1/42
1
OPERATIONAL RISK
MANAGEMENT ASSESSMENT
OPERATIONAL RISK
MANAGEMENT ASSESSMENT
CORE0101CORE0101
8/3/2019 CORE0101 Oper Risk Mgt Assessment
2/42
OVERVIEWOVERVIEW Background,
Definitions and terms,
Purposes and goals,
Why we use ORM,
Five step ORM process,
Three levels of applying ORM, Principles of the ORM process,
Responsibilities of implementing.
8/3/2019 CORE0101 Oper Risk Mgt Assessment
3/42
ORM BACKGROUNDORM BACKGROUND Originally developed to improve safety.
Adopted by Army.
ORM was implemented in Marine Corps.
8/3/2019 CORE0101 Oper Risk Mgt Assessment
4/42
ORM BACKGROUNDORM BACKGROUNDALMAR 210/97 states.
Commanders Shall Incorporate ORM:Crisis action
Exercise planning
Commanders intent
Discussion at decision briefs
8/3/2019 CORE0101 Oper Risk Mgt Assessment
5/42
DEFINITION OF OPERATION
RISK MANAGEMENT
DEFINITION OF OPERATION
RISK MANAGEMENT Process of Dealing With Risk Associated
With Military Operations.
Is Decision Making Tool.
Effective Tool for Maintaining Readiness
8/3/2019 CORE0101 Oper Risk Mgt Assessment
6/42
DEFINITION OF OPERATION
RISK MANAGEMENT
DEFINITION OF OPERATION
RISK MANAGEMENT Not Just an S-3 or S-4 Function.
Force Reductions.
Moral Responsibility.
8/3/2019 CORE0101 Oper Risk Mgt Assessment
7/42
PURPOSE & GOAL OF THE
ORM PROCESS
PURPOSE & GOAL OF THE
ORM PROCESS Purpose:
Minimize risk.
Goal:
Manage risk so mission can be accomplished.
8/3/2019 CORE0101 Oper Risk Mgt Assessment
8/42
WHY USE THE ORM
PROCESS?
WHY USE THE ORM
PROCESS? To prevent Unnecessary losses.
Common mishap causes:Individual failure.
Support failure .
Leader failure.Training failure.
Standards failure.
8/3/2019 CORE0101 Oper Risk Mgt Assessment
9/42
WHY USE THE ORM
PROCESS?
WHY USE THE ORM
PROCESS?Mishap injuriesReported USMC Ground mishap injuries during FY 1991-1999
Category Marine
Mishaps 14,049
Fatalities 962
Permanent Total Disability 111
Permanent Partial Disability 364
Lost Time Injury (1 + days) 14,046
Hospital Days 22,946
Lost Days (Non-Hospital) 95,568
NOTE: Marine includes Sailors & Soldiers attached to Marine Corps units. Table doesNOT include light duty or follow-up treatment. Statistics include on and off dutymishaps.
8/3/2019 CORE0101 Oper Risk Mgt Assessment
10/42
WHY USE THE ORM
PROCESS?
WHY USE THE ORM
PROCESS?Mishap costs
Reported USMC Ground mishap dollar costs during FY 1994-99
Category Total
Injury and Fatality Cost $188,700,836
Property Damage $30,073,474
Injury and FatalityPlus
Property Damage$218,774,310
8/3/2019 CORE0101 Oper Risk Mgt Assessment
11/42
WHY USE THE ORM
PROCESS?
WHY USE THE ORM
PROCESS?Combat losses
WWII
1942-45
Korea
1950-53
Vietnam
1965-72
DS/DS
1990-91
Mishaps 56% 44% 54% 75%
Friendly
Fire
1% 1% 1% 5%
EnemyAction
43% 55% 45% 20%
8/3/2019 CORE0101 Oper Risk Mgt Assessment
12/42
WHY USE THE ORM
PROCESS?
WHY USE THE ORM
PROCESS? Weve always done it!
The risk and degree of success has varieddepending on level of training and experience.
Different evaluation of course of action.
Mission GO/NO GO criteria Mission/confirmation briefings
Common sense
8/3/2019 CORE0101 Oper Risk Mgt Assessment
13/42
WHY USE THE ORMPROCESS?
WHY USE THE ORMPROCESS?
Traditional versus ORM approach to managing risk
Traditional ORM
Random, Individual Dependent Systematic
Common Sense Methodical
Uninformed Decision Informed Decision
Can do regardless of risk Conscious decision based on
risk vs. benefitCompliance Based Involvement & Empowerment
Reactive Proactive
8/3/2019 CORE0101 Oper Risk Mgt Assessment
14/42
WHY USE THE ORMPROCESS?
WHY USE THE ORMPROCESS?
Two Goals of Leadership.
Leadership failures contribute to unnecessarymishaps causes.
If principles of ORM taught and effectively
applied.
8/3/2019 CORE0101 Oper Risk Mgt Assessment
15/42
ORM TERMSORM TERMS Hazard
Condition with the potential to cause.
Cause
Produces effect, result, or consequence.
8/3/2019 CORE0101 Oper Risk Mgt Assessment
16/42
ORM TERMSORM TERMS Hazard versus cause
Method of clarifying if hazard or cause.
If more specific causes are not identified.
Hazard at one echelon may be a Cause at
another echelon.
8/3/2019 CORE0101 Oper Risk Mgt Assessment
17/42
ORM TERMSORM TERMS
Risk
Expression of possible loss in terms Severity
and probability.
Risk Assessment
Detecting hazards/assessing associatedrisks.
8/3/2019 CORE0101 Oper Risk Mgt Assessment
18/42
ORM TERMSORM TERMS Severity
Expected consequence of an event
ControlsActions to eliminate hazards, or reduce their
risk.
8/3/2019 CORE0101 Oper Risk Mgt Assessment
19/42
Three types of control
Engineering.
Administrative.
Personal protective equipment.
ORM TERMSORM TERMS
8/3/2019 CORE0101 Oper Risk Mgt Assessment
20/42
ORM TERMSORM TERMS Engineering
Design, material selection, or substitution.
Usually eliminate hazard.
May not be technically/economically feasible.
8/3/2019 CORE0101 Oper Risk Mgt Assessment
21/42
ORM TERMSORM TERMS Administrative
Specific administrative actions.
Train Marines recognize hazards.
Limit number exposure to a hazard.
Effective in reducing risk when used properly
8/3/2019 CORE0101 Oper Risk Mgt Assessment
22/42
ORM TERMSORM TERMS Personal Protective Equipment
Serves as a barrier.
Least effective type of control.
Used when other controls do not reduce
risk to an acceptable level.
8/3/2019 CORE0101 Oper Risk Mgt Assessment
23/42
FIVE STEP PROCESS OF ORMFIVE STEP PROCESS OF ORM 5-step Process
Identify hazards
Assess hazards
Make risk decisions
Implement controls
Supervise
8/3/2019 CORE0101 Oper Risk Mgt Assessment
24/42
Identify Hazards
Begins by conducting Operationalanalysis.
List major steps of the Operation.
Preliminary hazard analysis:
List all hazards
List all possible causes
FIVE STEP PROCESS OF ORMFIVE STEP PROCESS OF ORM
8/3/2019 CORE0101 Oper Risk Mgt Assessment
25/42
Assess Hazards
Degree of risk identifiedDetermine in terms of Severity and Probability
Risk assessment matrix (RAC)
Provides consistent framework
Show comparison of perceived risk
Prioritizes hazards
FIVE STEP PROCESS OF ORMFIVE STEP PROCESS OF ORM
8/3/2019 CORE0101 Oper Risk Mgt Assessment
26/42
RISK ASSESSMENT CODE
MATRIX
RISK ASSESSMENT CODE
MATRIXRisk Assessment Code Mishap Probability
1 - CRITICAL Frequent Likely Occasional Unlikely
2 - SERIOUS AB
C D3 - MODERATE
4 - MINOR
5 - NEGLIGABLE
Hazard Catastrophic - I 1 1 2 3
Severity Critical - II 1 2 3 4Marginal III 2 3 4 5
Negligible - IV 3 4 5 5
8/3/2019 CORE0101 Oper Risk Mgt Assessment
27/42
Determine Hazard Severity:
Catastrophic I
Critical II
Marginal III
Negligible IV
RISK ASSESSMENT CODE
(RAC)
RISK ASSESSMENT CODE
(RAC)
8/3/2019 CORE0101 Oper Risk Mgt Assessment
28/42
Determine Mishap Probability:
Frequent A
Likely B
Occasional C
Unlikely D
RISK ASSESSMENT CODE
(RAC)
RISK ASSESSMENT CODE
(RAC)
8/3/2019 CORE0101 Oper Risk Mgt Assessment
29/42
Determine Risk Assessment Code:
Critical 1
Serious 2
Moderate 3
Minor 4
Negligible 5
RISK ASSESSMENT CODE
(RAC)
RISK ASSESSMENT CODE
(RAC)
8/3/2019 CORE0101 Oper Risk Mgt Assessment
30/42
RISK ASSESSMENT CODE
(RAC)
RISK ASSESSMENT CODE
(RAC) Make Risk Decisions
Develop controls for each hazard.
Controls developed for most serious hazards first.
Determine residual risk.
Make risk decisions.
Accept risk.
Communicate with higher authority.
8/3/2019 CORE0101 Oper Risk Mgt Assessment
31/42
RISK ASSESSMENT CODE(RAC)
RISK ASSESSMENT CODE(RAC)
Implement Controls
Engineering, administrative, and/or personal protective
equipment
Incorporate selected controls:
SOP, LOI, orders, briefs, training, rehearsals
Communicate selected controls to lowest level:
Who will do what by when?
8/3/2019 CORE0101 Oper Risk Mgt Assessment
32/42
RISK ASSESSMENT CODE
(RAC)
RISK ASSESSMENT CODE
(RAC) Supervise
Enforce standards and controls: Ensure Marines are performing tasks to standard.
Ensure controls are in place.
Take corrective action.
Remain alert for changes/unexpected
developments.
8/3/2019 CORE0101 Oper Risk Mgt Assessment
33/42
RISK ASSESSMENT CODE
(RAC)
RISK ASSESSMENT CODE
(RAC)ORM in BAMCIS
BAMCIS ORM
Begin Planning Identify Hazards
Arrange Recon
Make Recon Assess the Hazards
Complete the Plan Make Risk Decisions
Issue the Order Implement Controls
Supervise Supervise
8/3/2019 CORE0101 Oper Risk Mgt Assessment
34/42
THREE LEVELS OF
APPLYING ORM
THREE LEVELS OF
APPLYING ORM Commanders determine which level based
on time available, proficiency, and assets.
Time Critical
Deliberate
In-Depth
8/3/2019 CORE0101 Oper Risk Mgt Assessment
35/42
THREE LEVELS OF
APPLYING ORM
THREE LEVELS OF
APPLYING ORM Time Critical ORM
On-the-run mental/oral review.
Not recorded on paper.
Normally applied in execution phase.
Unexpected events and changes.
8/3/2019 CORE0101 Oper Risk Mgt Assessment
36/42
THREE LEVELS OF
APPLYING ORM
THREE LEVELS OF
APPLYING ORM Deliberate ORM
Application of complete 5 step process.
Recorded on paper.
Applied in planning operations.
Used for evaluating SOPs, training,
maintenance procedures, damage control.
8/3/2019 CORE0101 Oper Risk Mgt Assessment
37/42
THREE LEVELS OF
APPLYING ORM
THREE LEVELS OF
APPLYING ORM In-depth ORM
More detailed risk assessment.
Advanced tools.
Professional expertise needed.
Used in long term planning.
Complex operations.
Introducing new equipment, tactics, or training curriculum.
8/3/2019 CORE0101 Oper Risk Mgt Assessment
38/42
PRINCIPLES OF THE
ORM PROCESS
PRINCIPLES OF THE
ORM PROCESS Accept Risk When Benefits Outweigh the Cost
Accept No Unnecessary Risk
Anticipate and Manage Risk by Planning
Make Risk Decisions at the Right Level
8/3/2019 CORE0101 Oper Risk Mgt Assessment
39/42
RESPONSIBILITIES OF
IMPLEMENTING ORM
RESPONSIBILITIES OF
IMPLEMENTING ORM Unit commanders
Provide ORM training.
Incorporate into briefs, notices, and written plans.
Risk assessment for all new/complex evolutions.
Address ORM.
Safety, training, and lessons learned reports.
8/3/2019 CORE0101 Oper Risk Mgt Assessment
40/42
SNCOs
Most experience/subject matter experts.
Active role in identifying hazards/appropriate
controls.
Supervision/enforcement of standards.
RESPONSIBILITIES OF
IMPLEMENTING ORM
RESPONSIBILITIES OF
IMPLEMENTING ORM
8/3/2019 CORE0101 Oper Risk Mgt Assessment
41/42
NCOs
First line of supervision
Make risk decisions daily
Individual MarineSelf-supervision (self-discipline)
Perform assigned tasks to standard
Recognize unsafe acts/conditions
Take corrective action or report discrepancies
RESPONSIBILITIES OF
IMPLEMENTING ORM
RESPONSIBILITIES OF
IMPLEMENTING ORM
8/3/2019 CORE0101 Oper Risk Mgt Assessment
42/42
42
QuestionsQuestions???