+ All Categories
Home > Documents > Construction status

Construction status

Date post: 09-Mar-2016
Category:
Upload: by-havn
View: 215 times
Download: 0 times
Share this document with a friend
Description:
This brochure outlines the businesses and institutions with which the City & Port Development has entered into agreements. The numbers correspond to the numbers on the map and denote the locations of the sites in Ørestad.
Popular Tags:
21
CPH City & Port Development Nordre Toldbod 7 PO Box 2083 DK-1013 Copenhagen K Tel +45 3376 9800 Fax +45 3376 9801 www.byoghavn.dk [email protected] StatuS memo Subject Construction Status Date 8 December 2010 Contact Britta Køster Chief Consultant [email protected] Editorial staff Heidi olsen [email protected] Construction status this brochure outlines the businesses and institutions with which the City & Port Development has entered into agreements. the numbers correspond to the num- bers on the map and denote the locations of the sites in Ørestad. the world’s most sophicated metro drives through Ørestad every 3 minutes dur- ing peak hour and every 6 minutes outside peak hour. With six stations in Ørestad, the metro provides internal coherence and connects the town with the rest of the capital. more details on Ørestad on www.orestad.dk and By & Havn on www.byoghavn.dk.
Transcript
Page 1: Construction status

[Name and Address (Use F11 to go from one field to another)] CPH City & Port Development Nordre Toldbod 7 PO Box 2083 DK-1013 Copenhagen K Tel +45 3376 9800 Fax +45 3376 9801 www.byoghavn.dk [email protected] CVR nr. 30823702

[Overskrift] 31 August 2009 HO [email protected]

[Text] Yours sincerely Heidi Olsen

StatuS memo

Subject Construction Status

Date 8 December 2010

Contact Britta Køster Chief Consultant [email protected]

Editorialstaff Heidi olsen [email protected]

Constructionstatus

this brochure outlines the businesses and institutions with which the City & Port Development has entered into agreements. the num bers correspond to the num-bers on the map and denote the locations of the sites in Ørestad.

the world’s most sophicated metro drives through Ørestad every 3 minutes dur-ing peak hour and every 6 minutes outside peak hour. With six stations in Ørestad, the metro provides internal coherence and connects the town with the rest of the capital.

more details on Ørestad on www.orestad.dk and By & Havn on www.byoghavn.dk.

Page 2: Construction status

E20E20

KALVEBOD FÆLLED

ROYAL GOLF CENTER

SPEEDWAYBANE

AMAGERFÆLLED

SYDHAVNEN

STORE HØJ

REMISEPARKEN

Ove

Aru

ps V

ej

Edvard Thomsens Vej

Arne Jacobsens Allé

Cent

er B

oule

vard

C. F. Møllers Allé

Hannemanns Allé

Ejler Billes Allé

Asger Jorns Allé

Robe

rt J

acob

sens

Vej

Else

Alfe

lts V

ej

Ric

hard

Mor

tens

ens

Vej

Kalvebod Sti

Øre

stad

s B

oule

vard

Met

rove

j

Kay

Fis

kers

Vej

Øre

stad

s B

oule

vard

Øre

stad

s B

oule

vard

Njalsgade

Tom

Kri

sten

sens

Vej

Amag

erfæ

lledv

ej

Kare

n B

lixen

s Ve

j

Øre

stad

s B

oule

vard

Amagerfæ

lledvej

Rued Langgaards Vej

Kaj Munks Vej

Grønjordsvej

Emil

Hol

ms

Kana

lN

ordr

e D

igev

ej

Vejlands Allé

1 12

50

19 89

1120

2

32

3623

14

6

53

21

29

47

18

1022

33354a4

16

567

3

4544 4649

5758

17

55

24 3130

16

28 25 27

3937

3826

40a

40

34

43

42

13

54

51

548

41

52

1 university of Copenhagen, amager2 DR Byen (DBC – City)3 Field’s4 Ferring4.a Neroport5 telia6 amager Hospital7 KLP ejendomme a/S (1)8 It university of Copenhagen9 Karen Blixen Parken10 Company Park11 tietgenkollegiet 12 Bikuben Kollegiet 13 Building site 114 Solstriben15 Horisonten16 Ørestad Gymnasium 17 Parkhusene18 Vm husene19 Fælledhaven20 universitetshaven21 Københavns energi/Vejlandshuset22 Porthuset23 Småland day-care centre24 Brohuset25 Sejlhuset26 Signalhuset27 City Husene28 Copenhagen Golfpark29 Bella Hus30 Det Flexible Hus31 Ørestadshuset32 metropolen33 City of Copenhagen – elementary school34 aaB – subsidised housing for seniors35 KLP ejendomme a/S (3)36 Ørestad Friskole

– private independant school37 Copenhagen Golfpark Sunset ,

City Fairway House38 Kobberhuset39 KLP ejendomme a/S (2)40 Ørestad Down town &

Ørestad Business Center 40.a CaBINN metro41 arkaden42 Building site 3.143 Frikvarteret44 Lake City45 8tallet46 Stævnen47 Vm BJeRGet / mountain Dwellings48 Copenhagen towers 49 Klasi Holistic House a/S50 mikado House 51 SeB Pension / Rambøll 52 Hannemannsparken 53 Danica ejendomme54 City of Copenhagen – elementary school55 Nordkranen/4D56 Winghouse57 Sheltered housing/KaB58 Residence hall/Schaumann

By 8 December 2010, City & Port Development has entered sales agreements with the following companies and institutions:

Page 3: Construction status

1UniversityofCopenhagen–SøndreCampus

Size: 40,000 m2

Status: Inaugurated august 2002Architects: KHRaSUseofthesite: universityLink: www.hum.ku.dk

In august 2002, the Faculty of Humanities at Copenhagen university was ex tended by 40,000 m2. the expansion means that the faculty can now accommodate an additional 5,000 students. the university of Copenhagen has started rebuilding Kua, the old premises at amager – the faculties of theology, computer science and law will be concentrated at one large campus at amager. these faculties will move into Søndre Campus in 2014. arkitema designed the project.

2 DRByen–multimediacomplexandconcerthall

Size: approximately 136,000 m2 including basement. Status: Inaugurated 2005. Architects: Wilhelm Lauritzen aS, DISSING+WeItLING

arki tektfirma a/s, ateliers Jean Nouvel, Gottlieb & Palu dan + NoBeL arkitekter a/s

Useofthesite: Culture/Broadcasting Coorporation Link: www.dr.dk/omdr, www.dr.dk/koncerthuset

In November 2005, the first building in DR Byen was inaugurated and throughout 2006 and 2007, even more DR employees got their new workplace here. the construction consists of four buildings each with its own architecture. the buildings are connected by “Indre Gade”, an inner bridge crossing the university Canal from the building’s second floors. the concert hall, designed by Jean Nouvel, opened in January 2009.

3Field’s–shoppingandentertainmentcentre

Size: 178,000 m2

Status: Inaugurated march 2004Architects: C.F. møllers tegnestueUseofthesite: Shopping centreLink: www.fields.dk

approximately 150 shops, restaurants, golf centre, leisure facilities etc. make Field’s the largest shopping centre in Scandinavia. Current tenants include magasin, el-Giganten, Stadium, Bilka one Stop, Hennes & mauritz and Zara, soon to be followed by offices and a cinema complex. the undeveloped area south of the present constructions will be part of the master plan that the architect Daniel Liebeskind has created.

Page 4: Construction status

4Ferring–pharmaceuticalscompany

Size: 15,000 m2

Status: Inaugurated January 2002Architects: Henning Larsens tegnestueUseofthesite: CommercialLink: www.ferring.com

Ferring was one of Ørestad’s first new residents. Via its relocation to Ørestad City, Ferring was able to consolidate its malmö, Copen-ha gen and Kiel activities in its new 20-storey headquarters. Ferring International Centre houses core functions such as product devel opment, drug registration, and international marketing. the building is owned by Norrporten.

4a Neroport–officecomplex

Size: 10,500 m2

Status: Inaugurated october 2009Architects: Henning Larsen architectsUseofthesite: office complexLink: www.neroport.dk

Norrporten has constructed an office complex in Ørestad City next to Ferring. apart from offices, the building will also house an atrium giving space to a restaurant and other activities. Its current tenants are the insurance company Skandia who has rented 35 per cent of Neroport and Bombardier transportation.

5Telia–telecommunications

Size: 1,900 m2

Status: Inaugurated 1999Architects: arkitektfirma erling Foged a/SUseofthesite: CommercialLink: www.telia.dk

telia’s technological Centre is an international junction for data traf fic, connecting telia’s Backbone Net in Denmark with telia’s Viking Ring and a transatlantic cable.

6 AmagerHospital–PsychiatricUnit

Size: 17,000 m2

Status: Inaugurated in November 2001Architects: aa arkitekter a/SUseofthesite: HospitalLink: www.amagerho spital.dk

Located near Sundby metro Station and the nature reserve of amager Fælled, the hospital has capacity for 110 patients.

Page 5: Construction status

7KLPEjendommeA/S–officecomplex

Size: 29,000 m2 including basement etc.Status: Inaugurated in September 2003Architects: DISSING+WeItLINGUseofthesite: office complexLink: www.klp-ejendomme.dk

Norwegian owned KLP ejendomme has built this eight-storey of fice building centrally in Ørestad City. KLP ejendomme offers tenancies of varying size, starting at 500 m2 adapted to meet the needs of any company or institution. Its current tenants are atkins, Han delsbanken, medicon Valley academy, uCB Pharma, Novo Nordisk Scandinavia, Dell, accenture and GlaxoSmithKline.

8 ITUniversityofCopenhagen

Size: 30,000 m2

Status: Inaugurated in September 2004Architects: Henning Larsens tegnestueUseofthesite: universityLink: www.itu.dk, www.5te.dk,

www.crossroadscopenhagen.dk

the It-university accommodates 3,000 students and houses teaching and research facilities, a multimedia lab, a student café and restaurant. on the university’s 5th floor lies the new It Growth Centre – “5te”, which is an environment for entrepreneurs, new starters, companies and researchers focusing on creativity and It. Network Crossroads Copenhagen is also housed in the It university. the State Science and education Buildings have purchased 11,000 m2, but use of the site has not yet been determined.

9KarenBlixenParken

Size: 20,700 m2

Status: Inaugurated in april 2004Architects: Wilhelm Lauritzens tegnestueUseofthesite: HousingLink: www.kbparken.dk, www.aab.dk

Karen Blixen Parken is located on the waterfront of the university Canal. the 212 family dwellings are divided into cooperative, owner-occupied and rented flats, each averaging 85 m2 in size.

Page 6: Construction status

10CompanyPark

Size: 5,300 m2

Status: Inaugurated may 2002Architects: Hvidt & mølgaardUseofthesite: office buildingLink: www.companypark.dk, www.api.fi

aberdeen Property Investors Denmark a/S owns this 4-storey office building. Its current tenants are masterfoods, BearingPoint, Bio gens, Brogen Idec. Denmark, Nikon, Shell Gas (LPG Danmark) and Rae Systems europe.

11Tietgenkollegiet(Residencehall)

Size: 25,000 m2

Status: Inaugurated in September 2006. Architects: Lundgaard & tranberg arkitektfirma a/SUseofthesite: Residence hall Link: www.tietgenkollegiet.dk

Nordea Danmark Fonden has constructed this distinctive, circular residence hall with an approximate 400-dwelling capacity. the circular form of the construction creates a common central court yard. the single and two-room dwellings are located along the build ing’s outer wall overlooking the university Canal and the Landskabelige Kanal (the Scenic Canal). the common rooms of the Residence Hall – music workshops for rhythmic and classical music, laundry, computer room, common rooms, administration etc. – face the inner courtyard.

12BikubenKollegiet(ResidenceHall)

Size: 6,800 m2

Status: Inaugurated in September 2006.Architects: a.a.R.t.Useofthesite: Residence hall Link: www.kollegiefonden.dk

Kollegiefonden Bikuben has built a 7-storey residence hall on the corner of Njalsgade and amager Fælledvej. the residence hall contains 96 one-room dwellings and four two-room dwellings, three dwellings for handicapped people and four two-storey family dwellings. the residence hall also contains an ex ercise room, studio, laundry room, reading room, lounge, assembly hall as well as communal kitchens and living rooms.

Page 7: Construction status

Ørestad Syd

Vestamager

13Buildingsite1–commercial

Size: 7,600 – 9,000 m2

Status: unresolvedArchitects: Domus arkitekter & Juul Frost arkitekterUseofthesite: Commercial

Keops Development a/S is constructing a commercial complex located in Ørestad Syd.

14 Solstriben

Size: 15,000 m2

Status: Inaugurated august 2004Architects: Boldsen & Holm arkitekterUseofthesite: HousingLink: www.solstriben.net

NCC has constructed 91 apartments in blocks of 3 to 5 storeys, and 55 two-storey non-detached houses. the building complex consist of 12 residential groups sharing a common entry forecourt. the dwellings vary in size from 86 m2 to 124 m2.

15 Horisonten

Size: 26,000 m2

Status: Horisonten 1: Inaugurated april 2007, Horisonten 2: Construction period unresolvedArchitects: arkitemaUseofthesite: HousingLink: www.horisonten-boliger.dk

Pension Danmark has constructed 180 owner-occupied and rental apartments overlooking amager Fælled nature reserve and the Ørestad City Park. the size of the apartments range from 70 to 147 m2. Pension Danmark bought an additional 7,600 m2 in 2005 for the construction of additional dwellings.

16 ØrestadGymnasium(seniorhighschool)

Size: 12,400 m2

Status: Inaugurated august 2007.Architects: 3XNUseofthesite: Senior high school Link: www.orestadgymnasium.dk

Ørestad Gymnasium, an upper secondary school, was opened in may 2007. For four successive years, this school has been the most applied to in its category. With its 800 students, Ørestad Gymnasium does much for the vibrant urban atmosphere of Ørestad. the profile of the school is media, communication and culture.

Page 8: Construction status

17Parkhusene

Size: 15,100 m2

Status: Inaugurated in July 2005.Architects: arkitemaUseofthesite: HousingLink: www.lejerbo.dk

Parkhusene was erected by aktivgruppen and Lejerbo. Stage 1 comprises 63 rented apartments distributed on 11 storeys. Stage 2 comprises 57 coop erative and owner-occupied apartments distributed over 8 storeys. In parts of the building, the top storey has been converted into a 150 m2 roof garden. on the ground floor the supermarket Netto has opened a store.

18VMhusene

Size: 25,400 m2

Status: Inaugurated in 2005.Architects: PLot arkitekterUseofthesite: HousingLink: www.vmhusene.dk

Vm husene are two very unconventional buildings of 4-12 storeys in Ørestad City with approximately 212 rented, cooperative, and own er-occupied apartments. there are 76 different kinds of apartments, and residents can adapt the apartments to suit their changing needs. Bicycle parking, common rooms/assembly halls have been established in the buildings, along with an integrated day-care cen tre, which accommodates 48 children. the houseowners´ association opened a new pocket park between V-Huset and Porthuset.

19 Fælledhaven

Size: 13,000 m2

Status: Inaugurated December 2005. Architects: Domus arkitekterUseofthesite: HousingLink: www.faelledhaven.dk

as part of “Boligslangen” in Ørestad Nord, FSBbolig has constructed approximately 114 social housing units, where of 15 are senior/handicap-friendly. an integrated day-care centre accommo dating 36 nursery children and 44 kindergarten children is also situated in “Boligslangen”.

Page 9: Construction status

20Universitetshaven

Size: 19,000 m2

Status: Inaugurated august 2006-2007Architects: arkitemaUseofthesite: HousingLink: www.kuben.dk

as part of “Boligslangen” in Ørestad Nord, Kuben has constructed two 7-storey buildings to house 170 cooperative and owner-occupied apartments of the buildings are connected by a portal spanning across the canal. all 170 apartments have balconies overlooking the green areas.

21KøbenhavnsEnergi(Vejlandshuset)

Size: 13,500 m2

Status: Inaugurated January 2005. Architects: schmidt, hammer & lassenUseofthesite: CommercialLink: www.ke.dk

the headquarters of Københavns energi in Ørestad City, Vejlandshuset, is located close to the Bella Center metro Station. Inside the white, cubical building, there is a large light patio. about 550 people are employed in Vejlandshuset. there are other tenants than Københavns energi in Vejlandshuset, though – for example, Carlson Wagonlit travel resides in Vejlandshuset.

22 Porthuset

Size: 14,100 m2

Status: Inaugurated July 2007Architects: Holgaard arkitekter apSUseofthesite: Housing & commercialLink: www.porthuset.dk

Porthuset a/S has constructed 165 owner-occupied apartments in Øre-stad City, east of the metro´s elevated track. Porthuset has the shape of a sculptural three-winged building. the apartments vary in size between 54 and 140 m2. In the ground floor you will find a kiosk, the restaurant VISa Sushi, and a driving school.

Page 10: Construction status

23Smålandday-carecentre,TheCityofCopenhagen

Size: 700 m2

Status: Inaugurated in april 2004Useofthesite: Day-care centreLink: www.daginstitutioner.kk.dk

the City of Copenhagen has built the “Småland” day-care centre accommodating 44 children.

24Brohuset

Size: 12,000 m2

Status: Inaugurated october 2007. Architects: 3XNUseofthesite: HousingLink: www.3b.dk, www.kab-bolig.dk

123 social housing units has been constructed in Ørestad City. the architects 3XN have designed the eight-storey building. Irregular surfaces and roof gardens invite the green element inside and up over the surface of the building, providing light and space.

25 Sejlhuset

Size: 12,000 m2

Status: Inaugurated march 2008. Architects: tegnestuen Vandkunsten Useofthesite: HousingLink: www.kab-bolig.dk, www.3b.dk

the architects from tegnestuen Vandkunsten have designed this outstanding residential structure. KaB was responsible for the construction of 128 subsidized housing units. a day-care centre, which accommodates 60 children is established in the building, along with a neighbourhood building with café and meeting rooms.

26 Signalhuset

Size: 8,300 m2

Status: Inaugurated in august 2006Architects: Nobel arkitekterUseofthesite: HousingLink: www.lejerbo.dk

Lejerbo has constructed “Signalhuset” on the corner of arne Jacobsens allé and edvard thomsens Vej in Ørestad City. With its 288 housing units for young people distributed on 9 floors, these dwellings have a flexible design, which allows easy conversion of the apartments into traditional family dwellings.

Page 11: Construction status

27CityHusene

Size: 12,800 m2

Status: Inaugurated april 2007Architects: tegnestuen VandkunstenUseofthesite: HousingLink: www.cityhusene.dk

arkitektGruppen has constructed 125 cooperative and owner-occupied apartments on the edge of the park in Ørestad City. the two-room, three-room, and four-room apartments vary in size from 83 to 113 m2.

28CopenhagenGolfpark

Size: 16,000 m2

Status: Inaugurated march 2007.Architects: Domus arkitekterUseofthesite: HousingLink: www.golfpark.dk

Nordbornholms Byggeforretning and Cargill have constructed 149 apartments on the corner of the park in Ørestad City, near Center Boulevard. ten ants enjoy the view of the amager Fælled nature reserve and the golf course, the Royal Copenhagen Golf Center.

29BellaHus

Size: 5,900 m2

Status: Inaugurated march 2007Architects: schmidt, hammer & lassenUseofthesite: Housing

on behalf of De Københavnske ejendomsselskaber, the Sjælsø Group a/S has built 63 rental dwellings in Ørestad City, close to the Bella Center metro Station. the height of the Bella Hus building varies from four to seven storeys. there is a clothing store on the ground floor.

30 DetFlexibleHus

Size: 12,000 m2

Status: Inaugurated July 2007Architects: arkitemaUseofthesite: HousingLink: www.detflexiblehus.dk

Kuben Byg a/S has constructed 124 owner-occupied dwellings in Ørestad City at the city park.

Page 12: Construction status

31Ørestadshuset

Size: 12,600 m2

Status: Inaugurated September 2007Architects: Lundgaard & tranberg arkitektfirma a/SUseofthesite: HousingLink: www.ørestadshuset.dk

Sjælsø Gruppen a/S has constructed 127 owner-occupied dwellings in Ørestad City at the city park. the size of the apartments varies from 78 to 105 m2 consisting of two, three or four rooms.

32Metropolen(commercial)

Size: 9,500 m2

Status: Inaugurated october 2010Architects: arkitektfirmaet C.F. møllerUseofthesite: CommercialLink: www.arkitektgruppen.net

PensionDanmark and arkitektgruppen has constructed a seven floor office building. metropolen has shops on the ground floor; the other floors will house offices. the office complex is located at Njalsgade in Øre stad Nord close to Islands Brygge metro Station. the urban space at metropolen and the station square is being developed with a water basin and a rambla.

33 CityofCopenhagen–primaryandlowersecondaryschool

Size: 10,000 m2

Status: Construction period mid 2010 - end 2011Architects: team Borga/KHRaSUseofthesite: Primary & lower secondary school Link: www.kk.dk

the City of Copenhagen is building a school in Ørestad City close to Ørestad Gymnasium. this school will be one of the ”profile schools” of the City, setting new standards for sustainability and new learning tools, and focus on food culture.

34 AAB–Subsidisedhousingforseniors

Size: 9,000 m2

Status: Construction has started.Architects: arkitektfirmaet entasisUseofthesite: HousingLink: www.aab.dk

aaB – arbejdernes andels Boligforening – is building 88 subsidized housing units for senior citizens in Ørestad City. the size of the apartments varies from 80 to 110 m2.

Page 13: Construction status

E20

Ørestad City

Ørestad

35KLPEjendommeA/S–officecomplex(3)

Size: 50,000 m2

Status: unresolvedArchitects: Gottlieb & PaludanUseofthesite: office complexLink: www.klp-ejendomme.dk

Norwegian owned KLP ejendomme a/S is extending its activities in Ørestad by constructing yet another commercial complex. the office building will be located next to Ferring, close to Ørestad Station.

36 ØrestadFriskole(privateindependentschool)

Size: 1,800 m2

Status: Inaugurated January 2006Useofthesite: Private independent schoolLink: www.orestad-friskole.dk

the small private school Ørestad Friskole started in the summer of 2005. the school has been founded by a group of parents who wished to create a school focusing on academic achievement and well-being in a healthy and safe environment. the school has 130 students.

37CopenhagenGolfParkSunset,FairwayCity

Size: 29,900 m2

Status: Inaugurated December 2007.Architects: Domus arkitekterUseofthesite: Housing and commercialLink: www.golfpark.dk

Nordkranen and Cargil Value Invest ment have constructed a residence for business and housing on the cor ner of arne Jacobsens allé and Center Boulevard. the apartments enjoy unrestricted views over amager Fælled nature reserve, whereas the commercial site is situated on arne Jacobsens allé.

Page 14: Construction status

E20

Ørestad City

Ørestad

E20

Ørestad City

Ørestad

38CERACODevelopment

Size: 10,000 m2

Status: Construction period 2011Architects: mangor & NagelUseofthesite: HousingLink: www.kobberhuset.dk

CeRaCo Development is constructing a housing complex situated on arne Jacobsens allé, Ørestad City. on the ground floor there will be space for a café and a shop.

39KLPEjendommeA/S–officecomplex

Size: 26,100 m2

Status: Inaugurated august 2008.Architects: DISSING+WeItLINGUseofthesite: office complexLink: www.klp-ejendomme.dk

Norwegian owned KLP ejendomme a/S has constructed a second office building. the office complex is situated next to the first office build ing of KLP ejendomme a/S on 17, arne Jacobsens allé near Ørestad station. KLP ejendomme offers tenancies of various sizes. at present Sofus Berendsen and Zurich Nordic have moved in.

40ØrestadDownTown&ØrestadBusinessCenter

Size: 25,000 m2 (205,000 m2)Status: Construction period unresolved Architects: Daniel Liebeskind (north of the motorway) and

Niels torp (south)Useofthesite: CommercialLink: www.orestaddowntown.dk,

www.orestadbusinesscenter.dk

NCC Property Development a/S and City & Port Development have entered into a cooperation agreement regard ing planning and development in Ørestad. In accordance with the agreement, NCC will construct a total of 205,000 m2 of commercial buildings in Ørestad over the next five years. the many square metres will be distributed by 100,000 square metres in Ørestad Down town north of the motorway and 105,000 square metres in Ørestad Business Center south of the motorway. the world famous architect, Daniel Liebeskind, has created the master plan for the area north of the motorway which has been named Ørestad Down town, while the Norwegian Niels torp designed the plan for Ørestad Business Center.

Page 15: Construction status

Ørestad Syd

Vestamager

Ørestad Syd

Vestamager

40aCABINNMetro

Size: 12,000 m2

Status: Inaugurated July 2009Architects: Daniel LiebeskindUseofthesite: HotelLink: www.orestaddowntown.dk, www cabinn.com

Situated in Ørestad City, Cabinn metro has 710 rooms and 1700 beds. CabInn is designed by the world-famous architect Daniel Liebeskind. the construction is part of the co-operation agreement on city development signed by NCC Property Development a/S and City & Port Development. the neighbours of Cab Inn is Field’s and the Royal Golf Center.

41Arkaden

Size: 16,500 m2

Status: unresolvedArchitects: 3XNUseofthesite: HousingLink: www.jmdanmark.dk

Jm Danmark has bought the building rights for 180 flats with attractive locations on the central city square of Ørestad Syd. the block plan was designed by Vandkunsten.

42 Buildingsite3.1

Size: 20,000 m2

Status: unresolvedArchitects: unresolvedUseofthesite: Housing & commercial

Building right for dwellings and commercials projects in Ørestad Syd. the area is in the southwest, with a direct view of Kalvebod Fælled.

Page 16: Construction status

Ørestad Syd

Vestamager

Ørestad Syd

Vestamager

43Frikvarteret

Size: 15,000 m2

Status: unresolvedArchitects: Gert Wingårdh arkitektkontor, Jensen & Skodvin

arkitektkontor, entasis, Fuglesang arkitekter, landscape architect – Vogt Landschaftarchitekten

Useofthesite: Housing & commercial

the project consist of housing and offices in Ørestad Syd. the dwellings will be flats for rent, for sale or coop-flats. the area is in the southwest, with a direct view of Kalvebod Fælled. the block will be dominated by small scale projects, its close urban houses giving sense of variation and intimacy.

44 LakeCity

Size: 32,000 m2

Status: First stage: Construction period end 2010 – early 2011Architects: arkitektfirmaet Vandkunsten has designed the master

plan of the complex. Besides, Århus arkitekterne, Kim utzon arkitekter and Wilhelm Lauritsens tegnstue are participating.

Useofthesite: HousingLink: www.lake-city.dk, www.aab.dk

arkitektgruppen has bought 32,000 m2 for the construction of approxi-mately 330 subsidized, rented and privately owned dwellings in Ørestad Syd. the constructions comprise multi-storey as well as low and compact residential complexes, as well as a daycare centre, common room, mini marina with access to a “lake”. the first two phases of building the block is 36 semi-detached houses and 83 council flats for families.

45 8-tallet

Size: 59,000 m2

Status: Inaugurated June 2010Architects: Bjarke Ingels GroupUseofthesite: HousingLink: www.8-tallet.dk

St. Frederikslund Holding a/S has constructed 476 owner-occupied and rented dwellings in Ørestad Syd. the site is placed to the far south with direct views over the future lake area and the nature reserve of Kalvebod Fælled. the ground floor already houses a café and a so-called integrated day care centre for 148 children. Furthermore, there will also be a number of minor businesses in 8taLLet.

Page 17: Construction status

46Stævnen

Size: 20,000 m2

Status: Stage 1: Inaugurated march 2009Stage 2: Construction period end 2010 – early 2011

Architects: Vilhelm Lauritzens tegnestueUseofthesite: HousingLink: www.sjaelsoe.dk; ww.stavnen.dk

Sjælsø Gruppen is building 8.500 m2 commercial complex and approx. 160 rented and owner-occupied flats in Ørestad Syd, with either balconies, terraces or roof gardens. the site is located to the far south with direct views of the lake area and the nature reserve of Kalve bod Fælled. the first dwellers moved in in march 2009. In the first stage, flats to be owned by the residents will be built – the second stage will see the building of 49 council-supported family flats.

47 VMBJERGET/MountainDwellings

Size: 10,200 m2

Status: Inaugurated July 2008Architects: Bjarke Ingels GroupUseofthesite: Housing and parkingLink: www.vmbjerget.dk

Centrally located in the Øresund City, Høpfner a/S and Dansk olie Kompagni have constructed 80 dwellings on top of a multi-storey car park holding parking facilities for 480 vehicles. Vm BJeRGet rises from ground level in one corner to a height of over 30 metres in the opposite corner. the dwellings located on the slanting terrain created by the differences of level, includes large roof gardens. the car park is located at the inside BJeRGet. CPH City & Port Development set aside 1,600 sqm for creative commercial activities. For instance, the ground floor has been rented to a deli and to a bakery.

Page 18: Construction status

Ørestad Syd

Vestamager

48CopenhagenTowers–commercial

Size: 129,200 m2

Status: First stage: Inaugurated November 2009.Architects: Foster+Partners in cooperation with

DISSING+WeItLINGUseofthesite: Business – office building, conference facilities and hotelLink: www.copenhagentowers.dk

Sjælsø Gruppen is behind the project Copenhagen towers, which will be built in Ørestad Syd in the area between the motorway and Hannemanns allé. When finished the whole complex will house a wide range of businesses, restaurants, conference facilities and shops. there will be three integrated 20 storey tower blocks. the height of the other buildings will be 7 to 9 stories. the plans are to build offices for firms of various sizes, from quite small tenancies to large one-firm office buildings. In the first stage, all tenancies are occupied. the four-star hotel Crowne Plaza and DI, the Confederation of Danish Industry, have moved in at Copenhagen towers.

49KlasiHolisticHouseA/S–WellnessCenter

Size: 17,300 m2

Status: unresolvedArchitects: schmidt hammer lassenUseofthesite: Wellness centre and hotelLink: www.shl.dk

the Icelandic company Klasi hf and the architectural firm of smidt hammer lassen are behind the construction of a wellness centre and hotel in Ørestad Syd. the wellness centre will be located to the far south with direct views over the future lake area and the nature reserve of Kalvebod Fælled. By inspiration from the Blue Lagoon in Reykjavik, Iceland, Holistic House has the ambition to become the No. 1 wellness centre in Scandinavia. the end result will be a health centre combined with a recreational hotel and conference centre.

50 MikadoHouse

Size: 18,000 m2

Status: Constructionstart 2008 - the first tenants are expected to move in in april 2010.

Architects: arkitemaUseofthesite: office, retail, café and residentialLink: www.mikadohouse.dk

arkitema architects has moved its Copenhagen headquarter from Søndre Frihavn into Ørestad Nord. In close collaboration with C.W. obel, arkitema has developed the plans of the constructions. In addition to arkitema’s headquarter, the complex accommodates offices and a fitness center. the ground floor houses the café Kong Hans.

Page 19: Construction status

E20

Ørestad City

Ørestad

51 SEBPension/Rambøll

Size: 40,000 m2

Status: Inaugurated august 2010Architects: DISSING+WeItLING.Useofthesite: office complexLink: www.sebpension.dk; www.ramboll.dk

SeB Pension and the consulting and engineering group of Rambøll has built a 40,000 m2 office complex in Ørestad Syd. With its influx of more than 1,600 employees, Rambøll will be the main tenant of these premises. the complex will be located at Hannemanns allé in Ørestad Syd – near Ørestad Station, Field’s shopping centre, metro and the Øresund motorway.

52Hannemannsparken–commercial

Size: 84,500 m2

Status: unresolvedArchitects: a.a.R.t., Hvidt & mølgaard, KHR, Shigeru Ban

(Japan),3XN, Force 4, hs ark og mVRDV (Holland)Useofthesite: Housing and commercialLink: www.nordkranen.dk

the ambition behind Hannemannsparken is to create a multifarious city environment with buzzing activities around the clock. Hannemannsparken shall therefore include a mixture of little units comprising commercial buildings as well as rented and owner- occupied dwellings.

53Danica–officecomplex

Size: 5,300 m2

Status: Inaugurated october 2009.Architects: Henning Larsen architectsUseofthesite: office complexLink:

Danica ejendomme built an office domicile at the corner of Vejlands allé and Ørestads Boulevard. among the tenants are Icelandic airline company Primera air and teleperformance Denmark.

Page 20: Construction status

Ørestad Syd

Vestamager

E20

Ørestad City

Ørestad

54CityofCopenhagen–primaryandlowersecondaryschool

Size: 8,000 m2

Status: unresolvedArchitects: unresolvedUseofthesite: primary and lower secondary schoolLink: www.kk.dk

the City of Copenhagen is planning the construction of two primary and lower secondary schools in Ørestad. one will be located in Ørestad City and one in Ørestad Syd.

55 Nordkranen/4D

Size: 26,000 m2

Status: unresolvedArchitects: CuBo arkitekter a/SUseofthesite: Commercial and housingLink: www.nordkranen.dk, www.dsbo.dk

Nordkranen has the option on the building rights for a combined project consisting of residential and non-residential buildings bordering on the city park in Ørestad City. the buildings are planned to demonstrate resource awareness and energy efficiency. the plan for this project was selected after four teams of architects and engineers specializing in sustainability had been invited to a competition. the winning project was designed by CuBo architects, CoWI and passivhus.dk.

56Winghouse

Size: 11,500 m2

Status: Inaugurated may 2010Architects: Henning Larsen architectsUseofthesite: CommercialLink: www.winghouse.dk

DaDeS has constructed the building and is placed directly on the parking space Kay Fisker, behind Ørestad High school in Ørestad City. Small tenants are residing in this building. Its current tenants are among others unilever Denmark and Helm Skandinavien.

Page 21: Construction status

Ørestad Syd

Vestamager

Ørestad Syd

Vestamager

57 Shelteredflats/KAB

Size: 11,500 m2

Status: end 2010 – early 2012Architects: the block plan and the sheltered housing were designed

by JJW architects.Useofthesite: Sheltered flatsLink: www.kab-bolig.dk

the council housing company KaB builds 114 sheltered flats in Ørestad Syd, close to Kalvebod Common and the neighbouring metro station of Vestamager.

58 Residencehall/Schaumann

Size: 5,100 m2

Status: early 2011 – mid 2012Architects: erik møller arkitekter. the block plan is designed by

JJW architects.Useofthesite: Residence hallLink: www.schaumanngroup.com

Schaumann builds 120 residence hall flats in Ørestad Syd, close to Kalvebod Common and the neighbouring metro station of Vestamager. It will be one-room flats for students and young people.


Recommended