR SANITARY SEWER SAN STORM / RAINWATER DRAIN BELOW FLOOR SD SOIL / WASTE / SANITARY SEWER BELOW FLR SAN GREASE DRAIN GD VENT ACID WASTE AW ACID VENT AV INDIRECT DRAIN D PUMP DISCHARGE LINE PD COLD WATER HOT WATER SUPPLY (140° F) HOT WATER RECIRCULATING (140° F) TEMPERED HOT WATER (110° F) TW TEMPERED HW RECIRCULATING (110° F) TWR (CHILLED) DRINKING WATER SUPPLY DWS (CHILLED) DRINKING WATER RECIRCULATING DWR SOFT WATER SW CONDENSATE DRAIN CD DISTILLED DRAIN DI DEIONIZED WATER DE LAWN SPRINKLER SUPPLY LS FIRE PROTECTION WATER SUPPLY F GAS, LOW-PRESSURE G GAS, MEDIUM-PRESSURE MG GAS, HIGH-PRESSURE HG GAS VENT GV IRRIGATION WATER IR ISOLATION VALVE GLOBE VALVE ANGLE VALVE BALL VALVE BUTTERFLY VALVE GAS COCK, GAS STOP COMBINATION FLOW MEASURING DEVICE AND BALANCING VALVE CHECK VALVE PLUG VALVE SOLENOID VALVE S MOTOR-OPERATED VALVE [SPECIFY TYPE] M PRESSURE REDUCING VALVE PRESSURE-RELIEF VALVE P TEMPERATURE-PRESSURE-RELIEF VALVE T HOSE BIBB VALVE IN YARD BOX (VALVE TYPE SYMBOL AS REQUIRED FOR VALVE USE) RECESSED-BOX HOSE BIBB OR WALL HYDRANT UNION (SCREWED) UNION (FLANGED) STRAINER PIPE ANCHOR PIPE GUIDE EXPANSION JOINT FLEXIBLE CONNECTOR TEE CONCENTRIC REDUCER ECCENTRIC REDUCER AQUASTAT FLOW SWITCH PRESSURE SWITCH WATER HAMMER ARRESTER PRESSURE GAUGE WITH GAUGE COCK THERMOMETER VALVE IN RISER RISER DOWN (ELBOW) RISER UP (ELBOW) AIR CHAMBER RISE OR DROP BRANCH-TOP CONNECTION BRANCH-BOTTOM CONNECTION BRANCH-SIDE CONNECTION CAP ON END OF PIPE CLEANOUT PLUG CIRCULATION PUMP FLOOR CLEANOUT WALL CLEANOUT YARD CLEANOUT OR CLEANOUT TO GRADE FLOOR DRAIN FLOOR SINK CONDUCTOR NOZZLE DIRECTION OF FLOW INDICATES PIPE SLOPE DOWN NEW TO EXISTING CONNECTION INDICATES ITEMS TO BE REMOVED GAS TURRET M 4" TO GAS TURRETS ( 72 MBH) 1-1/4" OVEN (160 MBH) OVEN (160 MBH) 1-1/4" 1-1/4" MAU-1 170 MBH 1-1/4" GWH-1 (800 MBH) B-1 (2500 MBH) B-2 (2500 MBH) B-3 (2500 MBH) GWH-2 (300 MBH) METER BY OTHERS GPR-2 GPR-1 1-1/2" GAS DIAGRAM 1-1/2" 2-1/2" 4" 4" 5" ENVISION MECHANICAL ENGINEERS INC. 9777 Pyramid Court, Suite 120 Englewood, CO 80112 Tel- 303-688-0223 Fax- 303-688-3584 envisionengrs.com Project # CONSULTANT: ISSUE: OWNER: PROJECT: DRAWING INFORMATION: DRAWN BY: PROJECT NO: SHEET TITLE: APPROVED BY: CHECKED BY: SHEET OF 1 2 3 4 5 6 A B C D E 1 2 3 4 5 6 P 303.607.0977 www.hcm2.com 1331 Nineteenth Street Denver, CO. 80202 hord|coplan|macht 015-078 5/24/2016 9:46:01 PM C:\Users\pfox.ENVISION.000\Documents\015-078 - JeffCO K-8 - PLUMBING CENTRAL_pfox.rvt P-001 PLUMBING CODE SHEET, LEGENDS AND NOTES Jefferson County School District CANDELAS K-8 JKB JJR 11576.000 JKB 19486 WEST 94th AVENUE ARVADA, CO 80007 1829 DENVER WEST DRIVE GOLDEN, CO 80401 05/25/16 WORK PACKAGE # 2 ISSUE FOR CONSTRUCTION 05.25.2016
Transcript
Page 1: CONNECTED GAS LOAD SCHEDULE GAS DIAGRAMpix.ghphipps.com/projects/2015/15.0770/ProjDocs/08 - ASIs, PRs... · coordinate piping system connection prior to installation. ... isometric

PLUMBING GENERAL NOTES1. ALL INFORMATION SHOWN ON THESE DRAWINGS INCLUDING

LOCATION AND SIZES ARE BASED ON THE BEST INFORMATION

AVAILABLE. INFORMATION SHOWN IS TO INDICATE THE INTENT OF

THE PLUMBING SYSTEM WORK BUT MAY NOT REFLECT THE

EXACT ROUTING AND LOCATION. IT IS THE RESPONSIBILITY OF

THE CONTRACTOR TO FIELD VERIFY EXISTING EQUIPMENT,

PIPING, CONNECTIONS, STRUCTURE, ELECTRICAL, LIGHTING AND

ARCHITECTURAL INFLUENCES PRIOR TO INSTALLATION OF THE

NEW WORK TO AVOID ANY CONFLICTS WITH SYSTEMS

REQUIRING MODIFICATIONS. NOTIFY ENGINEER OF ANY

CONFLICTS, PRIOR TO PERFORMING WORK.

2. OFFSET ALL PIPING AS REQUIRED TO AVOID STRUCTURAL

MEMBERS, FLASHING, MECHANICAL AND ELECTRICAL EQUIPMENT.

3. DO NOT SCALE DRAWINGS, SEE ARCHITECTURAL DRAWINGS FOR

FINAL LOCATIONS OF ALL PLUMBING FIXTURES, GENERAL

PURPOSE FLOOR DRAINS, AND ADDITIONAL EQUIPMENT

REQUIRING PLUMBING CONNECTIONS.

4. COORDINATE SANITARY DRAINAGE UTILITY LOCATIONS AND

INVERT ELEVATIONS PRIOR TO COMMENCING WORK, NOTIFY

ARCHITECT IMMEDIATELY IF CONDITIONS DISCOVERED WILL NOT

ALLOW SYSTEM INSTALLATION AS DESIGNED.

5. SEE ISOMETRICS AND DIAGRAMS FOR BRANCH PIPE SIZES NOT

INDICATED IN PLAN.

6. COORDINATE PLACEMENT OF SLEEVES THROUGH FLOORS,

WALLS AND ROOF CONSTRUCTION PRIOR TO COMMENCING

WORK.

7. SEE ARCHITECTURAL PLANS AND DETAILS FOR MOUNTING

ELEVATIONS OF ALL PLUMBING FIXTURES.

8. MOUNT WALL HYDRANTS AND HOSE BIBBS AT 18" ABOVE

SURROUNDING GRADE OR FINISHED FLOOR ELEVATIONS UNLESS

SPECIFICALLY NOTED OTHERWISE.

9. FIELD VERIFY EXACT LOCATION OF ALL EXISTING UTILITIES AND

EQUIPMENT PRIOR TO COMMENCING WORK.

10. PROTECT EXISTING UTILITIES AND EQUIPMENT TO REMAIN

DURING ENTIRE CONSTRUCTION PERIOD; REPLACE DAMAGED

MATERIALS IMMEDIATELY AT NO ADDITIONAL COST TO THE

OWNER.

11. COORDINATE EXACT ROUGH-IN CONNECTION LOCATIONS AND

SIZES WITH EQUIPMENT SUPPLIER PRIOR TO COMMENCING

WORK ASSOCIATED WITH EQUIPMENT BEING FURNISHED BY

OTHERS.

12. SEE HVAC PLANS FOR FINAL LOCATION OF ALL HVAC EQUIPMENT,

COORDINATE PIPING SYSTEM CONNECTION PRIOR TO

INSTALLATION.

13. ALL WORK SHALL COMPLY WITH IPC 2015 AND IFGC 2015.

14. ALL MATERIALS IN THE PLENUM SPACE SHALL MEET THE FLAME

SPREAD AND SMOKE DEVELOPMENT INDEX PER

IMC/2015-SECTION 602.2.1. AND SHALL BE LISTED AND LABELED

FOR INSTALLATION WITHIN A PLENUM.

15. ALL EQUIPMENT AND MATERIALS USED IN THE DISTRIBUTION OF

DOMESTIC POTABLE WATER SHALL BE APPROVED AND TESTED

FOR SUCH APPLICATION WITH DOCUMENTED LISTINGS AND

LABELING IN ACCORDANCE WITH THE LATEST EDITION OF THE

INTERNATIONAL PLUMBING CODE, PUBLIC LAW 111-380 AND

ANSI/NSF-61, ANNEX G.

16. EXTEND ALL VENT TERMINATIONS THROUGH THE ROOF A

MINIMUM OF 20' FROM ALL OUTSIDE AIR INTAKES, AND OTHER

BUILDING OPENINGS.

DESCRIPTIONSYMBOL

PLUMBING ABBREVIATIONS

ABOVEABV

AMERICANS WITH DISABILITIES ACTA.D.A.ABOVE FINISHED FLOORAFF

ABOVE FINISHED GRADEAFG

ACID NEUTRALIZATION TANKANT

ACCESS PANELAPARCHITECT, ARCHITECTURALARCH

ACID VENT THROUGH ROOFAVTR

BACK FLOW PREVENTERBFP

BELOWBLWBALL VALVEBV

COMMONC

CUBIC FEET PER HOURCFH

CAST IRON PIPINGC.I.CEILINGCLG

COLUMNCOL

CONCRETECONC

CONNECTCONNCONTINUECONT

CONSTRUCT, CONSTRUCTIONCONST

COORDINATECOOR

CRAWLSPACECSCHECK VALVECV

DOWNDN

DISHWASHERDW

EXISTING(E)EACHEA

ELECTRICAL CONTRACTOREC

ELECTRIC, ELECTRICALELEC

ELEVATIONELEVELECTRIC WATER COOLEREWC

FAHRENHEITF

FLOORFLR

GENERAL CONTRACTORGCGALLONS PER MINUTEGPM

HEADERHDR

HORIZONTALHORIZ

HORSEPOWERHPINVERT ELEVATIONIE

INDIRECT WASTEIW

INTEGRALINT

JOIST(S)JST(S)KITCHEN EQUIPMENT CONTRACTORKEC

LOCATIONLOC

MANUFACTUREMANUF

MAXIMUMMAXTHOUSAND BRITISH THERMAL UNIT PER HOURMBH

MECHANICAL CONTRACTORMC

MEDIUM PRESSURE GASMG

MINIMUMMINMEMORY STOPMS

NEW(N)

NORMALLY CLOSEDNC

NORMALLY OPEN / NUMBERNONOT TO SCALENTS

OUTSIDE AIROA

PLUMBING CONTRACTORPC

PHASEPHPOINT OF CONNECTIONP.O.C.

PROVIDEPROV

PRESSURE REDUCING VALVEPRV

PRESSURE PER SQUARE INCH GAUGEPSIGPRESSURE AND TEMPERATURE RELIEFPTR

POLYVINYL CHLORIDE PIPINGPVC

RELOCATED(R)

RETURN AIRRAREFERENCERE

REQUIREDREQD

SUPPLY AIRSA

SANITARY PIPINGSANSHEETSHT

SQUARESQ

SIMILARSIM

SAFETY RELIEF VALVESRVSTAINLESS STEELSS

TEMPERATURE CONTROLTCC

TYPICALTYP

VENT PIPINGVVERTICALVERT

VACUUM BREAKERVB

VENT THROUGH ROOFVTR

WITHW

DESCRIPTIONSYMBOL

PLUMBING ABBREVIATIONS

ABOVEABV

ABOVE FINISHED FLOORAFFARCHITECT, ARCHITECTURALARCH

BACK FLOW PREVENTERBFP

BELOWBLW

CAST IRON PIPINGC.I.CEILINGCLG

COLUMNCOL

CONCRETECONC

CONSTRUCT, CONSTRUCTIONCONSTCOORDINATECOOR

DOWNDN

DISHWASHERDW

EXISTING(E)EACHEA

ELECTRICAL CONTRACTOREC

ELECTRIC, ELECTRICALELEC

ELEVATIONELEVFLOORFLR

GENERAL CONTRACTORGC

GALLONS PER MINUTEGPM

INVERT ELEVATIONIEINDIRECT WASTEIW

MAXIMUMMAX

MECHANICAL CONTRACTORMC

MINIMUMMINNEW(N)

NORMALLY CLOSEDNC

NORMALLY OPENNO

NOT TO SCALENTSOUTSIDE AIROA

POINT OF CONNECTIONP.O.C.

PRESSURE REDUCING VALVEPRV

POLYVINYL CHLORIDE PIPINGPVCRETURN AIRRA

SUPPLY AIRSA

SIMILARSIM

STAINLESS STEELSSTEMPERATURE CONTROLTCC

TYPICALTYP

DESCRIPTIONSYMBOL

GENERAL

CONNECT NEW TO EXISTING

REFERENCE BUBBLE

REVISION NUMBER

SECTION OR ELEVATION BUBBLE

DRAWING NOTE

DEMOLITION NOTE

* SECTION NUMBER# SHEET NUMBER#

*

#

#*

* SECTION OR ELEVATION LETTER

*#

ISOMETRIC OR ELEVATION BUBBLE

# REFERENCE DRAWING NUMBER

* ISOMETRIC OR ELEVATION LETTER# REFERENCE DRAWING NUMBER

#

#

DEMOLITION NOTE, ALTERNATEX

DRAWING NOTE, ALTERNATE#

NOTES:

1. REFER TO PROJECT SPECIFICATIONS FOR ADDITIONAL INSULATION REQUIREMENTS.

2. (ASTM E84) ALL INSULATION MATERIALS INSTALLED WITHIN THE PLENUM SHALL MEET THE FLAME/SMOKE REQUIREMENTS OF 25/50.

REMARKS:

1. FOR PIPING SMALLER THAT 1-1/2" INSTALLED WITHIN A BUILDING PARTITION WITHIN A CONDITIONED SPACE WITHIN A CONDITIONED SPACE. INSULATION

REDUCTION OF UP TO 1" BUT NOT LESS THAN 1" PER IECC TABLE C403.2.1, NOTE A.

DOMESTIC

COLD WATER

DOMESTIC

COLD WATER

DOMESTIC

COLD WATER

DOMESTIC

HOT WATER & RECIRC.

DOMESTIC

HOT WATER & RECIRC.

DOMESTIC

HOT WATER & RECIRC.

DOMESTIC

HOT WATER & RECIRC.

DOMESTIC

HOT WATER & RECIRC.

DOMESTIC

HOT WATER & RECIRC.

STORM & OVERFLOW

DRAINAGE

ROOF & OVERFLOW

DRAIN BOWLS

CONDENSATE

DRAINAGE

CONDENSATE DRAINAGE

WITH HEAT TRACING

INTERIOR

INTERIOR

(WITHIN PARTITION)

EXTERIOR

INTERIOR

INTERIOR

(WITHIN PARTITION)

EXTERIOR

INTERIOR

INTERIOR

(WITHIN PARTITION)

EXTERIOR

INTERIOR

INTERIOR

GLASS FIBER

WITH ASJ-SSL

GLASS FIBER

WITH ASJ-SSL

GLASS FIBER

WITH ASJ-SSL

GLASS FIBER

WITH ASJ-SSL

GLASS FIBER

WITH ASJ-SSL

GLASS FIBER

WITH ASJ-SSL

GLASS FIBER

WITH ASJ-SSL

GLASS FIBER

WITH ASJ-SSL

GLASS FIBER

WITH ASJ-SSL

GLASS FIBER

GLASS FIBER

FLEXIBLE

ELASTOMERIC

YES

YES

YES

NONE

NONE

NONE

NONE

NONE

NONE

YES

YES

NONE

NONE

NONE

NONE

ALUMINUM

NONE

NONE

ALUMINUM

NONE

NONE

ALUMINUM

PVC

NONE

ALUMINUM

NONE

40 - 60

120 - 140

180

180

180

NA

NA

NA

NA

0.21 - 0.27 75

0.21 - 0.27 75

0.21 - 0.27 75

0.21 - 0.28 100

0.21 - 0.28 100

0.21 - 0.28 100

0.25 - 0.29 125

0.25 - 0.29 125

0.25 - 0.29 125

0.21 - 0.27 75

0.21 - 0.27 75

0.21 - 0.27 75

0.21 - 0.27 75

0.5 1 1 1 -

0.5 1 1 1 1

0.5 1 1 1 -

1 1.5 1.5 1.5 -

1 1.5 1.5 1.5 1

1 1.5 1.5 1.5 -

1.5 2 2 2 -

1 2 2 2 1

1.5 2 2 2 -

1 1 1 1 -

1 1 1 1 -

0.5 0.5 0.5 0.5 -

0.5 0.5 0.5 0.5 -

0.5

0.5

0.5

1

1

1

1.5

1

1.5

1

1

0.5

0.5

INTERIOR

INTERIORFLEXIBLE

ELASTOMERIC

40 - 60

40 - 60

120 - 140

120 - 140

SERVICE

INSULATION CONDUCTIVITY

CONDUCTIVITY BTU * IN / (H * FT * °F )

LOCATIONINSULATION

MATERIAL

VAPOR

BARRIERJACKET

OPERATING

TEMPERATURE( ° F )

MEAN TEMP RATING ( ° F )

NOMINAL PIPE SIZE (IN)REMARKS

< 1 1 TO < 1-1/2 1-1/2 TO < 4 4 TO < 8 ≤ 8

PIPE INSULATION SCHEDULE

F

P

PLUMBING LEGENDALL SYMBOLS MAY NOT BE USED

DESCRIPTIONSYMBOL

NOTE:

1. COORDINATE AND SCHEDULE WITH GAS SERVICE AND METER PROVIDER PRIOR TO COMMENCING WORK. MEDIUM PRESSURE GAS (2PSI) REQUIRED

FROM THE METER TO THE BUILDING. CONTACT XCEL BUILDERS CALL LINE @ 1.800.628.2121 PRIOR TO COMMENCING WORK.

2. GAS PIPE SIZING BASED UPON 70 LINEAR FEET OF GAS PIPING, LOW PRESSURE GAS (2PSI) AT 831 BTU/CF.

CONNECTED GAS LOAD SCHEDULE

1 B-1 2,500,000 2,500,000 2PSI/7"W.C. MECHANICAL ROOM -

9,162,000TOTAL CONNECTED LOAD

NO OF UNITS EQUIPMENT LOAD EACH (BTU/H) TOTAL LOADPRESSURE REQUIRED

MIN. / MAX.LOCATION REMARKS

1 B-2 -

1 B-3 -

1 MAU-1 170,000 170,000 14"W.C./7"W.C. ROOF -

1 GWH-1 800,000 800,000 -

1 GWH-2 300,000 300,000 -

2 OVENS 160,000 320,000 10.5"W.C./7"W.C. KITCHEN -

12 TURRETS 6,000 72,000 7"W.C. SCIENCE ROOMS -

2,500,000 2,500,000

2,500,000 2,500,000

MECHANICAL ROOM

MECHANICAL ROOM

MECHANICAL ROOM

MECHANICAL ROOM

2PSI/7"W.C.

2PSI/7"W.C.

14"W.C./7"W.C.

14"W.C./7"W.C.

STORM DRAIN, RAINWATER DRAINSD

OVERFLOW STORM DRAINOSD

SUBSOIL DRAIN, FOOTING DRAINSSDSOIL, WASTE, OR SANITARY SEWERSAN

STORM / RAINWATER DRAIN BELOW FLOORSD

SOIL / WASTE / SANITARY SEWER BELOW FLRSAN

GREASE DRAINGDVENT

ACID WASTEAW

ACID VENTAV

INDIRECT DRAINDPUMP DISCHARGE LINEPD

COLD WATER

HOT WATER SUPPLY (140° F)

HOT WATER RECIRCULATING (140° F)TEMPERED HOT WATER (110° F)TW

TEMPERED HW RECIRCULATING (110° F)TWR

(CHILLED) DRINKING WATER SUPPLYDWS

(CHILLED) DRINKING WATER RECIRCULATINGDWRSOFT WATERSW

CONDENSATE DRAINCD

DISTILLED DRAINDI

DEIONIZED WATERDELAWN SPRINKLER SUPPLYLS

FIRE PROTECTION WATER SUPPLYF

GAS, LOW-PRESSUREG

GAS, MEDIUM-PRESSUREMGGAS, HIGH-PRESSUREHG

GAS VENTGV

IRRIGATION WATERIR

ISOLATION VALVE

GLOBE VALVE

ANGLE VALVE

BALL VALVE

BUTTERFLY VALVE

GAS COCK, GAS STOP

COMBINATION FLOW MEASURINGDEVICE AND BALANCING VALVE

CHECK VALVE

PLUG VALVE

SOLENOID VALVE

S

MOTOR-OPERATED VALVE [SPECIFY TYPE]

M

PRESSURE REDUCING VALVE

PRESSURE-RELIEF VALVEP

TEMPERATURE-PRESSURE-RELIEF VALVET

HOSE BIBB

VALVE IN YARD BOX (VALVE TYPE SYMBOLAS REQUIRED FOR VALVE USE)

RECESSED-BOX HOSE BIBB ORWALL HYDRANT

UNION (SCREWED)

UNION (FLANGED)

STRAINER

PIPE ANCHOR

PIPE GUIDE

EXPANSION JOINT

FLEXIBLE CONNECTOR

TEE

CONCENTRIC REDUCER

ECCENTRIC REDUCER

AQUASTAT

FLOW SWITCH

PRESSURE SWITCH

WATER HAMMER ARRESTER

PRESSURE GAUGE WITH GAUGE COCK

THERMOMETER

VALVE IN RISER

RISER DOWN (ELBOW)

RISER UP (ELBOW)AIR CHAMBER

RISE OR DROP

BRANCH-TOP CONNECTIONBRANCH-BOTTOM CONNECTION

BRANCH-SIDE CONNECTION

CAP ON END OF PIPE

CLEANOUT PLUG

CIRCULATION PUMP

FLOOR CLEANOUT

WALL CLEANOUT

YARD CLEANOUT OR CLEANOUT TO GRADE

FLOOR DRAIN

FLOOR SINK

CONDUCTOR NOZZLE

DIRECTION OF FLOW

INDICATES PIPE SLOPE DOWN

NEW TO EXISTING CONNECTION

INDICATES ITEMS TO BE REMOVED

GAS TURRET

M

4"

TO GASTURRETS( 72 MBH)

1-1/4"

OVEN (160 MBH)

OVEN (160 MBH)

1-1/4"

1-1/4"

MAU-1 170 MBH

1-1/4"

GWH-1 (800 MBH)

B-1 (2500 MBH)

B-2 (2500 MBH)

B-3 (2500 MBH)

GWH-2 (300 MBH)

METER BY OTHERS

GPR-2GPR-1

1-1/2"

GAS DIAGRAM

1-1/2"

2-1/2"

4"

4"

5"

ENVISIONMECHANICAL ENGINEERS INC.

9777 Pyramid Court, Suite 120Englewood, CO 80112Tel- 303-688-0223Fax- 303-688-3584envisionengrs.comProject #

CONSULTANT:

ISSUE:

OWNER:

PROJECT:

DRAWING INFORMATION:

DRAWN BY:

PROJECT NO:

SHEET TITLE:

APPROVED BY:

CHECKED BY:

SHEET OF

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.hcm2.com

1331 Nineteenth StreetDenver, CO. 80202

hord|coplan|macht

015-078

5/2

4/2

016 9

:46:0

1 P

M

C:\U

sers

\pfo

x.E

NV

ISIO

N.0

00\D

ocum

ents

\015-0

78 -

JeffC

O K

-8 -

PLU

MB

ING

CE

NT

RA

L_pfo

x.r

vt

P-001

PLUMBING CODESHEET, LEGENDS ANDNOTES

Jefferson County SchoolDistrict

CANDELAS K-8

JKB

JJR

11576.000

JKB

19486 WEST 94th AVENUEARVADA, CO 80007

1829 DENVER WEST DRIVEGOLDEN, CO 80401

05/25/16 WORK PACKAGE # 2 ISSUE FORCONSTRUCTION

05.25.2016

Page 2: CONNECTED GAS LOAD SCHEDULE GAS DIAGRAMpix.ghphipps.com/projects/2015/15.0770/ProjDocs/08 - ASIs, PRs... · coordinate piping system connection prior to installation. ... isometric

SAN

4"

SAN

I.E.=96'-2"

5' - 0

"

I.E.=96'-2"

I.E.=96'-2"

5' - 0

"

6"

6"

6"

I.E.=96'-2"

5' -

0"

6"

SD

SD

SD

SD

I.E.=96'-2"

SD5' - 0"

I.E.=96'-2"

SD

8"

SAN SAN SAN SAN

?

3

F

9

7n

A

10n

4.9 8

EE

DD

CC

BB

4 5

I.E.=91'-6"

5' - 0"

SAN

SA

N

SA

N SA

N

SA

N

SAN

SAN

2

7

4

22

1

4

2

2

2"

2"

2"

2"

4"2"

4"

4"4"4"

2"

4"2"

4"

4"

4"

2"

2"

2"

4"

4"

2"

4"

4"

4"

2"

4"

2"4"

4"

4"

2"

4"

4"

4"

4"

4"

4"

2"

4"4"4"

4"

4" 4"

4"

2"

4"

2"

2"

1

2"

6"

10

1

22

3

8

6

8

3

7

5

4

3

11

12

8

4

34

7

7

4

3

8

5

3

121

21

11

11

8

4

3 4

5

7

7

2

8

3

4

9

10

2

10

11

2

12

11

7

7

3

8

3 5

2

4

3

8

4

78

3

7

88

4

7

4

3

3

5

5

3

2

5

RE:MATCHLINE

MATCHLINE

P-110B

RE:MATCHLINE

MATCHLINE

P-110B

92

2"

4"

2

2"

10

10

SUMP PUMP

I.E.=96'-4"

16

16

16

16

16

16

15

14

(SP-2)

100'-0"FINISHED FLOOR ELEVATION

6139.00' USGS100'-0"

FINISHED FLOOR ELEVATION

6139.00' USGS

I.E.=96'-2"

13 SD

3"

2"

2"

2

2

2

GENERAL NOTES1. ISOLATION VALVES WILL BE SPECIFIED AT ALL MAIN/SUBMAIN TAKE-OFFS AND BRANCH CONNECTIONS.

2. VENT PIPE ROUTING TO BE OUTLINED DURING DESIGN DEVELOPMENT TO MAINTAIN CLEARANCES TO OUTSIDEAIR.

3. DOMESTIC WATER DISTRIBUTION TO BE ROUTED ABOVE CEILING. THE WATER PIPING WILL BE ROUTED UP TOFIXURES ON THE SECOND FLOOR ABOVE AND DOWN TO FIXTURES ON THE FIRST FLOOR.

DRAWING NOTES #

1. 2" SANITARY UP TO FLOOR ABOVE.

2. 2" SANITARY UP TO SINK ABOVE.

3. 2" VENT UP TO FLOOR ABOVE.

4. 4" SANITARY UP TO WALL CLEANOUT.

5. 2" SANITARY UP TO LAVS.

6. 2" SANITARY UP TO EWC.

7. 2" SANITARY UP TO FLOOR DRAIN.

8. 4" SANITARY UP TO WATER CLOSET.

9. 4" SANITARY UP TO FLOOR ABOVE.

10. 4" SANITARY UP TO FLOOR CLEAN OUT.

11. 6" STORM DRAIN UP TO FLOOR ABOVE.

12. 8" STORM DRAIN UP TO FLOOR ABOVE.

13. 3" STORM DRAIN UP TO FLOOR ABOVE.

14. 2" SUMP PUMP DISCHARGE RISE UP TO FLOOR ABOVE.

15. 4" SANITARY RISE UP FOR TWO WAY GRADE CLEANOUT.

16. 4" STORM RISE UP TO GRADE CLEANOUT.

A

B

C

ENVISIONMECHANICAL ENGINEERS INC.

9777 Pyramid Court, Suite 120Englewood, CO 80112Tel- 303-688-0223Fax- 303-688-3584envisionengrs.comProject #

CONSULTANT:

ISSUE:

OWNER:

PROJECT:

DRAWING INFORMATION:

DRAWN BY:

PROJECT NO:

SHEET TITLE:

APPROVED BY:

CHECKED BY:

SHEET OF

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.hcm2.com

1331 Nineteenth StreetDenver, CO. 80202

hord|coplan|macht

015-078

5/2

4/2

016 9

:46:0

3 P

M

C:\U

sers

\pfo

x.E

NV

ISIO

N.0

00\D

ocum

ents

\015-0

78 -

JeffC

O K

-8 -

PLU

MB

ING

CE

NT

RA

L_pfo

x.r

vt

P-110A

PLUMBINGUNDERGROUND -AREA A

Jefferson County SchoolDistrict

CANDELAS K-8

JKB

JAL

11576.000

JKB

19486 WEST 94th AVENUEARVADA, CO 80007

1829 DENVER WEST DRIVEGOLDEN, CO 80401

05/25/16 WORK PACKAGE # 2 ISSUE FORCONSTRUCTION

PROJECTNORTH

0 2' 4' 8' 16' 1/8" = 1'-0"A1UNDERGROUND PLUMBING PLAN - AREA A

05.25.2016

Page 3: CONNECTED GAS LOAD SCHEDULE GAS DIAGRAMpix.ghphipps.com/projects/2015/15.0770/ProjDocs/08 - ASIs, PRs... · coordinate piping system connection prior to installation. ... isometric

SAN

5' - 0"

4"

I.E.=93'-8"

5' - 0"

I.E.=93'-4"

I.E.=96'-2"

SD

4"

5' - 0"

I.E.=96'-2"

SD

6"

I.E.=96'-2"

SD

I.E.=96'-2"

SD

4"

I.E.=96'-2"

SD

4"

I.E.=96'-2"

SD6"

SD

I.E.=96'-2"

6"

3

F

G

H

J

K

L

94.9 8

M

4

7

SANSANSANSAN

SAN SAN

SA

N

SA

N

SA

N

SA

N

SAN

SA

N

SA

N

SA

N

SA

N

SA

N

2

2

2

2

6

22

5

14

5

8

2

1

7

2

5

8

1

5

2

4"

2"

2"

4"

4"

2" 2"

4"

4"

2"

2"

4"

2

6

4"

4"

2"

2"

4"

2"

4"

2"

2"

2"4"

2"

4"

2"

4"

4"4"

2"

4"

4"

2"

4"

3"

4"

4"4"

2"

4"

2"

2"

2"

4"

10

22

5

5

5

4

5

84

14

8

4

5

5

5

4

8

8

8

1

1

5

5

5

5

3

8 8

8

8

8

5

5

5

5

14

1411

11

13

1311

1311

RE:MATCHLINE

MATCHLINE

P-110A

RE:MATCHLINE

MATCHLINE

P-110C

RE:

MATCHLINE

MATCHLINE

P-110C

FUTUREEXPANSION

RE:MATCHLINE

MATCHLINE

P-110A

7

7

3"

4"

2

7

7

I.E.=95.33'

15

2"

3

6"

2"

2"

100'-0"FINISHED FLOOR ELEVATION

6139.00' USGS

100'-0"FINISHED FLOOR ELEVATION

6139.00' USGS

19

18

17

17

17

17 17

1717

77

2

2

9

3

4

3

8

GENERAL NOTES1. ISOLATION VALVES WILL BE SPECIFIED AT ALL MAIN/SUBMAIN TAKE-OFFS AND BRANCH CONNECTIONS.

2. VENT PIPE ROUTING TO BE OUTLINED DURING DESIGN DEVELOPMENT TO MAINTAIN CLEARANCES TO OUTSIDEAIR.

3. DOMESTIC WATER DISTRIBUTION TO BE ROUTED ABOVE CEILING. THE WATER PIPING WILL BE ROUTED UP TOFIXURES ON THE SECOND FLOOR ABOVE AND DOWN TO FIXTURES ON THE FIRST FLOOR.

DRAWING NOTES #

1. 2" SANITARY UP TO FLOOR ABOVE.

2. 2" SANITARY UP TO SINK ABOVE.

3. 2" VENT UP TO FLOOR ABOVE.

4. 4" SANITARY UP TO WALL CLEANOUT.

5. 2" SANITARY UP TO LAVS.

6. 2" SANITARY UP TO EWC.

7. 2" SANITARY UP TO FLOOR DRAIN.

8. 4" SANITARY UP TO WATER CLOSET.

9. 4" SANITARY UP TO FLOOR ABOVE.

10. 4" SANITARY UP TO FLOOR CLEAN OUT.

11. 6" STORM DRAIN UP TO FLOOR ABOVE.

12. 8" STORM DRAIN UP TO FLOOR ABOVE.

13. 4" STORM DRAIN UP TO FLOOR ABOVE

14. 2" SANITARY UP TO URINAL ABOVE.

15. 4" SANITARY RISE TO GRADE CLEAN OUT, PLUGFOR FUTURE EXTENSION.

16. 2" SANITARY UP TO FLOOR CLEAN OUT.

17. 4" STORM RISE UP TO GRADE CLEANOUT.

18. 4" SANITARY RISE UP TO TWO WAY GRADE CLEANOUT.

19. 2" SANITARY UP TO MSB.

A

B

C

ENVISIONMECHANICAL ENGINEERS INC.

9777 Pyramid Court, Suite 120Englewood, CO 80112Tel- 303-688-0223Fax- 303-688-3584envisionengrs.comProject #

CONSULTANT:

ISSUE:

OWNER:

PROJECT:

DRAWING INFORMATION:

DRAWN BY:

PROJECT NO:

SHEET TITLE:

APPROVED BY:

CHECKED BY:

SHEET OF

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.hcm2.com

1331 Nineteenth StreetDenver, CO. 80202

hord|coplan|macht

015-078

5/2

4/2

016 9

:46:0

4 P

M

C:\U

sers

\pfo

x.E

NV

ISIO

N.0

00\D

ocum

ents

\015-0

78 -

JeffC

O K

-8 -

PLU

MB

ING

CE

NT

RA

L_pfo

x.r

vt

P-110B

PLUMBINGUNDERGROUND -AREA B

Jefferson County SchoolDistrict

CANDELAS K-8

JKB

JAL

11576.000

JKB

19486 WEST 94th AVENUEARVADA, CO 80007

1829 DENVER WEST DRIVEGOLDEN, CO 80401

05/25/16 WORK PACKAGE # 2 ISSUE FORCONSTRUCTION

1/8" = 1'-0"A1UNDERGROUND PLUMBING PLAN - AREA B

0

PROJECTNORTH

2' 4' 8' 16'

05.25.2016

Page 4: CONNECTED GAS LOAD SCHEDULE GAS DIAGRAMpix.ghphipps.com/projects/2015/15.0770/ProjDocs/08 - ASIs, PRs... · coordinate piping system connection prior to installation. ... isometric

SAN SAN

GD

GD

GD

3"

3"

6"

F

SA

NS

AN

SA

N

SAN

6"

4"

6"

4"

PRECAST CONCRETEGREASE INTERCEPTOR2500 GALLON CAPACITY

5' -

0"

I.E.=94'-7"

I.E.=95'-8"

I.E.=95'-6"

5' -

0"

I.E.=96'-2"

SD

6"

I.E.=96'-2"

SD

5' -

0"

I.E.=96'-2"

6"

31

N

M

P

Q

4 7

6

10

3

25

23

26

6"

4"

2"

3"

4"

2"

2"

4"

2"

6"

4"

4"

4"

4"

2"

3"

2"

2"

RE:

MATCHLINEMATCHLINE

P-110B

25

3

23

25

4

3

23

24

3

23

10

2

8

7

3

16

2

15

2

2"

5

7

10

12

3

8

7

7

12

11

10

P-530

10

P-530

10

P-530

6"

6"21

21

22

8

5

3

16

8

7

7

7

5

8

4

4"

2"

2" 4"

4"

2"

2"

316

8"

19

20

17

23

23

23

35

10

10

23

2"

2"

2"

2"

SAN

SA

N

23

25

23

25

3

3

3

233

27

27

23

28

5' -

0"

SD

3"

29

4"

2" 2"

18

16

P-530

6"

100'-0"FINISHED FLOOR ELEVATION

6141.17' USGS

100'-0"FINISHED FLOOR ELEVATION

6139.00' USGS

6

631

30

30

30

30

GENERAL NOTES1. ISOLATION VALVES WILL BE SPECIFIED AT ALL MAIN/SUBMAIN TAKE-OFFS AND BRANCH CONNECTIONS.

2. VENT PIPE ROUTING TO BE OUTLINED DURING DESIGN DEVELOPMENT TO MAINTAIN CLEARANCES TO OUTSIDEAIR.

3. DOMESTIC WATER DISTRIBUTION TO BE ROUTED ABOVE CEILING. THE WATER PIPING WILL BE ROUTED UP TOFIXURES ON THE SECOND FLOOR ABOVE AND DOWN TO FIXTURES ON THE FIRST FLOOR.

DRAWING NOTES #

1. 2" SANITARY UP TO SHOWER ABOVE.

2. 3" SANITARY UP TO FLOOR SINK ABOVE.

3. 2" VENT UP TO FLOOR ABOVE.

4. 4" SANITARY UP TO WALL CLEANOUT.

5. 2" SANITARY UP TO LAVS.

6. 2" SANITARY UP TO EWC.

7. 2" SANITARY UP TO FLOOR DRAIN.

8. 4" SANITARY UP TO WATER CLOSET.

9. 4" SANITARY UP TO FLOOR ABOVE.

10. 4" SANITARY UP TO FLOOR CLEAN OUT.

11. 6" STORM DRAIN UP TO FLOOR ABOVE.

12. 8" STORM DRAIN UP TO FLOOR ABOVE.

13. 4" STORM DRAIN UP TO FLOOR ABOVE

14. 2" SANITARY UP TO URINAL ABOVE.

15. 3" VERTICAL DRY VENT UP TO ABOVE FLOOR.

16. 2" SANITARY UP TO MSB.

17. 4" METERED COLD WATER SERVICE, 3" IRRIGATION SUPPLY AND 6" FIRE SERVICE, ENTERBUILDING BELOW GRADE, RE: SITE UTILITY AND IRRIGATION PLANS FOR CONTINUATION.

18. 4" CW UP TO ABOVE FLOOR, SEE PLAN B1 ON P-410 FOR CONTINUATION.

19. 3" IR UP TO ABOVE FLOOR, SEE PLAN B1 ON P-410 FOR CONTINUATION.

20. 6" FIRE SERVICE UP TO ABOVE FLOOR. SEE FIRE SPRINKLER PLANS FOR CONTINUATION.

21. 3" V UP IN WALL ABOVE.

22. (2) 4" SAN RISERS UP TO 2-WAY GRADE CLEANOUT ABOVE.

23. 2" SANITARY UP TO FLOOR SINK.

24. 2" SANITARY UP TO DISPOSAL.

25. 2" SANITARY UP TO HAND SINK.

26. 2" SANITARY DN. TO 6" SANITARY.

27. 2" SANITARY DN. TO 4" SANITARY.

28. 2" SANITARY UP TO WASHER WALL BOX.

29. 3" STORM DRAIN UP TO FLOOR ABOVE.

30. 4" STORM RISE UP TO GRADE CLEANOUT.

31. 2" SANITARY UP TO SINK ABOVE.

A

B

C

ENVISIONMECHANICAL ENGINEERS INC.

9777 Pyramid Court, Suite 120Englewood, CO 80112Tel- 303-688-0223Fax- 303-688-3584envisionengrs.comProject #

CONSULTANT:

ISSUE:

OWNER:

PROJECT:

DRAWING INFORMATION:

DRAWN BY:

PROJECT NO:

SHEET TITLE:

APPROVED BY:

CHECKED BY:

SHEET OF

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.hcm2.com

1331 Nineteenth StreetDenver, CO. 80202

hord|coplan|macht

015-078

5/2

4/2

016 9

:46:0

6 P

M

C:\U

sers

\pfo

x.E

NV

ISIO

N.0

00\D

ocum

ents

\015-0

78 -

JeffC

O K

-8 -

PLU

MB

ING

CE

NT

RA

L_pfo

x.r

vt

P-110C

PLUMBINGUNDERGROUND -AREA C

Jefferson County SchoolDistrict

CANDELAS K-8

JKB

JAL

11576.000

JKB

19486 WEST 94th AVENUEARVADA, CO 80007

1829 DENVER WEST DRIVEGOLDEN, CO 80401

05/25/16 WORK PACKAGE # 2 ISSUE FORCONSTRUCTION

PROJECTNORTH

0 2' 4' 8' 16' 1/8" = 1'-0"A1UNDERGROUND PLUMBING PLAN - AREA C

05.25.2016

Page 5: CONNECTED GAS LOAD SCHEDULE GAS DIAGRAMpix.ghphipps.com/projects/2015/15.0770/ProjDocs/08 - ASIs, PRs... · coordinate piping system connection prior to installation. ... isometric

REF.

DW

R.

FD

FD

FD

FD

FD

FD

FD

P-410

A2

P-411

B2

EWC-2

4"

WH-1

WH-1

2 1/2"

1 1/2"2 1/2"1 1/2"

3"

3"

OD

SD

8"

WH-1

P-410

B2

P-410

A4

S-1 W/TMV-2

P-411

B4

S-1S-1

S-1

S-1 W/TMV-2

S-1 W/TMV-2

EWC-1

S-1

S-1

S-1

S-1

3/4"

WH-1

FCO-1

4" FCO-1

3/4"

3/4"

1"

2"

KINDERGARTEN

106

STAIR

ST.C

KINDERGARTEN

107

CIRC.

100B

T.

108A

T.

107A

ST.

107B

KINDERGARTEN

108

KINDERGARTEN

105

T.

106A

T.

105A

BREAKOUT

100B.2

PRE-K

110

FLEX

104

T.

103A

ST.

103B

T.

104A

T.

110A

ST.

110B

PRE-K

111

BREAKOUT

100C.1

RES. RM.

112

CIRC.

100C

MULTI-PURPOSE

103

ELEM.READING

102E

LMC

102

SEM.

102D

ST.

102CSEM.

102B

OFF.

102A

VEST.

100

ADMIN.

101

OFFICE

101R

OFFICE

101Q

OFFICE

101N

OFFICE

101M

PRIN. OFFICE

101K

CONF.

101J

STOR.

101H

LOUNGE

101G

WORK ROOM

101L

MAIL

101L.1

CLINIC

101B

CLINIC T.

101C

T.

101D

T.

101E

IDF

101F

ELEC.

113

WK. RM.

114

CONF.

101P

CIRC.

101.2

CIRC.

101.1

M.S. ART

146

S-1

WCB-1

1

P-510

2

P-510

3

P-510

4

P-510

3

F

9

7n

A

10n

4.9 8

EE

DD

CC

BB

4 5

22

1

1/2"1/2"

3/4"3/4"

1/2"1/2"

3/4"3/4"3/4"

3"2"

1"3/4"3/4"3/4"

1 1/2"1 1/4"

3/4"

1/2"1/2"

2 1/2"1 1/2"

1"1"

3"

2"

1"

3"2"1"

2"

1 1/2"

S-2

12

S-2

2 1/2"

2"

2"1"

3/4"

3/4"3/4"3/4"

4"

2 1/2"2"

3/4"3/4"3/4"

IMB-1

DW-1

1"3/4"2"

2"

1 1/4"

3/4"

RE:MATCHLINE

MATCHLINE

P-111B

RE:MATCHLINE

MATCHLINE

P-111B

2

1

12

5

1

3/4"

1

2

1

1

1

22

2

1

1

1

5

1 1

1

1

10

9

11

3

8

2

4"

2

15

14

2

2"

2"

2

GG

G

16

3/4"

3/4" 3/4"

1 1/4"

1"

3/4"

OD

4" FCO-1

4" FCO-1

2"

1"

2"

SD

WH-1CN-1

CN-1

CN-1CN-1

CN-1 CN-1

S-2

S-1 W/TMV-2

S-1 W/TMV-2

S-1 W/TMV-2

4" GCO-2

4" GCO-1

4" GCO-1

4" GCO-1

4" GCO-1

4" GCO-1

4" GCO-1

CN-1

4" GCO-1

18

19

20

21

3"

3"

21

3/4"

3/4"3/4"3/4"

4"

2"4"

4"

GENERAL NOTES1. ISOLATION VALVES WILL BE SPECIFIED AT ALL MAIN/SUBMAIN TAKE-OFFS AND BRANCH CONNECTIONS.

2. VENT PIPE ROUTING TO BE OUTLINED DURING DESIGN DEVELOPMENT TO MAINTAIN CLEARANCES TO OUTSIDEAIR.

3. DOMESTIC WATER DISTRIBUTION TO BE ROUTED ABOVE CEILING. THE WATER PIPING WILL BE ROUTED UP TOFIXURES ON THE SECOND FLOOR ABOVE AND DOWN TO FIXTURES ON THE FIRST FLOOR.

DRAWING NOTES #

1. 2" VENT, 1/2" CW & HW DROP TO SINK.

2. 2" SANITARY, 1/2" CW & HW UP TO SINK ABOVE.

3. 2" VENT & 1/2" CW DROP TO EWC.

4. 2" VENT & 1/2" CW DROP TO DF.

5. 3/4" CW DN TO WALL HYDRANT.

6. 4" SD & 4" OD RISE TO RD-1 & OD-1.

7. 6" SD & 6" OD RISE TO RD-1 & OD-1.

8. 4" SANITARY DOWN IN WALL.

9. 4" SANITARY RISE UP TO FLOOR ABOVE.

10. 1" HW RISE UP TO FLOOR ABOVE.

11. 2" CW AND 3/4 HWC RISE UP TO FLOOR ABOVE.

12. 8" SD & 8" OD RISE UP TO RD-1 & OD-1.

13. 2" VENT RISE UP TO FLOOR ABOVE.

14. 6" STORM DOWN IN CHASE.

15. 2" SANITARY DOWN IN CHASE.

16. GAS PIPING TO EXTEND TO SECOND FLOOR SCIENCE ROOM GAS TURRETS.

17. 4" STORM DOWN.

18. 3/4" CW ROUTED UNDER STRUCTURAL BEAM.

19. 2" SUMP PUMP DISCHARGE RISE FROM ELEVATOR SUMP PUMP.

20. 2" SUMP PUMP DISCHARGE UP TO DISCHARGE INTO MOP BASIN ON FLOOR ABOVE.

21. 2" SANITARY UP TO FLOOR DRAIN ABOVE.

22. 3" SD AND 3" OD RISE TO 3" RD-1 & 3" OD-1.

A

B

C

ENVISIONMECHANICAL ENGINEERS INC.

9777 Pyramid Court, Suite 120Englewood, CO 80112Tel- 303-688-0223Fax- 303-688-3584envisionengrs.comProject #

CONSULTANT:

ISSUE:

OWNER:

PROJECT:

DRAWING INFORMATION:

DRAWN BY:

PROJECT NO:

SHEET TITLE:

APPROVED BY:

CHECKED BY:

SHEET OF

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.hcm2.com

1331 Nineteenth StreetDenver, CO. 80202

hord|coplan|macht

015-078

5/2

4/2

016 9

:46:1

1 P

M

C:\U

sers

\pfo

x.E

NV

ISIO

N.0

00\D

ocum

ents

\015-0

78 -

JeffC

O K

-8 -

PLU

MB

ING

CE

NT

RA

L_pfo

x.r

vt

P-111A

PLUMBING FIRSTFLOOR - AREA A

Jefferson County SchoolDistrict

CANDELAS K-8

JKB

JAL

11576.000

JKB

19486 WEST 94th AVENUEARVADA, CO 80007

1829 DENVER WEST DRIVEGOLDEN, CO 80401

05/25/16 WORK PACKAGE # 2 ISSUE FORCONSTRUCTION

PROJECTNORTH

0 2' 4' 8' 16' 1/8" = 1'-0"A1FIRST FLOOR PLUMBING PLAN - AREA A

05.25.2016

Page 6: CONNECTED GAS LOAD SCHEDULE GAS DIAGRAMpix.ghphipps.com/projects/2015/15.0770/ProjDocs/08 - ASIs, PRs... · coordinate piping system connection prior to installation. ... isometric

FD

FD

FD

P-410

D1

P-410

B1

FCO-1

WH-1

WH-1

WH-1

P-410

D2

S-4SI-1

SI-1S-4

EWC-2

S-1 W/TMV-2

S-1 W/TMV-2

FCO-1

3

2

1

1

2

1

2

1

2

1

2

2

1

2

1

4

EWC-3

S-1

2"1"3/4"

2"1 1/4"1"

2"2 1/2"4"

3/4"3/4"

1/2"

1/2"1/2"1/2"

3/4"3/4"1/2" 2"

2"2 1/2"4"

2 1/2"4"

2 1/2"4"

3/4"3/4"

3/4"3/4"

3/4"3/4"

3/4"3/4"

3/4"3/4"

3/4"

3/4"

3/4"

3/4"

1" 3/4"

3/4"3/4"

3/4"3/4"

3/4"

3/4"3/4"3/4"

3/4"

4"2 1/2"

4"2 1/2"

2

STAIR

ST.D

CLASSROOM

120

CIRC.

100D

CLASSROOM

121

CLASSROOM

122

IDF

100D.1

CLASSROOM

119

BREAKOUT

100D.2

CLASSROOM

118

CLASSROOM

123

CLASSROOM

124

CLASSROOM

117

CIRC.

100C

J.

115

WK. RM.

114

M.S. ART

146

KILN

145B

ART ST.

145A

E.S. ART

145

SPED/FLEX

127

M.S. MUSIC

144

BREAKOUT

100C.2

PR.

144D

PR.

144C

PR.

144B

ST.

144A

VEST.

100C.4

3

F

G

H

J

K

L

94.9 8

M

4

FUTUREEXPANSION

2"2 1/2"

1/2"

FCO-1

17

1417

14

14

6

7

2"

1 1/2"3/4"

1"

1"3/4"

2 1/2"

RE:MATCHLINE

MATCHLINE

P-111A

RE:MATCHLINE

MATCHLINE

P-111A

RE:MATCHLINE

MATCHLINE

P-111C

RE:

MATCHLINE

MATCHLINE

P-111C

S-1 W/TMV-2

S-1 W/TMV-2

S-1 W/TMV-2

S-1 W/TMV-2

S-1 W/TMV-2

S-1 W/TMV-2

S-1 W/TMV-2

SI-2

S-1 W/TMV-2

SI-2

S-1 W/TMV-2

SI-2

S-1 W/TMV-2

SI-2

CN-1

CN-1 CN-1

3/4"1/2"

3/4"

3/4"

CN-1

CN-1 CN-1

PT-1

TD-1

CN-1

4" GCO-1 4" GCO-1

4" GCO-14" GCO-1

4" GCO-1

4" GCO-1

4" GCO-1

1"

1"

1"

1"

1"1"

1"

G

GG

GG

23

BUILDINGEXPANSION JOINTRE: ARCH

ES-1

ES-1

23

GENERAL NOTES1. ISOLATION VALVES WILL BE SPECIFIED AT ALL MAIN/SUBMAIN TAKE-OFFS AND BRANCH CONNECTIONS.

2. VENT PIPE ROUTING TO BE OUTLINED DURING DESIGN DEVELOPMENT TO MAINTAIN CLEARANCES TO OUTSIDEAIR.

3. DOMESTIC WATER DISTRIBUTION TO BE ROUTED ABOVE CEILING. THE WATER PIPING WILL BE ROUTED UP TOFIXURES ON THE SECOND FLOOR ABOVE AND DOWN TO FIXTURES ON THE FIRST FLOOR.

DRAWING NOTES #

1. 2" VENT, 1/2" CW & HW DROP TO SINK.

2. 2" SANITARY, 1/2" CW & HW UP TO SINK ABOVE.

3. 2" VENT & 1/2" CW DROP TO EWC.

4. 2" VENT & 1/2" CW DROP TO DF.

5. 3/4" CW DN TO WALL HYDRANT.

6. 4" SD & 4" OD RISE TO RD-1 & OD-1.

7. 6" SD & 6" OD RISE TO RD-1 & OD-1.

8. 4" SANITARY DOWN IN WALL.

9. 4" SANITARY RISE UP TO FLOOR ABOVE.

10. 1" HW RISE UP TO FLOOR ABOVE.

11. 2" CW AND 3/4 HWC RISE UP TO FLOOR ABOVE.

12. 8" SD & 8" OD RISE UP TO RD-1 & OD-1.

13. 2" VENT RISE UP TO FLOOR ABOVE.

14. 6" STORM DOWN IN CHASE.

15. 2" SANITARY DOWN IN CHASE.

16. GAS PIPING TO EXTEND TO SECOND FLOOR SCIENCE ROOM GAS TURRETS.

17. 4" STORM DOWN.

18. 3/4" CW ROUTED UNDER STRUCTURAL BEAM.

19. 2" SUMP PUMP DISCHARGE RISE FROM ELEVATOR SUMP PUMP.

20. 2" SUMP PUMP DISCHARGE UP TO DISCHARGE INTO MOP BASIN ON FLOOR ABOVE.

21. 2" SANITARY UP TO FLOOR DRAIN ABOVE.

22. 3" SD AND 3" OD RISE TO 3" RD-1 & 3" OD-1.

A

B

C

23. PROVIDE EXPANSION LOOP FOR CW, HW, HWC, AND GAS AT EXPANSION JOINT TO ALLOWSETTLING.

ENVISIONMECHANICAL ENGINEERS INC.

9777 Pyramid Court, Suite 120Englewood, CO 80112Tel- 303-688-0223Fax- 303-688-3584envisionengrs.comProject #

CONSULTANT:

ISSUE:

OWNER:

PROJECT:

DRAWING INFORMATION:

DRAWN BY:

PROJECT NO:

SHEET TITLE:

APPROVED BY:

CHECKED BY:

SHEET OF

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.hcm2.com

1331 Nineteenth StreetDenver, CO. 80202

hord|coplan|macht

015-078

5/2

4/2

016 9

:46:1

5 P

M

C:\U

sers

\pfo

x.E

NV

ISIO

N.0

00\D

ocum

ents

\015-0

78 -

JeffC

O K

-8 -

PLU

MB

ING

CE

NT

RA

L_pfo

x.r

vt

P-111B

PLUMBING FIRSTFLOOR- AREA B

Jefferson County SchoolDistrict

CANDELAS K-8

JKB

JAL

11576.000

JKB

19486 WEST 94th AVENUEARVADA, CO 80007

1829 DENVER WEST DRIVEGOLDEN, CO 80401

05/25/16 WORK PACKAGE # 2 ISSUE FORCONSTRUCTION

1/8" = 1'-0"A1FIRST FLOOR PLUMBING PLAN - AREA B

0

PROJECTNORTH

2' 4' 8' 16'

05.25.2016

Page 7: CONNECTED GAS LOAD SCHEDULE GAS DIAGRAMpix.ghphipps.com/projects/2015/15.0770/ProjDocs/08 - ASIs, PRs... · coordinate piping system connection prior to installation. ... isometric

DN3084

Trash

Trash

Trash

2472

2472

2472

2472

2442

2472

2472

2472

2472

2460 2460

2472

2472

2442

2442

2472

3072

3072

3072

2460

3060

2448

2448

24362436

3048

P-410

A1

P-410

B3

WH-1

EWC-1

EXT. EQ. ST.

138

VEST.

136B

LOCKER ROOM

136C

OUT. EQ. ST.

139

FM. OFFICE

140BVEST.

140C

ELEC.

141D

DRY ST.

141F

FM REC.

142A

FM. ST.

142

COMMONS

140

E.S. MUSIC/STAGE

143

1519 SF

IDF

140D

T.

141A.1

FM T. / LR

140B.1

TABLE STOR.

140A

OFFICE

136D

SHOWER

136D.1

LOCKER ROOM

136E

JANITOR

136E.2

EQUIP. STOR.

136F

MULTIPURPOSE

137

GYM

136

VEST.

136A

CIRC.

100C

31

N

M

P

Q

4 7

WH-1

P-412

C4

P-412

D4

4"2 1/2"

1/2"

P-412

C1

RE:MATCHLINE

MATCHLINE

P-111B

RE:

MATCHLINE

MATCHLINE

P-111B

FUTUREEXPANSION

EWC-1

EWC-3

DF-1

G

GG

G

GG

CN-1 CN-1

CN-1

4"2 1/2"

2"

7

1"

2"

4"

2 1/2"

1 1/2" 3/4"3/4" 1/2"

2"

1"

3/4"

4" GCO-1

4" GCO-14" GCO-1

4" GCO-1

2"

1/2"

3/4"

3/4"3/4"3/4"

1/2"

3/4"3/4"3/4"

1/2"

1/2"

2"

2"

2"

22

3"

3"

12

GENERAL NOTES1. ISOLATION VALVES WILL BE SPECIFIED AT ALL MAIN/SUBMAIN TAKE-OFFS AND BRANCH CONNECTIONS.

2. VENT PIPE ROUTING TO BE OUTLINED DURING DESIGN DEVELOPMENT TO MAINTAIN CLEARANCES TO OUTSIDEAIR.

3. DOMESTIC WATER DISTRIBUTION TO BE ROUTED ABOVE CEILING. THE WATER PIPING WILL BE ROUTED UP TOFIXURES ON THE SECOND FLOOR ABOVE AND DOWN TO FIXTURES ON THE FIRST FLOOR.

DRAWING NOTES #

1. 2" VENT, 1/2" CW & HW DROP TO SINK.

2. 2" SANITARY, 1/2" CW & HW UP TO SINK ABOVE.

3. 2" VENT & 1/2" CW DROP TO EWC.

4. 2" VENT & 1/2" CW DROP TO DF.

5. 3/4" CW DN TO WALL HYDRANT.

6. 4" SD & 4" OD RISE TO RD-1 & OD-1.

7. 6" SD & 6" OD RISE TO RD-1 & OD-1.

8. 4" SANITARY DOWN IN WALL.

9. 4" SANITARY RISE UP TO FLOOR ABOVE.

10. 1" HW RISE UP TO FLOOR ABOVE.

11. 2" CW AND 3/4 HWC RISE UP TO FLOOR ABOVE.

12. 8" SD & 8" OD RISE UP TO RD-1 & OD-1.

13. 2" VENT RISE UP TO FLOOR ABOVE.

14. 6" STORM DOWN IN CHASE.

15. 2" SANITARY DOWN IN CHASE.

16. GAS PIPING TO EXTEND TO SECOND FLOOR SCIENCE ROOM GAS TURRETS.

17. 4" STORM DOWN.

18. 3/4" CW ROUTED UNDER STRUCTURAL BEAM.

19. 2" SUMP PUMP DISCHARGE RISE FROM ELEVATOR SUMP PUMP.

20. 2" SUMP PUMP DISCHARGE UP TO DISCHARGE INTO MOP BASIN ON FLOOR ABOVE.

21. 2" SANITARY UP TO FLOOR DRAIN ABOVE.

22. 3" SD AND 3" OD RISE TO 3" RD-1 & 3" OD-1.

A

B

C

ENVISIONMECHANICAL ENGINEERS INC.

9777 Pyramid Court, Suite 120Englewood, CO 80112Tel- 303-688-0223Fax- 303-688-3584envisionengrs.comProject #

CONSULTANT:

ISSUE:

OWNER:

PROJECT:

DRAWING INFORMATION:

DRAWN BY:

PROJECT NO:

SHEET TITLE:

APPROVED BY:

CHECKED BY:

SHEET OF

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.hcm2.com

1331 Nineteenth StreetDenver, CO. 80202

hord|coplan|macht

015-078

5/2

4/2

016 9

:46:1

8 P

M

C:\U

sers

\pfo

x.E

NV

ISIO

N.0

00\D

ocum

ents

\015-0

78 -

JeffC

O K

-8 -

PLU

MB

ING

CE

NT

RA

L_pfo

x.r

vt

P-111C

PLUMBING FIRSTFLOOR - AREA C

Jefferson County SchoolDistrict

CANDELAS K-8

JKB

JAL

11576.000

JKB

19486 WEST 94th AVENUEARVADA, CO 80007

1829 DENVER WEST DRIVEGOLDEN, CO 80401

05/25/16 WORK PACKAGE # 2 ISSUE FORCONSTRUCTION

PROJECTNORTH

0 2' 4' 8' 16' 1/8" = 1'-0"A1FIRST FLOOR PLUMBING PLAN - AREA C

05.25.2016

Page 8: CONNECTED GAS LOAD SCHEDULE GAS DIAGRAMpix.ghphipps.com/projects/2015/15.0770/ProjDocs/08 - ASIs, PRs... · coordinate piping system connection prior to installation. ... isometric

R.

DW

P-411

D1

S-3

S-3

S-3S-3

S-3S-3S-3S-3S-3

S-3

P-411

A1

3

F

9

7n

A

10n

4.9 8

EE

DD

CC

BB

4 5

RE:MATCHLINE

MATCHLINE

P-112B

RE:MATCHLINE

MATCHLINE

P-112B

3

5

5

5

5

111

3

1. PROVIDE (1) DUAL GT-1 & AT-1 AT EACH WORKSTATION.

2. PROVIDE (1) ANT-1 AT EACH SINK.

3. PROVIDE GAS VALVE AND GAS CONTROLS STATION FOR EACH ROOM.

4. EXTEND 2" G TO BOILER ROOM, TO SERVE ALL THREE CLASSROOMS

1. PROVIDE (1) DUAL GT-1 & AT-1 AT EACH WORKSTATION.

2. PROVIDE (1) ANT-1 AT EACH SINK.

3. PROVIDE GAS VALVE AND GAS CONTROLS STATION FOR EACH ROOM.

4. EXTEND 2" G TO BOILER ROOM, TO SERVE ALL THREE CLASSROOMS

1. PROVIDE (1) DUAL GT-1 & AT-1 AT EACH WORKSTATION.

2. PROVIDE (1) ANT-1 AT EACH SINK.

3. PROVIDE GAS VALVE AND GAS CONTROLS STATION FOR EACH ROOM.

4. EXTEND 2" G TO BOILER ROOM, TO SERVE ALL THREE CLASSROOMS

S-3 W/TMV-2

S-3 W/TMV-2

S-3 W/TMV-2

S-3 W/TMV-2

CLASSROOM

206

STAIR

ST.C

CLASSROOM

207

CIRC.

200B

CLASSROOM

208

CLASSROOM

205

ST.

200B.3

RES. RM.

209

IDF

200B.1

BREAKOUT

200B.2

CLASSROOM

210

SCIENCE

204

CLASSROOM

211

ST.

204A

ST.

203A

?

?

SCIENCE

203

ELEV.

VV

T.

213

T.

212

ELEC

249

J.

248

T.

247

WORK ROOM

246

SCIENCE

214

MDF

245

SCI. ST.

244

BREAK- OUT

D

CIRC.

200A

WORK RM.

200B.2

READINGROOM

202E

CSE-1

GENERAL NOTES1. ISOLATION VALVES WILL BE SPECIFIED AT ALL MAIN/SUBMAIN TAKE-OFFS AND BRANCH CONNECTIONS.

2. VENT PIPE ROUTING TO BE OUTLINED DURING DESIGN DEVELOPMENT TO MAINTAIN CLEARANCES TO OUTSIDEAIR.

3. DOMESTIC WATER DISTRIBUTION TO BE ROUTED ABOVE CEILING. THE WATER PIPING WILL BE ROUTED UP TOFIXURES ON THE SECOND FLOOR ABOVE AND DOWN TO FIXTURES ON THE FIRST FLOOR.

DRAWING NOTES #

1. 2" VENT RISE, 1/2" CW & HW DOWN TO FLOOR BELOW.

2. 2" VENT RISE & 1/2" CW DOWN TO FLOOR BELOW.

3. 2" VENT RISE UP FROM FLOOR BELOW.

4. 4" ROOF DRAIN DOWN.

5. 6" ROOF DRAIN DOWN.

A

B

C

ENVISIONMECHANICAL ENGINEERS INC.

9777 Pyramid Court, Suite 120Englewood, CO 80112Tel- 303-688-0223Fax- 303-688-3584envisionengrs.comProject #

CONSULTANT:

ISSUE:

OWNER:

PROJECT:

DRAWING INFORMATION:

DRAWN BY:

PROJECT NO:

SHEET TITLE:

APPROVED BY:

CHECKED BY:

SHEET OF

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.hcm2.com

1331 Nineteenth StreetDenver, CO. 80202

hord|coplan|macht

015-078

5/2

4/2

016 9

:46:2

3 P

M

C:\U

sers

\pfo

x.E

NV

ISIO

N.0

00\D

ocum

ents

\015-0

78 -

JeffC

O K

-8 -

PLU

MB

ING

CE

NT

RA

L_pfo

x.r

vt

P-112A

PLUMBING SECONDFLOOR - AREA A

Jefferson County SchoolDistrict

CANDELAS K-8

JKB

JAL

11576.000

JKB

19486 WEST 94th AVENUEARVADA, CO 80007

1829 DENVER WEST DRIVEGOLDEN, CO 80401

05/25/16 WORK PACKAGE # 2 ISSUE FORCONSTRUCTION

PROJECTNORTH

0 2' 4' 8' 16' 1/8" = 1'-0"A1SECOND FLOOR PLUMBING PLAN - AREA A

05.25.2016

Page 9: CONNECTED GAS LOAD SCHEDULE GAS DIAGRAMpix.ghphipps.com/projects/2015/15.0770/ProjDocs/08 - ASIs, PRs... · coordinate piping system connection prior to installation. ... isometric

P-411

D2

P-411

D4

P-411

B1

1

EWC-2

2

EWC-1 2

S-3 W/TMV-2

3

F

G

H

J

K

L

94.9 8

M

4

7

4

54

5

5

RE:MATCHLINE

MATCHLINE

P-112A

RE:MATCHLINE

MATCHLINE

P-112A

FUTURE EXPANSION

S-1 W/TMV-2

S-3 W/TMV-2

S-3 W/TMV-2

CLASSROOM

220

CLASSROOM

221

STAIR

ST.D

STAIR

ST.D

CLASSROOM

222

IDF

200D.1

CLASSROOM

219

BREAK OUT

200D.2CLASSROOM

223

CLASSROOM

218

CLASSROOM

217

?

?

CIRC.

200D

T.

216

SCIENCE

214

BREAK- OUT

D

SCI. ST.

244

CIRC.

200A

T.

225

FLEX

227

ELEC

243

IDF

242

ST.

241

WK. RM.

240

ST.

228

J.

239

T.

238

ST.

237

BREAKOUT

D

CIRC.

140E

GENERAL NOTES1. ISOLATION VALVES WILL BE SPECIFIED AT ALL MAIN/SUBMAIN TAKE-OFFS AND BRANCH CONNECTIONS.

2. VENT PIPE ROUTING TO BE OUTLINED DURING DESIGN DEVELOPMENT TO MAINTAIN CLEARANCES TO OUTSIDEAIR.

3. DOMESTIC WATER DISTRIBUTION TO BE ROUTED ABOVE CEILING. THE WATER PIPING WILL BE ROUTED UP TOFIXURES ON THE SECOND FLOOR ABOVE AND DOWN TO FIXTURES ON THE FIRST FLOOR.

DRAWING NOTES #

1. 2" VENT RISE, 1/2" CW & HW DOWN TO FLOOR BELOW.

2. 2" VENT RISE & 1/2" CW DOWN TO FLOOR BELOW.

3. 2" VENT RISE UP FROM FLOOR BELOW.

4. 4" ROOF DRAIN DOWN.

5. 6" ROOF DRAIN DOWN.

A

B

C

ENVISIONMECHANICAL ENGINEERS INC.

9777 Pyramid Court, Suite 120Englewood, CO 80112Tel- 303-688-0223Fax- 303-688-3584envisionengrs.comProject #

CONSULTANT:

ISSUE:

OWNER:

PROJECT:

DRAWING INFORMATION:

DRAWN BY:

PROJECT NO:

SHEET TITLE:

APPROVED BY:

CHECKED BY:

SHEET OF

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.hcm2.com

1331 Nineteenth StreetDenver, CO. 80202

hord|coplan|macht

015-078

5/2

4/2

016 9

:46:2

6 P

M

C:\U

sers

\pfo

x.E

NV

ISIO

N.0

00\D

ocum

ents

\015-0

78 -

JeffC

O K

-8 -

PLU

MB

ING

CE

NT

RA

L_pfo

x.r

vt

P-112B

PLUMBING SECONDFLOOR - AREA B

Jefferson County SchoolDistrict

CANDELAS K-8

JKB

JAL

11576.000

JKB

19486 WEST 94th AVENUEARVADA, CO 80007

1829 DENVER WEST DRIVEGOLDEN, CO 80401

05/25/16 WORK PACKAGE # 2 ISSUE FORCONSTRUCTION

1/8" = 1'-0"A1SECOND FLOOR PLUMBING PLAN - AREA B

0

PROJECTNORTH

2' 4' 8' 16'

05.25.2016

Page 10: CONNECTED GAS LOAD SCHEDULE GAS DIAGRAMpix.ghphipps.com/projects/2015/15.0770/ProjDocs/08 - ASIs, PRs... · coordinate piping system connection prior to installation. ... isometric

3

F

9

7n

A

10n

4.9 8

EE

DD

CC

BB

4 5

8" RD-17,616 SQ. FT.

6" RD-1 3,402 SQ. FT.

6" RD-1 3,674 SQ. FT.

6" RD-1 3,520 SQ. FT.

3" RD-11,096 SQ. FT.

6" RD-13,171 SQ. FT.

6" RD-13,281 SQ. FT.

RE:MATCHLINE

MATCHLINE

P-131B

RE:MATCHLINE

MATCHLINE

P-131B

3" VTR

3" VTR

6" OD-1 3,520 SQ. FT.

6" OD-13,171 SQ. FT.

6" OD-13,281 SQ. FT.

6" OD-13,674 SQ. FT.

6" OD-1 3,402 SQ. FT.

8" OD-17,616 SQ. FT.

3" OD-11,096 SQ. FT.

3" RD-21,815 SQ. FT.

3" OD-21,815 SQ. FT.

GENERAL NOTES1. VENT PIPE ROUTING TO BE OUTLINED DURING DESIGN DEVELOPMENT TO MAINTAIN CLEARANCES TO OUTSIDE

AIR.

2. ROOF DRAIN WILL BE OUTLINED AS DESINED BY ARCHITECT DURING DESIGN DEVELOPMENT. OVERFLOW WILLUTILIZE PARAPET SCUPPERS.

DRAWING NOTES #

1. 1-1/4" GAS DOWN THRU ROOF IN TO CEILING SPACE OF FLOOR BELOW.

2. 1-1/4" GAS CONNECTION TO MAU-1. RE: GAS CONNECTION DETAIL 11/P-530.

A

B

C

ENVISIONMECHANICAL ENGINEERS INC.

9777 Pyramid Court, Suite 120Englewood, CO 80112Tel- 303-688-0223Fax- 303-688-3584envisionengrs.comProject #

CONSULTANT:

ISSUE:

OWNER:

PROJECT:

DRAWING INFORMATION:

DRAWN BY:

PROJECT NO:

SHEET TITLE:

APPROVED BY:

CHECKED BY:

SHEET OF

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.hcm2.com

1331 Nineteenth StreetDenver, CO. 80202

hord|coplan|macht

015-078

5/2

4/2

016 9

:46:2

9 P

M

C:\U

sers

\pfo

x.E

NV

ISIO

N.0

00\D

ocum

ents

\015-0

78 -

JeffC

O K

-8 -

PLU

MB

ING

CE

NT

RA

L_pfo

x.r

vt

P-131A

PLUMBING ROOFPLAN - AREA A

Jefferson County SchoolDistrict

CANDELAS K-8

JKB

JAL

11576.000

JKB

19486 WEST 94th AVENUEARVADA, CO 80007

1829 DENVER WEST DRIVEGOLDEN, CO 80401

05/25/16 WORK PACKAGE # 2 ISSUE FORCONSTRUCTION

PROJECTNORTH

0 2' 4' 8' 16' 1/8" = 1'-0"A1ROOF PLUMBING PLAN - AREA A

05.25.2016

Page 11: CONNECTED GAS LOAD SCHEDULE GAS DIAGRAMpix.ghphipps.com/projects/2015/15.0770/ProjDocs/08 - ASIs, PRs... · coordinate piping system connection prior to installation. ... isometric

3

F

G

J

K

L

94.9 8

M

4

7

4" RD-11,571 SQ. FT.

6" RD-1 2,555 SQ. FT.

4" RD-1 2,138 SQ. FT.

6" RD-12,518 SQ. FT.

4" RD-1 2,224 SQ. FT.

6" RD-12,876 SQ. FT.

6" RD-16,587 SQ. FT.

FUTUREEXPANSION

RE:MATCHLINE

MATCHLINE

P-131A

RE:MATCHLINE

MATCHLINE

P-131A

RE:MATCHLINE

MATCHLINE

P-131C

RE:

MATCHLINE

MATCHLINE

P-131C

4" OD-1 2,138 SQ. FT.

6" OD-12,518 SQ. FT.

4" OD-1 2,224 SQ. FT.6" OD-1

2,555 SQ. FT.

6" OD-12,876 SQ. FT.

4" OD-11,571 SQ. FT.

6" OD-16,587 SQ. FT.

3" VTR.

6" RD-12,538 SQ. FT.

6" OD-12,538 SQ. FT.

3" RD-22,500 SQ. FT.

3" OD-22,500 SQ. FT.

GENERAL NOTES1. VENT PIPE ROUTING TO BE OUTLINED DURING DESIGN DEVELOPMENT TO MAINTAIN CLEARANCES TO OUTSIDE

AIR.

2. ROOF DRAIN WILL BE OUTLINED AS DESINED BY ARCHITECT DURING DESIGN DEVELOPMENT. OVERFLOW WILLUTILIZE PARAPET SCUPPERS.

DRAWING NOTES #

1. 1-1/4" GAS DOWN THRU ROOF IN TO CEILING SPACE OF FLOOR BELOW.

2. 1-1/4" GAS CONNECTION TO MAU-1. RE: GAS CONNECTION DETAIL 11/P-530.

A

B

C

ENVISIONMECHANICAL ENGINEERS INC.

9777 Pyramid Court, Suite 120Englewood, CO 80112Tel- 303-688-0223Fax- 303-688-3584envisionengrs.comProject #

CONSULTANT:

ISSUE:

OWNER:

PROJECT:

DRAWING INFORMATION:

DRAWN BY:

PROJECT NO:

SHEET TITLE:

APPROVED BY:

CHECKED BY:

SHEET OF

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.hcm2.com

1331 Nineteenth StreetDenver, CO. 80202

hord|coplan|macht

015-078

5/2

4/2

016 9

:46:3

2 P

M

C:\U

sers

\pfo

x.E

NV

ISIO

N.0

00\D

ocum

ents

\015-0

78 -

JeffC

O K

-8 -

PLU

MB

ING

CE

NT

RA

L_pfo

x.r

vt

P-131B

PLUMBING ROOFPLAN - AREA B

Jefferson County SchoolDistrict

CANDELAS K-8

JKB

JAL

11576.000

JKB

19486 WEST 94th AVENUEARVADA, CO 80007

1829 DENVER WEST DRIVEGOLDEN, CO 80401

05/25/16 WORK PACKAGE # 2 ISSUE FORCONSTRUCTION

1/8" = 1'-0"A1ROOF PLUMBING PLAN - AREA B

0

PROJECTNORTH

2' 4' 8' 16'

05.25.2016

Page 12: CONNECTED GAS LOAD SCHEDULE GAS DIAGRAMpix.ghphipps.com/projects/2015/15.0770/ProjDocs/08 - ASIs, PRs... · coordinate piping system connection prior to installation. ... isometric

31

N

M

P

Q

4 7

6" RD-1 3,446 SQ. FT.

4" RD-1 2,012 SQ. FT.

8" RD-1 10,462 SQ. FT.

FUTUREEXPANSION

RE:MATCHLINE

MATCHLINE

P-131B

RE:

MATCHLINE

MATCHLINE

P-131B

4" RD-1 2,012 SQ. FT.

G

4" OD-1 2,012 SQ. FT.

4" OD-1 2,012 SQ. FT.

8" OD-1 10,462 SQ. FT.

6" OD-1 3,446 SQ. FT.

3" VTRW/ VC-1

3" VTRW/ VC-1

3" VTRW/ VC-1

3" VTRW/ VC-1

8" RD-1 374 SQ. FT.

3" OD-1 374 SQ. FT.

3" VTRW/ VC-1

3" VTRW/ VC-1

3" VTRW/ VC-1

RTU-6

RTU-8

RTU-7

KEF-1

DEF-1

EF-14

EF-15

1

2

GENERAL NOTES1. VENT PIPE ROUTING TO BE OUTLINED DURING DESIGN DEVELOPMENT TO MAINTAIN CLEARANCES TO OUTSIDE

AIR.

2. ROOF DRAIN WILL BE OUTLINED AS DESINED BY ARCHITECT DURING DESIGN DEVELOPMENT. OVERFLOW WILLUTILIZE PARAPET SCUPPERS.

DRAWING NOTES #

1. 1-1/4" GAS DOWN THRU ROOF IN TO CEILING SPACE OF FLOOR BELOW.

2. 1-1/4" GAS CONNECTION TO MAU-1. RE: GAS CONNECTION DETAIL 11/P-530.

A

B

C

ENVISIONMECHANICAL ENGINEERS INC.

9777 Pyramid Court, Suite 120Englewood, CO 80112Tel- 303-688-0223Fax- 303-688-3584envisionengrs.comProject #

CONSULTANT:

ISSUE:

OWNER:

PROJECT:

DRAWING INFORMATION:

DRAWN BY:

PROJECT NO:

SHEET TITLE:

APPROVED BY:

CHECKED BY:

SHEET OF

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.hcm2.com

1331 Nineteenth StreetDenver, CO. 80202

hord|coplan|macht

015-078

5/2

4/2

016 9

:46:3

4 P

M

C:\U

sers

\pfo

x.E

NV

ISIO

N.0

00\D

ocum

ents

\015-0

78 -

JeffC

O K

-8 -

PLU

MB

ING

CE

NT

RA

L_pfo

x.r

vt

P-131C

PLUMBING ROOFPLAN - AREA C

Jefferson County SchoolDistrict

CANDELAS K-8

JKB

JAL

11576.000

JKB

19486 WEST 94th AVENUEARVADA, CO 80007

1829 DENVER WEST DRIVEGOLDEN, CO 80401

05/25/16 WORK PACKAGE # 2 ISSUE FORCONSTRUCTION

PROJECTNORTH

0 2' 4' 8' 16' 1/8" = 1'-0"A1ROOF PLUMBING PLAN - AREA C

05.25.2016

Page 13: CONNECTED GAS LOAD SCHEDULE GAS DIAGRAMpix.ghphipps.com/projects/2015/15.0770/ProjDocs/08 - ASIs, PRs... · coordinate piping system connection prior to installation. ... isometric

L-1 W/TMV-2

UR-2

UR-1

WC-1

WC-2

L-2 W/TMV-2

WC-2L-2 W/TMV-2

2"FD-1

2"FD-1W/ TG-1

H

J

3/4"

3/4"

3/4"

2"

2"

2"

2"

1 1/2"

3/4"

3/4"

3/4"

3/4"

T.

125

T.

126

H

J

L-1 W/TMV-2

S-1 W/TMV-2

MSB-1

WC-2

WC-1

WC-1

WC-1

2"FD-1W/ TG-1

L-1 W/TMV-2

L-2 W/TMV-2

F

G

3/4"

1"

2"

1"3/4"

1"

2"

3/4"

1/2"

3/4"

1"

1 1/2"

2"

4"

J.

115

T.

116

F

G

BUILDING WATERHEATING SYSTEMGWH-1

KITCHEN WATERHEATING SYSTEMGWH-2

Q

2

Q

3"FS-3

3"FS-3

4"FCO-14"

MECH.

141B

3"FS-2

2"FS-2

2"FS-2

4"FCO-1

B-3

B-2

B-1

CWP-2 CWP-1

HWP-1HWP-2

PUMPSRE: HVAC

BOILERSRE: HVAC

6

B-3

B-2

B-1

G

G

8

7

7

7

23

DET-24

6

P-530

15

P-530

1

P-531

GPR-2, VENTTO EXTERIOR

4

P-531

GPR-1, VENTTO EXTERIOR

4

P-531

5

MASTERMIXING VALVE

TMV-1

12

P-530

4"

9

11 10

G

3/4"3/4"

1/2"

G

G

2" PLUGGED BYPASSVALVE, COORDINATEWITH XCEL

2

Q

1

4"

3"

6"FS-1

6"FS-1WATER ENTRY

141E

1

4"

3"

3"BFP-1

FIRE SERVICEENTRY, RE: FP-111

4" METERED CW ENTRY

3" MASTER IRRIGATIONVALVE BY IRR.

3" BFP-2 (IRRIGATION)

3" IR DOWN TOBELOW SLAB

3" V. FROM BELOWFLOOR, UP TO 3" VTR

3" BFP-1 (DOMESTIC)

4" CW UP, OFFSET ATSTRUCTURE TODISTRIBUTION SYSTEM

2"

2"

2"

2"

WC-3

WC-3

L-1 W/TMV-2

L-1 W/TMV-2

2" FD-1W/ TG-1

2" FD-1W/ TG-1

S-1

T.

110A

T.

111A

PRE-K

110

D1 1/2"

3/4"

3/4"

1 1/2"

3/4"

3/4" 2"

3/4"

3/4"

3/4"

1"

1" 1/2"

GENERAL NOTES1. ISOLATION VALVES WILL BE SPECIFIED AT ALL MAIN/SUBMAIN TAKE-OFFS AND BRANCH CONNECTIONS.

2. VENT PIPE ROUTING TO BE OUTLINED DURING DESIGN DEVELOPMENT TO MAINTAIN CLEARANCES TO OUTSIDEAIR.

3. DOMESTIC WATER DISTRIBUTION TO BE ROUTED ABOVE CEILING. THE WATER PIPING WILL BE ROUTED UP TOFIXURES ON THE SECOND FLOOR ABOVE AND DOWN TO FIXTURES ON THE FIRST FLOOR.

3

2" FD-1W/ TG-1

2" FD-1W/ TG-1

2" FD-1W/ TG-1

WC-2

WC-4

WC-4

L-2 W/TMV-2

L-2 W/TMV-2

L-2 W/TMV-2

S-1 W/TMV-2

WORK ROOM

101L

CLINIC T.

101C

IDF

101F

T.

101D

T.

101E

3

C

2"

2"

2"

2"

2"1"

3/4"

2" FD-1W/ TG-1

2" FD-1W/ TG-1

WC-4

WC-4L-2 W/TMV-2

L-2 W/TMV-2

S-1 W/TMV-2

T.

103A

T.

104A

FLEX

104

C

WC-2WC-2

WC-1WC-1

WC-1WC-1

WC-1

WC-1

L-2 W/TMV-2

L-1 W/TMV-2

L-1 W/TMV-2

L-1 W/TMV-2

L-1 W/TMV-2

L-2 W/TMV-2

L-1 W/TMV-2

L-1 W/TMV-2

L-1 W/TMV-2

L-1 W/TMV-2

UR-2

UR-1

2"FD-1W/ TG-1

EWC-1

K

L

4

2"

2 1/2"

3/4"1"

3/4"

3/4"

1/2"

3/4"

1"

1 1/2"

1"2"

2"2"

2"2"

3/4"

1/2"

3/4"

1"

1 1/2"

1"

1 1/2"

3/4"

1"

1/2"

3/4"

4"

4"

4" 2"FD-1W/ TG-1

2"FD-1W/ TG-1

2"FD-1W/ TG-1

2"

2"

T.

128

T.

129

2

P-530

K

L

4

DRAWING NOTES #

1. 2"HWC, 2-1/2"HW, 4"CW & 1-1/4"MG TO KITCHEN AND 2-1/2"G TO COOKLINE AND SCIENCEDISTRIBUTION.

2. 1-1/2" 140° HW & 140° HWC TO KITCHEN.

3. 1" 140° HWC DROP AND CONNECT TO CP-2.

4. 1-1/2" 140° HW AND 1-1/2" CW TO GWH-2.

5. 1"G DROP AND CONNECT TO GWH-1 WITH GAS VALVE AND UNION.

6. 3" VERTICAL DRY VENT FROM BELOW, PROVIDE CLEANOUT PLUG AND RISE TO 3" VTR.

7. 1-1/2"MG CONNECT TO BOILER WITH GAS VALVE.

8. 4"MG RISE TO STRUCTURE ABOVE.

9. CORE DRILL AND PROVIDE SEAL AT WALL PENETRATION.

10. GAS SERVICE, METER, SERVICE REGULATOR AND VALVING BY XCEL.

11. GAS METER BY XCEL, SEE TOTAL CONNECTED GAS LOAD.

ENVISIONMECHANICAL ENGINEERS INC.

9777 Pyramid Court, Suite 120Englewood, CO 80112Tel- 303-688-0223Fax- 303-688-3584envisionengrs.comProject #

CONSULTANT:

ISSUE:

OWNER:

PROJECT:

DRAWING INFORMATION:

DRAWN BY:

PROJECT NO:

SHEET TITLE:

APPROVED BY:

CHECKED BY:

SHEET OF

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.hcm2.com

1331 Nineteenth StreetDenver, CO. 80202

hord|coplan|macht

015-078

5/2

4/2

016 9

:46:4

1 P

M

C:\U

sers

\pfo

x.E

NV

ISIO

N.0

00\D

ocum

ents

\015-0

78 -

JeffC

O K

-8 -

PLU

MB

ING

CE

NT

RA

L_pfo

x.r

vt

P-410

ENLARGED PLUMBINGGROUPS

Jefferson County SchoolDistrict

CANDELAS K-8

JKB

JAL

11576.000

JKB

19486 WEST 94th AVENUEARVADA, CO 80007

1829 DENVER WEST DRIVEGOLDEN, CO 80401

05/25/16 WORK PACKAGE # 2 ISSUE FORCONSTRUCTION

1/4" = 1'-0"D1First Floor - Area B - T. - 125

1/4" = 1'-0"B1First Floor - Area B - T. - 116

1/4" = 1'-0"B3First Floor - Area C - Mechanical Room - 141B

1/4" = 1'-0"A1First Floor - Area C - Water Entry - 141E

1/4" = 1'-0"A2First Floor Area A - T. - 110A and 111A

1/4" = 1'-0"B2First Floor - Area A - Callout Clinic - 101C

1/4" = 1'-0"A4First Floor - Area A - T. - 103A and 104A

1/4" = 1'-0"D2First Floor - Area B - T. - 128 and 130

PROJECTNORTH

0 1' 2' 4' 8'

PROJECTNORTH

0 1' 2' 4' 8'

PROJECTNORTH

0 1' 2' 4' 8'

PROJECTNORTH

0 1' 2' 4' 8'

PROJECTNORTH

0 1' 2' 4' 8'

PROJECTNORTH

0 1' 2' 4' 8'

PROJECTNORTH

0 1' 2' 4' 8'

PROJECTNORTH

0 1' 2' 4' 8'

NATURAL GAS PIPING SIZED AS MG 2.0 PSIG FOR 600' WITH A TOTAL LOAD OF 11,259 CFHLOW PRESSURE SYSTEM SIZED FOR 6" WC FOR 600' WITH A LOAD OF 1260 CFH (KITCHEN1200 CFH 100' FROM METER)SCIENCE LOAD 60 CFH AT 600 FEET FROM METER

05.25.2016

Page 14: CONNECTED GAS LOAD SCHEDULE GAS DIAGRAMpix.ghphipps.com/projects/2015/15.0770/ProjDocs/08 - ASIs, PRs... · coordinate piping system connection prior to installation. ... isometric

D

E

EWC-2

L-2 W/TMV-2

L-1 W/TMV-2

UR-2

WC-1

WC-2 WC-2

WC-1

WC-1

HB-1HB-1

WCO-1

WCO-1

L-1 W/TMV-2

L-2 W/TMV-2

L-1 W/TMV-2

L-1 W/TMV-2

CIRC.

200A

T.

212

T.

213

FD-1 W/TG-1

FD-1 W/TG-1

2"

D

E

H

J

H

J

EWC-1

L-1 W/TMV-2

L-2 W/TMV-2

UR-2

UR-1

WC-1

WC-1

WC-2

HB-1

WCO-1

L-1 W/TMV-2

L-1 W/TMV-2

L-1 W/TMV-2

CIRC.

200A

T.

225

FD-1 W/TG-1

H

J

S-1 W/ TMV-2

F

G

F

G

WC-2

WC-1

WC-1

WC-1

WC-1

L-1 W/TMV-2

L-1 W/TMV-2

L-1 W/TMV-2

L-1 W/TMV-2

L-2 W/TMV-2

T.

216

F

G

33

WC-2

L-2 W/TMV-2

J.

239

T.

2382" FD-1W/ TG-1

3

1 10

6 7

4 5

MSB-1

WC-3L-1 W/TMV-2

FD-1 W/TG-13/4"

S-1

WC-3FD-1 W/TG-1

EWC-1

2"1"

3/4"

1 1/2"

2"2"

1"

2"

1"

2"

2"

1 1/2"

2"

3/4"

L-1 W/TMV-2

T.

106A

T.

105A

CIRC.

100B

DD

WC-3

WC-3L-1 W/TMV-2

FD-1 W/TG-1

FD-1 W/TG-1

WCO-1

WCO-1

WCO-1

2"

3/4"3/4"1 1/2"

1/2"1/2"

3/4"3/4"

2"

WCO-1

2"

1"

2"

DD

L-1 W/TMV-2

T.

108A

T.

107A

ST.

107B

S-1 W/TMV-2

DD

33

WC-2

L-2 W/TMV-22" FD-1

W/ TG-1

WCO-1

WCO-1

T.

247

3

MSB-16 7

1 10 4 5

3

DRAWING NOTES #

1. 1" CW UP TO WATER CLOSET FROM BELOW.

2. 2" VENT RISE TO 3" VTR.

3. 2" VENT RISE FROM FLOOR DRAIN.

4. 2" VENT RISE FROM LAV.

5. 1/2" CW & HW UP TO LAV FROM BELOW.

6. 2" VENT RISE FROM MOP BASIN.

7. 1/2" CW & HW UP TO MOP BASIN FROM BELOW.

8. 3/4" CW TO URINAL UP FROM BELOW.

9. 2" VENT RISE UP FROM URINAL.

10. 2" VENT RISE UP FROM WATER CLOSET.

11. 3/4" CW TO HOSE BIB UP FROM BELOW.

12. 2" VENT RISE UP FROM WATERCOOLER.

13. 1/2" CW TO WATER COOLER FROM BELOW.

ENVISIONMECHANICAL ENGINEERS INC.

9777 Pyramid Court, Suite 120Englewood, CO 80112Tel- 303-688-0223Fax- 303-688-3584envisionengrs.comProject #

CONSULTANT:

ISSUE:

OWNER:

PROJECT:

DRAWING INFORMATION:

DRAWN BY:

PROJECT NO:

SHEET TITLE:

APPROVED BY:

CHECKED BY:

SHEET OF

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.hcm2.com

1331 Nineteenth StreetDenver, CO. 80202

hord|coplan|macht

015-078

5/2

4/2

016 9

:46:4

8 P

M

C:\U

sers

\pfo

x.E

NV

ISIO

N.0

00\D

ocum

ents

\015-0

78 -

JeffC

O K

-8 -

PLU

MB

ING

CE

NT

RA

L_pfo

x.r

vt

P-411

ENLARGED PLUMBINGGROUPS CONTINUED

Jefferson County SchoolDistrict

CANDELAS K-8

JKB

JAL

11576.000

JKB

19486 WEST 94th AVENUEARVADA, CO 80007

1829 DENVER WEST DRIVEGOLDEN, CO 80401

05/25/16 WORK PACKAGE # 2 ISSUE FORCONSTRUCTION

1/4" = 1'-0"D1Second Floor - Area A - T. - 212 and 213

1/4" = 1'-0"D2Second Floor - Area B - T. - 225

1/4" = 1'-0"D4Second Floor - Area B - T. - 216

1/4" = 1'-0"B1Second Floor - Area B - T. and J. - 238 and 237

PROJECTNORTH

0 1' 2' 4' 8'

1/4" = 1'-0"B2First Floor - Area A - T. - 105A and 106A

1/4" = 1'-0"B4First Floor - Area A - T. - 107A and 108A

1/4" = 1'-0"A1Second Floor - Area A - T. - 245

PROJECTNORTH

0 1' 2' 4' 8'

PROJECTNORTH

0 1' 2' 4' 8'

PROJECTNORTH

0 1' 2' 4' 8'

PROJECTNORTH

0 1' 2' 4' 8'

PROJECTNORTH

0 1' 2' 4' 8'

PROJECTNORTH

0 1' 2' 4' 8'

05.25.2016

Page 15: CONNECTED GAS LOAD SCHEDULE GAS DIAGRAMpix.ghphipps.com/projects/2015/15.0770/ProjDocs/08 - ASIs, PRs... · coordinate piping system connection prior to installation. ... isometric

#

REMARKS:

1. P.C. TO EXTEND IW FROM EVAPORATOR COILS TO FLOOR SINK.

2. P.C. TO EXTEND IW FROM SINK TO NEAREST FLOOR SINK.

3. P.C. TO EXTEND IW FROM KETTLE TROUGH TO FLOOR SINK. P.C. TO TEE HW AND CW TO KETTLE FAUCET. TEE CW TO COND. FEED AND BOILER FEED.

4. P.C. TO TEE WATER TO (2) FAUCETS.

5. P.C. TO EXTEND IW FROM BOOSTER HEATER TO NEAREST FLOOR SINK P.C. TO INTERCONNECT HW FROM BOOSTER HEATER TO DISH MACHINE.

6. P.C. TO EXTEND IW TO NEAREST FLOOR SINK.

7. P.C. TO TEE HW TO PRE-RINSE, TEE CW TO PRE-RINSE, DISPOSER AND TO SOILED DISH TABLE TROUGH NOZZLES.

8. P.C. TO EXTEND IW FROM STEAMER TO NEAREST FLOOR SINK P.C. TO TEE CW TO (2) STEAMER CONNECTIONS.

9. P.C. TO CONNECT 2"SAN AND 2" VENT TO DISPOSER.

10. P.C. TO PROVIDE WB-1 FOR WASHER/DRYER FOR HW, CW, SAN, AND VENT CONNECTIONS.

11. P.C. TO CONNECT HW,CW TO MOP SINK FAUCET AS SCHEDULED ON P600.

4

5

6

WASTEIN

VENTIN

HOTIN

COLDIN

INDIRECTWASTE IN

GASIN

KITCHEN EQUIPMENT ROUGH-IN SCHEDULE

DESCRIPTION REMARKS

STEAMER, 6 PAN

10 GALLON TILT KETTLE

CONVECTION OVENS, DOUBLE STACK

8- - - 1/2 2 -

3- - 1/2 1/2 - -

-- - - - - 3/4

12 HAND SINK -2 2 1/2 1/2 - -

17 VEGETABLE PREP SINK 2- - 1/2 1/2 2 -

24 HOT FOOD TABLE 6- - 1/2 - 1 -

33 WALK IN FREEZER 1- - - - 1 -

36 WALK IN COOLER 1- - - - 1 -

43 DISH TABLE 6- - - - 1 -

45 DISH MACHINE 5- - 3/4 - 2 -

51 DISPOSAL 92 2 - - - -

52 SPRAY RINSE 7- - 1/2 1/2 - -

54 3-COMPARTMENT SINK 2,4- - 1/2 1/2 2 -

57 WASHER/DRYER STACKED 102 2 1/2 1/2 2 -

60 MOP SINK 112 2 1/2 1/2 2 -

3084

Trash

Trash

Trash

2472

2472

2472

2472

2442

2472

2472

2472

2472

2460 2460

2472

2472

2442

2442

2472

3072

3072

3072

2460

3060

2448

2448

24362436

3048

1

P GG

G

GG

KITCHEN

141

DRY ST.

141F

KIT. ST./LOCKER

141A

OFFICE

141C

ELEC.

141D

FM. ST.

142

FM REC.

142A

1 1/4" 1 1/4"

G G

GG

FCO-1

1 1/4"

1 1/4"

G

G

3/4"

1/2"

1"

1"

WB-1

2"

3/4"1 1/2"1"3/4"

7

X

14

11

12 10

3/4"

3/4"

1"

1 1/4"

1 1/4"

2 1/2"

2"

1

2

WH-1

39

137

FS-X

3/4"

1 1/4"

1 1/2"

4"

2 1/2"2"

3/4"

4"

4"

1"

3/4"

1"

2"

2 1/2"

4"

2"

7

7

6

D

D

5

4

7

8

8

1/2"

1

2

P

N

WC-2

2"FD-1W/ TG-1

L-2 W/TMV-2

L-2 W/TMV-2

2"FD-1W/ TG-1

MSB-1

JANITOR

136E.2

LOCKER ROOM

136E

2"

2 1/2"

4" 1"

2"

2"

1 1/2"

3/4"3/4"

3/4"

1/2"

3/4"

2" 3/4"

1"

2"

1 1/4"

3/4"

N

21

18

19

15

15

20

P

SH-1

WC-2

WC-2

2"FD-1W/ TG-1

2"FD-1W/ TG-1

L-2 W/TMV-2

L-2 W/TMV-2

2"FD-1W/ TG-1

WC-2

MSB-1

L-2 W/TMV-2

L-2 W/TMV-2

2"FD-1W/ TG-1

4"FCO-1

SHOWER

136D.1

FM T. / LR

140B.1

FM T. / LR

140B.1

TABLE STOR.

140A

FM. OFFICE

140B

LOCKER ROOM

136C2"

3/4"3/4"

3/4"

3/4"

3/4"3/4"

1 1/2"

1"

2"

2" 2"

4"

2 1/2"

2"

3/4"

1"

2"

2"2"

P815

3

15

15

16

17

18

19

1516

11

19

18

20

1920

11

21

21

GENERAL NOTES1. ISOLATION VALVES WILL BE SPECIFIED AT ALL MAIN/SUBMAIN TAKE-OFFS AND BRANCH CONNECTIONS.

2. VENT PIPE ROUTING TO BE OUTLINED DURING DESIGN DEVELOPMENT TO MAINTAIN CLEARANCES TO OUTSIDEAIR.

3. DOMESTIC WATER DISTRIBUTION TO BE ROUTED ABOVE CEILING. THE WATER PIPING WILL BE ROUTED UP TOFIXURES ON THE SECOND FLOOR ABOVE AND DOWN TO FIXTURES ON THE FIRST FLOOR.

DRAWING NOTES #

1. 4" CW, 2-1/2" HW, AND 2" HWC ROUTED ABOVE CEILING TO COMMONS AREA. SEE SHEET P-111C FORCONTINUATION.

2. 1-1/2" GAS LINE ROUTED ABOVE CEILING TO COMMONS AREA. SEE SHEET P111C FOR CONTINUATION.

3. 3/4" CW DROP IN WALL TO WH-1.

4. 4" CW FROM WATER SERVICE ENTRY ROOM. SEE SHEET P-111C FOR CONTINUATION.

5. HEAT TRACE CONDENSATE IN FREEZER COORDINATE WITH KE CONSULTANT.

6. 1-1/4" GAS (14" W.C.) UP TO MAKE-UP AIR UNIT ON ROOF. SEE SHEET P-131C FOR CONTINUATION.

7. 1/2" CW & HW RUN DOWN IN WALL TO HAND SINK IN KITCHEN.

8. 2" VENT RISE INTO STRUCTURE AND TRANSITION TO A 3" VTR IN STRUCTURE SPACE.

9. 1/2 CW& HW DOWN IN WALL TO SERVE SCULLERY HAND SPRAYER.

10. 1/2 CW & HW DOWN IN WALL TO SERVE HAND SPRAYER.

11. 2" VENT RISE IN WALL TO ABOVE CEILING.

12. 1/2" HW DOWN IN WALL TO SERVE DISH TABLE.

13. 2" SANITARY FROM FLOOR SINK. SEE P-110C FOR CONTINUATION.

14. 3" SANITARY UP FROM BELOW TO WALL CLEAN-OUT.

15. 2" VENT, 1/2" CW & HW TO LAV.

16. 3/4" HWC DOWN IN WALL & CONNECT TO HW WITHIN 2'-0" OF THE LAV.

17. 2" VENT, 1/2" CW & HW TO SHOWER.

18. PROVIDE WATER HAMMER ARRESTOR WHA-1 WITH ACCESS PANEL.

19. 2" VENT & 1" CW TO WATER CLOSET.

20. 2" VENT, 1/2" CW & HW TO MOP BASIN.

21. CIRCUIT SETTER, BALANCE TO 0.5 GPM.

ENVISIONMECHANICAL ENGINEERS INC.

9777 Pyramid Court, Suite 120Englewood, CO 80112Tel- 303-688-0223Fax- 303-688-3584envisionengrs.comProject #

CONSULTANT:

ISSUE:

OWNER:

PROJECT:

DRAWING INFORMATION:

DRAWN BY:

PROJECT NO:

SHEET TITLE:

APPROVED BY:

CHECKED BY:

SHEET OF

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.hcm2.com

1331 Nineteenth StreetDenver, CO. 80202

hord|coplan|macht

015-078

5/2

4/2

016 9

:46:5

2 P

M

C:\U

sers

\pfo

x.E

NV

ISIO

N.0

00\D

ocum

ents

\015-0

78 -

JeffC

O K

-8 -

PLU

MB

ING

CE

NT

RA

L_pfo

x.r

vt

P-412

ENLARGED PLUMBINGGROUPS CONTINUED

Jefferson County SchoolDistrict

CANDELAS K-8

JKB

JJR

11576.000

JKB

19486 WEST 94th AVENUEARVADA, CO 80007

1829 DENVER WEST DRIVEGOLDEN, CO 80401

05/25/16 WORK PACKAGE # 2 ISSUE FORCONSTRUCTION

1/4" = 1'-0"C1First Floor - Area C - Kitchen - 141

PROJECTNORTH

0 1' 2' 4' 8'

1/4" = 1'-0"D4First Floor - Area C - North Locker Room - 136E

PROJECTNORTH

0 1' 2' 4' 8'

1/4" = 1'-0"C4First Floor - Area C - South Locker Room - 136C

PROJECTNORTH

0 1' 2' 4' 8'

05.25.2016

Page 16: CONNECTED GAS LOAD SCHEDULE GAS DIAGRAMpix.ghphipps.com/projects/2015/15.0770/ProjDocs/08 - ASIs, PRs... · coordinate piping system connection prior to installation. ... isometric

2"2"

2"

2"

2"

2"

2"

2"

2"

2"

4"2"

2"

4"

2"

4"

2" 4"

FD-1

FD-1

WC-1

WC-1

S-1

L-1

S-1

WCO-1

2"

2"

2"2"

2"

4"

4"

2"

2"

4"

4"

2"

2"

4"

FD-1

WC-1

L-1WCO-1

WCO-1

FD-1

WC-1

2"

2"

2"

2"

2"

2"

2"

4"

2"4"

4"

2"

2"

2"

4"

2"

2"

2"

4"

4"

4"

4"

4"

2"

4"

2"

2"

2"

2"2"

2"

2"

4"

2"

ENVISIONMECHANICAL ENGINEERS INC.

9777 Pyramid Court, Suite 120Englewood, CO 80112Tel- 303-688-0223Fax- 303-688-3584envisionengrs.comProject #

CONSULTANT:

ISSUE:

OWNER:

PROJECT:

DRAWING INFORMATION:

DRAWN BY:

PROJECT NO:

SHEET TITLE:

APPROVED BY:

CHECKED BY:

SHEET OF

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.hcm2.com

1331 Nineteenth StreetDenver, CO. 80202

hord|coplan|macht

015-078

5/2

4/2

016 9

:46:5

3 P

M

C:\U

sers

\pfo

x.E

NV

ISIO

N.0

00\D

ocum

ents

\015-0

78 -

JeffC

O K

-8 -

PLU

MB

ING

CE

NT

RA

L_pfo

x.r

vt

P-510

PLUMBINGISOMETRICS

Jefferson County SchoolDistrict

CANDELAS K-8

JKB

JAL

11576.000

JKB

19486 WEST 94th AVENUEARVADA, CO 80007

1829 DENVER WEST DRIVEGOLDEN, CO 80401

05/25/16 WORK PACKAGE # 2 ISSUE FORCONSTRUCTION

NTS1

ISOMETRIC - TOILET 105A & 106ANTS

2ISOMETRIC - TOILET 107A & 108A

NTS3

ISOMETRIC - TOILET 103A & 104ANTS

4ISOMETRIC - TOILET 110A & 111A

05.25.2016

Page 17: CONNECTED GAS LOAD SCHEDULE GAS DIAGRAMpix.ghphipps.com/projects/2015/15.0770/ProjDocs/08 - ASIs, PRs... · coordinate piping system connection prior to installation. ... isometric

S

INTERCEPTOR NOTES

12"

DIELECTRIC UNION (TYP.)

G

2"

RELIEF VALVE, PIPE

DISCHARGE TO FLOOR SINK

GWH-1

THERMOMETER

1"HW, SEE PLAN

FLUE, SEE HVAC

DRAWINGS

1-1/2"CW, 3/4"HWC SEE

PLAN

1-1/2"

3/4"

CP-1

CHECK VALVE IN HORIZONTAL

BALL VALVE (TYP.)

1"

DET-1

CONCRETE HOUSEKEEPING

PAD, SEE ARCH.FINISHED FLOOR

6" LONG DRIP LEG

DRAIN VALVE

UNION

MANUAL GAS VALVE

SWAY BRACING SWAY BRACING

NOTE: PROVIDE FOR PIPING

2-1/2" AND SMALLER WHERE

APPLICABLE

WASHER & DOUBLE HEX

NUTS

UNI-STRUT TYPE CHANNEL

20 GA. GALV. SHIELD 12"

LONG

RIGID 360°INSULATION

INSERT

VAPOR BARRIER

PIPE CLAMP

1/2"Ø HANGER ROD

1/2" INLET CONNECTION

3/8" OUTLET CONNECTION

1/4 TURN STOP VALVE

INTEGRAL WATER HAMMER

ARRESTORMETAL BOX FASTEN TO

STUDS OR WALL

PRIMARY CHAMBER

4"EXTEND TO GCO-1

GRADE ADJUSTMENT RINGS

AS REQUIRED

6" THICK REINFORCED PRECAST

CONCRETE TOP W/ LIFT RINGS

SEALANT AT ALL JOINTS

4" OUTLET, SEE PLAN

GASKET AT ALL PIPE

PENETRATIONS

SECONDARY CHAMBER

BAFFLE WALL WITH

BAFFLE FITTINGS

STATIC WATER LEVEL

4" INLET, SEE PLAN

4" OPEN ENDED PIPE

SECTIONS (TYP.)

24"Ø GAS TIGHT RING AND

COVER (TYP. OF 2)

3"V TO BUILDING, SEE PLAN

ALL PIPING INDICATED SHALL BE 4" CAST IRON UNLESS SPECIFICALLY NOTED OTHERWISE.

PIPING AND FITTINGS INSTALLED SHALL MEET THE REQUIREMENTS OF THE LATEST EDITION OF THE

INTERNATIONAL PLUMBING CODE.

INLET AND OUTLET BAFFLE FITTINGS SHALL EXTEND A MINIMUM OF 4" ABOVE THE STATIC WATER

LEVEL AND TO WITHIN 12" OF THE FLOOR.

SECONDARY CHAMBER VOLUME SHALL BE EQUAL TO 13 TOTAL CAPACITY.

TANK SHALL MEET ASTM C-913-79 SPECIFICATIONS FOR USE AS A WASTEWATER STRUCTURE, ALL

SEALANTS SHALL MEET FEDERAL SPECIFICATION SS-S-210A AND SHALL BE PROVIDED WITH THE

TANK.

TANK AND LID SHALL BE DESIGNED FOR H-20 TRAFFIC LOADING.

TOTAL TANK HOLDING CAPACITY SHALL BE 2500 GALLONS. COORDINATE EXACT DIMENSIONAL DATA

WITH EQUIPMENT SUPPLIER PRIOR TO INSTALLATION.

CLEANOUT COVER, SEE

PLUMBING EQUIPMENT

SCHEDULE

FINISHED GRADE

SEWER, RE: PLANS

CONCRETE RETAINING PAD

MIN. 6" THICK & EXTEND 4"

BEYOND CLEANOUT HOUSING

ALL AROUND

SEWER FROM BUILDING,

RE: PLANS

BEDDING

4" CAST IRON EXTENSION

(TYPICAL)

TWO-WAY CLEANOUT

P-TRAP

COUNTER

INSIDE CABINET

SINK (RE: SCHEDULE)

FINISHED FLOOR

THERMOSTATIC MIXING VALVE

W/ WALL BRAKET

HOT WATER SUPPLY

TEMPERED WATER SUPPLY

COLD WATER SUPPLY

COLD WATER SUPPLY

FAUCET (RE: SCHEDULE)

NOT TO SCALE

ROOFTOP GAS CONNECTION DETAIL

ICE MAKER BOX DETAIL

TRAPEZE HANGER DETAIL

VACUUM RELIEF

NOT TO SCALE

GREASE INTERCEPTOR DETAIL

GAS VALVE

1'-0" MINIMUM

GAS PIPE SUPPORT

STANDARD TYPE

6" DIRT LEG

ROOF LINE

UNION @ CONNECTION

FOR SLAB ON GRADE OR EXPOSED

APPLICATIONS P-TRAP

DRAINAGE PIPING, SEE PLAN

FOR SIZE AND CONTINUATION

EXISTING OR NEW CONCRETE

FINISHED FLOOR W/ NEW

TOPPING RE: ARCH

FLOOR SINK, SEE PLAN

FOR DESIGNATION

QUICK SET MORTAR RE: SPECIFICATIONS

CHIP CONCRETE AS REQUIRED FOR FLUSH

INSTALLATION

FINISHED FLOOR

MIXING VALVE WITHIN RECESSED

ENCLOSURE (EXCEPT IN BOILER

ROOM WHERE THE UNIT IS

EXPOSED)

CW AND HW SUPPLY

RE: PLANS

EW-1

P-TRAP

EXPOSED PIPING TO

FLOOR IN BOILER RM.

RE: ARCH FOR

MTD HEIGHT

EW-1

WASTE IN WALL RE:

PLANS

VENT IN WALL RE:

PLANS

6"

1-1/2" P-TRAP

SECURE TO CABINET BACK

1-1/2" WYE FITTING

DISHWASHER DRAIN TUBE, SECURE TO STANDPIPE

W/ HOSE CLAMP

PROVIDE GROMMET AT TUBE PENETRATION THRU

BASE CABINET

PROVIDE ESCUTCHEON AT WALL

PENETRATION

CONNECT TO 2"W AT SINK, SEE

PLAN

2"PD, SEE PLAN

MULTI-PIN CONNECTOR

JUNCTION BOX PROVIDED W/ MULTI-PIN

CONNECTOR & CORD IN LENGTHS AS

REQUIRED

OIL-MINDER POWER CABLE,

PROBE CABLE & FLOAT CABLE

GATE VALVE

COVER

SUMP PUMP

SUMP PIT CAST IN PLACE COOR. W. G.C.

CHECK VALVE

HIGH LIQUID ALARM FLOAT W/ CLAMP DEVICE TO

MOUNT TO PUMP DISCHARGE PIPING

FLOOR

MULTI-PIN CONNECTOR & CORD IN

CONDUIT LENGTHS AS REQUIRED

MULTI-PIN CONNECTOR

POWER

SUPPLY

ELECTRICAL

OUTLET

STANCOR OIL-MINDER 115V, 1Ø CONTROL SYSTEM W/ BUILT IN AUDIBLE AND VISUAL

ALARM WHEN PUMP DOESN'T RUN DUE TO OIL IN PIT, HIGH AMPERAGE OR HIGH

LIQUID CONDITION. PROVIDE SILENCING BUTTON FOR AUDIBLE ALARM BUILT INTO

PANEL. PANEL SHALL HAVE ADDITIONAL CONTACT FOR A REMOTE ALARM LOCATION.

3" BFP-1, EXTEND FUNNEL

DRAIN TO FLOOR SINK

IR

4" METERED CW SERVICE, SEEPLAN FOR CONTINUATION

EXTEND FUNNEL DRAIN TOFLOOR SINK SEE PLAN

4" MAIN BUILDING ISOLATIONVALVE, PROVIDE SIGN ON WALL

3" MASTER IRRIGATION CONTROLVALVE, FURNISHED BY IRRIGATIONCONTRACTOR, INSTALLED BY P.C.

REDUCE TO 3" CW.

3" IR DROP TO BELOW FLOOR,SEE PLAN FOR CONTINUATION.

FINISHED FLOOR

3/4" DRAIN VALVE

3" ISOLATION VALVE

SUPPORT VERTICALPIPING FROM WALL.

4" CW TO STRUCTUREAND EXTEND TO SYSTEM

3" IRRIGATION BACKFLOW

PREVENTION DEVICE BFP-2.

3" PRESSURE REDUCING VALVE PRV-1

1" PRESSURE REDUCING VALVE PRV-2

PRESSURE GAUGE (TYP)

2" BYPASS WITH BYPASS VALVE(NC)

STRUT FRAMING VERTICALSUPORT SYSTEM (TYP)

GRADE CLEANOUTNOT TO SCALE10

11

NOT TO SCALE7

NOT TO SCALE8

THERMOSTATIC MIXING VALVE DETAILNOT TO SCALE12

GAS FIRED WATER HEATER PIPING DIAGRAMNOT TO SCALE15

POINT OF USE NEUTRALIZATION TANK DETAILNOT TO SCALE5

FLOOR SINK DETAILNOT TO SCALE3

CABINET MIXING VALVE DETAILNOT TO SCALE2

ELEVATOR SUMP PUMP DETAILNOT TO SCALE4

CIRCULATION PUMP DETAILNOT TO SCALE6

CLEVIS HANGER DETAILNOT TO SCALE9

EWH-1 PIPING DETAILNOT TO SCALE13

DISHMACHINE STANDPIPE DETAILNOT TO SCALE14

REDUCE TO INLET

CONNECTION (TYP.)

THERMOSTAT

(TYP.)

THERMOSTAT

UNION

1-1/4" HW (140°)

3" HW (120°) TO SYSTEM

1-1/4" CW

INCREASER

3/4"HWC FROM FROM

CP-1TMV-1

CHECK VALVE

BALANCING VALVE W/

MEMORY STOP.

16

GCO-X

HANGER ROD

HEAVY DUTY CLEVIS HANGER

VAPOR BARRIER INSULATION, RE:SPEC

180° INSERT CALCIUM SILICATE INSULATION OF

SAME THICKNESS AS PIPE INSULATION

180° GALVANIZED SHEET STEEL

SADDLE MIN. 9" LONG, RE: SPEC.

NUT AND BOLT

SUPPORT NUT

LOCKING NUT

5 PIPEDIAMETER

MINIMUM

BALL VALVE

CHECK VALVE

UNION

NEOPRENE ISOLATED CLAMP

IN-LINE CIRCULATION PUMP,

SEE PLAN FOR DESIGNATION

UNI-STRUT MOUNTED ON WALL

UNION

BALL VALVE

3/4" HWC FROM SYSTEM

ACID NEUTRALIZATION TANK

(ANT), SEE PLAN FOR SPECIAL

DESIGNATION

THREADED CONNECTIONS

(TYP.)

1-1/2"AW

FINISHED FLOOR

BASE CABINET FLOOR

2"SAN & VENT WITHIN WALL

2"AW TO WALL W/

ESCUTCHEON

SERVICE CLEANOUT PLUG-IN LID

2"AV TO WALL W/ ESCUTCHEON

SINK, SEE PLANS

FOR DESIGNATION

WATER SERVICE DETAILNOT TO SCALE1

ANCHOR STRUT TO WALL

WALL WASHER & DOUBLE HEX NUTS

BACKING ASREQUIRED FORFRAMED WALL

VERTICAL PIPE MOUNTING DETAILNOT TO SCALE17

ENVISIONMECHANICAL ENGINEERS INC.

9777 Pyramid Court, Suite 120Englewood, CO 80112Tel- 303-688-0223Fax- 303-688-3584envisionengrs.comProject #

CONSULTANT:

ISSUE:

OWNER:

PROJECT:

DRAWING INFORMATION:

DRAWN BY:

PROJECT NO:

SHEET TITLE:

APPROVED BY:

CHECKED BY:

SHEET OF

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.hcm2.com

1331 Nineteenth StreetDenver, CO. 80202

hord|coplan|macht

015-078

5/2

4/2

016 9

:46:5

4 P

M

C:\U

sers

\pfo

x.E

NV

ISIO

N.0

00\D

ocum

ents

\015-0

78 -

JeffC

O K

-8 -

PLU

MB

ING

CE

NT

RA

L_pfo

x.r

vt

P-530

PLUMBING DETAILS

Jefferson County SchoolDistrict

CANDELAS K-8

JKB

JAL

11576.000

JKB

19486 WEST 94th AVENUEARVADA, CO 80007

1829 DENVER WEST DRIVEGOLDEN, CO 80401

05/25/16 WORK PACKAGE # 2 ISSUE FORCONSTRUCTION

05.25.2016

Page 18: CONNECTED GAS LOAD SCHEDULE GAS DIAGRAMpix.ghphipps.com/projects/2015/15.0770/ProjDocs/08 - ASIs, PRs... · coordinate piping system connection prior to installation. ... isometric

R

3

GAS VALVECONTROL ONOFFON

GAS VALVE CONTROLSTATION

GAS AND COMPRESSED AIR SHUT OFF PANELNOT TO SCALE2

POTTER-ROEMER FIG. #1812-FSSEMI-RECESSED CABINET W/ SOLIDMETAL DOOR & FIG. #1901 CAM CATCHLOCK. PROVIDE SPECIAL CABINETPUNCHING FOR GAS, COMPRESSED AIRAND ELECTRICAL CONDUIT. PROVIDEDECAL AS NOTED (MIN. 1" HIGH) W/CLEAR BACK- GROUND & BLACKLETTERING

TO SYSTEM,RE: PLAN

AUTOMATIC GASVALVEINSTALLED BYPC., RE:SPEC

POTTER-ROEMER FIG. #1812-CSEMI-RECESSED CABINET W/ SOLIDMETAL DOOR & FIG. #1901 CAMCATCH LOCK. PROVIDE SPECIALCABINET PUNCHING FOR GAS PIPINGSHOWN & ELEC. CONDUIT. PROVIDEDECAL AS NOTED (MIN. 1" HIGH) W/CLEAR BACK- GROUND & BLACKLETTERING' (TYP.)

WIRING FROMCONTROL PANELTO VALVE BY E.C.

WARRICK CONTROLS, INC.GAS VALVE CONTROLPANEL MODEL SA4006A

FROM POWERSOURCE, RE:ELEC

UNION(TYP.)

DIRT LEG(TYP.)

MANUAL GASCOCK (TYP.)

PROVIDE DECAL ON ACCESSDOOR READING: "AUTOMATIC GAS

VALVE SHUT-OFF VALVE" (TYP.)

GAS SUPPLY,RE: PLAN

GAS VALVE CONTROL PANELNOT TO SCALE

COMPRESSED AIR TO SYSTEM

NATURAL GAS TO SYSTEM

ISOLATION VALVE (TYPICAL)

COMPRESSED AIR FROM SYSTEM

NATURAL GAS FROM SYSTEM

GAS SOLENOID VALVE

MG

1 NOT TO SCALE

GAS FIRED WATER HEATER PIPING DETAIL

MAINTAIN A REGULATED 8.5" W.C. PRESSURE AT MAX. BTU/H INPUT

1-1/2"HWC, SEE PLAN AND CIRC. PUMP PIPING

DIAGRAM

RELIEF VENT EXTEND

FULL SIZE THROUGH

EXTERIOR WALL

1"MG, SEE PLAN

6"

2'-0"

FINISHED FLOOR

HOUSEKEEPING PAD, RE: ARCH

DRAIN VALVE

X" TO DET

2"CW, SEE PLAN

GWH-1

6" (TYP.)

2"HW, SEE PLAN

RELIEF VALVE

ROLLER SUPPORT

PLASTIC BASE

NOTE:

1. GAS PIPING SHALL BE A MINIMUM OF 7" ABOVE ROOF LINE.

2. GAS PIPE SUPPORT MIRO 3-RAH-7 SERIES.

ROOF

ROOFING FELT

ALL THREAD ROD

ADJUSTMENT NUTS

SPINDLE

GAS PIPING, SEE PLAN

GAS PIPE GUIDE DETAILNOT TO SCALE5

MEDIUM PRESSUREGAS, SEE PLAN FORCONT.

MANUAL GAS VALVE

SERVICE UNION

6" LONG DIRT LEG

NOTE: SEE PLAN FOR PIPE SIZES NOT INDICATED HERE.

GAS PRESSURE REGULATOR(GPR) SEE PLAN AND SCHEDULEFOR REQUIREMENTS

LOW PRESSURE GAS, SEEPLAN FOR CONTINUATION

INCREASER AS REQUIRED

PRESSURE GUAGE

(4) PIPE DIAMETERS

VENT TO ROOF FULL SIZEOF UNIT DISCHARGE W/GOOSENECK

GAS PRESSURE REGULATOR PIPING DETAILNOT TO SCALE4

ENVISIONMECHANICAL ENGINEERS INC.

9777 Pyramid Court, Suite 120Englewood, CO 80112Tel- 303-688-0223Fax- 303-688-3584envisionengrs.comProject #

CONSULTANT:

ISSUE:

OWNER:

PROJECT:

DRAWING INFORMATION:

DRAWN BY:

PROJECT NO:

SHEET TITLE:

APPROVED BY:

CHECKED BY:

SHEET OF

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.hcm2.com

1331 Nineteenth StreetDenver, CO. 80202

hord|coplan|macht

015-078

5/2

4/2

016 9

:46:5

4 P

M

C:\U

sers

\pfo

x.E

NV

ISIO

N.0

00\D

ocum

ents

\015-0

78 -

JeffC

O K

-8 -

PLU

MB

ING

CE

NT

RA

L_pfo

x.r

vt

P-531

PLUMBING DETAILS(CONT.)

Jefferson County SchoolDistrict

CANDELAS K-8

JKB

JJR

11576.000

JKB

19486 WEST 94th AVENUEARVADA, CO 80007

1829 DENVER WEST DRIVEGOLDEN, CO 80401

05/25/16 WORK PACKAGE # 2 ISSUE FORCONSTRUCTION

05.25.2016

Page 19: CONNECTED GAS LOAD SCHEDULE GAS DIAGRAMpix.ghphipps.com/projects/2015/15.0770/ProjDocs/08 - ASIs, PRs... · coordinate piping system connection prior to installation. ... isometric

DOMESTIC WATER PRESSURE REDUCING VALVE SCHEDULE

SYMBOL SERVES MANUF. MODEL NUMBERINLETSIZE

OUTLETSIZE

INLETPRESSURE

PSIG

OUTLETPRESSURE

PSIG

FALL-OFFPRESSURE

REMARKS

PRV-1 X X XX X" X" XX XX XX XX XX

SYMMONS S-6080

1,4

3/4"-- -- -- 3/4" 1S19-314BRADLEYCOMBO SHOWER EYEWASH

CSE-1

S-3SCIENCE SINK

FAUCETELKAY

CHICAGO 201AGN2BVBE7317LRAD3122

1-1/2" 2" 2" 1/2"1/2"

DRAIN STRAINER ELKAY LK-35

LK-35ELKAYDRAIN STRAINER

1,31/2" 1/2"2"2"1-1/2"LRAD-1919

100-GN2AE3-317CPCHICAGOELKAY

FAUCET1-COMPT. SINK

S-1

1,21/2"--2"2"1 1/4"0355.012

0700J.R. SMITH

AM. STD.

SUPPORT CARRIERFAUCET

WALL HUNG LAVATORYL-2

HWCWCWVWREMARKS

TRAP

ROUGH-IN CONNECTIONSMODEL NOMANUFACTURERTAG DESCRIPTION

PLUMBING FIXTURE SCHEDULE

8

L-1 1 1/4" 2" 2" -- 1/2" 2

--1"2"2"INT.TUE1LN12CP0637

6601.012

J.R. SMITHTOTO

AM. STD.

CARRIERFLUSH VALVEUR-1

WALL HUNG URINAL

S-42-COMPARTMENT SINK

FAUCETELKAY

CHICAGO SI-1 2" 2" 1/2"1/2" 5

1/2"1-1/4" 2" 2" -- 1EWC-1J.R. SMITH

ELKAY VRCGRNTL8C0830

SS8248LR640-L12E35-317YAB

1-117-FS-X-B30SH-1 SHOWER VALVE SYMMONS -- -- -- 1/2"1/2" 6

ELECTRIC WATER COOLERSUPPORT CARRIER

1/2" 1/2" -3" 3"FIAT

CHICAGOMSB-2424MOP SERVICE BASIN

MSB-1FAUCET

2"

BADGER 5ISEDISPOSER

1,31/2" 1/2"2"2"1-1/2"LRAD-3122

100-GN2AE3-317CPCHICAGOELKAY

FAUCET1-COMPT. SINK

S-2

1,8--1"2"2"INT.TUE1LN12CP6541.132

TOTOAM. STD.

CARRIERFLUSH VALVEUR-2

WALL HUNG URINAL

WALL. MTD. WATER CLOSET TOTO CT708EWC-1 FLUSH VALVE

SEATINT. 2"4" --1"TOTO TET1LN32#CP 9

WALL. MTD. WATER CLOSET TOTO CT708EWC-2 FLUSH VALVE

SEATINT. 2"4" --1"TOTO TET1LN32#CP 1,9

2"FLUSH VALVEWC-3FLR. MTD. WATER CLOSET 2234.015

TOTOTOTO

4"INT. 9--1"SEAT

FLR. MTD. WATER CLOSET TOTO

TET1LN32#CP

CT705ELNWC-4 FLUSH VALVE

SEATINT. 2"4" --1"TOTO TET1LN32#CP 1,9

BRADLEY S19-2100TEMPERING VALVE

445897SRCXKCP

CHURCH 9500SSC

CHURCH 9500SSC

CHURCH 9500SSC

CHURCH 9500SSC

0637J.R. SMITH

SYMMONS S-60800355.012

0700J.R. SMITH

AM. STD.

SUPPORT CARRIERFAUCET

WALL HUNG LAVATORY

SP-2 12"ELEVATOR 20 FT. 1/2 HP

1. ONE (1) 2" SUBMERSIBLE WASTEWATER PUMP MODEL 1411; CAST IRON CASE AND IMPELLER, 1/2" SOLIDS HANDLING MAX; 1750 RPM; 15' POWER CABLE;

ONE (1) TYPE 4X SIMPLEX CONTROL PANEL MODEL 8111 - ISOLATED CONTACT FOR HWA; THREE (3) TETHERED FLOAT SWITCHES MODEL 8233K1006.

PROVIDE 30" DIAMETER BASIN 36" DEEP WITH OPEN GRATED COVER, COORDINATE LOCATION WITH ELEVATOR HOIST EQUIPMENT.

1-110-XSH-2 SHOWER VALVE SYMMONS -- -- -- 1/2"1/2" 7

LOCATED IN MECHANICAL

ROOM475 CFH1-1/2"1"7"WC2PSI

COOKLINE,

TURRETSGPR-2

REMARKSCAPACITYOUTLET SIZEINLET SIZEOUTLET

PRESSURE

INLET

PRESSURESERVICETAG

LOCATED IN MECHANICAL

ROOM10,566 CFH5"2"14"WC2PSI

B-1, B-2, B-3,

GWH-1, GWH-2, MAU-1GPR-1

GAS PRESSURE REGULATOR SCHEDULE

1015115/150 GPM1411-09DLWEIL

1, 296%349 GPH @ 100°F140°F300119 GAL.SUF 119 300 NE(A)STATEKITCHENGWH-2

REMARKSMOCPMCAV/PH

ELECTRICALHP/ WATTSHEAD

FLOWRATE

OUTLET

SIZE

MODEL

NUMBERMANUF.SERVICETAG

SUMP PUMP SCHEDULE

REMARKS

1, 296%924 GPH @ 100°F140°F80024 GAL.INN 800AERCOBUILDINGGWH-1

REMARKSEFFICIENCYRECOVERY RATE

@ DEGREE RISEOUTLET WATERTEMPERATURE

MBH

INPUT

STORAGE

CAPACITY

GALLONS

MODEL NUMBERMANUFACTURERSERVICETAG

FUEL-FIRED WATER HEATER SCHEDULE

REMARKS:

1. EFFICIENCY BASED ON 2XXX IECC TABLE 504.2.

2. INLET GAS PRESSURE REQUIREMENTS; 4" MINIMUM, 14" MAXIMUM.

NOTES:

1. REFER TO ARCHITECTURAL DRAWINGS AND ELEVATIONS FOR EXACT LOCATION AND MOUNTING HEIGHT ELEVATIONS OF ALL PLUMBING FIXTURES PRIOR

TO INSTALLATION.

2. PROVIDE ALL FIXTURES WITH CHROME PLATED CAST BRASS, ADJUSTABLE 'P' TRAPS WITH CLEANOUT PLUGS, TUBING OUTLETS AND WALL FLANGES

UNLESS FIXTURE IS FURNISHED WITH AN INTEGRAL TRAP OR IS PROVIDED ONE AS A STANDARD ACCESSORY.

3. PROVIDE ALL FIXTURES WITH CHROME PLATED SUPPLIES WITH ANGLE OR STRAIGHT PATTERN LOOSE KEY 1/4 TURN STOPS UNLESS FIXTURE IS

FURNISHED WITH INTEGRAL STOPS OR STOPS ARE PROVIDED AS STANDARD ACCESSORIES.

4. ALL LAVATORIES AND SINKS DESIGNATED TO BE IN COMPLIANCE WITH ANSI-A117.1 SHALL BE PROVIDED WITH OFFSET TAILPIECE CONNECTIONS AND

PROTECTIVE TRAP AND SUPPLY WRAPPING KITS, REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

5. FURNISH ALL BATTERY POWERED FAUCETS AND FLUSH VALVES WITH NEW SET OF BATTERIES FOLLOWING FINAL ACCEPTANCE OF THE PROJECT,

COORDINATE WITH THE OWNER'S DESIGNATED REPRESENTATIVE.

6. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION WHICH MAY NOT BE NOTED HERE.

7. ALL EQUIPMENT AND MATERIALS USED IN THE DISTRIBUTION OF DOMESTIC POTABLE WATER SHALL BE APPROVED AND TESTED FOR SUCH APPLICATION

WITH DOCUMENTED LISTINGS AND LABELING IN ACCORDANCE WITH THE LATEST EDITION OF THE INTERNATIONAL PLUMBING CODE, PUBLIC LAW 111-380

AND ANSI/NSF-61, ANNEX G .

REMARKS:

1. FIXTURE DESIGNATED TO BE IN COMPLIANCE WITH ANSI-A117.1.

2. BATTERY POWERED SENSOR FAUCET, 0.5 GPM, 4" CENTERS, PROVIDE WITH TMV-2.

3. MANUAL FAUCET, 8" CENTERS, RIDGID GOOSENECK FAUCET, 2.2 GPM, WRISTBLADE HANDLES. PROVIDE WITH TMV-2.

4. SINGLE HOLE DRILLING, PROVIDE BLANK OFF FOR REAR CENTER HOLE, DECK MOUNTED FAUCET ON LEFT SIDE (COORDINATE WITH ARCHITECTURAL

CASEWORK), 8"CENTERS, RIDGID GOOSENECK VACUUM BREAKER, SERRATED NOZZLE, WRISTEBLADE HANDLES, 2.2 GPM.

5. RIGHT AND LEFT DRAIN BOARDS, 32"RIM HEIGHT(SPECIAL ORDER LEGS), REAR MOUNTED FAUCET, 8"CENTERS, 1.5 GPM, WRISTBLADE HANDLES.

6. ADA SHOWER SYSTEM, 5"HOSE WITH HAND HELD SHOWER, DIVERTER VALVE, PRESSURE BALANCING MIXING VALVE, 30"SLIDE BAR IN PLACE OF WALL

HOOK.

7. 2.5 GPM SHOWER HEAD, PRESSURE BALANCING MIXING VALVE.

8. BATTERY POWERED SENSOR FLUSH VALVE, 0.5GPF.

9. BATTERY POWERED SENSOR FLUSH VALVE, 1.28 GPF.

1/2"1-1/4" 2" 2" -- 1EWC-2J.R. SMITH

ELKAY VRCGRN8WSK0830

ELECTRIC WATER COOLERSUPPORT CARRIER

1/2"1-1/4" 2" 2" -- 1EWC-3J.R. SMITH

ELKAY VRCGRN80830

ELECTRIC WATER COOLERSUPPORT CARRIER

DRAIN STRAINER ELKAY LK-35

3/4"-- -- -- 3/4" 1S19-270BBRADLEYCOUNTER MOUNTED EYEWASH

EW-1BRADLEY S19-2000TEMPERING VALVE

REMARKS:

1. SURFACE MOUNTED, PROVIDE COMPLETE WITH WALL MOUNTING BRACKET; LEAD FREE DESIGN, INLET STRAINER CHECKSTOPS, INTEGRAL DIAL

THERMOMETER.

2. MINIMUM FLOW OF 0.5 GPM WITH OPERATIONAL CIRCULATION.

3. SINK AND LAVATORY TO MEET ASSE 1070.

TMV-1 BUILDING BRADLEY S59-3080-B 1" 1-1/4" 40 140 110 2.0 1,2

REMARKSMINIMUM FLOW

GPM

OUTLET

TEMPERATURE°FHWCW

INLET

TEMPERATURE °FOUTLET

SIZE INCH

INLET SIZE

INCHMODEL NUMBERMANUF.SERVICETAG

WATER MIXING VALVE SCHEDULE

1140115 VOLT/ 1 PHASE32501/8 HP27.0 FT.4.0 GPM3/4"3/4"009-SF5TACOCP-2

1120115 VOLT/ 1 PHASE32501/8 HP20.0 FT.10.0 GPM1-1/2"1-1/2"011-SF4TACOCP-1

REMARKSSERVICEELECTRICAL

CHARACTER.RPMHPHEADFLOW RATE

OUTLET

SIZE

INLET

SIZEMODEL NUMBERMANUF.TAG

DOMESTIC WATER CIRCULATION PUMP SCHEDULE

REMARKS:

1. STAINLESS STEEL CASING, SEALLESS, REPLACEABLE CARTRIDGE STYLE, FLANGED INLET AND OUTLET CONNECTIONS. PROVIDE COMPLETE WITH 24 HOUR

TIMER/ AQUASTAT COMBINATION CONTROLLER.

LM495-1POWERSTEMPERATURE MIXING VALVETMV-21/2" THREADED INLETS. PROVIDE WITH PAINTED WALL

MOUNTED CABINET AND CHECK STOPS.

J.R. SMITHTRAP GUARDTG-1

2" = 2692-02

3" = 2692-03

4" = 2692-04

BARRIER TRAP SEAL GUARD (ASSE 1072). PROVIDE SIZE

AS REQUIRED.

MM-500MIMBPPPWCB-1

STEEL BOX WITH STEEL FACEPLATE, SUPPORT

BRACKETS, SUPPLY PIPE OPENING. PROVIDE WATER

HAMMMER ARRESTOR ON SUPPLY LINE.

DISHWASHER BOX/

ICE MAKER BOX

982-VR909CAGCPCHICAGODECK MTD. DBL GAS/AIR TURRETGT-1 / AT-1

DUAL 90° TURRET W/VANDAL RESISTANT PIN, BALL

VALVE, ET7 SERRATED NOZZLE W/ CHECK VALVE AND

INDEX LEVER HANDLE.

SC-1250DPPPWATER HAMMER ARRESTORWHA-4

SC-1000CPPPWATER HAMMER ARRESTORWHA-3

SC-750BPPPWATER HAMMER ARRESTORWHA-2

SC-500APPPWATER HAMMER ARRESTORWHA-1

B67WOODFORDWALL HYDRANTWH-1

4710-UJ.R. SMITHWALL CLEANOUTWCO-1

MM-500MLBPPPWASHER BOXWB-1

Z-1180ZURNSOLIDS INTERCEPTORSI-1

1010Y-C-CIDJ.R. SMITHROOF DRAINRD-1

Z1181-E-SSZURNPLASTER TRAPPT-1

1070Y-C-CIDJ.R. SMITHOVERFLOW ROOF DRAINOD-1

998-RCFCHICAGOHOSE BIBBHB-2

B75WOODFORDHOSE BIBBHB-1

4880-UJ.R. SMITH2-WAY GRADE CLEANOUTGCO-2

4880-UJ.R. SMITHGRADE CLEANOUTGCO-1

3100Y-PDBS-12J.R. SMITHFLOOR SINK (ICE/FREEZERS)FS-5

9693-DBSJ.R. SMITHFLOOR SINK (DISHWASHER)FS-4

9693-DBSJ.R. SMITHFLOOR SINK (BOILERS)FS-3

3430Y-PDBS-12J.R. SMITHFLOOR SINK (KITCHEN)FS-2

3200Y-PDBS-12J.R. SMITHFLOOR SINK (WATER ENTRY)FS-1

2005Y-P050-F37J.R. SMITHFLOOR DRAIN (ICE/CONDENSATE)FD-3

2330Y-FBSJ.R. SMITHFLOOR DRAIN (HVAC PUMPS)FD-2

2005YJ.R. SMITHFLOOR DRAIN (GENERAL)FD-1

4220J.R. SMITHFLOOR CLEANOUTFCO-1

1770J.R. SMITHCONDUCTOR NOZZLECN-1

510FEBCOBACKFLOW PREVENTERBFP-3

975XLWILKINSREDUCED PRESSURE BACKFLOW

PREVENTERBFP-2

375WILKINSREDUCED PRESSURE BACKFLOW

PREVENTERBFP-1

STYLE 9ORIONACID NEUTRALIZATION TANKANT-1

REMARKSMODEL NOMANUFACTURERDESCRIPTIONTAG

PLUMBING EQUIPMENT SCHEDULE

COMPLETE WITH SERVICE ISOLATION VALVE

COMPLETE WITH SERVICE ISOLATION VALVE

COMPLETE WITH SERVICE ISOLATION VALVE

COMPLETE WITH SERVICE ISOLATION VALVE

BOX TYPE, 3/4" INLET, POLISHED CHROME

1-1/2" INLET AND OUTLET CONNECTIONS COMPOSITE

MAT'L., TOP ACCESS TYPE

ON FLOOR TYPE 2" INLET/OUTLET CONNECTIONS

REMOVABLE SEDIMENT BUCKET, ALLOW 14-1/2" ABOVE

UNIT FOR BASKET REMOVAL

VACUUM BREAKER SPOUT W/ HOSE THREAD OUTLET,

1/2"FPT INLET LOOSE KEY HANDLE

BOX TYPE, 1/2" INLET, POLISHED CHROME

1/2" INLINE DUAL CHECK VALVE ASSEMBLY. NSF-61.

1-1/2" MECHANICAL JOINTS ON INLET & OUTLET, TOP

INLET AND VENT, 6" CLEANOUT IN LID, 5 GALLON. DIP

TUBE

STAINLESS STEEL, 12" SQ. 10" DEEP WITH 1/2 GRATE

AND FLASHING FLANGE, DOME STRAINER. PROVIDE

WITH TRAP GUARD.

EXTEND FUNNEL DRAIN FULL SIZE TO FLOOR SINK.

NSF-61.

EXTEND FUNNEL DRAIN FULL SIZE TO FLOOR SINK.

NSF-61.

STAINLESS STEEL SHALLOW COVER, ROUND FACE W/

VANDAL RESISTANT CENTER SCREW.

3/4" INLETS, 2" OUTLET CONNECTIONS, RECESSED BOX

W/ SERVICE STOPS AND INTEGRAL WATER HAMMER

ARRESTORS.

NO HUB BOTTOM OUTLET, UNDER DECK CLAMP, CAST

IRON DOME STRAINER.

NO-HUB BOTTOM OUTLET, PVC OVERFLOW STANDPIPE

WITH UNDER DECK CLAMP, CAST IRON DOME STRAINER

(2) REQ'D. PROVIDE TYLER #003519 2-WAY CLEANOUT

FITTING, VANDAL RESISTANT SCREWS.

GALVANIZED FLANGED HOUSING WITH HEAVY DUTY

COVER, VANDAL RESISTANT SCREWS.

8.5" SQ. 6" DEEP W/ ALUMINUM DOME BOTTOM

STRAINER AND 1/2 NICKEL BRONZE GRATE. PROVIDE

WITH TRAP GUARD.

12" SQ. 8" DEEP W/ 1/2 DEPRESSED

STAINLESS STEEL GRATE AND STAINLESS STEEL

BOTTOM DOME STRAINER. PROVIDE WITH TRAP GUARD.

12" SQ. 8" DEEP W/ ALUMINUM DOME BOTTOM STRAINER

AND 1/2 A.R.C. GRATE. PROVIDE WITH TRAP GUARD.

16.5" SQ. 12" DEEP W/ ALUMINUM DOME BOTTOM

STRAINER AND 1/2 NICKEL BRONZE GRATE. PROVIDE

WITH TRAP GUARD.

6"Ø STRAINER W/ EXTENDED RIM AND VANDAL

RESISTANT SCREWS. PROVIDE WITH TRAP GUARD.

12" Ø BAR GRATE AND BOTTOM STRAINER. PROVIDE

WITH TRAP GUARD.

6" Ø STRAINER W/ VANDAL RESISTANT SCREWS.

PROVIDE WITH TRAP GUARD.

CAST IRON ADJUSTABLE CLEANOUT WITH ROUND

BRONZE TOP AND ABS PLUG.

BRONZE FINISH WITH WALL FLANGE.

TD-1 TRENCH DRAIN ZURN Z-806

ENVISIONMECHANICAL ENGINEERS INC.

9777 Pyramid Court, Suite 120Englewood, CO 80112Tel- 303-688-0223Fax- 303-688-3584envisionengrs.comProject #

CONSULTANT:

ISSUE:

OWNER:

PROJECT:

DRAWING INFORMATION:

DRAWN BY:

PROJECT NO:

SHEET TITLE:

APPROVED BY:

CHECKED BY:

SHEET OF

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.hcm2.com

1331 Nineteenth StreetDenver, CO. 80202

hord|coplan|macht

015-078

5/2

4/2

016 9

:46:5

5 P

M

C:\U

sers

\pfo

x.E

NV

ISIO

N.0

00\D

ocum

ents

\015-0

78 -

JeffC

O K

-8 -

PLU

MB

ING

CE

NT

RA

L_pfo

x.r

vt

P-610

PLUMBINGSCHEDULES

Jefferson County SchoolDistrict

CANDELAS K-8

JKB

JAL

11576.000

JKB

19486 WEST 94th AVENUEARVADA, CO 80007

1829 DENVER WEST DRIVEGOLDEN, CO 80401

05/25/16 WORK PACKAGE # 2 ISSUE FORCONSTRUCTION

05.25.2016


Recommended