Introduction
2011.05.12.
2
Planning The selection of the route
The selection of the construction methods Geotechnical investigation Investigating soil structure, soil strength,
permeability, ground water condition etc. Staking out of the construction (layout) Using coordinate system or reference system
Tools: tape measure, theodolite, electronic distance measurement devices, GPS…
2011.05.12.
3
Construction of the Tunnel Cut-and-cover methods
Mining methods
Special methods
Construction of the Stations Cut-and-cover methods
Mining methods
Other methods
Other connecting operations Solidifying the soil
Water removal works
Construction of the Tunnel
Cut-and-cover methods Bottom-up methods (with different ground support methods)
Top-down method (Milan-method)
Mining methods Belgian method
German method
New Austrian method (NÖT)
Tunnel Boring Machines (shields)
Special methods Caisson
2011.05.12.
4
Construction of the Tunnel
Cut-and-cover methods Bottom-up methods (with different ground support methods)
Top-down method (Milan-method)
Mining methods Belgian method
German method
New Austrian method (NÖT)
Tunnel Boring Machines (shields)
Special methods Caisson
One One and a half Two Two and a half
Levels of cut-and-cover tunnels
2011.05.12.
5
Construction of the Tunnel
Cut-and-cover methods Bottom-up methods (with different ground support methods)
Top-down method (Milan-method)
Mining methods Belgian method
German method
New Austrian method (NÖT)
Tunnel Boring Machines (shields)
Special methods Caisson
Ground support
Sloped trench (a)
Partly sloped (b)
Sheet pile wall (c, d)
Steel and timber bracing (soldier piles)(e)
Slurry-wall (f)
Pile wall (f)
With propping or tie-back
2011.05.12.
6
Ground support
Pile wall
Budovatelu station, Prague
Construction of the Tunnel
Cut-and-cover methods Bottom-up methods (with different ground support methods)
Top-down method (Milan-method)
Mining methods Belgian method
German method
New Austrian method (NÖT)
Tunnel Boring Machines (shields)
Special methods Caisson
2011.05.12.
7
2011.05.12.
8
2011.05.12.
9
2011.05.12.
10
Construction of the Tunnel
Cut-and-cover methods Bottom-up methods (with different ground support methods)
Top-down method (Milan-method)
Mining methods Belgian method
German method
New Austrian method (NÖT)
Tunnel Boring Machines (shields)
Special methods Caisson
2011.05.12.
11
Construction of Fort George Tunnel
Construction of the Tunnel
Cut-and-cover methods Bottom-up methods (with different ground support methods)
Top-down method (Milan-method)
Mining methods Belgian method
German method
New Austrian method (NÖT)
Tunnel Boring Machines (shields)
Special methods Caisson
2011.05.12.
12
The Belgian method (proportions in m)
Construction of the Tunnel
Cut-and-cover methods Bottom-up methods (with different ground support methods)
Top-down method (Milan-method)
Mining methods Belgian method
German method
New Austrian method (NÖT)
Tunnel Boring Machines (shields)
Special methods Caisson
2011.05.12.
13
The German method (proportions in m)
Construction of the Tunnel
Cut-and-cover methods Bottom-up methods (with different ground support methods)
Top-down method (Milan-method)
Mining methods Belgian method
German method
New Austrian method (NÖT)
Tunnel Boring Machines (shields)
Special methods Caisson
2011.05.12.
14
The New Austrian method
Construction of the Tunnel
Cut-and-cover methods Bottom-up methods (with different ground support methods)
Top-down method (Milan-method)
Mining methods Belgian method
German method
New Austrian method (NÖT)
Tunnel Boring Machines (shields)
Special methods Caisson
2011.05.12.
15
Tunnelling shield at the Thames Tunnel, London
Schematic diagram of an EPB shield
2011.05.12.
16
The shields in Antwerp and Hamburg
2011.05.12.
17
TBM, Budapest1. Rock environement2. Cutting wheel3. Supporting earth mass4. Watertight steel separator wall5. Hydraulic pressing jacks6. Earth mass screw conveyor7. Segment erector8. Segment ring
2011.05.12.
18
Prefabricatedreinforced concretesegments of the tube
The construction of Metro line 2, Budapest
The construction of the subway at the Navy Yard, Washington DC
2011.05.12.
19
Construction of the Tunnel
Cut-and-cover methods Bottom-up methods (with different ground support methods)
Top-down method (Milan-method)
Mining methods Belgian method
German method
New Austrian method (NÖT)
Tunnel Boring Machines (shields)
Special methods Caisson
Construction of a four track tunnel in Stockholm
2011.05.12.
20
Caisson Cutting edge types Creating an underground
station
Construction of the Stations
Cut-and-cover methods Bottom-up methods (with different ground support methods)
Top-down method (Milan-method)
Mining methods One Vault method
Three Vault method
Five(six) –tunnel method
Special methods Caisson
2011.05.12.
21
Construction of the Stations
Cut-and-cover methods Bottom-up methods (with different ground support methods)
Top-down method (Milan-method)
Mining methods One Vault method
Three Vault method
Five(six) –tunnel method
Special methods Caisson
2011.05.12.
22
Equipment of constructionBaross tér
Tétényi út
Móricz Zsigmond körtér
2011.05.12.
23
Tétényi út
Bocskai út
TBM arrives toRákóczi tér
2011.05.12.
24
Construction of the Stations
Cut-and-cover methods Bottom-up methods (with different ground support methods)
Top-down method (Milan-method)
Mining methods One Vault method
Three Vault method
Five(six) –tunnel method
Special methods Caisson
Construction of the Stations
Cut-and-cover methods Bottom-up methods (with different ground support methods)
Top-down method (Milan-method)
Mining methods One Vault method
Three Vault method
Five(six) –tunnel method
Special methods Caisson
2011.05.12.
25
Construction of the Stations
Cut-and-cover methods Bottom-up methods (with different ground support methods)
Top-down method (Milan-method)
Mining methods One Vault method
Three Vault method
Five(six) –tunnel method
Special methods Caisson
2011.05.12.
26
Construction of the Stations
Cut-and-cover methods Bottom-up methods (with different ground support methods)
Top-down method (Milan-method)
Mining methods One Vault method
Three Vault method
Five(six) –tunnel method
Special methods Caisson
2011.05.12.
27
Other connecting operations
Solidifying the soil Freezing the soil
Grouting methods
Water removal works Drainage
Sinking groundwater level
Watertight working pit
Wall Wall
Workingpit
AnchoringSolidified soil Solidified
soil
Other connecting operations
Solidifying the soil Freezing the soil
Grouting methods
Water removal works Drainage
Sinking groundwater level
Watertight working pit
Sheet pile wall
Workingpit
AnchoringSolidified soil
Slurry wallGroundwater level
Well Planned object
2011.05.12.
28
http://www.nycsubway.org/articles/irtbook_index.html http://science.howstuffworks.com/engineering/structural/tunnel.htm http://www.vivanext.com/gallery_subways http://en.wikipedia.org/wiki/Tunnel http://www.metro4.hu/hogyanepul.php