33
CTCI and Partners Co. Ltd. -- 1 -- Introduction to CTCI and Partners Co. Ltd. February, 2010 Al-Khobar -- 1 --
Transcript
Page 1: CPCL

CTCI and PartnersCo. Ltd.

-- 1 --

Introduction toCTCI and Partners

Co. Ltd. February, 2010

Al-Khobar

-- 1 --

Page 2: CPCL

-- 2 --

Contents

Who we are

What we serve

How we serve

Our achievements

Our vision

-- 2 --

Page 3: CPCL

Who we are Who we are

-- 3 --

Page 4: CPCL

CTCI and Partners Company Limited is established in JV form to echo Aramco’s IK Initiative program. His mother companies include:

CTCI and Partners Company Limited is established in JV form to echo Aramco’s IK Initiative program. His mother companies include:

1. CTCI Corporation, based in Taiwan, ROC

2. Al-Rabiah Consulting and Engineering Services, based in Al-Khobar

3. PI-Consult, based in Al-Khobar

1. CTCI Corporation, based in Taiwan, ROC

2. Al-Rabiah Consulting and Engineering Services, based in Al-Khobar

3. PI-Consult, based in Al-Khobar

-- 4 --

Page 5: CPCL

• Establishment since 1959

• A public company listed in Taiwan Stock Exchange (TSE) since 1993

• Integrated service provider specialized in oil, gas, petroleum refining, petrochemical, chemical, power, infrastructure and environmental industries

• ISO 9001 / 14001 and OHSAS 18001 certificates

• Hundreds proven track record worldwide, including Taiwan, China, Thailand, Singapore, Malaysia, Vietnam, Philippines, Indonesia, KSA, Qatar and USA

• CTCI’s CSR report (1st Issuance) was published in June 2008.

• CTCI’s CSR report was rewarded by BSI (British Standard Institution) on Oct. 29, 2008

CTCI Introduction

-- 5 --

Page 6: CPCL

MorganStanley,19.57%

Other ForeignInvestors,20.83%Domestic

Legal Entities,23.33%

DomesticFinancialInstitutes,11.72%

DomesticIndividuals,

24.55%

CTCI Corporate Overview & Shareholders

Paid-up Capital : 199 MUSDShareholder’s Total Equity (2007) : 314 MUSDFY 2006 New Orders

Turnover FY 2007 New Orders

Turnover FY 2008 New Orders

TurnoverBacklog

(as of Oct 2008)

: 2.2 BUSD: 1.0 BUSD: 809 MUSD: 1.3 BUSD: 2.3 BUSD: 1.2 BUSD: 2.9 BUSD

(as of Oct 31, 2008)

-- 6 --

Page 7: CPCL

CTCI Worldwide Network

CTCI Arabia, KSA CTCI, Thailand

Jingding, PRC

CTCI Kaohsiung

CIMAS, Vietnam

CTCI, Malaysia

CIPEC, the Philippines

Shangding, PRC

CTCI, Qatar

CTCI, Abu Dhabi

CTCI Taipei HQ

CINDA,India

CTCI & Partners, KSA

-- 7 --

Page 8: CPCL

• Alrabiah and Partners Co. ‘Consulting Engineers’ formed in

1988.

• 51 Design Engineers & Support Personnel.

• 72 Engineers for Project Management & Site Supervision

• Serving Several Major Clients in Saudi Arabia.

• ISO 9001:2000 Certified since 2007.

• Consulting and Design Experience in Infrastructure, Roads,

Traffic and Transportation.

• Experience in Structural Damage Assessment

-- 8 --

Page 9: CPCL

9

Main Offices

Satellite Offices / Projects

ALRABIAH & PARTNER CO. OFFICES IN SAUDI ARABIA

-- 9 --

Page 10: CPCL

• Petro-Infrastructure Engineering Consultants Company

was formed in 1988 and has over 40 years of combined

experience.

• Present strength of 160 Design Engineers & Support

Personnel.

• Executed Sizable Projects for Major clients in the

Kingdom.

• ISO 9001:2000 Certified since 1998.

• Versatile and wide range of Consulting Experience in

various fields, Including Design, Construction Support

Services Feasibility Studies & Procurement Assistance.

-- 10 --

Page 11: CPCL

What We Serve

-- 11 --

Welcome to visit us atwww.ctci.com.twwww.alrabiah.com.sawww.pi-con.com

Welcome to visit us atwww.ctci.com.twwww.alrabiah.com.sawww.pi-con.com

Page 12: CPCL

Our Core Business Line

Refinery Petrochemical Strategic HDS Hydrocracker FCC / RFCC Reformer Alkylation Isomerization

EO / EG PTA PP Aromatics Styrenics Cumene/Phenol/BPA OCT

Ethylene Plant LNG Terminal LLDPE / HDPE LDPE PDH Methanol

-- 12 --

B. General Industry and Infrastructure Building, Road, Marine Structure, Airports, Telecommunication, etc.

B. General Industry and Infrastructure Building, Road, Marine Structure, Airports, Telecommunication, etc.

A. Oil & GasA. Oil & Gas

Page 13: CPCL

How We Serve

-- 13 --

Page 14: CPCL

-- 14 --

One Team One Spirit One GoalPassions for Customer!

AttitudeAttitudeAttitudeAttitude

Page 15: CPCL

-- 15 --

Project Control Plan (1/2)

Evaluated the planning work and the planning

resources mobilization to achieve the schedule and

cost baseline

Monitoring actual and forecast schedules, cost and

progress by comparing them to the plan so that

problem areas can be identified

Taking corrective action against the causes of

actual or anticipated problems so that the impact

on the final schedule or cost targets is minimized

-- 15 --

Page 16: CPCL

-- 16 --

Presentation of timely and accurate reporting and

forecasting of cost and schedule information the

project team to permit decision-making and, if

necessary, intervention, in a timely manner that

will enable project goals to be achieved

Coordinating other project discipline groups to

adopt and follow the process of scope, cost and

time management

-- 16 --

Project Control Plan (2/2)

Page 17: CPCL

-- 17 --

Schedule Philosophy Plot Plan

Equipment List

P3 & P3 E/C &IN-HOUSE SYSTEM

E/P/C Execution Plan

Heavy Equipment Erection Plan

Proposal Schedule

Master Schedule

Detail Control Schedule

Weekly Monthly Report

90-day Schedule

Pre-Comm. Schedule

Quantity Productivity

Report

Project CPM Schedule

Contract Requirement

Quantity Take Off

WBS & Scope Defined

E/P/C Schedule IntegrationPM / PEM / PIM / PCM / PSM / LE

Project Project Level

Summary Schedule & Progress

Master Schedule & Progress

Management Management

Level

PlanningStageStage

ReportingReportingStageStage

Control Control

Level

Pre- comm SystemSchedule

Level III & Project CPM Level III & Project CPM

E/P/C Schedule

PRS CRSERS/SPF

Schedule Overall Conceptual

-- 17 --

Page 18: CPCL

Our Achievements

-- 18 --

Page 19: CPCL

CTCI Major Reference in ChinaICI – PU System House

Rohm & Haas – IER

Fujian Huaxing – LPG Terminal

Montell-TPP China – PPAM

ZGPC – SAN II

Rohm & Haas – Ag Chemical

Xiang Lu – PTA

ZGPC – ABS II

CPPE – West-East Natural Gas

Pipeline

Secco – SAR

BASF-YPC – LDPE

BASF-YPC – C1

CNOOC-Shell – EO/EG

Mitsubishi Rayon – AF

Lucite – MMA

Nantong SKT – PVDC

CNOOC Shanghai – LNG

(Confidential) – Polysilicon

TSRC – SBR

CIBA – Additive

LCY – PMMA

LCY – PFA

SPC – Ethylene Plant Expansion

FPC – PVC

FCFC – PTA

FCFC – ABS

Qilu Petrochemical – PVC

BASF/Huntsman – IIP (EPsCm)

Oriental – PTA (EPsCm)

ZGPC – ABS III

PetroChina – EB/SM

TSRC – BR

TSRC – SEBS

PetroChina – FCC (BD)

DuPont – TiO2 (EPsCm)

Beijing

Shanghai

Guangzhou

EPC LSTK

ENG’G

CONSTR. MGT

On-going Project

19

12

3

4

85

6

7

910

11 12

13

14

15

16

17

18

19

20

2122

26

23

24 25

27

28

29

30

31

32

34

35

1

2

3

4

8

5

6

7

9

10

11

12

13

14

15

16

17

18

19

20

21

22

26

23

24

25

27

28

29

30

31

32

33

34

35

33

-- 19 --

Page 20: CPCL

CTCI Major Reference in Thailand: On-going Project

Bangchak – Gas Oil HDSMPKC – ABS/SANTuntex – PTAVinythai – VCM TPC OXY – PVC Paste ResinHMC – PP IITOC – C2 and C3 Recovery ExpansionTIG – ASU Rohm & Haas – PAABayer – BPA & PC II ExpansionThai MMA – TBA - IIDiapolyacrylic – PMMAHMC – PP I Upgrading / PP II UpgradingBangchak – HydrocrackerPPCL – PhenolHMC – PDH PTTAC – AN/MMAAmata – CCPP Maxxis – Rubber TireThai Oil – Co GenerationPTTUT – Co GenerationIRPC – Co Generation

12

3

4

8

56

7

910

11

12

1314

15

16

17

21

1819

20

20

Sriracha

Bangkok1 14

18

15-17 212-13Rayong

19

22

22

-- 20 --

Page 21: CPCL

CTCI Major Reference in Singapore

SRC –Visbreaker & Catalytic ReformingEsso – Power System ExpansionEsso – Propane Recovery from CVSSRC – HCU IIEsso – Long Term Engineer ServiceSRC – RCC ExpansionChevron – Lube Oil AdditivePUB – Senoko Power Station Fuel Oil Tank FacilityPUB – Senoko Power Station Electrochlorination SystemPUB – Gas Turbine Power Plant

Seletar

Jurong

7-9

1-6 10

1

2

3

4

5

6

7

8

9

10

Changi

: On-going Project

-- 21 --

Page 22: CPCL

2

3

4

6

7

8

9

1

1011

12

13

14

15

Petromin - Riyadh Refinery ExpansionPetromin - Yanbu Domestic Refinery

SAMREF - Yanbu Export Fuel Refinery

Luberef - Yanbu Luberef II

YANPET - EG & Polymer

Petrokemya - EthyleneSHARQ - EG & LLDPE

Qatargas - LNGQAFAC - Methanol & MTBE

SAMAD - Urea Quality Improvement

GBPC - ABS/SAN

QAPCO - Ethylene Expansion II

Jeddah Oil Refinery - Hypo-Chlorination

SWCC - Riyadh Water Transmission System Pumping Station

1

2 4

6

5

87 10

12 13 14

16

15

3

9

Jordan Fertilizer Ind. - Aqaba Fertilizer

UAEUAEQATARQATAR

16

Saudi Kayan - EO/EG

11

CTCI Major Reference in Middle East: On-going Project

KSAKSA

QatarQatar

IranIran

5

JordanJordan

JubailJubailYanbuYanbu

TehranTehran

RiyadhRiyadh

IRANIRAN

KSAKSA

-- 22 --

Page 23: CPCL

CTCI Major Reference in Vietnam: On-going Project

PV – Phu My Go Dau PipelinePV – Condensate Processing PlantPV – Dung Quat Refinery BuildingPV & ZNSM – Vietross Refinery Package II & IIINa Doung – Power PlantPhu My – Power Plant IIICa Mau – Power Plant I & IIPHI – Hai Duong Phase 1 & 2 (Building EPC)

3 4

1

7

Hochiminh 2 6

Hanoi

5

8

1

2

34

5

6

7

8

-- 23 --

Page 24: CPCL

BUILDINGSBUILDINGSBUILDINGSBUILDINGS

King Faisal University, Al-Hassa, KSAPrince Faisal Stadium, Riyadh

-- 24 --

Page 25: CPCL

MARINE MARINE STRUCTURESSTRUCTURES

MARINE MARINE STRUCTURESSTRUCTURES

Jetty, Shoaiba, KSA Saudi Bahrain Causeway

-- 25 --

Page 26: CPCL

AIRPORTS AIRPORTS AIRPORTS AIRPORTS

King Abdulaziz International Airport, Jeddah Aramco Airport Runway, Shaybah, KSA

-- 26 --

Page 27: CPCL

Major Achievements of PI-Consult

Client: ROYAL COMMISSION FOR JUBAIL AND YANBU

Project Location: JUBAIL

Description: Front End Engineering & Design (FEED) include the following: Staged site development and drainage of entire site Roads and utilities crossing at the

KRT (3.0 KM Wide) High Ways, Main roads and high ways rail road system. Sea water cooling supply and distribution. Potable water supply distribution. Industrial Wastewater collection and treatment system. Sanitary wastewater collection and treatment system. Material Handling, pipe and utility corridors. Feedstock supply and fuel gas system supply and distribution. Electrical Power and telecommunication transmission. Value

Engineering and Optimization.Value in SAR: 35 Million (For FEED)

Project Title: FEED FOR THE NEW INDUSTRIAL PARK WEST /JUBIAL 2 CONTRACT NO. 202-TO3

Design Duration: 2003-2008

Client: SAUDI ARAMCO

Project Location: K.S.A

Project Title: INSTALL & UPGRADE IDAS SYSTEM AT 18 COMPANY FACILITIESDescription: Provide Conceptual / project Proposal for the Following:

All IDAS field devices will be located within respective perimeter site fences. The IDAS system equipment which will be located at respective Control Center with relevantcommunications transport for each site. Also, the system shall provide local monitoring

for the gate of each.

Value in SAR: 7,232,963

Design Duration: 2007-2008

-- 27 --

Page 28: CPCL

Client: SAUDI ARAMCOProject Location: KHURSANIA

Description: Provide detail engineering of crude oil upstream facilities at Abu-Hadriyah and Fadhili fields consisting of Drill-sites development including the connecting pipelines

from wellheads to interface manifolds. Each Drill-sites, consisting of single-well to multi-wells system, is equipped with multi-phase flow-meters and testing facility, corrosion inhibitor

chemical injection system, corrosion monitoring system, remote terminal unit, switch-rack, signal muti-plexing unit (mux).

Value in SAR: 5,000,000

Project Title: DETAILED ENGINEERING FOR ABU HADRIYAH / FADHILI NEW OIL DRILL SITES & DETAILED ENGINEERING FOR ABU HADRIYAH / FADHILI T/L, INTERFACE MANIFOLDS & UPGRADING EXISTING WELLS

Design Duration: 2005-2006

Client: PUBLIC HOUSING EST. DAMASCUS, SYRIA

Project Location: DAMASCUS, SYRIA

Project Title: DIPLOMATIC QUARTERS PROJECT - DAMASCUS

Description: The project is located in the suburbs of Damascus city with a total area of 600 Hectare. The project includes diplomatic area (225 Hect), General Services Area (125

Hect), open uncovered area (50 Hect.), Landscaped Area (150 Hect), Roads and Access passage and walk ways (50 Hect). Pi-Consult consortium grouped with Arch Center Riyadh, and SPC Damascus were awarded the design on Jan 19, 2006.

Design Duration: 2006-2007

Value in SAR: 5 Million

Major Achievements of PI-Consult

-- 28 --

Page 29: CPCL

Client: NESMA TRADING COMPANY LTD.

Project Location: VARIOUS

Description: The project shall provide a detail engineering design package for IDAS at 18 Company facilitates with a dedicated Alarm Management System (AMS) per site to monitor,

detect, assess, trace and video record potential intrusion for 18 Company facilities. And to provide Long Range Detection and Assessment System (LRDAS) with the required infrastructure at twenty five (25) company’s vital sites as specified henceforth in this document.

Value in SAR: 5,000,000

Project Title: IDAS, LR DAS INFRASTRUCTURE PROJECT

Design Duration: 2009-2010 On going

Major Achievements of PI-ConsultMajor Achievements of PI-Consult

-- 29 --

Page 30: CPCL

Our VisionOur Vision

-- 30 --

Page 31: CPCL

-- 31 --

Core Team from CTCI Group

Full Spectrum Coach / Self-Dependent Stage

Time

High Value /Localization

Creat

e Val

ue in

KSA

Setting Up Operation Mechanism / Implant Stage

2009

Comprehensive Training

2014

Leading EPC Company in KSA, Patnership with Mr. Clients

Recruit KSA Engineers

Common 3D Work Platform

Advanced On-Line SupportStretch Local Capablity

ISO 9001 Certificate

Intergration Capability / Esteem Stage

Our Vision – Partnership with Clients

-- 31 --

On-Line Support

Introduce Corporate Social Responsibility

Page 32: CPCL

-- 32 ---- 32 --

Page 33: CPCL

-- 33 ---- 33 --


Recommended