CONSTRUCTION DIVISION Analysis References
Transcript
Page 1: CONSTRUCTION DIVISIONEMETHANEX Damietta 1 MASS SPECTROMETER ANALYZER SHELTER / 1 AIR SEPARATION UNIT ANALYZER SHELTER Dimensions 4 x 2,5 x 2,7 m each Weight : 5.500 Kg each 2008 SAIPEM

CONSTRUCTIONDIVISION

Analysis

References

Page 2: CONSTRUCTION DIVISIONEMETHANEX Damietta 1 MASS SPECTROMETER ANALYZER SHELTER / 1 AIR SEPARATION UNIT ANALYZER SHELTER Dimensions 4 x 2,5 x 2,7 m each Weight : 5.500 Kg each 2008 SAIPEM

REFERENCES: ANALYSIS

CUSTOMER END USER PROJECT DESCRIPTION YEAR

ALSTOM POWER RIMINI PROJECT“TURN KEY JOB”Supply of 1 Nitrogen Blanketing System”.

2009

COREIMPIANTO DITERMOVALORIZ-ZAZIONE RSU

Revamping Analysis System 2009

SAIPEM QATARBRANCH

MTY LLDPE PLANTMESAIEED QATAR

Hydrocarbon L.E.L. Detector infraredcomplete with sampling systemDimensions 1,2 x 0,8 x 2,1 mWeight : 150 Kg

2009

SARLUXRAFFINERIA DISARROCH

Emissions Analyzers Shelter 2009

TECHINTEMETHANEXDamietta

1 MASS SPECTROMETER ANALYZER SHELTER /1 AIR SEPARATION UNIT ANALYZER SHELTERDimensions 4 x 2,5 x 2,7 m eachWeight : 5.500 Kg each

2008

SAIPEMCOMERCIOMARITIMOSOCIEDADE LDA

ENGROAMMONIA - UREAPLANT

NOX Analysis Local Cabinet + O2 Analysis Local Rack + 13 Local Racks for PH, Free Chlorine Conductivity Analysis complete with Sample Conditioning System.

2008

FWIREFINERY GASDESULPHURAZA-TIONBAHRAIN

“TURN KEY JOB”Supply of 1 Conductivity Analyzer

2008

TECHINT

ENI R & M

HYDROGENPRODUCTION HMU

“TURN KEY JOB”Supply of 1 ProcessAnalyzer Shelter with Analyzers

2008

TECHINT

ENI R & M

HYDROGENPRODUCTION HMU

“TURN KEY JOB”Supply of 1 Continuos Emissions Monitoring System Analyzer Shelter with Analyzers

2008

TECNIMONTHDPE 400 KT-Y JUBAILSAUDI ARABIA

“TURN KEY JOB”Supply of 1 Analyzers ShelterDimensions 3 x 2,5 x 2,7 m - Weight: 13.000 kg

2008

TECNIMONTHDPE 400 KT-Y JUBAILSAUDI ARABIA

“TURN KEY JOB”Supply of 3 Analyzers SheltersDimensions 10 x 2,5 x 2,7 m - Weight: 50.000 kg

2007

EDISON COLLALTO PLANT

“TURN KEY JOB”. Supply of 1 Analyzer Shelter &1 Metering Skid & 1 Filtering Skid.Analyzer Dimensions: 3 x 2,5 x 2,7 m Weight: 15.000 kgMetering Skid Dim.: 19 x 3,7 x 2 m Weight: 25.000 kgFiltering Skid Dim.: 9,7 x 3,2 x 3m Weight: 24.000 kg

2007

Sede Amministrativa: Via Pavia, 21 - 20053 Muggiò (MB), Italy - Tel. +39 039 2788.1 - Fax +39 039 2781353 - Sede Legale: Via Giulini, 12 - 22100 Como (CO), Italy

Reg. Imprese di Como N° 03046260133 - R.E.A. CO - 292997 - C.F. / P.I. 03046260133 - Capitale Sociale Euro 700.000,00 i.v.

Page 3: CONSTRUCTION DIVISIONEMETHANEX Damietta 1 MASS SPECTROMETER ANALYZER SHELTER / 1 AIR SEPARATION UNIT ANALYZER SHELTER Dimensions 4 x 2,5 x 2,7 m each Weight : 5.500 Kg each 2008 SAIPEM

REFERENCES: ANALYSIS

CUSTOMER END USER PROJECT DESCRIPTION YEAR

ALSTOM30245 FORLI’ PROJECT

“TURN KEY JOB”Supply of 1 Nitrogen Blanketing System”.

2007

ALSTOM30245 FERRARAPROJECT

“TURN KEY JOB”Supply of 1 Nitrogen Blanketing System

2007

SNAMPROGETTIMTY LLDPE PLANT -MESAIEED QATAR

“TURN KEY JOB”Supply of 1 Analyzer ShelterDimensions : 9 x 2,5 x 2,7 mWeight: 45.000 kg

2007

SNAMPROGETTISUD

ENI R & M

HYDROCRACKING RHU - TARANTO RAFFINERY

“TURN KEY JOB”Supply of 30 Sampling Systems

2007

FOSTERWHEELER

REFINERY GASDESULPHURAZA-TIONBAHRAIN

“TURN KEY JOB”Supply of 2 Green Field AnalyzersDimensions: 1 x 0,8 x 2,1 mWeight: 500 kg

2006

SNAMPROGETTI AUTO - OIL 2“TURN KEY JOB”Supply of analyzer shelter and FTIRanalyser for sampling analysis

2005

F.W.I. AUTO-OIL 2“TURN KEY JOB”Supply of analyzer package for sampling analysis

2004

SNAMPROGETTI RIO POLIMEROS“TURN KEY JOB”Supply of Laboratory Sampling Systems

2003

SNAMPROGETTI/ENIPOWER

CENTRALE A CICLOCOMBINATO DIFERRARAERBOGNONE

“TURN KEY JOB”Supply of analyzer shelter for BTUmeasurement of natural gas and syngas analysis

2003

SNAMPROGETTI/ENIPOWER

CENTRALE A CICLOCOMBINATO DIRAVENNA

“TURN KEY JOB”Supply of analyzer shelter for BTUmeasurement of natural gas

2003

SNAMPROGETTI/ENIPOWER

CENTRALE A CICLOCOMBINATO DI BRINDISI

“TURN KEY JOB”Supply of analyzer shelter for BTUmeasurement of natural gas

2003

SNAMPROGETTI/ENIPOWER

CENTRALE A CICLOCOMBINATO DIMANTOVA

“TURN KEY JOB”Supply of analyzer shelter for BTUmeasurement of natural gas

2003

Sede Amministrativa: Via Pavia, 21 - 20053 Muggiò (MB), Italy - Tel. +39 039 2788.1 - Fax +39 039 2781353 - Sede Legale: Via Giulini, 12 - 22100 Como (CO), Italy

Reg. Imprese di Como N° 03046260133 - R.E.A. CO - 292997 - C.F. / P.I. 03046260133 - Capitale Sociale Euro 700.000,00 i.v.

Page 4: CONSTRUCTION DIVISIONEMETHANEX Damietta 1 MASS SPECTROMETER ANALYZER SHELTER / 1 AIR SEPARATION UNIT ANALYZER SHELTER Dimensions 4 x 2,5 x 2,7 m each Weight : 5.500 Kg each 2008 SAIPEM

REFERENCES: ANALYSIS

CUSTOMER END USER PROJECT DESCRIPTION YEAR

ENELPOWER

SULCIS

HIGH PRESSURE BOILER SAMPLING AND ANALYS SYSTEM

“TURN KEY JOB”Supply of 11 sampling streams equipped with sample treatment analysers.

2003

ENELPOWER

TERMINI - IMERESE

HIGH PRESSURE BOILER SAMPLING AND ANALYS SYSTEM

“TURN KEY JOB”Supply of 32 sampling streams equipped with sample treatment, analysers and one new shelter.

2003

ENELPOWER

PRIOLO - GARGALLO

HIGH PRESSURE BOILER SAMPLING AND ANALYS SYSTEM

“TURN KEY JOB”Supply of 32 sampling streams equipped with sample treatment, analysers and one new shelter.

2002

ENELPOWER

PORTO CORSINI

HIGH PRESSURE BOILER SAMPLING AND ANALYS SYSTEM

“TURN KEY JOB”Supply of 28 sampling streams equipped with sample treatment , analysers and one new shelter.(ext dim. 10 x 7x 3m)

2001

F.W.I. ISOMERIZATION Revamping sampling streams selection 2001

F.W.I. ISOMERIZATIONRevamping existing analyser shelter with new gaschromatograph

2001

TECNIMONT POLYETHYLENE

“TURN KEY JOB”. Supply of two new analyzers shelters(ext. dim. 11 x 3,5 x 3,2m and 13 x 3,5 x 3,2m) with: 20 “GCs”; / 27 “Moisture analyzers in field sampling sys-tems” / 20 “O2 ppm analyzers in field sampling systems”; / 7 “O2 Thermoparamagnetic in field sampling systems”.

2001

SNAMPROGETTI

FERRARA

HYPROX

Supply of new analyzers shelters(ext. dim. 5,5 x 2,5 x 2,7m) with installation of:- q.ty 2 “GCs”;- q.ty 4 “O2 Thermoparamagnetic analyzers”;- q.ty 1 Colorimeter analyzer.

2001

SNAMPROGETTI SUD

SANNAZZARODE BURGONDI (PV)

GAS TO LIQUIDDEMOSTRATION

Supply of new analyzers shelters(ext. dim. 5 x 2,5 x 2,7m) with installation of:- q.ty 4 “GCs”;

2001

TECNIMONT POLYETHYLENEMoisture Analyser and Analyser Data CommunicationCabinets

2001

SNAMPROGETTIFERTINITRO C.E.C.

JOSE’ EDO. A.(VENEZUELA)

FERTILIZER

Supply of new two analyzers shelters(ext. dim. 7 x 2,6 x 2,7m) with installation of:- q.ty 10 “Infrared analyzers” (safekeeping);- q.ty 1 “Thermal Conductivity analyzer” (safekeeping);- q.ty 4 “O2 analyzers in Flue Gas” (safekeeping);- q.ty 4 “GCs” (safekeeping).

1999

SNAMPROGETTI AGD

“TURN KEY JOB”. Supply of five new analyzers shelters (ext. dim. 5 x 3,2 x 3,4m, 5,5 x 3,2 x 3,4m,6 x 3,2 x 3,4m, for q.ty 2 and 8 x 5 x 3,4m) with:q.ty 4 “GCs”; q.ty 2 “RVP analyzers”;q ty 2 “TOC analyzers”;

1999

Sede Amministrativa: Via Pavia, 21 - 20053 Muggiò (MB), Italy - Tel. +39 039 2788.1 - Fax +39 039 2781353 - Sede Legale: Via Giulini, 12 - 22100 Como (CO), Italy

Reg. Imprese di Como N° 03046260133 - R.E.A. CO - 292997 - C.F. / P.I. 03046260133 - Capitale Sociale Euro 700.000,00 i.v.

Page 5: CONSTRUCTION DIVISIONEMETHANEX Damietta 1 MASS SPECTROMETER ANALYZER SHELTER / 1 AIR SEPARATION UNIT ANALYZER SHELTER Dimensions 4 x 2,5 x 2,7 m each Weight : 5.500 Kg each 2008 SAIPEM

REFERENCES: ANALYSIS

CUSTOMER END USER PROJECT DESCRIPTION YEAR

F.W.I. COGE

“TURN KEY JOB”. Revamping analyzers shelters at site with installation of new “GC” and “H2S analyzers”. Supply of one new analyzer shelter (ext. dim. 4 x 2,5 x 2,7m) with: q.ty 1 Environment analysis system.

1998

TECHINT BTHSupply of new one analyzer shelter(ext. dim. 2,5 x 2,5 x 2,7m) with installation of:- q.ty 1 “GC” (safekeeping).

1998

ENICHEM

PRIOLO (SR)

CLA/CS3Supply of new one analyzers shelter(ext. dim. 5 x 2,5 x 2,7m) with installation of:- q.ty 3 “GCs” (safekeeping).

1998

TECHNIP ITALYGDANSKA REF.

GDANSKA (POLAND)IMERIZATION &REFORMER

Supply of new one analyzers shelter(ext. dim. 4 x 2,5 x 2,7m) with installation of:- q.ty 2 “GCs” (safekeeping);- q.ty 2 “H2” analyzer (safekeeping).

1998

SNAMPROGETTI

(POLAND)

VACUUM

Supply of new one analyzers shelter(ext. dim. 5 x 2,5 x 2,7m) with installation of:q.ty 1 “GC”; q.ty 1 “TOC analyzer”;q.ty 1“Vacuum distillar”; q ty 1“Wobbe Index analyzer”

1998

TECHNIP ITALY

P.TO MARGHERA (VE)

ETHYLENE

Supply of new six analyzers shelters (ext. dim. 5 x 2,5 x 2,7m for q.ty 2, 2,5 x 2,5 x 2,7m for q.ty 3 and 8 x 3 x 2,7m) with installation of: q.ty 12 “GCs” (safekeeping);q.ty 2 O2 analysis control board (safekeeping).

1997

F.W.I.

AUGUSTA (SR)

A.M.B.R.

“TURN KEY JOB”.Supply of one new analyzers shelter(ext. dim. 5 x 2,5 x 2,7m) with:- q.ty 2 “GCs”.

1997

ENICHEM

PRIOLO (SR)

OLE/ARO CR23Supply of one new analyzers shelter(ext. dim. 5 x 2,5 x 2,7m) with installation of:- q.ty 5 “GCs” (safekeeping).

1997

ENICHEM

PRIOLO (SR)

PROPILENE OXIDESupply of one new analyzers shelter(ext. dim. 6 x 2,5 x 2,7m) with installation of:- q.ty 5 “GCs” (safekeeping).

1996

HARTMANN &BRAUN

BRINDISI (BR)

POLYETHYLENE

Supply of one new analyzers shelter(ext. dim. 13 x 3 x 2,9m) with installation of:- q.ty 6 “GCs” (safekeeping);- q.ty 2 H2 analyzers (safekeeping);- q.ty 6 O2 analyzers (safekeeping);

1996

SNAMPROGETTI

TULA (MEXICO)

HYDROCRACKER

Supply of new analysis system composed by loosesmaterials needed to connect at “GCs”, “IR analyzers”,“O2/combustible in flue gas analyzers”, “Densityanalyzers”, “Moisture analyzers”, “pH analyzer”, “SO2/O2 in flue gas analyzer” and “H2S/SO2 air demand”.

1996

HARTMANN &BRAUN

HOLLAND

POLYMER. &MONOMERS

Supply of two new analyzers shelters(ext. dim. 5 x 2,5 x 2,7m and 2,5 x 2,5 x 2,7m)with installation of:- q.ty 8 “GCs” (safekeeping)

1996

Sede Amministrativa: Via Pavia, 21 - 20053 Muggiò (MB), Italy - Tel. +39 039 2788.1 - Fax +39 039 2781353 - Sede Legale: Via Giulini, 12 - 22100 Como (CO), Italy

Reg. Imprese di Como N° 03046260133 - R.E.A. CO - 292997 - C.F. / P.I. 03046260133 - Capitale Sociale Euro 700.000,00 i.v.

Page 6: CONSTRUCTION DIVISIONEMETHANEX Damietta 1 MASS SPECTROMETER ANALYZER SHELTER / 1 AIR SEPARATION UNIT ANALYZER SHELTER Dimensions 4 x 2,5 x 2,7 m each Weight : 5.500 Kg each 2008 SAIPEM

REFERENCES: ANALYSIS

CUSTOMER END USER PROJECT DESCRIPTION YEAR

F.W.I.

LIVORNO (LI)

ISOMERIZ.

“TURN KEY JOB”. Supply of one new analyzers shelter (ext. dim. 3,5 x 2,5 x 2,7m) with:- q.ty 1 “GC”;- q.ty 1 “H2 analyzer”

1996

SNAMPROGETTI

(POLAND)

HYDROCRACKER

Supply of one new analyzers shelter(ext. dim. 5,5 x 2,5 x 2,7m) with installation of:- q.ty 1 “GC” (safekeeping);- q.ty 1 “Flue gas monitoring system” (safekeeping).

1996

SARPOM FCCU

“TURN KEY JOB”. Revamping of one analyzers shelter at site with supply of new analyzers shelter and installation of: q.ty 1 “CO anal.” (safekeeping); q.ty 2 “O2 anal.” (safekeep-ing); q.ty 1 “GC” (safekeeping).The above analyzers were dismantling by the old shelter. All these activities was performed with the plant running.

1995

SARPOMSOLVENTS &REFORMER

“TURN KEY JOB”.Revamping of three analyzers shelter at site withinstallation of new “CFPP analyzer” and “Distillaranalyzer”.

1995

TECNIMONT

FERRARA (FE)

POLYPROPILENESupply of one new analyzers shelter (ext. dim. 5 x 2,5 x 2,7m) with installation of:- q.ty 4 “GCs” (safekeeping).

1995

SNAMPROGETTIIBN ZAHRAL JUBAIL(S. ARABIA)

MTBE III“TURN KEY JOB”. Supply of one new analyzers shelter (ext. dim. 6 x 2,5 x 2,7m) with installation of:- q.ty 5 “GCs” (safekeeping).

1995

SNAMPROGETTI

PUYANG (P.R. CHINA)

POLYETHYLENE

“TURN KEY JOB”. Supply of new analysis system composed by sample conditioning systems and looses materials needed to connect at “GCs”,“Moisture and Oxygen analyzers”.

1995

SNAMPROGETTIZHONG -YOUAN

(P.R. CHINA)

POLYETHYLENE

“TURN KEY JOB”. Supply of new analysis system composed by sample conditioning systems and looses materials needed to connect at “GCs”,“Moisture and Oxygen analyzers”.

1994

HARTMANN &BRAUN

MAOMING (P.R. CHINA)

POLYETHYLENE

“TURN KEY JOB”Supply of one new analyzers shelter(ext. dim. 4 x 2,5 x 2,7m) with installation of:- q.ty 4 “GCs” (safekeeping).

1994

HARTMANN &BRAUN

MAOMING (P.R. CHINA)

STYRENE“TURN KEY JOB” Supply of one new analyzers shelter (ext. dim. 4 x 2,5 x 2,7m) with installation of:- q.ty 2 “GCs” (safekeeping).

1994

TECHINTSPLITTERPROPANE

“TURN KEY JOB”Supply of one new analyzers shelter(ext. dim. 2,5 x 2,5 x 2,7m) with installation of:- q.ty 1 “GC” (safekeeping).

1993

SARPOM SOLVENTS“TURN KEY JOB”Revamping analyzers shelter at site with installation of new “Distillar analyzer”.

1992

Sede Amministrativa: Via Pavia, 21 - 20053 Muggiò (MB), Italy - Tel. +39 039 2788.1 - Fax +39 039 2781353 - Sede Legale: Via Giulini, 12 - 22100 Como (CO), Italy

Reg. Imprese di Como N° 03046260133 - R.E.A. CO - 292997 - C.F. / P.I. 03046260133 - Capitale Sociale Euro 700.000,00 i.v.

Page 7: CONSTRUCTION DIVISIONEMETHANEX Damietta 1 MASS SPECTROMETER ANALYZER SHELTER / 1 AIR SEPARATION UNIT ANALYZER SHELTER Dimensions 4 x 2,5 x 2,7 m each Weight : 5.500 Kg each 2008 SAIPEM

CONSTRUCTIONDIVISION

Pneumo-HydraulicSystems & WHCP

References

Page 8: CONSTRUCTION DIVISIONEMETHANEX Damietta 1 MASS SPECTROMETER ANALYZER SHELTER / 1 AIR SEPARATION UNIT ANALYZER SHELTER Dimensions 4 x 2,5 x 2,7 m each Weight : 5.500 Kg each 2008 SAIPEM

REFERENCES: WHCP

CUSTOMER END USER PROJECT DESCRIPTION YEAR

KPOKARACHAGANAK.KAZAKHSTAN

“TURN KEY JOB”Supply of 9 hydraulic panels for old production designed to controll well-heads

2006/2009

INTERMARE SARDA

ANNAMARIA BPROJECT

“TURN KEY JOB”Supply of 5 local control panel

2008

VETCO GREYDENIS-05 “A” GASDEVELOPMENTPROJECT

“TURN KEY JOB”Supply of 1 electropneumatic-hydraulic wellhead controlpanel unit designed to controll 4 wellheads

2008

TECHNIP &CHIYODA JV

QATARGAS 3 & 4ONSHORE PROJECT.QATAR

“TURN KEY JOB”Supply of 2 electropneumatic-hydraulic wellhead controlpanels each unit to 1 well and 1 Singleportable Shut-Down Panel

2007

TECHNIP &CHIYODA JV

QATARGAS 2 LNGONSHORE

“TURN KEY JOB”Supply of 2 electropneumatic-hydraulic wellhead controlpanels each unit to 1 well

2007

TECHNIP &CHIYODA JV

RAS GAS 3ONSHOREEXPANSION

“TURN KEY JOB”Supply of 2 Wellhead control panels each unit to 1 well

2007

ENPPIDENIS-05 “A” GASDEVELOPMENTPROJECT

“TURN KEY JOB”Supply of 6 pneumatic-hydraulic control units designed to controll well-heads

2007

ENPPI NOSPCOONS FIELD DEV.EGYPT

“TURN KEY JOB”Supply of 1 wellhead control designed to controll 7 wells

2006

SUDELETTRACANDELA GASPOVERO

“TURN KEY JOB”Supply of 2 new pneumo-hydraulic wellhead panelsdesigned to controll well-heads

2006

SUDELETTRACANDELA GASPOVERO. ITALIA

“TURN KEY JOB”Supply of 4 new pneumatic control panel designed tocontrol actuators

2006

ENI GROUP DAVIDE PLATFORM“TURN KEY JOB”Supply of new electropneumatic control panel todesigned to control valves on the weelhead

2005

ENPPITEMSAH NORTHWEST PROJECT

“TURN KEY JOB”Supply of new pneumo-hydraulic control units designedto control well-heads Q.ty n. 8 control units

2005

Sede Amministrativa: Via Pavia, 21 - 20053 Muggiò (MB), Italy - Tel. +39 039 2788.1 - Fax +39 039 2781353 - Sede Legale: Via Giulini, 12 - 22100 Como (CO), Italy

Reg. Imprese di Como N° 03046260133 - R.E.A. CO - 292997 - C.F. / P.I. 03046260133 - Capitale Sociale Euro 700.000,00 i.v.

Page 9: CONSTRUCTION DIVISIONEMETHANEX Damietta 1 MASS SPECTROMETER ANALYZER SHELTER / 1 AIR SEPARATION UNIT ANALYZER SHELTER Dimensions 4 x 2,5 x 2,7 m each Weight : 5.500 Kg each 2008 SAIPEM

REFERENCES: WHCP

CUSTOMER END USER PROJECT DESCRIPTION YEAR

SNAMPROGETTIQATAR RAS LAFFANONSHOREEXPANSION

“TURN KEY JOB”Supply of 2 new pneumo-hydraulic control units designed to control well-heads Q.ty n. 2 controlunits

2004

ENPPITEMSAH-4PLATFORM PROJECT

“TURN KEY JOB”Supply of new pneumo-hydraulic control units designedto control well-heads Q.ty n. 8 control units

2004

ENI DIV.Exploration &Production

D.E.& P.

CLUSTERCALDAROSE RETEMONTE ALPI

“TURN KEY JOB”Supply of 1 Pneumohydraulic control unit

2004

SNAMPROGETTIQATAR RAS LAFFANONSHOREEXPANSION

“TURN KEY JOB”Supply of new pneumo-hydraulic control unit designedto control well-heads q.ty n. 3 control units

2002

ENI DIV. AGIPOIL FIELDS VALD’AGRI (ITALY)

“TURN KEY JOB”Supply of new pneumo-hydraulic control units designedto control well-heads. q.ty n. 10 control units.

2002

EDISON GAS

(PESCARA) ITALY

SARAGO MARE 2“TURN KEY JOB”Supply of new pneumo-hydraulic control unit designedto control well-heads q.ty n.1 control unit.

2001

ENI S.p.A.STOGIT DIVISION

GAS STATIONSETTALA (MI) ITALY

“TURN KEY JOB”Supply of new pneumo-hydraulic control unit designed to control 7 well-heads. q.ty n.2 control units.

2001

COSMIPLATFORMSPCMS 1 PCC

Pneumatic Local Control Panels foractuated valves q.ty n.4 pneum. control panels

2001

LCM PIPELINEPneumatic Local Control Panels for Pipeline valves actuators q.ty n. 3 pneum. local control panels

2001

ENI S.p.A.DIVISIONE AGIP

RAVENNA

PLATFORMBARBARA F.

“TURN KEY JOB”Supply of new one pneumo-hydraulic control unit design for controller of: q.ty n.12 well-heads.

2000

GUPCO

RAS EL BAR (EGYPT)

HA’PY PROJ. GASTREATMENT

“TURN KEY JOB”Supply of new one pneumo-hydraulic control unit design for controller of: q.ty n.12 well-heads.

1999

AGIBAPETROLEUM CO.

ASRAFI FILEDPLATFORM

Revamping of a pneumo-hydraulic control unit. Supply of a new one module for controller of: q.ty n.4 well-heads

1996

Sede Amministrativa: Via Pavia, 21 - 20053 Muggiò (MB), Italy - Tel. +39 039 2788.1 - Fax +39 039 2781353 - Sede Legale: Via Giulini, 12 - 22100 Como (CO), Italy

Reg. Imprese di Como N° 03046260133 - R.E.A. CO - 292997 - C.F. / P.I. 03046260133 - Capitale Sociale Euro 700.000,00 i.v.

Page 10: CONSTRUCTION DIVISIONEMETHANEX Damietta 1 MASS SPECTROMETER ANALYZER SHELTER / 1 AIR SEPARATION UNIT ANALYZER SHELTER Dimensions 4 x 2,5 x 2,7 m each Weight : 5.500 Kg each 2008 SAIPEM

CONSTRUCTIONDIVISION

Skids & Packages,EPC Contractors

References

Page 11: CONSTRUCTION DIVISIONEMETHANEX Damietta 1 MASS SPECTROMETER ANALYZER SHELTER / 1 AIR SEPARATION UNIT ANALYZER SHELTER Dimensions 4 x 2,5 x 2,7 m each Weight : 5.500 Kg each 2008 SAIPEM

REFERENCES:SKIDS/CHEMICAL INJECTION/PROCESS EQUIPMENT

CUSTOMER END USER PROJECT DESCRIPTION YEAR

ENI TUNISIA BVPDG e KARMATUNISIE

Manifold Skids Dim. LxW xH KARMA 7,5 x 2,5 x 3,6 m PDG 10,2 x 2,5 x 2 mWeight: KARMA ~17.000 Kg - PDG ~22.000 KgOil Flow Rate: PDG 1.500 bbl/day KARMA 3.000 bl/day

2010

ENPPINew land Oil Treatment TrainEGYPT

Nitrogen Generator PackageDim. LxWxH 5,9 x 2,5 x 2 mWeight: ~2000 KgN2 Production: 200 Nm3/h 6 barg

2010

NUOVO PIGNONE

NUOVO PIGNONE

BAGHDAD CO. FORGAS TURBINE INC.

“TURN KEY JOB”Supply of 2 Fuel Gas Scrubber SkidsDimension 3,6 x 2,2 x 3,85 mWeight: 4.500 kg

2009

EMCEGYPT SWGEZONSHORE FACILITY

“TURN KEY JOB”Supply of 1 air compressor PackageDimension: 6,3 x 4,2 x 3,86 m - Weight: 8.100 kgSupply of 1 Chemical Injection SkidDimension: 1,2 x 0,9 x 1,5 m - Weight: 500 kg

2009

ENPPIEGYPT PFSE 2 BISDEV. PROJECT

1 Methanol Injection SkidDimension: 1,5 x1 x1 mWeight: 400 kg

2009

EMCQARUN

PETROLEUMCOMPANY

EGYPT KARAMAPOWER PLANT

1 Air Compressor PackageDimension: 10 x 5 x 5,54 mWeight: 37.000 kg

2009

ENPPIVENEZUELAPAGMI PROJECT

1 Nitrogen Supply PackageDimension: 10 x 6 x 10,55Weight: 20.000(This job is in development)

2009

NUOVO PIGNONECENTRALEIDROGENO ENELFUSINA VENEZIA

2 Fuel Gas Treatment SkidDimension: 3,4 x 1,5 x 2,4 mWeight: 3.000 kg

2009

NUOVO PIGNONEALGERIASKIKDA LNG

5 Fuel Gas TreatmentSkidDimension: 4 x 2,5 x 3,6 mWeight: 6.600 kg

2009

KPOKARACHAGANAK DEVELOPMENTPROJECT

1 deg/Water Fired Heater PackageDimension: 14 x 8,5 x 3,1 m(This job is in development)

2009

ENPPI

POLYSTYRENE PROJECTAL - DEKHILAH,ALEXANDRIA

5 Chemical Injection Dimension: 10 x 4 x 2,4 m1 Fire Water Sodium Hypochloryte Injection PackageDimension: 3 x 2,2 x 3,2 m - Weight: 3.500 1 Cooling Tower Chemical Injection PackageDimension: 10 x 4 x 3,8 m - Weight: 10.000 kg

2009

ENPPIVENEZUELAPAGMI PROJECT

2 Gas Metering SkidDimension: 16,8 x 3,6 x 3 mWeight: 52.000 Kg

2009

Sede Amministrativa: Via Pavia, 21 - 20053 Muggiò (MB), Italy - Tel. +39 039 2788.1 - Fax +39 039 2781353 - Sede Legale: Via Giulini, 12 - 22100 Como (CO), Italy

Reg. Imprese di Como N° 03046260133 - R.E.A. CO - 292997 - C.F. / P.I. 03046260133 - Capitale Sociale Euro 700.000,00 i.v.

Page 12: CONSTRUCTION DIVISIONEMETHANEX Damietta 1 MASS SPECTROMETER ANALYZER SHELTER / 1 AIR SEPARATION UNIT ANALYZER SHELTER Dimensions 4 x 2,5 x 2,7 m each Weight : 5.500 Kg each 2008 SAIPEM

CUSTOMER END USER PROJECT DESCRIPTION YEAR

ENPPIEGYPT EL GAMILUPGRADINGPROJECT

2 Chemical Injection SkidDimension: 19,6 x 3,2 x 2,7 m (Port Fouad)Dimension: 13,4 x 3,2x 2,7 m (Denise)Weight: 44.150 kg (Port Fouad)Weight: 36.000kg (Denise)

2009

EMC EGYPT SWGEZ-21 Gas Filter Skid PackageDimension: 1,5 x 1 x 2 mWeight: 700 kg

2008

EMCEGYPT SWGEZ-2PLATFORM

Chemical Injection SkidDimension: 12 x 0,9 x 2,4 mWeight: 1.700 kg

2008

WECOENGINEERING

AMERYAPETROLEUMREFINARY Co.

APRC’S NITROGENPLANT EGYPT

“TURN KEY JOB”Supply of One Adsorption UnitDimensions: 4 x 2 x 2,5 m.Weight: 4000 Kg

2008

BROWN &ROOT - CONDOR

CENTRE SATELLITEROM - ALGERIA

“TURN KEY JOB”Supply of Fire Water Pumps SkidsDimensions 1,6 x 3 x 2,5 mWeight 14.000 kg

2008

PETROJET PPC (EGYPT)

HBA/2006 LPGPIPELINE FROMDELTA TO MOSTOROD

“TURN KEY JOB” Supply of Pressure reduction & Metering Station. Dimensions for Reduction skid 10,5 x 2,6 x 3,5 m - Weight 17.000 kgDimensions for Metering skid 9 x 1,2 x 1,5 mWeight 4200 kg

2008

NUOVO PIGNONE NAJAF PS3 - IRAQ“TURN KEY JOB”Supply of 1 Indirect Water Bath Gas HeaterDimensions 9,8 x 2 x 2,5 m - Weight:14.000 kg

2008

SNC LAVALINQATALUMALUMINIUMPLANT

“TURN KEY JOB”Supply of 1 Fuel Gas Treatment Package andinterconnecting site installation.Scrubber SkidDimensions: 3,6 x 1,5 x 2,5 m - Weight: 2500 kgFiltration & Metering Skid:Dimensions: 8,6 x 1,4 x 3 m - Weight: 5500 kgPressure Reducing Station Skid:Dimensions: 7 x 1,5 x 1,5 m - Weight: 4000 kgFuel Gas Condensate Tank Skid:Dimensions: 4 x 0,5 x 2,5 m - Weight: 4000 kg

2008/2009

NUOVO PIGNONESHELL PEARL GTLPROJECT- QATAR

“TURN KEY JOB”Supply of 6 Nitrogen Purge SkidsDimensions: 2,6 x1,5 x 2 mWeight: 2000 kg each

2008

NUOVO PIGNONEDAS ISLANDPROJECTOAG

“TURN KEY JOB”Supply of 2 Fuel Gas Treatment SkidDimensions: 8 x 3 x 4,3 mWeight: Kg 12.000

2008

NUOVO PIGNONESHELL PEARL GTLPROJECT- QATAR

“TURN KEY JOB”Supply of 6 NG + 6 HOG Fuel Gas Scrubber Skids NG: Dimensions: 3,20 x 2,15 x 3,8 - Weight: 3000 kg each HOG: Dimensions: 4,10 x 2,45 x 4; Weight: -4300 kg each

2007

REFERENCES:SKIDS/CHEMICAL INJECTION/PROCESS EQUIPMENT

Sede Amministrativa: Via Pavia, 21 - 20053 Muggiò (MB), Italy - Tel. +39 039 2788.1 - Fax +39 039 2781353 - Sede Legale: Via Giulini, 12 - 22100 Como (CO), Italy

Reg. Imprese di Como N° 03046260133 - R.E.A. CO - 292997 - C.F. / P.I. 03046260133 - Capitale Sociale Euro 700.000,00 i.v.

Page 13: CONSTRUCTION DIVISIONEMETHANEX Damietta 1 MASS SPECTROMETER ANALYZER SHELTER / 1 AIR SEPARATION UNIT ANALYZER SHELTER Dimensions 4 x 2,5 x 2,7 m each Weight : 5.500 Kg each 2008 SAIPEM

CUSTOMER END USER PROJECT DESCRIPTION YEAR

NUOVO PIGNONERAS LAFFAN/QATARGAS III -TRAIN 7

“TURN KEY JOB”Supply of 2 Fuel Gas Treatment SkidsDimensions: 3,2 x 2,3 x 3,6 mWeight 4500 kg each

2007

NUOVO PIGNONE WGTE II CHINAWEST EASTPIPELINE FLOW INCREASED PROJ.

“TURN KEY JOB”Supply of 6 Fuel Gas Conditioning SkidDimensions 1,8 x 4,2 x 3 m - Weight 3520 kg

2007

TECHNIPHDS VII PLANT -POLAND

“TURN KEY JOB”Supply of 2 Chemical Dosing SystemsDimensions: 3 x 2 x 3,64 eachWeight: Kg 2.200 each

2007

EDISON COLLALTO PLANT

“TURN KEY JOB”. Supply of 1 Analyzer Shelter & 1Metering Skid & 1 Filtering Skid.Analyzer Dimensions: 3 x 2,5 x 2,7m; Weight: 15 000 kg Metering Skid Dim.: 19 x 3,7 x 2m; Weight: 25 000 kg Filtering Skid Dim.: 9,7 x 3,2 x 3m; Weight: 24 000 kg

2007

EDISON COLLALTO PLANT

“TURN KEY JOB”Supply of 7 MEG Dosing SystemsDimensions7,2 x 2,75 x 4 m eachWeight: Kg 8800 each

2007

ENPPIDENIS “ A” FIELDDEVELOPMENT -EGYPT

“TURN KEY JOB”Supply of 1 Corrosion Inhibitor skidDimensions: 4 x 3,3 x 3 m eachWeight: Kg 4000

2007

ENPPI NOSPCOONS DEVELOPMENTPROJECT - EGYPT

“TURN KEY JOB”Supply of 1 Fuel Gas Conditioning PackageDimensions: 2,8 x 6 x 4 mWeight 7.000 kg.

2007

BROWN & ROOT -CONDOR

CENTRE SATELLITEROM - ALGERIA

“TURN KEY JOB”Supply of Inlet Manifold UnitDimensions: 20 x 7 x 2.6 mWeight: Kg 80.000

2007

NUOVO PIGNONEBLNG POWERPROJECT - BRUNEI

“TURN KEY JOB”Supply of 1 Fuel Gas Scrubber SkidDimensions: 3 x 1,6 x 4,1 mWeight: Kg 3.600

2007

NUOVO PIGNONEASABDEVELOPMENTPHASE II

“TURN KEY JOB”Supply of 2 Seal Gas SkidDimensions: 1,2 x 3,5 x 2,6 mWeight: Kg 2000

2007

NUOVO PIGNONEPOWER PLANT 3YARA SLUISKILNETHERLANDS

“TURN KEY JOB”Supply of 1 Fuel Gas SystemDimensions: 5 x 3 x 4 mWeight: 12.000 kg

2007

ENPPIHA’PY PRODUCTIONINCREASED 3RDPROJECT - EGYPT

“TURN KEY JOB”Supply of 1 Glycol Injection PackageDimensions: 9 x 2,6 x 2,8 mWeight: Kg 9.000

2006

REFERENCES:SKIDS/CHEMICAL INJECTION/PROCESS EQUIPMENT

Sede Amministrativa: Via Pavia, 21 - 20053 Muggiò (MB), Italy - Tel. +39 039 2788.1 - Fax +39 039 2781353 - Sede Legale: Via Giulini, 12 - 22100 Como (CO), Italy

Reg. Imprese di Como N° 03046260133 - R.E.A. CO - 292997 - C.F. / P.I. 03046260133 - Capitale Sociale Euro 700.000,00 i.v.

Page 14: CONSTRUCTION DIVISIONEMETHANEX Damietta 1 MASS SPECTROMETER ANALYZER SHELTER / 1 AIR SEPARATION UNIT ANALYZER SHELTER Dimensions 4 x 2,5 x 2,7 m each Weight : 5.500 Kg each 2008 SAIPEM

CUSTOMER END USER PROJECT DESCRIPTION YEAR

ENPPI NOSPCOONS DEVELOPMENTPROJECT - EGYPT

“TURN KEY JOB”Supply of 1 Chemical Injection System

2006

NUOVO PIGNONELNG RAS LAFFAN -QATAR GAS 3TRAIN 7

“TURN KEY JOB”Supply of 3 Seal Gas SkidsDimensions: 2,3 x 9,4 x 4 eachWeight: Kg 6000 each

2006

NUOVO PIGNONELNG RAS LAFFAN -QATAR GAS 3TRAIN 6

“TURN KEY JOB”Supply of 3 Seal Gas SkidsDimensions: 2,3x 9,4 x 4 m eachWeight: Kg 6000 each

2006

NUOVO PIGNONE COVE POINT U.S.A.

“TURN KEY JOB”Supply of 2 Fuel Gas Treatment SkidDimensions: 2,6 x 1,7 x 3,8 mWeight: Kg 3.500

2006

KBRSAQQARA FIELDDEVELOPMENT PROJECT - EGYPT

“TURN KEY JOB”Supply of 1 Chemical Injection SystemDimensions: 16 x 3,5 x 4 m - Weight: Kg 23000

2006

KBRSAQQARA FIELDDEVELOPMENT PROJECT - EGYPT

“TURN KEY JOB”Supply of 1 PSA Nitrogen Generation PackageDimensions: 7,5 x 2,3 x 2,8 mWeight: Kg 10.000

2006

ENPPIDENIS FIELDDEVELOPMENT -EGYPT

“TURN KEY JOB”Supply of 4 Chemical Injection SkidsDimensions: 4 x 3,5 x 3 m eachWeight: Kg 4.500

2006

KPOKARACHAGANAKDEVELOPMENTPROJECT

“TURN KEY JOB”Supply of 1 LP Closed Drain VesselsL :14,7 m; Ø:3.6 m - Weight: 39.000 kg

2006

NUOVO PIGNONE WGTE II CHINA

WEST EASTPIPELINE FLOW INCREASEDPROJ.

“TURN KEY JOB”Supply of 16 Fuel Gas Conditioning SkidDimensions 1,8 x 4,2 x 3 m; Weight 3520 kg

2006

NUOVO PIGNONERAS LAFFAN - QATARGAS II -TRAIN 5

“TURN KEY JOB”.Supply of 3 Seal Gas SkidsDimensions: 2,3x 9,4 x 4 m eachWeight: Kg 6.000 each

2006

NUOVO PIGNONERAS LAFFANQATARGAS II - TRAIN 4

“TURN KEY JOB”Supply of 3 Seal Gas SkidsDimensions: 2,3x 9,4 x 4 m eachWeight: Kg 6.000 each

2005

ENPPITEMSAH NORTHWEST PLATFORMPROJECT- EGYPT

“TURN KEY JOB”Supply of n. 7 Chemical Injection Skids(Methanol, Glycol and Chemical injection skids)Dimensions: 5 x 2,8 x 4 m each - Weight: Kg 5.000

2005

REFERENCES:SKIDS/CHEMICAL INJECTION/PROCESS EQUIPMENT

Sede Amministrativa: Via Pavia, 21 - 20053 Muggiò (MB), Italy - Tel. +39 039 2788.1 - Fax +39 039 2781353 - Sede Legale: Via Giulini, 12 - 22100 Como (CO), Italy

Reg. Imprese di Como N° 03046260133 - R.E.A. CO - 292997 - C.F. / P.I. 03046260133 - Capitale Sociale Euro 700.000,00 i.v.

Page 15: CONSTRUCTION DIVISIONEMETHANEX Damietta 1 MASS SPECTROMETER ANALYZER SHELTER / 1 AIR SEPARATION UNIT ANALYZER SHELTER Dimensions 4 x 2,5 x 2,7 m each Weight : 5.500 Kg each 2008 SAIPEM

CUSTOMER END USER PROJECT DESCRIPTION YEAR

ENPPITEMSAH NORTHWEST PLATFORMPROJECT- EGYPT

“TURN KEY JOB”.Supply of New One Instrument & Service Gas Skid(ext. dim. 7 x 3,2 x 5,2 m.).

2005

ENI DIV. E&PVAL D’AGRI RETEDI RACCOLTA

“TURN KEY JOB”Supply of n 12 chemical injection skidsDimensions: 3,2 x 2,4 x 2 eachWeight: Kg 3.000

2005

NUOVO PIGNONESOUTH PARSASSALUYEH - IRAN

“TURN KEY JOB”Supply of 9 fuel gas skidsDimensions: 6,8 x 2,5 x 4 eachWeight: Kg 15.000 each

2005

KPOKARACHAGANAKDEVELOPMENTPROJECT

“TURN KEY JOB”Supply of Spent Caustic Neutralization SkidDimensions 2.5 x 1 x 2.8 mWeight 550 kg

2005

KPOKARACHAGANAKDEVELOPMENTPROJECT

“TURN KEY JOB”Supply of Nitrogen Purification PackageDimensions: 2.5 x 1 x 2.8 mWeight 1.500 kg

2004

NUOVO PIGNONEHASSI R’MELALGERIA

“TURN KEY JOB”Supply of one fuel gas skidDimensions: 3 x 12 x 4,3 mWeight: Kg 28.000

2004

PETROJETBASANDILA, SHATTA& TALKHA PROJECT

“TURN KEY JOB”Supply of new 3 LPG Receiving Skids

2004

ENPPITEMSAH - 4PLATFORMPROJECT

TURN KEY JOB”Supply of new one instrument & service gas skids(ext. dim. 7 x 3,2 x 5,2 m.).

2004

ENPPI

RASHID - 2PLATFORMAND SEA LINE TOP - 1 EGYPT

“TURN KEY JOB”Supply of n. 3 chemical injection skids (methanol, glycol and chemical injection skids)Dimensions: 5,3 x 2 x 4,6 m eachWeight: Kg 7.500 each

2004

ENPPITEMSAH - 4PLATFORMPROJECT - EGYPT

“TURN KEY JOB” Supply of n. 7 chemical injection skids (methanol, glycol and chemical injection skids) Dimensions: 5 x 2,8 x 4 m each

2004

UOPGREENGASMANTOVA

6 PSA Greengas PolybedDimensions: 26 x 3,5 x 2,5 m

2003

MEISAL ANBAR POWERSTATION (Iraq)

“TURN KEY JOB”Supply of Oil metering skidDimensions: 2,5 x 6,5 x 2,7 mWeight:10.000 Kg

2003

REFERENCES:SKIDS/CHEMICAL INJECTION/PROCESS EQUIPMENT

Sede Amministrativa: Via Pavia, 21 - 20053 Muggiò (MB), Italy - Tel. +39 039 2788.1 - Fax +39 039 2781353 - Sede Legale: Via Giulini, 12 - 22100 Como (CO), Italy

Reg. Imprese di Como N° 03046260133 - R.E.A. CO - 292997 - C.F. / P.I. 03046260133 - Capitale Sociale Euro 700.000,00 i.v.

Page 16: CONSTRUCTION DIVISIONEMETHANEX Damietta 1 MASS SPECTROMETER ANALYZER SHELTER / 1 AIR SEPARATION UNIT ANALYZER SHELTER Dimensions 4 x 2,5 x 2,7 m each Weight : 5.500 Kg each 2008 SAIPEM

CUSTOMER END USER PROJECT DESCRIPTION YEAR

MEISYOUSFYIA POWERSTATION (Iraq)

“TURN KEY JOB”Supply of Oil metering skidDimensions: 2,5 x 6,5 x 2,7 mWeight 10.000 Kg

2003

NUOVO PIGNONE GREENSTREAMMELLITAH GASCOMPRESSIONSTATION (LYBIA)

“TURN KEY JOB”Supply of N. 3 fuel gas heater skidsDimensions: 2 x 7,5 x 7 mWeight 6.000 Kg

2003

PETROBELRPP PLATFORM(EGYPT)

“TURN KEY JOB”Supply of instrument and service gas skidDimensions: 2 x 5 x 4,5 mWeight: 7.500 Kg

2003

PETROBELPFD & RPPPLATFORM (EGYPT)

“TURN KEY JOB”Supply of n. 5 chemical injection skids(methanol, glycol and chemical injection skids)

2003

PETROBELPFD PLATFORM (EGYPT)

“TURN KEY JOB”Supply of instrument and service gas skidDimensions: 2 x 5 x 4,5 mWeight: 7.500 Kg

2003

SAIPEM

NAOC

IRRI FLOW STATIONPROJECT (NIGERIA)

“TURN KEY JOB”for execution of nitrogen generator package- N° 1 Compressor and Air treatment skid Dim. 2,2 x 6 x 3,5 m - Weight 5.800 Kg- N° 1 Nitrogen Vessel- N° 1 Membrane skid Dim. 1 x 1,5 x 2 m - Weight 600 Kg

2003

KPOKARACHAGANAKDEVELOPMENTPROJECT

“TURN KEY JOB”Supply of Water Steam Plant 6t/h + skids

2003

NUOVO PIGNONE

(EGYPT)

ROSETTA FIELD(EGYPT)

“TURN KEY JOB”Supply of one fuel gas treatment skid.Dimensions: 4,2 x 2,6 x 4,2 mWeight: 6.500 Kg

2002

SAIPEM

NAOC

OBIAFU/ OBRIKOMPLANT WORKS & IRRIFLOWSTATIONS -NIGERIA

“TURN KEY JOB”Supply of one chemical injection skid.Dimensions: 4 x 2,5 x 2,8 m.Weight: 2.500 Kg

2002

ERG PETROLIISAB REFINERY(Priolo ITALY)

“TURN KEY JOB”Supply of four new GPL treatment skidsDimensions: 6,8 x 2,5 x 4m eachWeight: Kg 15.000 each

2002

ENI DIV. AGIP

VIGGIANO (PZ)

CENTRO OLIO“TURN KEY JOB”Supply of four chemical injection skids(each ext. dim. 4 x 2,5 x 3,5 m.)

2002

PETROJET PPC(EGYPT)

AGROUD

“TURN KEY JOB”Supply of two pressure control skids for liquidhydrocarbons products (each ext dim.9.4 x 2.4 x 3 m.)Weight: 18.000 Kg

2002

REFERENCES:SKIDS/CHEMICAL INJECTION/PROCESS EQUIPMENT

Sede Amministrativa: Via Pavia, 21 - 20053 Muggiò (MB), Italy - Tel. +39 039 2788.1 - Fax +39 039 2781353 - Sede Legale: Via Giulini, 12 - 22100 Como (CO), Italy

Reg. Imprese di Como N° 03046260133 - R.E.A. CO - 292997 - C.F. / P.I. 03046260133 - Capitale Sociale Euro 700.000,00 i.v.

Page 17: CONSTRUCTION DIVISIONEMETHANEX Damietta 1 MASS SPECTROMETER ANALYZER SHELTER / 1 AIR SEPARATION UNIT ANALYZER SHELTER Dimensions 4 x 2,5 x 2,7 m each Weight : 5.500 Kg each 2008 SAIPEM

CUSTOMER END USER PROJECT DESCRIPTION YEAR

HYUNDAIENGINEERING& CONSTRUCTIONCOMPANY

ATTAHADDYGAS FIELDDEVELOPMENT, LIBYA

“TURN KEY JOB”N° 3 Corrosion Inhibitor Injection SkidsDimensions: 3 x 2 x 3 m/eachWeight: Kg 3.000

2001

ISA MANNAI/ IMAD

ABHA BULK PLANT Disinfectant Injection System 2001

HYUNDAIENGINEERING& CONSTRUCTIONCOMPANY

ATTAHADDYGAS FIELDDEVELOPMENT,LIBYA

“TURN KEY JOB”N° 25 Corrosion Inhibitor Injection SkidsDimmensions: 3 x 2 x 3 m/ eachWeight: Kg 3.000

2001

HYUNDAIENGINEERING& CONSTRUCTIONCOMPANY

ATTAHADDYGAS FIELDDEVELOPMENT,LIBYA

“TURN KEY JOB”N° 8 Chemical Injection SkidsDimensions: 3 x 2 x 2,5 m/ eachWeight: Kg 2.200

2001

PETROFACINTERNATIONAL

UNITY WATERINJECTION. PROJECTPHASE 1-SUDAN

“TURN KEY JOB”Supply of new two chemical injection skids(each ext. dim. 5,65 x 2,55 x 2,30 m)

2001

ENI DIV. AGIP

VIGGIANO (PZ)

CENTRO OLIO“TURN KEY JOB”Supply of new four chemical injection skids(each ext. dim. 4 x 2,5 x 3,5 m)

2000

PETROBEL

TEMSAH PROJ. (EGYPT)

EL GAMILGAS TREATMENTPLANT - EGYPT

“TURN KEY JOB”Supply of one new gas metering skid(ext. dim. 13 x 5,1 x 4,5 m)

2000

PETROBEL

TEMSAH PROJ. (EGYPT)

EL GAMILGAS TREATMENTPLANT - EGYPT

“TURN KEY JOB”Supply of one new fuel gas skid(ext. dim. 8 x 3,2 x 4,4 m)

2000

PETROBEL

TEMSAH PROJ. (EGYPT)

EL GAMILGAS TREATMENTPLANT - EGYPT

“TURN KEY JOB”Supply of new three glycol injection skids(ext. dim.: 9 x 3,2 x 3,2 m.; 6 x 3,1 x 3,2 m.; 4,3 x 2,5 x 2,8 m)

2000

PETROBEL

TEMSAH PROJ. (EGYPT)

NORTH WESTGAS PLATFORM -EGYPT

“TURN KEY JOB”Supply of new one instrument & service gas skids(ext. dim. 7 x 3,2 x 5,2 m)

2000

ENI DIV. AGIP

VIGGIANO (PZ)

CENTRO OLIO“TURN KEY JOB”Supply of new four chemical injection skids(each ext. dim. 4 x 2,5 x 3,5 m)

2000

PETROBEL

BALTIM (EGYPT)

BALTIM EAST PROJ.GAS PLATFORM

“TURN KEY JOB”Supply of new one instrument and service gas skid(ext. dim. 4 x 2 x 4 m)

1999

REFERENCES:SKIDS/CHEMICAL INJECTION/PROCESS EQUIPMENT

Sede Amministrativa: Via Pavia, 21 - 20053 Muggiò (MB), Italy - Tel. +39 039 2788.1 - Fax +39 039 2781353 - Sede Legale: Via Giulini, 12 - 22100 Como (CO), Italy

Reg. Imprese di Como N° 03046260133 - R.E.A. CO - 292997 - C.F. / P.I. 03046260133 - Capitale Sociale Euro 700.000,00 i.v.

Page 18: CONSTRUCTION DIVISIONEMETHANEX Damietta 1 MASS SPECTROMETER ANALYZER SHELTER / 1 AIR SEPARATION UNIT ANALYZER SHELTER Dimensions 4 x 2,5 x 2,7 m each Weight : 5.500 Kg each 2008 SAIPEM

CUSTOMER END USER PROJECT DESCRIPTION YEAR

PETROBEL

BALTIM EL QARA (EGYPT)

BALTIM EL QARAPROJ.GAS ON SHORE

“TURN KEY JOB”Supply of new three glycol injection skids(each ext. dim. 4 x 2,5 x 3 m).

1999

GUPCOHA’PY PROJ.GAS TREATMENT -EGYPT

“TURN KEY JOB”Supply of new one gas and liquid metering skid(ext. dim. 10,7 x 5 x 3,3 m) design for:q.ty 3 + 1 spare metering line by 14” andq.ty 2 headers by 24” 900 RJ.

1999

GUPCOHA’PY PROJ.GAS TREATMENT -EGYPT

“TURN KEY JOB”Supply of new one air treatment skid composed by:- q.ty 1 air compressors skid (ext. dim. 6 x 1,5 x 2 m);- q.ty 1 instrument and service air treatment

1999

INTERMARE SARDA

CLARA COMPLEXGAS PLATFORM

“TURN KEY JOB”Supply of new two glycol injection skids(each ext. dim. 2 x 2,5 x 2 ,m )

1999

SARAS S.p.A.Raffinerie Sarde

SARROCH (CA)N° 3 Oxygen Control Skid(ext. dim. 5,9 x 0,9 x 2,1 m - Weight : 2.000 Kg.)

1999

ENI DIV. AGIP

VIGGIANO (PZ)

CENTRO OLIO“TURN KEY JOB”Supply of new two chemical injection skids(each ext. dim. 4 x 2,5 x 3,5 m)

1999

ENI DIV. AGIP

VIGGIANO (PZ)

CENTRO OLIO“TURN KEY JOB”Supply of new twelve chemical and injection skids(each ext. dim. 4 x 2,5 x 3,5 m)

1998

PETROBELDARFEEL PROJ. GASPLATFORM - EGYPT

“TURN KEY JOB”Supply of new one instrument and service gas skid(ext. dim. 4 x 2 x 4 m) and new one chemicals injection skid (ext. dim. 6,5 x 2,5 x 3 m)

1998

PETROBELPORT FOUAD PROJ.GAS ON SHORE

“TURN KEY JOB”Supply of new one air treatment skid composed by:N°1 air compressors skid (ext. dim. 6 x 1,5 x 2m); N°1 instrument and service air treatment (ext. dim. 4 x 2 x 4m); N°1 air surge drum having capacity about 30 m3.

1997

PETROBEL

ABU DHABI

ABU MADI PROJ. GAS ON SHORE

“TURN KEY JOB”Supply of new two corrosion inhibitor injection skids(each ext. dim. 3 x 2 x 2 m)

1997

AGIP

RAVENNA (RA)

ANEMONE CLUSTERPLATFORM

“TURN KEY JOB”Supply of new one fuel gas treatment control unit

1997

CHEMIT

RECHERCHES CONGO

LOANGO DP1PLATFORM

“TURN KEY JOB”Supply of new three water service treatment skids

1995

REFERENCES:SKIDS/CHEMICAL INJECTION/PROCESS EQUIPMENT