Dear Friends
This document is intended to use for novice (like me). The pressure mounted by the client (and sometimes by
the parent company also) puts us in hot waters and we are bound to take help of others. Thanks to SAP for
creating such a wonderful place (for me like a garden) where we get best help without demanding anything
against it.
Any ways without beating the bush I will come directly to the point.
I was asked by the client to show cost component wise detail of Process Orders for a given period. First I
tried to search in the standard reports but could not get success. Then I scratched my head but could not get
success again. At last I went in the shelter of SCN and posted there a query for the same http://scn.sap.com/
thread/3406448 with an intension that my favorite consultants will reply soon and the same happened. On the
very next day I got replies from experts. Out of that Mr. Ajay Maheshwari SAP Trainer Sir’s reply was more
suitable for me as I did not want to go for ABAP reports.
Ajay Sir suggested me to go for Report painter/writer report which he had already discussed with some other
consultant in some old thread https://scn.sap.com/message/9773105.However till that time I never
worked on Report painter/writer so bit afraid to start a new venture. But any how I was to satisfy
client’s requirement so jumped in the field. After preparation of report, I prepared a document
with screen shots for this report for my future reference.
Recently I again saw the same requirement on SCN raised by Mr. David. Ajay Sir replied on this thread also
and referred the same old thread again. He (David) tried but could not get through (as he and some other
colleagues saying that the links given in Ajay sir string are not opening). However I am surprised because for
me those are still live and perfectly opening.
When I assured Mr David (on the thread) that the links are opening to me and even I have prepared a
report using it, and I have prepared a document with screens for my report. Mr. David requested me to send
the document on mail but I thought why I should not post the document on SCN itself so that many other
colleagues may also be benefited. Hence I am posting this document with due regards and thanks to Mr. Ajay
Maheshwari. Also I would like to request him to make corrections (as he is actual owner of this document in a
way) in the document.
The desired Format
7/24/2019 Cost Compments-Report Painter
http://slidepdf.com/reader/full/cost-compments-report-painter 2/12
Cost Component wise detail of Production Orders- Report Designing through Report Painter/Writer
Generated by Jive on 2015-07-13+02:00
2
Order No. RM Cost Wages Power Material OHs Works OHs Admn.OHs Total Cost
GR Value
How I designed the report
First of all create an additional Cost component structure (Auxiliary) and add one cost component
‘COGM’ to it. This is required to get the Credit (GR) values of order. This CCS can be created by
copying your main CCS. For this report we have created ‘ZK’ CCS. Activate the CCS.
First we need to create Form
Go to KKO4. Give Form code and description
Press Create. It will look like below
7/24/2019 Cost Compments-Report Painter
http://slidepdf.com/reader/full/cost-compments-report-painter 3/12
Cost Component wise detail of Production Orders- Report Designing through Report Painter/Writer
Generated by Jive on 2015-07-13+02:00
3
Now Set General Data Selection
And update as follow
7/24/2019 Cost Compments-Report Painter
http://slidepdf.com/reader/full/cost-compments-report-painter 4/12
Cost Component wise detail of Production Orders- Report Designing through Report Painter/Writer
Generated by Jive on 2015-07-13+02:00
4
Double click row1 and select characteristic
7/24/2019 Cost Compments-Report Painter
http://slidepdf.com/reader/full/cost-compments-report-painter 5/12
Cost Component wise detail of Production Orders- Report Designing through Report Painter/Writer
Generated by Jive on 2015-07-13+02:00
5
Now double click on column1
7/24/2019 Cost Compments-Report Painter
http://slidepdf.com/reader/full/cost-compments-report-painter 6/12
Cost Component wise detail of Production Orders- Report Designing through Report Painter/Writer
Generated by Jive on 2015-07-13+02:00
6
Updates as follows
7/24/2019 Cost Compments-Report Painter
http://slidepdf.com/reader/full/cost-compments-report-painter 7/12
Cost Component wise detail of Production Orders- Report Designing through Report Painter/Writer
Generated by Jive on 2015-07-13+02:00
7
Confirm and change the name as ‘Output Qty’
7/24/2019 Cost Compments-Report Painter
http://slidepdf.com/reader/full/cost-compments-report-painter 8/12
Cost Component wise detail of Production Orders- Report Designing through Report Painter/Writer
Generated by Jive on 2015-07-13+02:00
8
Now double click second column heading and change as following. Remember we are creating this column for
our Raw material Cost.
7/24/2019 Cost Compments-Report Painter
http://slidepdf.com/reader/full/cost-compments-report-painter 9/12
Cost Component wise detail of Production Orders- Report Designing through Report Painter/Writer
Generated by Jive on 2015-07-13+02:00
9
Click Ok and change Column name as RAW Material Cost.
Click next column heading and change it as below to fetch Wages figures
7/24/2019 Cost Compments-Report Painter
http://slidepdf.com/reader/full/cost-compments-report-painter 10/12
Cost Component wise detail of Production Orders- Report Designing through Report Painter/Writer
Generated by Jive on 2015-07-13+02:00
10
Likewise create columns for all of your cost components.
After that create a formula column for total of all cost components. This will look like below:
After it create one column for GR values like below
7/24/2019 Cost Compments-Report Painter
http://slidepdf.com/reader/full/cost-compments-report-painter 11/12
Cost Component wise detail of Production Orders- Report Designing through Report Painter/Writer
Generated by Jive on 2015-07-13+02:00
11
Your form is ready, Save it. Now create report. Go to Environment-report-create. Give report name code and
description; give form name you just created.
Give Characteristics for reports
Give variable for report
7/24/2019 Cost Compments-Report Painter
http://slidepdf.com/reader/full/cost-compments-report-painter 12/12
Cost Component wise detail of Production Orders- Report Designing through Report Painter/Writer
Generated by Jive on 2015-07-13+02:00
12
Save and run report. System will ask you to assign report to a report group using GR51/GR52 and assign the
report to it.
Output report will look like as under
The same report you can use for different drill down as defined in the characteristics of the report.
Your report is ready for presentation.
Now its my time to request you for your valuable suggestions as this is my first effort.