DEVELOPMENT APPLICATION
[Office Use Only]
Date Received: DA No
COOTAMUNDRA UNOAGAL
Use this fom to apply for development consent to
Erect a building Camry out alterations or additüions
Change the use of land or a building Cary out earthworks or similar Demolish a building
Undertake activities, events or functions
Rural developments & quarries
Subdivide land
Strata subdivide a building
Erect or display advertising
A odgement checklist is available to tell you about the plans and other documents that
you must provide with this application. Make sure you receive one specific to your
development.
ne application to us by mail or deliver it in person. Applications accented Monday
to Friday 9am to 5pm (Public Holidays excepted). Refer to Part 12 for details.
Phone our Officers on (02)6940 2100 or come in and see us Part 1: Applicant Details (person or company having the benefit of the consen
Title: Mr
Family name (or company)
Mrs Miss Ms Other . **********.****"
****'****'°*********'**''** ** ***** ******°''''''****************
Given Names...DPCM Pty Ltd*****'** *** **
****************************************
(or ACN)... ******'**"*********** * ** *****'***°************** ***************
Postal address:A Crimea Street ***********"****************** ********* *******
2150 .. Post Code:. -***.**********' Parramatta
Phone (.).. ****''"'************** Mobilephone(... 0403 488 851
***********************"a** **.
.E-mail. [email protected] [email protected]
Fax (. **** ****""****
Contact person...haval Patel *************''. ..Reference No .
apply for development consent for the development described in this application. | declare that all the information given is true and correct. l also understand that if the application is incomplete or does not comply with the requirements the appication it may be refused.
signature:. . ...Date:... 912020 ********o***
Part 2: Owners Details (include details ofall registered owners of the land) AS ABOVE YES. (tick yes ifsame above or complete details below) Title: Mr Mrs Miss Ms Other: ***********°******* '*
tel Family name (or company):.. **°'''°''******'***''"'****'****'**°°*****°****°"***°*********'***
Given Names.naval and Kunjal ******************** ****** ****'* *************'*°**'**°°***°°*****.****'***
(or ACN)... *******"**''*' *"***" **********°**''°"''*'''******"***'*******"*** **e***********a***
Postal addres8: 8A.Crimea Street. ******°***°°°*" '*****"u******°*°°****.******'*"* ****
*************************************' Post Code.... Paramatta.
Phone(..). ..Mobile phone(..9403.488.851.
Fax ( ..E-mai:[email protected].. [email protected]
.Reference No . Contact person...Dhaval.Patel.. **********°'***°***** °**
2017-2018 Cootamundra-Gundagal Reglonal Councll Fage 1 of 8
Part 8: Ownars Signatures s OOr of tho land to wlhlch this applicalon relnteos, IWo consont to this application,. I n0 vo consont for authorlsod Council officors to ontor tho land to carry out inspoctions:
Signature Capacity Date
1. ... ' '*'''"*"'"*"*" ''''*''*'*"
2 .0Pt. 16109.22 unt. *****'"' isseee. it****** ***''***"""""****"***
*'***'''"** " tsndode ****'""**''"**""*******'****
Signing on the owner's behalf as the owner's legal representative, you must state the harure of your legal authority and attach documentary evidence (eg, power or atofmey,
executor, trustee, company director Part 3: Land To Be Developed Unit No... House No. Sreet..Five Mile.Creek Road.
Town/Locality....Gundagai... *********** *** *** ************
Lot(s).. .Section........ .****************'********* * *********
Deposited Plan(s):.. 244273 .Strata Plan.. '''******'*'.
7.633Ha Area of allotment to be developed . m2/ Ha) **********'"******.** aa***
Floor area of all existing buildings onsite.. ***************************** m2) Floor area of proposed building works...********* **°°°*****************'°'****" (m2)
Part 4: Description Of Proposed Development A Erection of a New Building B Aterations or Additions C Earthworks or similar D Advertisement or sign E Demolition of structure
FO Subdivision of land/building G Undertake activities, event or functions H Advertisement or sign IRural development & quarries J Other.... . *"****
Description.. Solar Farm 4Mw
Proposed Use. Commercial**********""*****************"'* BCA Classification..
****''°'******.
Primary Production *******°*************************************'****"*******************°*°*******************
*************"****°**'''*' ****
************ "** * *** Estimated Cost $. .292m
.. Only f you ticked boxes A, B, C, D, E, I or J above Include the full cost of labour and materials. lf unsure, ask us for current building construction figures.
Part 5: Construction Certificate
No Yes
(See note below) Where yes, a Construction Certiflcate application must be completed and lodged with this application with all applicable supporting information. Part 6: Type of Consernt (if applicable)
Please tick the box beside the type of consent you are looking for:
Standard consent OStaged development
ODeferred commencement 2017-2013 Cootamundra-Gundagal Regional Council
Page 2 of 83
Part 8: Critical Habitat 1 ls any part of the land
ldentifled as critical habitat under the Theatened Spocles Conservatlon Act
19952 Part 9: Integrated Development
No Yes
1. ls the application Integrated Development?
No Than disregard this part of the Yes Please identify the Government
application and continue to Part 10.
Authority from which further
approval is required from those
listed below.
Itegrated development means prbjeats which also need approverom a State Govemment Authoriy
Os144 (aquaculture) NSW FISHERIES Fisheries Management Act 1994
s201 (dredging or reclamation in any
waters) s205 (cut, remove, damage or
destroy marine vegetation)
s219 (set a net, other material construct/alter a dam, floodgate causeway, etc; otherwise create
an obstruction acrossa bay,
inlet, etc.)
Rlease discuss what approvals you might need with our staft.
he commentary in brackets beside each section of the Act 1s provided tor guidance onlyou should consult the relevant Act for complete
detals. NSW HERITAGE OFFICE
Heritage Act 1977 S58 (development where an Interim or
Permanent Conservation Order) Separate applications will need to be made to each approval authority to gain omalapproval when Tegured
NATIONAL PARKS & wILDLIFE SERVICE National Parks & Wildlife Act 1974
s90 (destruction of Aboriginal relic/place)
he integratedt Development DEPARTMENT OF ENVIRONMENT AND process orovides certainty CLIMATE CHANGE that subsequent approvals Protection of the Environment rom state govemment Operations Act 1997 authorties will be granted in the future
S43(a), 47 &55
S43(d),55 & 122
S43(b), 48 &55 S89, 90 & 91 DEPARTMENT OF ENVIRONMENT AND
CLIMATE CHANGE (water use approval, water management work approval or activity approval under
Part 3 of Chapter 3) Water Management Act 2000
S138 (Driveway access to property or construction or modification of kerb and
ROADS&TRAFFIC AUTHORITY Note inat a deveopmer not ntegrated Developaient f works are to be camedout on a council Conttoied roada0ween
Roads Act 1993
gutter or footpath paving on a public road
controlled by the RTA) separateapprova sii maybe reuredto be obtair
NSW RURAL FIRE SERVICE S100B rom coinci Rural Fires Act 1997
Note: For each different authority approached on your behalf regarding approvals for this application, a fee of $320 applies which will be paid to each approval authorityin accordance with cl100 of the regulation. Cheques must be made payable to the authority.
Part 10: Concurrence
oes ths appication No Then disregard this part of the eure ine Concurenceof ay other autrorites?
Yes Please identify the Government application and continue to Part 11.
Authority from which further approval is required from those
listed beloW. Some PpcalonS regu aro901enoaitoner
nnnAuhorB/beleg an 0aanbe oEten,
Planning NSW
NSW National Parks and Wildlife Service
NSW Fisheries
Cootamundra-Gundagal Regional Council Page 3 of 6
Part 11: Lodgement Checklist Have you got overylhing? MOkO Surd you havo answorod all queslions roqulred for yourdovelopmor
you have completed a Statement of Environmental Effects (where applicable) See attachment .
Complote the checklist specific to your development and ensure that you have all plans and informa"lon 2s
Make sure you have suplied a minimum of 3 copies of all required plans. Make sure that you have enclosed the appropriate fee (see schedule of fees on back of tnis rom Make sure all owners have signed the application.
ake sure Political Donations Disclosure Statement has been completed if the applicant or owmer nas maoe reportable political donations (donations of $1000 or above) in the past two (2) years. Form can oE Oa from Council website www.cgrc.nsw.gov.au
ined
Is your application complete for lodgement:
Yos Part 12: How to lodge your application
No
Address the The General Manager
Cootamundra-Gundagai Regional Council
Fees Application to: Fees are calculated on a scale based on the contract value of the work. See schedule of fees on back of this form) You can send it to us by any of the following methods Payment methods Post PO Box 420
Cootamundra NSW 2590 Pay by cash, EFTPOS, credit or cheque. Make cheques payable to "Cootamundra-Gundagai Regional Council" for the relevant Council fees. Do not send cash in the mail.
Courier or Council Chambers Wallendoon Street Cootamundra NSW 2590
personal delivery
Processing Time How to cotact us by phone, fax or electronically The standard time for determination of this application
shall occur within 40 working days of its lodgement. Applications where notification, advertisement, referral or additional information is required, may take longer to determine.
Phone (02) 6940 2100
Fax: (02) 6940 2127
Email: [email protected] Coming in to see us?
Web: www.carc.nsw.gov.au Our offices are located on the Comer of Wallendoon & Cooper Streets, Cootamundra. Monday- Friday 9am to 5pm (public
holidays excluded) Hours of
Lodgement
OFFICE USE ONLY Date |Fee type Amount Receipt No.
DA Application Fee
Plan First Fee
Advertising Fee
Referral Fee
Other Fees Applicable
Total Accepted by Page 4 of 8 2017-2018 Cootamundra-Gundagal Reglonal Councll
Dovelopment Application Fees ()in the case of a proposod dovolopmont involving tho orocllon of a builaing alcudatod in accordance estimato cost within lp/mont involving tho oroctlon of a bulding or tho carrying oul of work, and naving
followina tahio a rongo specifiod In thho table reforred to In this clause, is calculatod in accordane w d
0n the case of a proposed dovolopment involving the erection of a building 1or u wdro the estinated cost of the development does not exceed $100,000 - be 4.0 fee ole eof advertising signs -$285.00 plus $93.00 for each advertisement in excess of one, Or u
calculated in accordance with the table, whichever is the greater. (d) In the case of a proposed development involving the subdivision of land
New Road- $665 plus $65 per additional lot No new road - $330 plus $53 per additional lot
ne Case of a proposed development not refered to in paragraph (a) or (b) or (c)- be $285.00 (change o se)
TABLE Column 1 Column 2
Maximum amount of fee Estimated cost of development Up to $5000 $5001-$50,000
$110 $170 plus an additional $3 for each $1,000 (or part of $1,000) of
the estimated cost $352 plus an additional $3.64 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $50,000 1,160, plus an additional $2.34 for each $1,000 (or part of
S1,000)by which the estimated cost exceeds $250,000
$1,745, plus an additional $1.64 for each $1,000 (or part of
$1,000) by which the estimated cost exceeds $500,000 $2,615, plus an additional $1.44 for each $1,000 (or part of
$1,000) by which the estimated cost exceeds $1,000,000 $15,875, plus an additional $1.19 for each $1,000 (or part of
$1,000) by which the estimated cost exceeds $10,000,000 Section 94A Development Contributions
$100,001-$200,000 = 0.5% Greater than $200,000 = 1%
S50,001-$250,000
$250,001-$500,000 S500,001-$1.000,000
$1,000,001-510.000.000 More than $10,000,000
$0- $100,000 0 % of
Estimated Cost of DevelopmentEstimated Cost of Development Estimated Cost of Development ( Crown Developments As per table above
9) Minimum fee for designated development- dlause 251 of the regulations as per table above plus $920.00 Additional fees required under Clause 248 of the Environmental Planning and Assessment Regulations, 2000
for:
a) Referral to a Design Review Panel under SEPP65 $760.00 Additional fees required under Clause 252 of the Environmental Planning and Assessment Regulations, 2000
for:
(a) Designated Development $2220.00
(b) Advertised Development $1105.00
(c) Notified Development (EPI) S830.00
If the application requires concurence from a government agency to be granted (Council does not have assumed concurence), their fees are required for each concurence authority as follows:
(a) Where Concurence is requred from Govenment Agencies (og SEPP 1) 8320.00
(b) Additional fee to Council $140.00 Addlitonal Fees under Clause 100 of the EPA Regulations:
Integrated Development $320 for each approval body
Concurence authority $320 for each approval body
CHEQUES SHOULD BE MADE PAYABLE TO THE INTEGRATED OR CONCURRENCE AUTHORITY NOT cOOTAMUNDRA-GUNDAGAI REGIONAL COUNCIL
2017-2018 Cootamundra-Gundagal Reglonal Councll Fage 5 of 8